HomeMy WebLinkAboutNCC202525_Annual Fee Unpaid Email with NOD_20220725Georgoulias, Bethany
From: laserfiche@ncdenr.gov
Sent: Monday, July 25, 2022 6:21 PM
To: pwright@pgrenewables.com
Cc: Georgoulias, Bethany; Tran, Kieu M;jhuntley@pgrenewables.com
Subject: Notice of Deficiency: Unpaid Permit Fee for NCC202525
Attachments: Notice of Deficiency.pdf
This email is to convey a Notice of Deficiency for failure to pay the 2022 annual permit fee per the requirements of NC
General Statute 143-215.3D(a)(4). Please be sure to coordinate payment with other parties copied on this e-mail to
avoid duplicate payments.
Your Certificate of Coverage (COC) under the Construction Stormwater NPDES General Permit was not renewed because
the annual fee payment (Invoice No. NCC202525-2022) was not received. The payment is 24 day(s) overdue. A Notice
of Deficiency is attached.
Please contact the Stormwater Program at kieu.tran@ncdenr.gov or (919) 707-3640. Please reference:
COC no. NCC202525
This COC is for ESA Albemarle in Stanly County, issued to Pine Gate Renewables, LLC.
Annual fee payment can be made through this website:
https://deq.nc.gov/sw-epayments
If this project has been closed -out, it is important that you submit a Notice of Termination request here:
https://edocs.deq.nc.gov/Forms/NCGOI-Termination
Please visit https://deg.nc.gov/NCG01 for more information about this permit.
The NC DEMLR Stormwater Program
512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612
This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not
monitored.