HomeMy WebLinkAbout20140792 Ver 1_Application_20140728n� � � .� STATE OF NORTH CAROLINA DEPART'MENT OF TRANSPORTATION PAT L. MCCRORY GOVEAIVOR Jtiily 28, 2014 Mr. Steven Kichefski Asheville Regulatory Field Office US Anny Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 ANTHONY J. TATA SECRETABY SUBJECT: Bridge #149 Replacement, SR 1664 (Middle Road), Alexander County Dear Mr. Kichefski: The North Carolina Department of Transportation requests authorization to replace a deteriorating bridge on SR 1664 (Middle Road) in Alexander County. NCDOT proposes to replace the existing single span, 20 fooY wide bridge with a 46-foot long, triple 10 foot x 8 foot box culvert. Inlet and outlet riprap-faced floodplain benches (�60 feet) will be constructed to maintain `naturaP channel dimensions upstreun and downstream of the proposed culvert. Coir fiber matting will be urilized to stabilize the benches. Due to the severe meander in the stream immediately upstream of the proposed culvert, approximately 17 feet of stream channel will be relocated to better align with the culvert and the outside meander bend adjacent to the roadway will be stabIlized with riprap (122 feet). Please note thaY the sixty feet of riprap faced bench impacts and the stream relocation impact on the upstream side is within the 122 feet of bank stabilizarion impacts. It is proposed ThaT the triple barrels of culvert will be constructed in stages and impervious dikes will be utilized to manage the stream flow thtough the barrels during conshuction. Any areas affected by the sTaging and temporary impervious dikes will be restored to pre-project conditions. The total scope of the work will result in 228 feet of permanent impacts to Big Branch, which is classified as a WS-1V watershed by Yhe N.C. Division of Water Resources. The project is not located within'/z mile of any critical watershed area nor is SR 1664 a rural or urban arterial; therefore, hazardous spIll basins are not required. Enclosed is the hazardous spill basin checklist. The proposed project has been submittedlcleared by the cultural resources office, (Project Tracking # 12-09-0053). This oifice has conducted a threatened/endangered species sarvey within the project footprint. The federally listed species for Alexander County (USFWS listed date September 22, 2010) include dwarf-flowered heartleaf (Hexastylis naniflora) and bog turtle (Glyptemys muhlenburgii). Nationa] HeriYage Program records documenY the nearest heartleaf location 113 miles south of the proposed project area. The heartleaf is usually found on dry to moist ravine slopes (usually north facing and of the oak-hickory-pine forest type) and in boggy areas near springheads. There is no suitable habitat in the proposed project area and no heartleaf species were observed within the project footprint No impact on this species is anticipated. Natural Heritage Program records document the nearest bog turtle location appro�mately 9.5 miles north of the proposed proj ect area. Bridge #149, SR 1664, Middle Road Page 2 July 28, 2014 Bog turtles are typically found in bogs, marshes, and wet pastures. There is no suitable habiYat located within the project footprint. T/SA species are not subject to Section 7 consultation; however, no impact on this species is anticipated. [ have enclosed a pre-construction notification for a NW#14, sketches of planned activities and location maps relative to the project. Project information for the 401 Automated Payment Procedure is as follows: • Work arder number: 150465-55120005-17BP.12.R.102-3372 • T1P#: NA • Project Category: $240.00 Fee If you have any questions or concerns please feel free to contact me at (704) 480-9044. Thank you for your time and consideration on this matter. Respectfully yours, Reuben Chandler, P.E. Division Engineer T�velfth Division � BY: ��� %2�G�_. Trish Beam Division 12 Environmental Supervisor Enclosures �r W ATFq O `F.