HomeMy WebLinkAboutWQ0014885_Inspection_20220720 (2)Compliance Inspection Report
Permit: WQ0014885 Effective: 12/01/21 Expiration: 10/31/27 Owner : Harnett County
SOC: Effective: Expiration: Facility: Harnett County DCAR
County: Harnett 310 W Duncan St
Region: Fayetteville
Contact Person: Amanda Bader
Directions to Facility:
Lillington NC 27546
Title: Phone: 910-814-6151
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
NC0088366 Harnett County - South Harnett Regional WWTP
NC0007684 Harnett County - Harnett County Regional WTP
Inspection Date: 07/20/2022 D,:00PM Exit Time: 03:OOPM
Primary Inspector: Tony W Honeycutt .�a41, 46.iv7/22/2022 Phone: 910-433-3339
Secondary Inspector(s):
Reason for Inspection: Routine
— 4A7E697D34CF4C2...
�DocuSigned by:
m, 7/25/2022
5189C2D3DD5C426... Inspection Type: Compliance Evaluation
Permit Inspection Type: Distribution of Residual Solids (503 Exempt)
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Miscellaneous Questions Record Keeping Land Application Site
(See attachment summary)
Page 1 of 4
Permit: WQ0014885 Owner - Facility: Harnett County
Inspection Date: 07/20/2022 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Inspection Summary:
Facility records were up to date and available for review.
There has been no land application of solids in 2021 or 2022 to date. With the installation of the 2 centrifuges, (one for the
water treatement residuals and one for the wastewater residuals) all residuals have been sent to the Sampson County landfill
or McGill's compost facility.
No additional items noted.
Page 2 of 4
Permit: WQ0014885 Owner - Facility: Harnett County
Inspection Date: 07/20/2022 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Type
Distribution and Marketing
Land Application
Record Keeping
Is GW monitoring being conducted, if required?
Are GW samples from all MWs sampled for all required parameters?
Are there any GW quality violations?
Is GW-59A certification form completed for facility?
Is a copy of current permit on -site?
Are current metals and nutrient analysis available?
Are nutrient and metal loading calculating most limiting parameters?
a. TCLP analysis?
b. SSFA (Standard Soil Fertility Analysis)?
Are PAN balances being maintained?
Are PAN balances within permit limits?
Has land application equipment been calibrated?
Are there pH records for alkaline stabilization?
Are there pH records for the land application site?
Are nutrient/crop removal practices in place?
Do lab sheets support data reported on Residual Analysis Summary?
Are hauling records available?
Are hauling records maintained and up-to-date?
# Has permittee been free of public complaints in last 12 months?
Has application occurred during Seasonal Restriction window?
Comment:
Land Application Site
Is a copy of the permit on -site during application events?
Is the application site in overall good condition?
Is the site free of runoff/ponding?
If present, is the application equipment in good operating condition?
Are buffers being maintained?
Are limiting slopes buffered?
10°/o for surface application
18% for subsurface application
Are there access restrictions and/or signs?
Yes No NA NE
El
•
Yes No NA NE
❑ ❑ • ❑
• ❑ ❑ ❑
❑ ❑ • ❑
❑ ❑ • ❑
DEED
❑ ❑ • ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ • ❑
Yes No NA NE
❑ ❑ • ❑
Page 3 of 4
Permit: WQ0014885 Owner - Facility: Harnett County
Inspection Date: 07/20/2022 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Is the application site free of odors or vectors?
Have performance requirements for application method been met?
For injection?
For incorporation?
Does permit require monitoring wells?
Have required MWs been installed?
Are MWs properly located w/ respect to RB and CB?
Are MWs properly constructed (including screened interval)?
Is the surrounding area served by public water?
If Annual Report indicates overapplication of PAN, are wells nearby that may be impacted?
Are soil types consistent w/ Soil Scientist report/evaluation?
Is the water table greater than 1'/3' bls.
Is application occurring at the time of the inspection?
❑ ❑ • ❑
❑ ❑ • ❑
❑ ❑ • ❑
❑ ❑ • ❑
❑ • ❑ ❑
Comment: Land application operations of residuals was not taking place at the time od the inspection visit,
\.
Page 4 of 4