HomeMy WebLinkAbout404 permit Alleghany 5 SAW-2021-02318.pdfU.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action ID. SAW-2021-02318 County: Alleghany
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Property Owner / Authorized Agent: North Carolina Department of Transportation
Attn: Mr. Kevin Hining
Address: 801 Statesville Road
North Wilkesboro, North Carolina 28659
336-903-9129
Size and location of property (water body, road name/number, town, etc.): The protect is
located at Bridge No. 5 over the Little River on SR 1133 in Alleghany County, North
Carolina.
Description of project area and activity: In order to replace the bridge, the permittee is
authorized to impact waters of the U.S. as follows:
Summary of Authorized Impacts and Required Mitigation
Impact ID #
NWP /
Open Water (ac)
Wetland (ac)
Stream (If)
Temporary
Permanent
Temporary
Permanent
Temporary
Permanent
GP #
Site 1
37'
(Little River)
14
(bank
stabilization)
Sites 2 & 3
(Unnamed
79'
5'
tributary (UT)
14
(dewater)
(culvert
to the Little
replacement)
River
Impact Totals
0
0
0
0
79'
42'
Total Loss of waters of the U.S.
Total Loss of waters of the U.S.
(wetlands and/or open waters in
0
in If)
5,
ac)(streams
Required Wetland Mitigation ac
0
Required Stream Mitigation If
0
Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Regional General Permit Number:
Nationwide Permit Number: 14
Your work is authorized by the above referenced permit provided it is accomplished in strict
accordance with the attached conditions, your submitted application, and the following special
conditions:
Special Conditions
1. All work must be performed in strict compliance with (a) the description of work in the
PCN and (b) the Wetland and Stream Impacts Drawing(s) (Permit Plans) in the application
dated October 26, 2021. Any modification to the description of work and/or the permit plans
must be approved by the USACE prior to implementation.
SAW-2021-02318, Bridge No. 5, Alleghany Co. -2-
2. The permittee shall require its contractors and/or agents to comply with the terms and
conditions of this authorization letter in the construction and maintenance of this project and
shall provide each of its contractors and/or agents associated with the construction or
maintenance of this project with a copy of this authorization letter, all conditions, and any
authorized modifications. A copy of this authorization letter, all conditions, and any
authorized modifications, shall be available at the project site during construction and
maintenance of this project.
Any violation of the attached conditions or deviation from your submitted plans may subject
the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or
appropriate legal action.
This verification will remain valid until the expiration date identified below unless the
nationwide and/or regional general permit authorization is modified, suspended or revoked. If,
prior to the expiration date identified below, the nationwide and/or regional general permit
authorization is reissued and/or modified, this verification will remain valid until the expiration
date identified below, provided it complies with all requirements of the modified nationwide
and/or regional general permit. If the nationwide and/or regional general permit authorization
expires or is suspended, revoked, or is modified, such that the activity would no longer comply
with the terms and conditions of the nationwide and/or regional general permit, activities which
have commenced (i.e., are under construction) or are under contract to commence in reliance
upon the nationwide and/or regional general permit, will remain authorized provided the activity
is completed within twelve months of the date of the nationwide and/or regional general permit's
expiration, modification or revocation, unless discretionary authority has been exercised on a
case -by -case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section
401 Water Quality Certification. You should contact the NC Division of Water Resources
(telephone 828-296-4500) to determine Section 401 requirements.
This Department of the Army verification does not relieve the permittee of the responsibility to
obtain any other required Federal, State or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or
the U.S. Army Corps of Engineers regulatory program, please contact at 828-271-7980.
i "tk- Date:2021.12.22
USACE Regulatory Official: Monte Matthews /�s 13:46:41-05'00'
Date: December 22, 2021 Expiration Date of Verification: March 18, 2022
Action ID Number: SAW-2021-02318
County: Alleghany
Permittee: NCDOT, Mr. Kevin Hining
Project Name: NCDOT / Bridge No. 5 / SR 1133 / Alleghany Co. / Div 11
Nationwide Permit: 14
Date Verification Issued: December 22, 2021
Project Manager: Lori Beckwith
Upon completion of the activity authorized by this permit and any mitigation
required by the permit, sign this certification and return it to the following
address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: Lori Beckwith
151 Patton Avenue
Room 208
Asheville, NC 28801-5006
Please note that your permitted activity is subject to a compliance inspection by a
U. S. Army Corps of Engineers representative. Failure to comply with any terms
or conditions of this authorization may result in the U.S. Army Corps of Engineers
suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been
completed in accordance with the terms and condition of the said permit, and
required mitigation was completed in accordance with the permit conditions.
Signature of Permittee
Date