`^" "'', PG � �9 O�� °P' Y '�,� �* y Offce Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Noti�cation PC Form A. A licant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: � Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No 1d. Type(s) of approval sought from the DWQ (check ail that apply): � 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certification: ❑ Yes � No ❑ Yes � No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes ❑ No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No below. 1 h. Is the project located within a NC DCM Area of Environmental Concem (AEC)? ❑ Yes � No 2. Project Information 2a. Name of project: Bridge #149 Replacement, SR 1664 (Middle Road) 2b. County: Alexander 2c. Nearest municipality / town: Stony Point 2d. Subdivision name: NA 2e. NCDOT only, T.I.P. or state 17BP.12.R.102 project no: 3. Owner Information 3a. Name(s) on Recorded Deed: NCDOT Right of Way 3b. Deed Book and Page No. 3c. Responsible Party (for LLC i f applicable): 3d. Streetaddress: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: Reuben Chandler 4c. Busines s name N.C. Department of Transportation, Division 12 (if applicable): 4d. Street address: 1710 East Marion Street 4e. City, state, zip: Shelby, NC 28151 4f. Telephone no.: 704-480-9020 4g. Fax no.: 704-480-5401 4h. Email address: rchandler@ncdot.gov 5. Agent/Consultant Information (if applicable) Sa. Name: Trish Beam 5b. Business name N.C. Department of Transportation, Division 12 (if applicable): Sc. Street address: 1710 East Marion Street 5d. City, state, zip: Shelby, NC 28151 Se. Telephone no.: 704-480-9044 5f. Fax no.: 704-480-5401 Sg. Email address: pdbeam@ncdot.gov Page 2 of 11 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): NA Latitude:35.841095 Longitude: - 1 b. Site coordinates (in decimal degrees): 51.109276 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 0.10 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to gig Branch proposed project: 2b. Water Quality Classification of nearest receiving water: WS-IV 2c. River basin: Alexander 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Site is located on a paved secondary road. Landuse designation is vicinity of project is forested. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 200 3d. Explain the purpose of the proposed project: The purpose of the proposed work is to replace a deteriorating bridge for the safety of the travelling public. 3e. Describe the overall project in detail, including the type of equipment to be used: NCDOT proposes to replace the existing timber deck bridge with a 46 foot long, triple 10' x 8' box culvert. Due to the severe meander in the stream immediately upstream of the proposed culvert, approximately 17 feet of stream channel will be relocated to better align with the culvert and the outside meander bend adjacent to the roadway will be stabilized with riprap. Inlet and outlet floodplain benches will be constructed to maintain channel dimensions and to direct flow into the center culvert cell. It is proposed that the triple barrels of culvert will be constructed in stages and impervious dikes will be utilized to manage the stream flow through the barrels during construction. A temporary cofferdam diversion channel will be used to manage the stream flow around the construction site. Any areas affected by temporary diversion will be restored to pre-project conditions. All Best Management Practices will be utilized during the course of the project. The Project will be constructed using typical heavy equipment (trackhoe, backhoe, etc.) 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes � No ❑ Unknown Comments: Jurisdictional stream determination made by Division 12 DEO. 4b. If the Corps made the jurisdictional determination, what type � preliminary ❑ Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Page 3 of 11 PCN Form — Version 1.3 December 10, 2008 Version 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes � No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes � No 6b. If yes, explain. Page 4 of 11 PCN Form — Versian 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands � Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type ofjurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Tem orar W1 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ WZ � P� T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ WS ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P 0 T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Camments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3 b. 3 c. 3d. 3e. 3f. 3 g. Stream impact Type of impact Stream name Perennial Type ofjurisdiction Average Impact number- (PER)or (Corps-404,10 stream length Permanent (P) or intermittent DWQ — non-404, width (linear Temporary ('f) (INT)? other) (feet) feet) S1 � P❑ T Culvert Big Branch � PER � Corps 10.5 46 ❑ INT � DWQ S2 � P � T Stream Relocation Big Branch � PER � Corps 10.5 **17 ❑ INT � DWQ Inlet/Outlet Riprap S3 � P❑ T faced benches g� granch � PER � Corps 10.5 182 and Riprap bank 9 ❑ INT � DWQ stabilization S4 ❑ P� T Dewatering Big Branch � PER � Corps 10.5 38 ❑ INT � DWQ S5 ❑ P � T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P � T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and YribuYary impacts *228 3i. Comments: ` Permanent Impacts = Culvert fill impacts (46 feet) + floodplain bench and bank stabilization impacts (122 feet on upstream side and 60 feet floodplain bench impacts on downstream side) = 228 feet *`Note: Stream relocation impacts are within the same area as the riprap bank stabilization impacts Page 5 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list ali open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number— (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Tem orar T 01 ❑P❑T 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T Af. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If ond or lake construction ro osed, then com lete the chart below. Sa. Sb. 5c. Sd. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 Sf. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): Sk. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require miti ation, then ou MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar-Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number— Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Tem ora T im act re uired? B1 ❑P❑T ❑Yes ❑ No B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑P❑T ❑Yes ❑ No 6h. Total buffer impacts 6i. Comments: Page 6 of 11 PCN Form — Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Riprap faced floodplain benches constructed to maintain 'natural' channel dimension and stabilized with coir fiber matting. Minor relocation of channel to direct flow into main culvert cell will be done following natural channel design principles. Streambed material will be salvaged from the streambed to be filled and utilized in the relocated stream section as well as on the floodplain benches. 