Loading...
HomeMy WebLinkAboutNCC203415_NOT Closeout Documents_20220722North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Greene Project: Hookerton Dump River basin: Neuse Person financially responsible: URS Corporation - Scott Hartung, Vice President Project #: GREEN-2020-001 Address: 1600 Perimeter Park Drive, Suite 400, Morrisville, NC 1. Project Location: NC 123, Hookerton Pictures: No 2. Weather and soil conditions: sunny, warm, wet Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Mike Title: Environmental Inspector Inspection report: Sent Report Date given/sent: July 22, 2021 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage 10. Comments: under the NP®ES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deg.nc.goy/Forms/NCG01- Termination. Please note that this correspondence must be uploaded as part of completing the NOT process Reported by: Bradley West Others present: Date of inspection: July 19, 2021 Time arriving on site: 11:00 AM Time leaving site: 11:45 AM cc: