Loading...
HomeMy WebLinkAbout20120288 Ver 1_Public Notice_20140801US Army Corps Of Engineers Wilmington District lq -19Y0- PUBLIC NOTICE Issue Date: August 1, 2014 Comment Deadline: September 1, 2014 Corps Action ID #: SAW- 2012 -00040 All interested parties are hereby advised that the Wilmington District, Corps of Engineers (Corps) has published in the Federal Register a Notice of Availability (NOA) for the Final Environmental Impact Statement (FEIS) for the Village of Bald Head Island Shoreline Protection Project on Bald Head Island, Brunswick County, North Carolina. This public notice serves to address requirements for public notification as contained in general regulatory statutes (i.e., 33CFR325 -332) and those statutes (i.e., 33CFR230 and 40CFRI500) which outline requirements for compliance with the National Environmental Policy Act. The main purpose of the proposed project is to address erosion at the western end of South Beach and to thereby protect public infrastructure, roads, homes, beaches, dunes and wildlife habitat. The applicant's proposed action includes the construction of a 1,900 -ft terminal groin as well as creation and maintenance of an updrift sand fillet on the western end of South Beach. Current plans and location information are described below and shown on the attached plans. This Public Notice and all plans are also available on the Wilmington District Web Site at: httR: / /www.saw. usace. army. mil/ Missions/ Reg ulatoUPermitProaram /PublicNotices Applicant: Agent (if applicable): Authority Village of Bald Head Island c /o: Calvin Peck, Village Manager Post Office Box 3009 Bald Head Island, North Carolina 28461 -7000 Olsen Associates, Inc. c /o: Erik J. Olsen 2618 Herschel Street Jacksonville, Florida 32204 AUG 0 12014 W - wA ou , The Corps will evaluate this project to compare alternatives that have been carried forward for study pursuant to applicable procedures under Section 10 of the River and Harbors Act and Section 404 of the Clean Water Act (33 U.S.C. 1344). In order to more fully integrate Section 404 permit requirements with the National Environmental Policy Act of 1969, and to give careful consideration to our required public interest review and 404(b)(1) compliance determination, the.Corps is soliciting public commenton the merits of this proposal. `This comment period is offered to allow agencies and the public the opportunity to provide comments on the FEIS and the applicant's proposed project. Written comments on the FEIS will 'be'received until September 1, 2014. The District Commander is not authorizing, construction of a proposed terminal groin or any alternative under consideration at this time. A Department of the Army permit could be issued following a complete review of the proposal for compliance with our regulations and related laws, including assurance that impacts to the aquatic environment have been minimized to the maximum extent practicable and a compensatory mitigation plan for unavoidable impacts has been approved. This FEIS includes responses to comments received during public review of the Draft EIS (DEIS). Location Bald Head Island is located in Brunswick,County, North Carolina at ,approximately 33 651'N, 78 000' W (see Figure 1). It is roughly 25 miles south of-the City of Wilmington and 32 miles east of the South Carolina/North Carolina state line. It is the southernmost of the coastal barrier islands which form the Smith Island complex at the mouth of the Cape Fear River. The southeastern tip. of the island is Cape Fear (also referred to as Cape Fear Point) from which Frying Pan Shoals extend seaward over 20 miles to the southeast. The island's east and south shorelines, "East Beach" and "South Beach, front the Atlantic shoreline. The west shoreline, or "West Beach," fronts the Cape Fear River. A depositional spit feature known as the "Point" lies at the juncture of West Beach and South Beach (see Figure f). The north side