1 b. Specifcally describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for � Yes ❑ No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ � Corps ❑ Mitigation bank 2c. If yes, which mitigat ion option will be used for this project? � Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-Ileu fee program is attached. ❑ Yes 4b. Stream mitigation requested: 46 linearfeet 4c. If using stream mitigation, stream temperature: � warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: Mitigation required shall be provided in accordance with the procedures detailed in the USACE letter dated September 1, 2004, from Mr. Ken Jolly to Dr. Gregory J. Thorpe. Attached is a copy of the EEP acceptance letter for culvert construction. 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified � Yes � No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: ❑ Yes ❑ No 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? NA % 2b. Does this project require a Stormwater Management Plan? ❑ Yes � No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Complies with NCDOT's individual NPDES permit NCS000250. ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program � DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? NA ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Pro ram Review ❑ Coastal counties ❑ HQW 4a. Which of the following state-implemented stormwater management programs apply � ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review Sa. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes � No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ❑ Yes � No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in � yes � No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. The project is a minimum criteria project which has low potential for cumulative/indirect impacts and will not result in additional development which could impact water quality. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No sewage generated from project. Page 10 of 11 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or � Yes � No habitat? Sb. Have you checked with the USFWS concerning Endangered Species Act � yes � No impacts? ❑ Raleigh Sc. If yes, ind icate the USFWS Field Office you have contacted. ❑ Asheville Sd. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC Natural Heritage Program database. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? No salt marshes, oyster reefs, or seagrass beds in the vicinity of the project. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation � yes � No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Cultural Resources review/clearance (12-09-0053). 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics coordination with FEMA 8c. What source(s) did you use to make the floodplain determination? FEMA FIRM panel number: 3710377600J . ___. ,; f� �r l\ �� �? ✓�hG� �-er � ^��Cw_._---� �7-��' /� ApplicanUAgenYs Printed Name Applicant/AgenYs Signature Date (AgenYs signature is valid oniy rf an authorization letter from the applicant is pravided.) Page 11 of 11 PCN Form — Version 1.3 December 10, 2008 Version I� I u I ✓.'t �I�II I �f?i i��,i ',., ' .. i ill��i ii11� I i-, �� y i ,.' Pst fvleGrcry I�1ush�r� �I �, i, L��i �:tnr .r0�J8�1101 �'i/i�\�„?