HomeMy WebLinkAboutWQ0007026_NOV-2022-PC-0347 Response_20220721I�
Sanford
HEALTHf HEALTH &
REHABILITATION
July 19, 2022
Attn: North Carolina Dept. of Environmental Quality/Division of Water Resources
To Whom It May Concern:
NC Dept of Environmental Quality
JUL 212022
Raleigh Regional Office
In order to correct the ponding on the sand filter system at Sanford Health & Rehabilitation,
approximately one foot depth of material will be excavated over the entire surface area to remove the
algae -covered sand and replace that material with the specified silica filter -grade sand.
We are in the process of locating the required materials and resources to complete the
replacement and plan to have the work completed in sixty days from the date of this letter.
Sincerely,
Cam■
Jord• all, nclgc
Dire'. r of Asset Management & Development
SanStone Health & Rehabilitation
aaJ
DecoSign Envelope ID: 8F5A9F49-9A6E-4DA9-A43A-B97C4C15601 F
ROY COOPER
Governor
ELIZABETTH 5. BISER
srcray
RICHARD E. ROGERS. JR.
okrcror
NORTH CAROI,INA
Environmental Quality
June 24, 2022
CERTIFIED MAIL If 7016 2140 0000 4368 5487
RETURN RECEIPT REQUESTED
Mr. Christopher Sprenger
Sanford Health and Rehabilitation
2702 Farrell Road
Sanford, NC 27330
Dear Mr. Sprenger:
NC Dept of En vironmen tat Quality
JUL 212022
Raleigh Regional Ogicc
Subject: Notice of Violation & Notice of Intent to Enforce
NOV-2022-PC-0347
Compliance Evaluation Inspection
Sanford Health and Rehabilitation WWTP
Non -Discharge Permit No. WQ0007026
Lee County
On June 15, 2022, Cassidy Kurtz from the Raleigh Regional Office conducted a compliance
evaluation inspection of the subject wastewater irrigation system. The purpose of this inspection
was to ensure compliance with the conditions and limitations specified in Non -discharge Permit
No. WQ0007026. During the inspection, the cooperation and assistance of Mr. Randall Jarrell,
ORC, and Mr. Skot Hancox, Director of Plant Operations, was greatly appreciated.
This compliance evaluation inspection consisted of the following:
- Review of the permit,
Review of ORC logbooks, calibration documentation, non -discharge monitoring reports
(NDMRs), non -discharge application reports (NDARs) and
On -site inspection of the treatment components and spray fields.
The current permit was issued March 2, 2017 and expired February 28, 2022. The renewal
application was received by the Division on April 18, 2022. Randall Jarrell is designated as
Operator in Responsible Charge (ORC) and Chad Leinbach is designated as backup ORC.
Components of the wastewater treatment and irrigation system were observed. The septic tanks
are typically pumped annually and were pumped in the spring. The storage pond had plenty of
freeboard available. The irrigation field appeared to be in good condition with good vegetative
cover and no evidence of ponding or runoff The grass on the spray fields and surrounding the
storage pond is routinely mowed. Each of the 5 sections of the spray field was activated and
appeared to overall have good spray patterns and coverage. Monitoring wells MW-1, MW-4, and
MW-5 were observed to be secured and well casings appeared to be in good condition.
North Online Depnuseiof8sriromemtalQsa1ii i Division ofWiw:Resouces
RWie s Regional QSa 5100 Sinus Drive Raleigh. North Conlin'27609
919'91 4200
DocuSfgn Envelope ID: 8F5A9F49-9A$E-40A9-A43A-B97C4C15801F
A review of records was conducted during the inspection. Maintenance logs are organized and
thorough. NDMR records were available and complete; lab results were available and compared
to NDMR forms for June 2021 and March 2022. NDAR and GW-59 records were available and
complete. The flow meter was last calibrated August 24, 2021, and the most recent annual
representative soils analysis was conducted August 16, 2021. Please continue to ensure the flow
meter is calibrated at least once per year (permit condition IV. 3.) and the annual representative
soils analysis is conducted for this year (permit condition IV. 12.).
The following permit condition violation was observed during the inspection.
III. OPERATION AND MAINTENANCE REQUIREMENTS
Condition 1 states "The facilities shall be properly maintained and operated at all times. The
facilities shall be effectively maintained and operated as a non -discharge system to prevent the
discharge of any wastewater resulting from the operation of this facility."
At the time of the inspection, approximately one quarter of the sand filter surface was ponded
with wastewater. During the previous inspection conducted by RRO staff in 2020, a violation
was generated due to ponding across the whole surface of the sand filter, and no response was
received from the facility. Please submit a plan of action for repairing or replacing the sand filter.
This facility was found to be non -compliant with permit conditions for failure to properly
operate and maintain the treatment system as indicated by the observed ponding on the
sand filter, and as a result, this inspection is being issued as a Notice of Violation. You are
required to provide a written response with planned actions to return the facility to
compliance to this office no later than 30 days after receiving this report.