of the island is bounded by the Bald Head Creek estuary, Middle Island and Bluff Island. The Cape Feat River entrance, over one mile in width, separates Bald Head Island from Oak Island (or Caswell Beach). EXi'stiriglS terCofh�ditions • A temporary sand - filled tube groin field was constructed by the Village of Bald Head Island:;(Village)-,along the westernmost portion of South Beach in March 1996, l-_5immedi6felySollowing completion of a1996 dredge disposal project constructed by the Wilmington District. Sixteen groins (sand -filled tubes) were constructed of geotextile material and filled with sand. These temporary groins were replaced by the applicant in 2005 and in 2009. 2 The Island',s gross volumetric sediment loss over the period from November 2000 to May 2011 (excluding East Beach) was approximately 4.363 million cubic yards (Mcy), or approximately 415,000 cy per year. During this period, the largest erosion impacts occurred at the west end of South Beach near the Cape Fear River entrance. Since 2001, the Wilmington District has placed approximately 4.09 Mcy on the South Beach shoreline from material dredged during the Cape Fear River channel deepening/widening project and three channel maintenance projects. In 2009, the Village dredged approximately 1.85 Mcy from Jay Bird shoals and placed this material onto South Beach and West,Beach. In July 2011, the VBHI constructed an extension to groin no. 16 (located closest to the Cape Fear River, Entrance). The need for this structure was due to erosion on the downdrift side of groin no. 16. In December 2011 „the Village constructed approximately 350 ft. of sand bag revetment-located downdrift of groin no. 16 in order to alleviate erosion impacts to the nearby adjacent dunes, roads, homes, habitat, and infrastructure. The Village recently,placed approximately 140,000 cy of material at the western end of,South Beach: The source of material for this project was Bald Head Creek Shoals. Most recently, during the Winter and early Spring of 2013, the maintenance dredging of the Federal channel has resulted in the disposal of approximately 1.525 Mcy along South Beach between Sta 44 +00 and 150 +00 and along a portion of West Beach. Applicant's Stated Purpose The purpose of the proposed work is to address erosion at the>western end of South Beach and to thereby protect public infrastructure, roads, homes, beaches, dunes and wildlife habitat. Project Description The Corps, in consultation with the Project Review Team (PRT,), developed a range of alternatives to be considered, in the FEIS. The range of alternatives includes considerations of various means by which to respond to the project need and associated objectives. An initial' alternative identified during scoping, but not advanced`further in the EIS analysis, included consideration of construction of a terminal groin without beach nourishment. As, this alternative, is not compliant with the provisions of State Senate Bill 151 and is not preferred from an engineering standpoint, it has been eliminated from further consideration. The remaining alternatives evaluated within the FEIS are,identified. in'Table 1. Below: Table 1. Project Alternatives Alternative #1 No- Action (includes component of Status -Quo) Alternative #2 Retreat Alternative 43 Beach Nourishment /Disposal with Existing Sand Tube Groinfield to Remain in Place 3 Alternative #4 Beach Nourishment /Beach Disposal and Sand Tube Groinfield Removal Alternative #5 Terminal Groin with Beach Nourishment /Beach Disposal (Sand Tube Groinfield Remaining) Alternative #6 Terminal Groin with Beach Nourishment /Disposal (Removal of Sand Tube Groinfield) Description of Alternatives 1. No Action/Status Quo Alternative Under the No- Action Alternative; the Village would not implement any comprehensive action (or actions) to offset the on -going erosion of the western end of South Beach. The No- Action Alternative ,takes into consideration the