@.Il i' I VF`(I � i�� F�IO�lld;i� - July 17, 2Q14 Ms. Trish Beam Division 12 Environmental Supervisor North Carolina Deparhuent of Traosportation Post Officc Box 47 Shelby, Nortli Carolina 28151-0047 Dear Ms. Beam: Subject EEP Mitigation Acceptance Letter: 1C:� I i<.V:-i.l�=1. �i! �xct;,;q"� Replace Bridge 149 on SR 1664 (Middle Road) over Big Creek, Alexander County; WBS number 17BP.L2.R.102 The purpose of U�is letter is to notify you that the Hcosystem Enhancemevt Program (EEP) will provide the compensatory stream mitigarion for Che subject project Based on the nifonnarion supplied by you on July 15, 2014, the im}�acts are located in CU 03050101 of the Catawba River basiv in the Central Pied�vont (CP) Eco-Region, and are as follows: Catawba 03050101 CP Impacts (feeUacres) Stream Cold Cool s[ream impacts may be prnposed to Wami I Riparian 46.0 Wetlands Non- Coastal at a mitipation iatio less than 2:1. See Bufter (Sq. FtJ Zone 1 I Zoue 2 This impact and associaCed mitigation need were under projected by Che NCDOT iu Yhe 2014 impaet data. EEP will commit to implement sufficienC eompensarory strean� mitigation credits to offset the impacts associated with this project as determined Uy the regulatory agencies usiug die delivery timeline listed in Seclion F3.c.iii of the N.C. Deparhnent of Environment and Natural Resources' Pcosystem E�thancement Program In-Lieu Cee Instrument dated July 28, 2010. If il�e above referenced impaet anzouvts are revised, then Uiis miGgation acceptauce letter will no longer be valid and a new mitigation acceptance letter will be required from EEP. If you have any questions or need additio��al ii�fonnation, please contacC BeCh Harmon at 919-707-8420. Sincerely, f. _ f _ jt, f '`�,'rx ��"..�' 4� £ 'fj-1{ �_ �-�. ! t 7arzdesfi3. Stanfill EEP Asset Management Supervisor cc: Mr. Steve Kiehefski, USACE — Asheville Regulatory Field Office Mr. Alan Jolmson, Division of Water Q�aliry, Mooresville Office Ms. Linda Fitzpatrick, NCDOT — PDEA File: SR 1664—Bridge 149—Division 12 rn , .,.. �.,.il�_.i, � ��.. ..,� .i �,.,. � , i_ � 3 i/ +S"r'fi 'i _ � i ' �., , _ i _-_. . , NCDOT HAZARDOUS SPILL BASIN CHECKLIST Division: 1 � County: A1PXanr�er Project ID: 17BP.12.R.102 River Basin: Catawba Bridge No: NA Route: SR 1664 Water Ouality Criteria: Stream: Big Branch Yes No Stream Crossing Blue Line On USGS ORW WSI WS II,III OR IV, Crossing Within O.Smi of W.S. Critical Area Roadway Criteria: Route Designation- Arterial Urban Arterial Rural Additional Site Information: Is a Hazardous Spill Basin Required? Yes No � I� i� � Yes No � t� Criteria Based Upon NCDOT `Best Management Practices for the Protection of Surface Waters" (March, 1997). V ==MPH ADT D O N O T U S E F O R C O N S T R U C T I O N P R E L I M I N A R Y P L A N S 000PROFILE (HORIZONTAL) P R O J E C T L E N G T H R I G H T O F W A Y D A T E : L E T T I N G D A T E : S T A T E S T A T E P R O J E C T R E F E R E N C E N O . S T A T E P R O J . N O . F . A . P R O J . N O . D E S C R I P T I O N N O . T O T A L S H E E T S N . C . S H E E T DESIGN DATA S I G N A T U R E : S I G N A T U R E : P . E . P . E . 2 0 1 2 S T A N D A R D S P E C I F I C A T I O N S P R O J E C T E N G I N E E R P R O J E C T D E S I G N E N G I N E E R PLANSPROFILE (VERTICAL) H Y D R A U L I C S E N G I N E E R E N G I N E E R R O A D W A Y D E S I G N L O C A T I O N : T Y P E O F W O R K : 09/08/99 D I V I S I O N O F H I G H W A Y S S T A T E O F N O R T H C A R O L I N A 00017-JUL-2014 10:14R:\Hydraulics\PERM ITS_Environm ental\Draw ings\01-0149_Hyd_prm _w et_tsh_01.dgncaamaya AT CHABW CAM AYA2CONTRACT: C203275 ARTMEN N A S O H DEP T O F T R A S P OR T T IO N T ATE O F N R T C AROLINA F - 1 0 8 4 P r o f e s s i o n a l C o r p o r a t i o n L i c e n s e N u m b e r : C a r y , N C 2 7 5 1 8 8 0 0 0 R e g e n c y P a r k w a y , S u i t e 6 0 0 M i c h a e l B a k e r E n g i n e e r i n g , I n c . P r e p a r e d i n t h e O f f i c e o f : VICINITY MAPBOUNDARIES.THIS PROJECT IS NOT WITHIN ANY MUNICIPAL 2013SUBREGIONAL TIER