If you have any questions regarding the attached reports, the inspection, or this letter, please
contact Cassidy Kurtz at Cassitl ,Kurtz ncdenr.yrov or (919) 791-4237.
Sincerely,
ooculipn.aay:
L-
Vanessa Manuel
Assistant Regional Supervisor
Water Quality Regional Operations
Raleigh Regional Office
Attachments: EPA Water Compliance Inspection Report
CC: Skot Hancox, Randall Jarrell, RRO Files, Laserfiche
Noah CznanaNimmons Haahozmaoulcudiryi Divides ofWEIBReonrod
PA skits Mosul OIDct i 1100 Ewes Deive 1 1a1eI6.Ne/6 Camliaa27009
919'91 4200
Compliance Inspection Report
NC Dept of Environmental Quality
JUL 212022
Raleigh ReRioaalOffice
Permit: W00007026 Effective: 03/02/17 Expiration: 02/28/22 Owner : Sanford Health and Rehab tatio o,
SOC: Effective: Expiration: Facility: Sanford Health and Rehabilitation
County: Lee 2702 Farrell Rd
Region: Raleigh
Contact Person: Christopher Sprenger
Sanford NC 27330
Title: Phone: 919-776-9602
Directions to Facility:
US 1 South to Farrell Rd. Left on Farrell Rd. Address is 2702.
System Classifications: SI,
Primary ORC: Randall Craig Jarrell Certification: 23925 Phone: 919-210-2500
Secondary ORC(s):
On -Site Representatives):
Related Permits:
Inspection Date: 06/15/2022
Primary Inspector: Cassidy Kurtz
Secondary Inspector(s):
Entry Time 10:30AM Exit Time: 11:45AM
Phone: 919-807-6388
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Wastewater Irrigation
Facility Status: ❑ Compliant El Not Compliant
Question Areas:
II Miscellaneous Questions 111 Treatment In Record Keeping
Treatment Lagoons • End Use -Irrigation IIITreatment Disinfection
(See attachment summary)
Page 1 of 5
Permit: WQ0007026 Owner - Facility: Sanford Health and Rehabilitat on Co
Inspection Date: 06/15/2022 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Inspection Summary:
On June 15, 2022, Cassidy Kurtz from the Raleigh Regional Office conducted a compliance evaluation inspection of the
subject wastewater irrigation system. The purpose of this inspection was to ensure compliance with the conditions and
limitations specified in Non -discharge Permit No, WQ0007026. During the inspection, the cooperation and assistance of Mr.
Randall Jarrell, ORC, and Mr. Skot Hancox, Director of Plant Operations, was greatly appreciated.
This compliance evaluation inspection consisted of the following:
- Review of the permit,
- Review of ORC logbooks, calibration documentation, non -discharge monitoring reports (NOMRs), non -discharge applicatior
reports (NDARs) and
- On -site inspection of the treatment components and spray fields.
The current permit was issued March 2, 2017 and expired February 28, 2022. The renewal application was received by the
Division on April 18, 2022. Randall Jarrell is designated as Operator in Responsible Charge (ORC) and Chad Leinbach is
designated as backup ORC.
Components of the wastewater treatment and irrigation system were observed. The septic tanks are typically pumped
annually and were pumped in the spring. The storage pond had plenty of freeboard available. The irrigation field appeared to
be in good condition with good vegetative cover and no evidence of ponding or runoff. The grass on the spray fields and
surrounding the storage pond is routinely mowed. Each of the 5 sections of the spray field was activated and appeared to
overall have good spray patterns and coverage. Monitoring wells MW-1, MW-4, and MW-5 were observed to be secured and
well casings appeared to be In good condition.
A review of records was conducted during the inspection. Maintenance logs are organized and thorough. NDMR records
were available and complete; lab results were available and compared to NDMR forms for June 2021 and March 2022. NON
and GW-59 records were available and complete. The flow meter was last calibrated August 24, 2021, and the most recent
annual representative soils analysis was conducted August 16, 2021. Please continue to ensure the flow meter is calibrated
at least once per year (permit condition IV. 3.) and the annual representative soils analysis is conducted for this year (permit
condition IV. 12.).
The following permit condition violation was observed during the inspection.
III. OPERATION AND MAINTENANCE REQUIREMENTS
Condition 1 states "The facilities shall be properly maintained and operated at all times. The facilities shall be effectively
maintained and operated as a non -discharge system to prevent the discharge of any wastewater resulting from the operation
of this facility."
At the time of the inspection, approximately one quarter of the sand filter surface was ponded with wastewater. During the
previous inspection conducted by RRO staff in 2020, a violation was generated due to ponding across the whole surface of
the sand filter, and no response was received from the facility. Please submit a plan of action for repairing or replacing the
sand filter.
This facility was found to be non -compliant with permit conditions for failure to properly operate and maintain the treatment
system as indicated by the observed ponding on the sand filter, and as a result, this inspection is being issued as a Notice
of Violation. You are required to provide a written response with planned actions to return the facility to compliance to this
office no later than 30 days after receiving this report.