existing or status quo condition. Disposal events occurring under the existing Wilmington Harbor Sand Management Plan (SMP) would occur. The current SMP anticipates roughly 2/3 of the total volumetric sand dredged from the channel would be placed on Bald Head Island. Under the No- Action Alternative, short-term stabilization measures such as the placement of emergency sand -bags for protection of structures imminently threatened by erosion and the maintenance of the existing sand -tube groinfield would�occur. Furthermore, the no- action or status quo alternative would include use of beach scraping during the winter months to stabilize foredunes in critically eroded areas, The Village would also continue its program of sand fencing to promote dune formation and stabilization. 2. Retreat' Under the Retreat Alternative, the Village would identify high -risk areas for the development and implementation of a Managed Shoreline Retreat Plan (MSRP) that would ultimately provide for the unimpeded recession of the shoreline. The, Plan would provide for the systematic removal of the sand .tube groinfield and the demolition or relocation of residences, roads, and infrastructure, if land and funds are available, in advance=of the shoreline recession Thresholds would be mdentified to trigger the demolition or, relocation of specific structures. As part of the retreat strategy, undeveloped lots of the interior sections of Bald, Head Island would be identified and acquired for the explicit use of relocating homes. Unimproved lots potentially available for acquisition and structure relocation have been identified based upon several factors, including: distance from nine -year predicted shoreline position under the Retreat Alternative; condition of lot (i.e. unimproved); and relocation logistics (e.g. avoiding areas in maritime forest that would require additional clearing along narrow right-of- ways for structure transport). 4 3. Beach-Nourishment/Disposal with Existing Sand Tube Groinfield to Remain in Place Under Alternative #3, it is assumed that beach disposal Would continue per the terms of the existing SMP. The Village would continue to design and implement independently - sponsored beach nourishment and beach disposal projectsdon,an as- needed basis. While Federal Emergency Management Agency (FEMA) funds- may be available to the Village to address sand losses subsequent to,a declared disaster, FEMA support is not available for scheduled renourishment events. Potential sand sources that may be considered in EIS include the following: a. Wilmington harbor Entrance Channel Prior federal channel maintenance and disposal events conducted under the Wilmington Harbor SMP have demonstrated that-the innermost segment of the Ocean Entrance Channel is a suitable source of beach - compatible material. Navigation channel surveys for three channel reaches (Smith Island Range, Baldhead Shoal Channel 1, and Baldhead Shoal Channel 2) continue to be conducted on bi- monthly intervals. Condition surveys performed by the Corps of Engineers in,2012 indicate the occurrenceaof continued shoaling in Smith Island Channel and Baldhead Shoal Reaches 1 and 2. Areas of pronounced decreases in channel depth resulting from shoaling represent suitable high quality sources for beach nourishment material. b. Jay Bird -Shoals Jay Bird Shoals is a linear, ebb tidal feature of the Cape Fear River and is situated immediately west of the confluence of the current Wilmington Harbor entrance channel and the former, abandoned channel. Suitable sediment (i.e. beach compatible by North Carolina sediment standard criteria) has been previously identified throughout much of the shoal feature to an average depth of -22 ft NGVD. In 2009, the Village received federal and state authorizations, to dredge up to 2 Mcy,of material from Jay Bird Shoals. The permitted borrow site was approximately 158 acres and was located at the seaward end of the