GRAPHIC SCALES G R A D I N G , D R A I N A G E , P A V I N G , & S T R U C T U R E A L E X A N D E R C O U N T Y See Sheet 1-B For Conventional Symbols See Sheet 1-A For Index of Sheets 4 27055 B I G B R A N CH C R E E K - L - NC GRID NAD 83/2011 306015303015306036612FUNC CLASS = R. LOCAL A P R I L 2 3 , 2 0 1 3 A P R I L 2 3 , 2 0 1 3 ( S R 16 2 7 ) M A R T I N R O A D T O J O H N N Y (SR 1605)STORE ROAD TO PAUL PAYNE S R 1 6 6 4 M I D D L E R O A D TO THE LIMITS ESTABLISHED BY METHOD II .CLEARING ON THIS PROJECT SHALL BE PERFORMED DETOUR ROUTE P E , R / W , U T I L I T I E S & C O N S T . 1 7 B P . 1 2 . R . 1 0 2 NC D O T C O N T A C T : K . Z A K H A M I D I , P E D E S I G N B U I L D P R O J E C T E N G I N E E R D B 1 2 - 0 1 0 1 4 9 S T R U C T U R E N O . 1 4 9 O V E R B I G B R A N C H C R E E K O N S R 1 6 6 4 - L - P O T S t a . 1 0 + 0 5 . 0 0 B E G I N C O N S T R U C T I O N B E G I N P R O J E C T D B 1 2 - 0 1 0 1 4 9 - L - P O T S t a . 1 4 + 1 5 . 0 0 E N D C O N S T R U C T I O N E N D P R O J E C T D B 1 2 - 0 1 0 1 4 9 TO T A L L E N G T H O F P R O J E C T D B 1 2 - 0 1 0 1 4 9 LE N G T H S T R U C T U R E P R O J E C T D B 1 2 - 0 1 0 1 4 9 LE N G T H R O A D W A Y P R O J E C T D B 1 2 - 0 1 0 1 4 9 TIP PRO JECT: 17BP.12.R.102 T O D D H . B U C K N E R , P E S U E F L O W E R S = 0 . 0 7 8 M I = 0 . 0 0 7 M I = 0 . 0 7 1 M I W E T L A N D A N D S U R F A C E W A T E R I M P A C T S P E R M I T C A L a c k e y D a m 1.56 N o n a m e L a k e BigBranchCreek ElkShoalsIsland Creek 6 4 Ch Baptist Mt. NeboChBaptistThird CreekChHomePleasantChBaptistConcord ChWesleyMt.BEGIN PROJECT END PROJECT - L - S t a . 1 1 + 9 5 . 1 7 B E G I N R C B C - L - S t a . 1 2 + 2 6 . 6 7 E N D R C B C S H E E T 1 O F 5 P E R M I T D R A W I N G ENERGY UNITED E N E R G Y U N IT E D E L E V . = 9 7 4 . 3 4 L O W W I R E G e o t e x t i l e 3 @ 1 0 ’ X 8 ’ B O X C U LV E R T R E IN F O R C E D C O N C R E T E * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * t h a t 9 5 2 . 3 0 ’ i s t h e c o r r e c t e l e v a t i o n o n B M # 1 . c o n t a c t e d D i v 1 1 L & S . i t w a s c o n f i r m e d w i t h t h e m E S P f o u n d t h e e r r o r w h e n v e r i f i y i n g c o n t r o l a n d B M # 1 e l e v a t i o n i n o r i g i n a l F S f i l e w a s i n c o r r e c t . * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * NC GRID NAD 83/2011 10 1 1 1 2 1 3 1 4 10 1 1 1 2 1 3 1 4 930 940 950 960930940950960 5/28/9917-JUL-2014 10:15R:\Hydraulics\PERM ITS_Environm ental\Drawings\01-0149_Hyd_prm _wet_psh_04.dgncaamaya AT CHABW CAM AYA2 H Y D R A U L I C S R O A D W A Y D E S I G N E N G I N E E R E N G I N E E R R / W S H E E T N O . S H E E T N O . P R O J E C T R E F E R E N C E N O . 9 4 0 9 5 0 9 6 0 9 3 0 970 980 9 8 0 9 7 0 2 ’ S I L L I N B A R R E L # 3 2 ’ S I L L I N B A R R E L # 1 T O B E R E M O V E D E X I S T I N G B R I D G E 2 0 0 1 5 0 1 0 0 5 0 C L 5 0 1 0 0 1 5 0 9 6 0 9 5 0 9 4 0 S T R E A M B E D E X I S T I N G B R I D G E T O B E R E M O V E D N G @ C U L V E R T C / L 2.30:1 2. 32: 1 0 .0 19 0 . 0 1 6 S K E W = 1 2 0 3 @ 1 0 X 8 R C B C G R A D E P O I N T E L E V = 9 5 3 . 8 4 C E N T E R L I N E S T A . 1 2 + 1 0 . 0 0 - L - T B R I G H T T B R I G H T T B L E F T T B L E F T P R O P 2 5 Y R = 9 5 0 . 4 ’ P R O P 1 0 0 Y R = 9 5 2 . 8 3 ’ N W S E L = 9 4 4 . 3 ’ S L O P E = 0 . 5 0 % C . L . I N V . E L E V . = 9 4 2 . 4 8 2:1 2:1 D ( N o t t o S c a l e ) S T A N D A R D B A S E D I T C H B d F R O M - L - S T A . 1 0 + 9 1 T O S T A . 1 2 + 1 5 L T D E T A I L 1 B = 2 F t . M a x . d = 1 . 