Page 2 of 5
*
Permit: W00007026 Owner - Facility: Sanford Health and Rehabilitation Co
Inspection Date: 06/1512022 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Type Yes No NA NE
Reuse (Quality) ❑
Infiltration System 0
Single Family Spray. LR ❑
Activated Sludge Spray, LR ❑
Activated Sludge Spray, HR ❑
Activated Sludge Drip, LR ❑
Recycle/Reuse ❑
Single Family Drip ❑
Lagoon Spray, LR
Treatment Yes No NA NE
Are Treatment facilities consistent with those outlined in the current permit? •❑ ❑ ❑
Do all treatment units appear to be operational? (if no, note below.) ❑ • ❑ ❑
Comment. There is ponding on the sandfilter (covering approx. 1/4 of sandfilter surface).
Treatment Disinfection
Yes No NA NE
Is the system working? •❑ 0 0
Do the fecal coliform results indicate proper disinfection? • 0 ❑ ❑
Is there adequate detention time (>=30 minutes)? • ❑ 0 0
is the system properly maintained? •❑ ❑ ❑
If gas, does the cylinder storage appear safe? 0000
Is the fan in the chlorine feed room and storage area operable? ❑ ❑ • ❑
Is the chlorinator accessible? • ❑ ❑ ❑
If tablets, are tablets present? 00110
Are the tablets the proper size and type? DOM ❑
Is contact chamber free of sludge, solids, and growth? ❑ ❑ ❑ U
If UV, are extra UV bulbs available? ❑ ❑•❑
If UV, is the UV intensity adequate? ❑ ❑ E ❑
# Is it a dual feed system? ❑ ❑ � ❑
Does the Stationary Source have more than 2500 Ibs of Chlorine (CAS No. 7782-50-5)? ❑ ❑ • ❑
If yes, then is there a Risk Management Plan on site? ❑ ❑ � ❑
If yes, then what is the EPA twelve digit ID Number? (1000-- )
If yes, then when was the RMP Iasi updated?
Comment:
Record Keeping
Yes No NA NE
Page 3 of 5
Permit: W00007026 Owner - Facility: Sanford Health and Rehabilitation Co.
Inspection Date: 06/15/2022 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Is a copy of current permit available? •❑ ❑ ❑
Are monitoring reports present: NDMR? MDEID
NDAR? 1110120
Are flow rates Tess than of permitted flow? • ❑ ❑ 0
Are flow rates less than of permitted flow? • ❑ ❑ ❑
Are application rates adhered to? •❑ ❑ ❑
Is GW monitoring being conducted, if required (GW-59s submitted)? • ❑ ❑ ❑
Are all samples analyzed for all required parameters? MOOD
Are there any 2L GW quality violations? ❑ ❑ • ❑
Is GW-59A certification form completed for facility? 0 0 ❑ •
Is effluent sampled for same parameters as GW? 00.0
Do effluent concentrations exceed GW standards? ❑ ❑•❑
Are annual soil reports available? MOOD
# Are PAN records required? 00.0
# Did last soil report indicate a need for lime? ❑ ❑ ❑
If so, has it been applied? ❑ ❑ . ❑
Are operational Togs present? • ❑ 0 ❑
Are lab sheets available for review? • ❑ ❑ ❑
Do lab sheets support data reported on NDMR? • 000
Do lab sheets support data reported on GW-59s? 1.000
Are Operational and Maintenance records present? 1.0120
Were Operational and Maintenance records complete? •❑ 0 ❑
Has permittee been free of public complaints in last 12 months? • ❑ ❑ ❑
Is a copy of the SOC readily available? ❑ ❑•❑
No treatment units bypassed since last inspection? ❑ ❑ ❑
Comment:
End Use -Irrigation Yes No NA NE
Are buffers adequate? •❑ ❑ ❑
Is the cover crop type specified in permit? 00.0
Is the crop cover acceptable? U ❑ ❑ ❑
Is the site condition adequate? •❑ ❑ ❑
Is the site free of runoff / ponding? •❑ ❑ ❑
Is the acreage specified in the permit being utilized? • ❑ ❑ ❑
Is the application equipment present? • ❑ ❑ ❑
Is the application equipment operational? • ❑ ❑ ❑
Is the disposal field free of limiting slopes? • ❑ 0 ❑
Page 4 of 5
Permit: WO0007026 Owner - Facility: Sanford Health and Rehabilital on Co.
Inspection Date: 06/15/2022 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Is access restricted and/or signs posted during active site use?
Are any supply wells within the CB?
Are any supply wells within 250' of the CB?
How close is the closest water supply well?
Is municipal water available in the area?
# Info only: Does the permit call for monitoring wells?
Are GW monitoring wells located properly w/ respect to RB and CB?
Are GW monitoring wells properly constructed, including screened , nterval?
Are monitoring wells damaged?
Comment:
■ ❑❑❑
❑❑■❑
❑ ❑ ❑
❑ ❑■❑
1:10110
■ ❑❑❑
■ ❑❑❑
■ ❑❑❑
❑ ❑ N❑