shoal. Prior to authorization, of the final borrow site footprint, boundaries were refined to avoid and minimize disturbance to potential cultural and environmental resources. A 200 -ft buffer was maintained around two areas containing potential shipwreck material. The final authorized borrow limits avoided shallow subtidal and intertidal habitat (Land Management Group, 2009). Approximately 1.85 Mcy of material (measured volume from - borrow site) was excavated and pumped to South Beach and West Beach during'the Village- sponsored 2009/2010 beach restoration project. Based upon geotechnical evaluations completed in 2007, the Jay Bird Shoals permitted borrow area contained over 3 Mcy of beach quality material 5 (O1sen,2007). However; as indicated above, the final volume requested for the 2009/2010 project: was-2 Mcy for a one -time nourishment event. c. Bald Bead Creek Shoals . The depositional shoal feature located at the•mouth of Bald Head Creek (BHC) is a potential smaller volume sand source in the,immediate vicinity of the Island. The creek mouth is located approximately 1600 linear feet north of the entrance to Bald Head Marina. BHC is a relatively small saltwater creek,system (approximately 3.5 km, from headwaters to mouth) subject to semidiurnal tidal flows. It is bordered to the south by Bald Head Island and to the "north by Middle ,Island. In November 2010, the Village received Federal and state authorization to dredge 100,000 cy of material from an approximate 21 -acre borrow site at the mouth of BHC for the purpose of providing supplemental sand to a severely eroded segment of western South Beach. The permit was subsequently modified to allow forup to 140,000 cy of material to be,excavated. The Village, completed the dredge and nourishment work in March 2012., Monitoring of the borrow site-,is on -going fora period of up to 3 years post - construction. Given the relatively short-time period since project construction (one year), there has been no significant infilling,or adjustment of the borrow site documented to date. The borrow site limits may be expanded to the north to allow for the excavation of approximately 200,000 cy of beach quality material. d. Frying Pan Shoals Frying,Pan Shoals is a submerged extension of cuspate foreland (i.e. accret'ional feature formed by processes of longshore drift and prevailing wind and wave conditions). The shoals extend nearly 20 miles offshore from the eastern end of Bald Head Island. Early reconnaissance level sand resource evaluations conducted for the Cape Fear Region (Meisburger 1977) identified that "modern sediment accretion on the inner shelf appears to be largely restricted to the shoal fields off Cape Lookout and Cape Fear, and to inlet shoals along the coast." It included exploratory density type seismic lines, as well as a limited number of cores and,surficial,grab samples. Based upon sediment core data collected as part of this early study, the most appropriate beach quality sand identified within the Cape Fear shoal field appeared to be sixteen (16) nautical miles offshore of Bald Head Island. It should be noted that sediment sampling forthe study was relatively limited given the expansive area of Frying-Pan Shoals. More recent evaluations conducted by the Corps as part of the General Reevaluation Report (GRR) for the Brunswick County Beaches Coastal Storm Damage Reduction Project indicate the presence of substantial volumes, of "beach- compatible" material. However, in correspondence received on 9, 2014, the National Marine Fisheries, Service (NMFS) stated that the use of Frying Pan Shoals may be included in the Final EIS provided there is a commitment to reinitiate Essential Fish Habitat consultation with NMFS should the Village actuallypursue mining sand from this area. 0 4. Beach Nourishment/Beach Disposal and Sand Tube'Groinfield Removal Under this alternative, beach disposal would continue per the terms of the existing,SMP, and