5 F t . M i n . D = 2 F t . G r o u n d N a t u r a l G r o u n d N a t u r a l T y p e o f L i n e r = C L B R i p - R a p BCL = BRIDGE DECK CENTER LINE POINT BD = BRIDGE DECK CORNER 40.00’EXISTING R/W EXISTING R/W E X I S T I N G R / W E X I S T I N G R / W 40.00’ BIG BRANCH D B 5 6 7 P G 12 6 3 A N D W IF E D E B O R A H T . S IN K J A C O B S C O T T S IN K D B 5 6 7 P G 12 6 3 A N D W IF E D E B O R A H T . S IN K J A C O B S C O T T S IN K S S S U R F A C E W A T E R D E N O T E S I M P A C T S I N T S T S I M P A C T S I N S U R F A C E W A T E R D E N O T E S T E M P O R A R Y REVISIO N S M i c h a e l B a k e r E n g i n e e r i n g , I n c . M i c h a e l B a k e r E n g i n e e r i n g , I n c . N C L i c e n s e : F - 1 0 8 4 C a r y , N C 2 7 5 1 8 S u i t e 6 0 0 8 0 0 0 R e g e n c y P a r k w a y N C L i c e n s e : F - 1 0 8 4 C a r y , N C 2 7 5 1 8 S u i t e 6 0 0 8 0 0 0 R e g e n c y P a r k w a y D B 1 2 - 0 1 0 1 4 9 E L = 9 4 4 . 0 0 S T A . 1 2 + 1 5 L T 2 ’ B A S E D I T C H E N D S T A N D A R D (- ) 5 .118 1% EL = 9 5 0 . 5 0 STA. 1 0 + 9 1 L T 2’ BASE D I T C H BEG STA N D A R D 0 10 1 4 9 - 1 0 1 0 1 4 9 - 1 SEE DETAIL 172 TONS, 193 SY FF, DDE=73 CY STA. 12+15 -L- LTFROM STA. 10+91 TOW/ CLASS B RIP RAPSTANDARD 2’ BASE DITCH EST 35 T O N S CLASS I RIP R A P EST DDE=2 5 C Y INLET CHA N N E L E S T 4 7 T O N S C LA S S I R IP R A P E S T D D E 1 0 5 C Y U P S T R E A M C H A N N E L EST 30 TONSCLASS I RIP RAPEST DDE=21 CY OUTLET CHANNEL F FF F F F F F (NOT TO SCALE)(NOT TO SCALE)CLASS I RIP RAP1.5:1 1.5:11’WESTERNMOST BARREL #3 OUTLET CHANNELEXCAVATE2’ SILL IN BARREL #3 BARREL #22’ SILL IN BARREL #1 NGSTREAMBED BACKFILL BARRELS WITH NATIVE BED MATERIAL. *PLACE SILLS AT INLET AND OUTLET OF CULVERT ONLY. INLET CHANNELCLASS I RIP RAP1.5:1 1.5:11’EXCAVATE33’2’ SILL IN BARREL #3 WESTERNMOST BARREL #3 BARREL #2STREAMBED2’ SILL IN BARREL #1 NG(NOT TO SCALE)1.5:11.5:1VARIES NG FLOODPLAIN BENCHCLASS I RIP RAP BENCH PROPBENCHPROPCLASS II RIP RAP CLASS II RIP RAP EASTERNMOST BARREL #1EASTERNMOSTBARREL #1 P O T S t a . 1 4 + 2 0 . 5 6 -L- STA. 10+05.00 - L - S T A . 1 4 + 1 5 . 0 0 BEGIN CONSTRUCTION BEGIN PROJECT DB12-010149 E N D C O N S T R U C T I O N E N D P R O J E C T D B 1 2 - 0 1 0 1 4 9 3 @ 10’ X 8’BOX CULVERTREINFORCED CONCRETEBEGIN GR A D E EL = 955 . 7 2 -L- STA. 1 0 + 0 5 . 0 0 E L = 9 5 6 . 6 9 - L - S T A . 1 4 + 1 5 . 0 0 E N D G R A D E D S = 3 5 m p h * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * 8 " S P I K E I N 2 4 " M A P L E N 7 6 7 6 8 2 . E 1 3 7 4 9 6 9 . B M # 1 E L E V A T I O N = 9 5 2 . 3 0 ’ * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * LIMITS MILLING +15.00 L I M I T S M I L L I N G +71.28 P I = 1 0 + 9 0 . 0 0 E L = 9 5 3 . 4 8 ’ (-)2.640 0 % ( + ) 0 . 3 0 0 0 % V C = 1 5 0 ’ K = 5 1 P I = 1 3 + 4 0 . 0 0 E L = 9 5 4 . 2 3 ’ ( + ) 0 . 3 0 0 0 % ( + ) 3 . 2 8 0 0 % V C = 1 5 0 ’ K = 5 0 D S = 3 5 m p h +50.80+05.00 9 4 9 . 8 9 5 0 . 5 9 5 1 . 2 9 5 2 . 1 6 9 5 3 . 2 7 9 5 2 . 2 9 5 1 . 0 9 5 0 . 7 9 4 9 . 6 9 5 0 . 4 9 5 1 . 3 9 5 2 . 8 3 2 4 F T . F R O M U S F A C E O F C U L V E R T @ S E C T I O N 1 2 8 2 6 2 4 F T . F R O M U S F A C E O F C U L V E R T @ S E C T I O N 1 2 8 2 6 9 5 2 . 8 3 9 5 3 . 2 7 9 5 2 . 9 3 9 5 2 . 6 9 5 3 . 6 9 5 3 . 9 2 5 y r . 5 0 y r . 