Loading...
HomeMy WebLinkAbout20040325 Ver 2_Other Agency Comments_20140717REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403 -1343 July 15, 2014 Regulatory Division Action ID No. SAW- 2009 -00189 Southern Produce Distributors, Inc. c /o: Mr. Stewart Precythe Post Office Box 130 Faison, North Carolina 28341 Dear Mr. Precythe: n,, 6�S v2, JUL 1 7 20 JU` MR - WATER c—�- --i �►,,... -. AL►TY This letter serves to confirm our evaluation of the March 2014 Year 3 monitoring report for Section One of Barra Farms II Mitigation Bank (Bank) located in Harrison Creek Bay wetland complex, off Highway 53, near Cedar Creek Community, Cumberland County, North Carolina. Also, please reference the approved July 2010 mitigation plan, the February 22, 2011 execution of the Mitigation Bank Instrument (MBI) for this established bank, and our April 24, 2013 letter response to the Year 2 monitoring report. In review of the third year report for Section One of the Bank, our office agrees that the bank is meeting the stem density success criteria for vegetation. While the mortality of pond pine (Pinus serotina) exceeds 50% in three of the seven plots, remedial action is not required due to the amount of volunteer wetland native species which were observed in the plots. For the hydrology monitoring, the well results demonstrated that all (11) of the restoration wells (including the supplement calibration wells), all (4) of the enhancement wells, and both of the reference wells met the targeted hydrologic success criteria of 15% (or 45 consecutive days) of the growing season under normal rainfall conditions. Our office, in coordination with the Interagency Review Team (IRT), concurs that Task 5.0 in Table 5 of the MBI has been fulfilled and that 10% (or 8.0 credits) of the mitigation credits in Section One of the Bank can be released for use. Last year's withheld 2% (or 1.6 credits) will also be released due all the wells meeting the hydrology criteria under normal rainfall conditions. To date, this brings the total release to 48.2 non - riparian wetland mitigation credits. -2- Please be reminded of your obligations pursuant to the February 22, 2011 Mitigation Banking Instrument (MBI); and to continue maintenance inspections of the armored ditch plugs and check dams within the bank in order to evaluate the condition and stability of each structure in'perpetuity. Should you have any questions, please do not hesitate to contact me at the Wilmington Regulatory Field Office, telephone (910) 251 -4811. Copies Furnished: Mr. Christian Preziosi Land Management Group, Inc. Post Office Box 2522 Wilmington, North Carolina 28402 Ms. Kathy Matthews U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh North Carolina 27636 -3726 Mr. Eric Kulz / Wetlands, Buffers, Stormwater V Compliance and Permitting Unit 1650 Mail Service Center Raleigh, North Carolina 27699 -1650 Sincerely, Alf Mickey Sugg, Project Manager Wilmington Regulatory Division Mr. Todd Bowers United States Environmental Protection Agency - Region 4 61 Forsyth Street, S.W. Atlanta, Georgia 30303 -8960 Mr. Fritz Rohde National Marine Fisheries Service Pivers Island Beaufort, North Carolina 28516 Ms. Maria Dunn North Carolina Wildlife Resources Commission 943 Washington Square Mall Washington, North Carolina 27889 Mr. Travis Wilson North Carolina Wildlife Resource Commission 1718 Highway 56 West Creedmoor, North Carolina 27522 J