the Village would implement supplementary beach nourishment and/or beach disposal projects on intervals sufficient to accomplish the stated Purpose and,Need. In addition, the Village would terminate maintenance of the sixteen (16) sand -filled tube groinfield or seek means by which it would be removed. Removal of the sand -filled geotextile tubes and associated underlayments would require excavation with heavy machinery and sand tube clearing via hydraulic means (i.e. washing of sand from each tube structure). Sand tube removal can occur only subsequent to a beach _fill operation in order to ensure a sandy shorefront immediately upon removal. Similarly„ excavation of the structures — essentially in the "dry" after a fill project — ensures both complete and relatively cost - effective removal. The potential sand sources required for this Alternative are the same as those identified under Alternative #3. 5.. Terminal Groin with Beach Nourishment/Beach Disposal (Sand Tube Groinfield Remaining) Alternative #5, the applicant's preferred alternative, includes the construction of a 1,900 linear foot (If) terminal groin concurrent with, and following a federal beach disposal operation on Bald Head Island. The structure would be constructed in two phases (as discussed below) and would serve as a "template" for fill material placed eastward thereof. Federal beach disposal activities on South Beach typically proceed from west to east. Historically, the westernmost limit of direct federal beach-disposal in proximity-to the channel (by design specification) has been approximately South Beach baseline station 44 +00. As required by current North Carolina General Statute, the.construction of a terminal groin would necessanly,involye the placement and maintenance of a concurrent beach fillet (NC Session Law 2013 -384). The concurrent beach fillet would be achieved via disposal from an approved source site. As indicated above, the proposed source site for the fillet is sand disposal from the Wilmington- Harbor navigation project. Additional sand source sites proposed by the applicant for maintenance and future Village- sponsored nourishment are: (1) Jay Bird Shoals; (2) reaches of the Wilmington Harbor Channel demonstrated to contain beach - compatible material (i.e. Baldhead Shoal Channel 1, Baldhead Shoal Channel 2, and Smith Island Channel); (3) Bald Head Creek Shoal; and (4) Frying Pan Shoals. Construction Phasing: In order to expedite beneficial post -groin shoreline equilibration conditions (both,updrift and downdrift of the structure, and,including formation of the sand fillet), the terminal groin woulddbe constructed in two phases. Phase I would involve the, construction, of an,approximate 1,300 -1f structure,(approximately 2/3 of the structure's overall design length) coincident with the federal beach disposal. Phase Il would extend the seaward end.of the structure to complete the structure's overall design 7 length. It is estimated that the timing of the Phase II groin construction would be based upon two to four years of performance monitoring. The implementation of Phase II would be coordinated with agencies subsequent, to the submittal of physical monitoring data. Physical monitoring is described in'more :detail in the EIS. It is presently estimated that a Phase I (1,300, ft long) terminal groin, constructed without 'the need for a hydraulically placed fillet, could theoretically begin in November or December of the construction season but would in all probability extend at least 3 months past the 1 May 2015 moratorium observed to minimize impacts to nesting sea turtles. Certain construction activities associated with terminal groin construction can begin prior to beach disposal operations. They are principally limited however to stone transport and stockpiling at the site, installation of a construction trestle (if deemed necessary), excavation and limited placement of structure