I neglected to indicate on the plan for Mr. Roten, that the culvert will be placed in a dry channel. The plan should have
stated that a pump around should be in place before the culvert is placed. A sandbag damn will be placed upstream
from the proposed site, with a pump and pipe large enough to clewater the stream. A temporary impact of 10 feet
upstream and a temporary impact of 10 feet downstream will occur, additional to the 30 feet of permanent impact.
Thank you • your patience
• 11 l .:
From: Homewood, Sue [ mailto :sue.homewood(a)ncdenr.Qov]
Sent: Tuesday, July 29, 2014 10:24 AM
To: kmdavisCa)skybest.com
Subject: FW: Roten Driveway Project - Ashe County
E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties.
From: Homewood, Sue
Sent: Monday, July 28, 2014 8:59 AM
To: 'kmdavis @skybeat.com'
Cc: Alexander, Tasha L SAW ( Tasha .L.Alexander(a)usace.army.mil)
Subject: Roten Driveway Project - Ashe County
Mr. Davis,
Per our phone conversation this morning, the 401 Water Quality Certification requires that all work be conducted "in the
dry'. Your application did not indicate that the stream channel would be dewatered during construction. Please clarify
that this project will be in compliance with this requirement and please indicate what length of stream will be
temporarily impacted (additional to the 30 feet of permanent impact) to accomplish dewatering. Thank you.