Loading...
HomeMy WebLinkAbout820734_Routine Inspection_20220719Onsite Representative: Type of Visit: (Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: ID Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Farm Name: i.19 22 Arrival Time: ):�>a slate King faYm I Departure Time: Owner Name: QnThb 01&V KIN J Owner Email: Phone: Mailing Address: Physical Address: {{` j� i Facility Contact: (AMAS fiaht ltiIl, TitleTeth or, - carne Certified Operator: gr Vfly King Back-up Operator: Location of Farm: Latitude: Count SUTORegion: LASERFICHE u 2 2022 i?EO/DWR WQROS FAYETTEVILLE REGIONAL OFFICE Integrator: Phone: 5m1t Md Certification Number: 119 £OQ' Certification Number: Longitude: tx48xsx fY $RS4§S% 33Y x§6Y§k%eSd 2<d3kBY! 4kE44*§:%Sai;me:» 1`9bx£4ti.#4t4S: i*t 2'. izm Mux3as';,s m %dtt .SCA"`Rnxnk k44 4}an95R# {g;}h4 x§#L#G +att ' FF:str gS�use tl•d §A �" 'FPF°34ktE q§Yg3:tl+A{kkG kY Whk 4..t W"3 � �'kXk 4'k' '* yy�� ##�Yyy{{A 4�v+nnit®�jt�Y�„+ib 5id4i6gq4 4 F4YD nIXk(�yyy SYi itii#Y /n $k'.S 5#iNIY:N#Pbx{*##MPI #kdY#S`%34u Fii§i.YkhffH��4b A§tl L8$�b['* Tm*')B i{# 4 ti! W4FUP a. (F (�q t �apy �•#*. �t�'dultr * § ixi SSW VV#tp�... ti}#a4%Po trF£Ft rtkMNA aetty� �3� Ykx .a. #R*T my as » Ad4 Si N.Yd#q• W.2 Hk••#r fd3+-k "a�xPrY'N zt Oa t skkpYt W¢%j3*h�ti##g4Wy#g 9tt' 4R 4tfibQ-�%#4 Ra 3 S7 s##asea ,; N+h 84*fl44&$i }YK i*14a. �attl uybk ,�,i�xaC'r�l>��C Wean to Finish f'Ia.. Layer Dairy Cow y€# Wean to Feeder 5 a Non -Layer # Dairy Calf Feeder to Finish's°{#§{*§x a: ¢+k% %# 4i##Rk}}R#xb§. Ft K-4#i�#RkF §a y$I. *§Po*t1t E#aqi.�+fir uFo�lt .##.'��'#�kGr q_, Layers ���.�U *$" =+Y";*{'q"y5 y.„{':�{' Si'T. YD3 kICM D'C'S'i naw�'•e #�#�#��.I• d ■ Dai Heifer --3*1 } *EF C#k Farrow to WeandY4a,r„a t',�Dry $ �c.....�Non-Dairy Cow ask Farrow to Feeder '. 4 Farrow to Finish --'ii■ Stockerd a5 Gilts =�;�Non-La ers --*���B Beef d#q qa= pX4h4 }T 8M15 #,¢u2k§#� BoarsBeef Pullets --sAa■B q�# i'.YX2§:p'. %* COO e fB Brood { Mt K xd .Ft 'k#d Y m-b A{ 4 Tfik #"k bqH k$4& --#'� Pt4mY##kdsht#hk@AiY3k § '# q {0 #*i M1fi4 tl 51 9. Y4 t M iA.#NY Y43Mt9 4. Yd akk2##ti F qd tt �45A 458Yx a #i ii stir §ktr .•Other trd#kqI D YA,..,.■ S#SC4.ft9 t¢fi53 R#3'ht2b Turkeys TurkeyPoults 1 i!r3 re. r.5 fi. rtr.no m. y:. aaase '"� Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes 4cNo ❑NA ❑NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ' No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes tyNo El NA ❑NE ❑ Yes ERNo ❑NA ❑NE Page 1 of 3 5/12/2020 Continued Facility Number: Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): ❑ Yes ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 NO No ❑ NA ❑ NE No ❑ NA ❑ NE Structure 6 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes EN No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes R o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes To ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE `maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ) No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window�❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): CB- Wf �R -e� r' ' 1} p 13. SoilType(s): WOOL {VI h!X7u)IS Glut' V(lle, 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: No ❑ NA ❑ NE No ❑ NA ❑ NE No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ Yes & No ❑ NA ❑ NE ❑ NE No ❑ NA ❑ NE No ❑ NA ❑ NE 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes N No ❑ NA ❑ NE 0 Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 5/12/2020 Continued Facility Number: Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the appropriate box(es) below. ❑ Yes Fly No ❑ NA ❑ NE 13:) Yes To ❑ NA ❑ NE KE- ❑ Failure to complete annual sludge survey ['Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: U 3) cnm 9l 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes N No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE El Yes No ❑NA El NE ❑ Yes tNo ❑NA ❑NE El Yes ERNo ❑NA ❑NE El Yes No ❑NA ❑NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? El Yes NclNo ET NA ❑NE ❑ Yes No ❑ NA ❑ NE ❑ Yes N No ❑ NA ❑ NE I4Q0vn (DDKS goo Reviewer/Inspector Name: Gift fvniuk Phone: lig E {° N Reviewer/Inspector Signature: Page 3 of 3 Date: Ty 1 a 5/12/2020