foundation mattresses and armorrock (above the MLWL). If implemented concurrent with the Federal disposal, it is possible that the Phase I structure may not require any additional sand from a supplemental source site. At the least, a Phase I structure would reduce both the initial volume of sand required, as well as potentially the timing of updrift fillet enhancement (if necessary) by approximately six months to one year. 6. Terminal Groin with Beach Nourishment/Disposal (Removal of Sand Tube Groinfield) Alternative #6 would involve the construction of a single, low- profile terminal groin ,as described in Alternative #5 above. However, upon completion of the installation of the terminal groin, the Village would begin the systematic removal ,of the existing sand -tube groinfield on South Beach: Sand placement via Village- sponsored nourishment projects and federal beach disposal would continue on periodic intervals. Avoidance and Minimization - Efforts to avoid and minimize effects on aquatic resources will be evaluated during the analysis of alternatives and prior to permit decision. Compensatory Mitigation The project will have no direct or indirect effects on wetlands. No compensatory mitigation to offset unavoidable functional loss to the aquatic environment is proposed. Avoidance and minimization measures proposed by the applicant are described in the FEIS. Rationale for not including construction moratoria are - described in the FEIS. Other Related Federal Laws Since, distribution of 'the DEIS in January 2014, the Corps has concluded consultation with the appropriate Federal and State resource agencies' on the following Federal laws: National Historic Preservation ,Act — State Historic Preservation Officer, Endangered Species Act -U.S. Fish and Wildlife Service; and the Magnuson- Stevens Fisheries Conservation and Management Act — NMFS_ Consultation with NMFS Protected Resources Division regarding the project's effects on Atlantic sturgeon and marine sea turtles is pending. Other Required Authorizations This notice and all applicable application materials are being forwarded to the appropriate State agencies for review. The Corps will generally not make a final permit decision until the North Carolina Division of Water Quality ( NCDWQ) issues, denies, or waives State certification required by Section 401 of the Clean Water Act (PL 92 -500). The receipt of the application and this public notice combined with appropriate application fee at the North Carolina Division of Water, Quality central office, in Raleigh will constitute,initial receipt of an application for a 401 Water Quality Certification. A waiver will be deemed to occur if the NCDWQ fails to act on this request for certification within sixty days of the date of the receipt of this notice in the NCDWQ Central Office. Additional information regarding the Clean Water Act certification may be reviewed at the NCDWQ Central Office, 401 Oversight and Express Permits Unit, 2321 Crabtree Boulevard, Raleigh, North Carolina 27604 -2260. All persons desiring to make comments regarding the application for certification under Section 401 of the Clean Water Act should do so in writing delivered to the North Carolina Division of Water Quality (NCDWQ), 1650 Mail Service Center, Raleigh, North Carolina 27699 -1650 Attention: Ms Karen Higgins by September 1, 2014. The applicant has not provided to the�Corps, a certification statement that his/her proposed activity complies with.and will be conducted in a manner that is consistent`with the approved North Carolina Coastal Zone Management Program. Pursuant to'33 CFR 325.2(b)(2), the Corps cannot issue a permit for the proposed work until the applicant submits such a certification to the Corps and the North Carolina Division of Coastal, Management (NCDCM), and the NCDCM,notifies the Corps that it concurs with'the applicant's consistency certification. Evaluation The decision whether to issue a