HomeMy WebLinkAboutSite Inspection 7.22.25 Br 2 on NC 141 Slow CreekWetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20191578
NCDOT - Replace Bridge 2 on NC141 (BR-0011)
Cherokee
NCDOT - Replace Bridge 2 on NC141 (BR-0011)
NC DOT Division 14 - Sylva
7/22/2022
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-83° 56' 44''+35° 05'
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Site inspection was conducted on July 22, 2022 by Kevin Mitchell with the Asheville Regional Office. Kenny Corn
was present during the inspection.
Site is compliant with the 401 Water Quality Certification with additional conditions.
Please ensure stormwater outlets have rip rap where specified in plans.
Continue to add ground cover per NPDES stabilization timeframes.
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20191578
7/22/2022
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2