permit' will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the W proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain values (in accordance with Executive Order 11988), land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving the discharge of dredged or fill materials in waters of the United States, the evaluation of the impact of the activity on the public interest will include application of the Environmental Protection Agency's 404(b)(1) guidelines. Commenting Information This notice announces that we have distributed a Notice of Availability for the FEIS which will be published in the Federal Register on August 1, 2014 and can be found in the Federal Register at the following website: http: / /www.gpo. og v /fdsysibrowse/ collection .action ?collectionCode =FR After connecting with the website, click through the dates to August 1, 2014. Click on "Defense Department" and then locate the Village of Bald Head Island Shoreline Protection Project under "Notices." As disclosed in the NOA, any written comments pertinent to the proposed work, as outlined above, will be received by the Corps of Engineers, Wilmington District, until September 1, 2014. Comments should be submitted to Mr. Ronnie Smith, Wilmington Regulatory Field Office, 69 Darlington Ave., Wilmington, North Carolina 28403 -1343, or (910) 251 -4829, or by email at: ronnie.d.smith(&usace.army.mil. 10 N j6a9) °fie. 5S \ P� 26 12 MISS tr ro \ la a _a T -1 ^ .I (JCl�S7 _ VPAi1 WMI�o l 2t m N 17 •� a lief n PO 04 11 7 Channel 1, •� , {' m 23 as �_ 0 {le 1 ��.1l. " n 13 1s Pit 7.b s 1 _ a''I� A 21 I 19 p ro { 1d a ). -• a ;w4 1 R'n�33 II 14 4 xr N m ro a N { 7M, 7 Srf 6, ° N 7 e g' 9 0 ' d %, � ^^ �. 11 psa 3 Y l, 17 '� 11 +.. „ i• �. 36 ' ]] 3 Tt 7 { elf, '!A; / / - 32 23 tl N a { \• i �`'�� w 14 / ' T ]/ s Bald Heed 20 =AO 21 17' 70 J) S1 t3 w 29 �7 r .x,10 a { 1W RG2s. OT 19 M 17 la 'b s. a 3. 711 19 ,1 { x 1 - P•,v s 4 0 ) m:� M .0 •ice / r OR zl 21 r 3111 35 31 Y a 17 /i » 2. 7e 1. 7 17 N x 1{ 71 a an 311 ' I a - 29 wyl• 0 11 a u a: Iw 30 r 31 n � 7G/ L7'i n 3 N \ s' m xo PT 33 fIR25. 7, :f2 Jt 27 23 25 zr 3, In x T, /21 _' Base map is NOAA navigation chart 11537 obtained from www charts noaa gov (ENC chart US5NC12M) LMG Pw10/c. 11Cw TSD IIOTC�:sn2 i II ,S ,9 to ' 2 to N 17 1t u e ,6 r 16 G _ f S� „ N 5 Q O e 5 3 13 t^ 3 9 J " (\ Villalia of as d Naa,e ,al. ahoralina ►rotoctlen aruj OrwR {w.Mwwnrwlwl 1AK, tUN VICINITY MAP APPLICANT: VILLAGE OF BALD HEAD ISLAND ENGINEER: OLSEN ASSOCIATES, INC. AGENT: ERIK J. OLSEN, P.E. DATUM: MLLW NOT FC TAB .0 .,, LS 14 � 4 COLREGS oEUAA(A N7N (fMF I • 0 it C A W5259r9ffr40At 1 WAK 20 B • r u �q _ i Lu _- TI ■ _� 0 20 �a r1 �l 4 . s SI `>�� �►"�'r ,,,.tic IM a.� /��I� \ \p�, ° • � >� 3?!! I J 1 I� 13 4 �i . p a3 / 8wzffrqr ' .w•� ' 6 1 • _ � FI r 16 r f 9'' W J JMe•TM�, 26 ,,,��•, ", I ' BALD HEAD ISLAND z Js.ials..a 22% �24 26 r b �frlB 23 / a 14 A2 r 11 �•'� a .,_ • '' ONSLOW d ° tow ♦ 9 ATL4 COCEAN „i a —S°' �9•r�- f '� w a ° FRYING PAN SHOALS NTS VILLAGE OF BALD HEAD ISLAND TERMINAL GROIN PROJECT PROJECT LOCATION ✓1 I L DATE APPROVED O CAPE HATTERAS IT OCFAN 09/30/2013 RAWN BY: ML SHEET of 21 olsen ter# associates, inc. 2618 Herschel Street Jocksonville, FL. 32204 1904)387 -6114 C -1468 VILLAGE OF BALD HEAD ISLAND TERMINAL GROIN PROJECT PROJECT LOCATION ✓1 I L DATE APPROVED O CAPE HATTERAS IT OCFAN 09/30/2013 RAWN BY: ML SHEET of 21 a. t6 c'b!:NOTES. 1) MAXIMUM GROIN LENGTH IS 19W FT-�'W 2) FILLETNQT SHOWN � 05! /7s 1t A all I �*z � @ m § _ � C4. � k�nk :( \�7�� a� F � @ m § _ . @ : 7 $ § \ � § § P 7r a� F � - . §fz F \ § ul \§ lu § z ° § § 0 § § $ Lu It § § w Z = ¢� c �< 2 Z § ow , z g f § ¢ _ . Am ,. §p 2 2 ° >0 k \ § E § § A _ ice§ . § 3 i E §y % § � g �& . 8 0zg ��§ ¥ z ` §® ƒkS z ° z \k§� A£ ƒ ©o . o A_ $ gE�t ,$ & A m« � gf$&§ 2 8 mf 8 ƒ1X § wf § s moo § ]\ " k &z w,� 0§ _ '0 IL o� �e�EC* z E ILL 2 §Ok�KR § �l¥%2§w§ 2 � 2�_ ■� < k 111111illf I 11111111111111111n F- ° =#R «E § ap ^ z e,® ° f o q, � ) ■ § No�■�R�sSOCOmnu�N WAUN�n■ i , 0 - o lse n, , DATE APPROVED ._» 09/30 £2 0 1 associates, Inc +LAGEOFBAL HEAD ISLAND DRAWN BY 26e�el 2� TERMINAL ML JckSon k Ram + i SHED c ,� . GROIN 6 of 2 ¢a. ! |�. �� 6Z . t .� �.: i 'SECTION PI -PI, PHASE 1 GROIN 20 .-: AY 2013 0 10 z a, some" 0 r P.." -10 � d � W III= Boom dim OWN -20 S o o o g CO, o 0 8 8 m v Ln D n w O r-1 � M Ln • w e i a; ' ri ei r-1 Offshore Distance from Baseline (Feet) SECTION P2 -1*2 PHASE 11 GROIN 20 oil in 0 �� 10 z w IV IV 0 on 1 0 t0 -10 W IN -20 MIN O O O O O O O O pp O ° S -1 CNI D O Lf171 s-1 ri r•1 ei r-1 �-1 � Offshore Distance from Baseline (Feet) NOTES: 1 SEPT '09 "SURVEY FOR REFERENCE ONLY 2 MAY'13 SURVEY -POST DISPOSAL �� ►lOi` OF CONSTRUCTION ol$en VILLAGE�OF BALD HEAD ISLAND " 09/30/2013' c • moo, TERMINAL GROIN PROJECT DRAWN BY- 2618 Herschel Street ML Jacksonville, Fl. 32204 SHEET 38T6114 C-14i - C -1468 SAND FILLET SECTIONS 10 of 19 in W EAST 13EAqH,, A 4 SCALE 0 NOTES: 1)PAbkC-f,BASELINk,YTIUZtD FOR jBEACH MONITORING A iQ FE' DIE kA L FA BEACHDIWSAL * k OJ t Cit6 h S'TRU C T 10 N BY WILMINGTON DISTRICT, USACOE 2)ACTUAL LIMITS•OF-FILL PLACEMENT BY VILLAd1FdRUfI(3iA'f,I0k-6Ik FILLET MAINTENAN'd'SM-LI. BE IN ACCORDANCE W ITH, k E-Q- V1 A i M th-TS'b F S .JB. I 10. 3)STA,444WIS TYPICAL WESTERN LIMIT OF FEDERALIS'-BEAC-H DISPOSAL. t') -BALD HEAD ISLAND ' z r,; ' 01p Limrrs OF FUTURE PROJECT BASELINE 1'/�t PROJECT RELATED FILL AcnvaiS BY VILLAGE (SEE� NOTE 2) 4 Law jX1 2 dft 'Iy OCTOBER mi P TOGRAPHY INO) FOR PIJRPOSESOFCONSTRUCTION o Ise n associates, inc VILLAGE OF BALD HEAD ISLAND DATE APPROVED REVWDN- 09/30/2013 DRAWN BY - 2618 Herschel Street TERMINAL GROIN PROJECT MIL Jacksbnville, FL. 32204 PROJECT BASELINE 317-6114 M68 C I AND LIMITS OF FILL SHEET 12 of 19 in W V 0 En c at Co a (NMVNpu) UOPAG 3 4 ale l 00 W cc m 4 3 O Z 1 NOI FOR PURPOSES OF C01-iSIRUC11ON ••, Olsen • k <_ 09/30/,2013 �qN P� g VILLAGE OF BALD HEAD ISLAND 8 DRAWN BY. 2618 Herschel Street TERMINAL GROIN PROJECT ''i ML Jacksomtlle, FL. 32204 , v SHEET (904) 387 -61,14 C-14M BORROW SITE TYPICAL SECTION ` 16 of 21 B- w� x r A i_ I C C �RRj aE� N .0 (630MJN'11) U13PB-B j a m - °l m 910 Z 3 0 N N J g v7 `•, Q LLI W 0 J U �C m 1C Q Z O E qn 4, Z N W (VIM O N xu OZ .0-C &n uu1 JAY BIR OW SITE NOI FOR PURPOSES OF C01-iSIRUC11ON ••, Olsen • SI ON 09/30/,2013 �qN P� g VILLAGE OF BALD HEAD ISLAND 8 DRAWN BY. 2618 Herschel Street TERMINAL GROIN PROJECT ''i ML Jacksomtlle, FL. 32204 , SHEET (904) 387 -61,14 C-14M BORROW SITE TYPICAL SECTION ` 16 of 21 B- x r A i_ , o Ili C C :r_774: g ^�'rr1-rr•r, 1 -r r� ^1•rr� r1 -. �'• rl'r-. �QPi `:'r�Tr� o vj D H is iQ r7 � Y r (630MJN'11) U13PB-B j a m - °l m 910 Z 3 0 N N J g v7 `•, Q LLI W 0 J U �C m 1C Q Z O E qn 4, Z N W (VIM O N xu OZ .0-C &n uu1 JAY BIR OW SITE NOI FOR PURPOSES OF C01-iSIRUC11ON ••, Olsen • SI ON 09/30/,2013 - assoclates, Inc. VILLAGE OF BALD HEAD ISLAND DRAWN BY. 2618 Herschel Street TERMINAL GROIN PROJECT ''i ML Jacksomtlle, FL. 32204 , SHEET (904) 387 -61,14 C-14M BORROW SITE TYPICAL SECTION ` 16 of 21 I - SURVEY.� je, DREDGED 2012 14 0 250 50-3 ET A NOT FOR PURPOSES OF CONSTRUCTION olsen associates, inc. 2618 Herschel Sheet Jocksonvilie, FL. 32204 (904) 387 -6114 C 1468 V) W a Z 1_ 0 LLJ w 3 r 0 0 3 o tiz I I I MIIIIIIIIIIII11M. T.� A i 2 w cr w J a w a a 0 w W K Lz m� 0 W J oU 4� °e��0 '% Id VILLAGE OF BALD HEAD ISLAND TERMINAL GROIN PROJECT TEMPORARY TRESTLE J Z O a O O I^ J J H Z LLI J F- U) LU Of 1` J U } m � � c z �2 Ix W W W U H pm Co�cmaS W Y O 1 K W co 2 0 O LL Q J��Po >>� a W Z Q m W v=iOS 0 W IA W U U iuvi a W U V' I- inZv~iv`��i+0w W Q W a W Ln J O w 3 K W O OC lL J K F- ¢ F m v h- GC 4- F N N M z 09/30/2013 2-AWN BY: ML SHEET 20 of 21 r��1 1 ' � s mss; z4kv.. TYPICAL • D • • 2. TRANSPORT OF ROCK BETWEEN MATERIAL STORAGE Y. AREA AND GAOIN'BY 4WD 3. CONSTRUCTION (QPTION) NOT SHOWN. CONTFWCfOR TO 40ly i 1 D • D • EXCAVATE POST- • • to k OF,GROIN. y