1 0 0 y r . F R E Q U E N C Y 1 0 y r . P E R F O R M A N C E T A B L E N C D O T 1 0 0 y r . P E R F O R M A N C E T A B L E F E M A D U P L I C A T E E F F E C T I V E C O R R E C T E D E F F E C T I V E R E V I S E D 5 0 0 y r . N A T U R A L E X I S T I N G P R O P O S E D P R O P T O B S H E E T 2 O F 5 P E R M I T D R A W I N G 941942943 943 944 944 944 944944945 9 4 5 945 945 9 4 5 945 945945946 946 946 9 4 6 9 4 6 946 9 4 6 946946946947 947 947 9 4 7 947 9 4 7 94 7 947947 947948 948 948 9 4 8 948 9 4 8 948 9 4 8 948948 948 949 9 4 9 9 4 9 949 949 9 4 9 949949949949949949 950 9 5 0 950950 9 5 0 950 950 950 950 950 950 950 950 951951951951951 951 9 5 1 9 5 1 951 951 951 951 951 951951 952952952952952952 9 5 2 9 5 2 9 5 2 9 5 2 952 952 952952952 953953953 9 5 3 9 5 3 9 5 3 953 954954 954 9 5 4 954 955955 955 956 956 957 957 ENERGY UNITED E N E R G Y U N IT E D E L E V . = 9 7 4 . 3 4 L O W W I R E G e o t e x t i l e 3 @ 1 0 ’ X 8 ’ B O X C U LV E R T R E IN F O R C E D C O N C R E T E * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * t h a t 9 5 2 . 3 0 ’ i s t h e c o r r e c t e l e v a t i o n o n B M # 1 . c o n t a c t e d D i v 1 1 L & S . i t w a s c o n f i r m e d w i t h t h e m E S P f o u n d t h e e r r o r w h e n v e r i f i y i n g c o n t r o l a n d B M # 1 e l e v a t i o n i n o r i g i n a l F S f i l e w a s i n c o r r e c t . * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * NC GRID NAD 83/2011 10 1 1 1 2 1 3 1 4 10 1 1 1 2 1 3 1 4 930 940 950 960930940950960 5/28/9917-JUL-2014 10:15R:\Hydraulics\PERM ITS_Environm ental\Drawings\01-0149_Hyd_prm _wet_psh_04_contours.dgncaamaya AT CHABW CAM AYA2 H Y D R A U L I C S R O A D W A Y D E S I G N E N G I N E E R E N G I N E E R R / W S H E E T N O . S H E E T N O . P R O J E C T R E F E R E N C E N O . 9 4 0 9 5 0 9 6 0 9 3 0 970 980 9 8 0 9 7 0 2 ’ S I L L I N B A R R E L # 3 2 ’ S I L L I N B A R R E L # 1 T O B E R E M O V E D E X I S T I N G B R I D G E 2 0 0 1 5 0 1 0 0 5 0 C L 5 0 1 0 0 1 5 0 9 6 0 9 5 0 9 4 0 S T R E A M B E D E X I S T I N G B R I D G E T O B E R E M O V E D N G @ C U L V E R T C / L 2.30:1 2. 32: 1 0 .0 19 0 . 0 1 6 S K E W = 1 2 0 3 @ 1 0 X 8 R C B C G R A D E P O I N T E L E V = 9 5 3 . 8 4 C E N T E R L I N E S T A . 1 2 + 1 0 . 0 0 - L - T B R I G H T T B R I G H T T B L E F T T B L E F T P R O P 2 5 Y R = 9 5 0 . 4 ’ P R O P 1 0 0 Y R = 9 5 2 . 8 3 ’ N W S E L = 9 4 4 . 3 ’ S L O P E = 0 . 5 0 % C . L . I N V . E L E V . = 9 4 2 . 4 8 2:1 2:1 D ( N o t t o S c a l e ) S T A N D A R D B A S E D I T C H B d F R O M - L - S T A . 1 0 + 9 1 T O S T A . 1 2 + 1 5 L T D E T A I L 1 B = 2 F t . M a x . d = 1 . 5 F t . M i n . D = 2 F t . G r o u n d N a t u r a l G r o u n d N a t u r a l T y p e o f L i n e r = C L B R i p - R a p BCL = BRIDGE DECK CENTER LINE POINT BD = BRIDGE DECK CORNER 40.00’EXISTING R/W EXISTING R/W E X I S T I N G R / W E X I S T I N G R / W 40.00’ BIG BRANCH D B 5 6 7 P G 12 6 3 A N D W IF E D E B O R A H T . S IN K J A C O B S C O T T S IN K D B 5 6 7 P G 12 6 3 A N D W IF E D E B O R A H T . S IN K J A C O B S C O T T S IN K S S S U R F A C E W A T E R D E N O T E S I M P A C T S I N T S T S I M P A C T S I N S U R F A C E W A T E R D E N O T E S T E M P O R A R Y REVISIO N S M i c h a e l B a k e r E n g i n e e r i n g , I n c . M i c h a e l B a k e r E n g i n e e r i n g , I n c . N C L i c e n s e : F - 1 0 8 4 C a r y , N C 2 7 5 1 8 S u i t e 6 0 0 8 0 0 0 R e g e n c y P a r k w a y N C L i c e n s e : F - 1 0 8 4 C a r y , N C 2 7 5 1 8 S u i t e 6 0 0 8 0 0 0 R e g e n c y P a r k w a y D B 1 2 - 0 1 0 1 4 9 E L = 9 4 4 . 0 0 S T A . 1 2 + 1 5 L T 2 ’ B A S E D I T C H E N D S T A N D A R D (- ) 5 .118 1% EL = 9 5 0 . 5 0 STA. 1 0 + 9 1 L T 2’ BASE D I T C H BEG STA N D A R D 0 10 1 4 9 - 1 0 1 0 1 4 9 - 1 SEE DETAIL 172 TONS, 193 SY FF, DDE=73 CY STA. 12+15 -L- LTFROM STA. 10+91 TOW/ CLASS B RIP RAPSTANDARD 2’ BASE DITCH EST 35 T O N S CLASS I RIP R A P EST DDE=2 5 C Y INLET CHA N N E L E S T 4 7 T O N S C LA S S I R IP R A P E S T D D E 1 0 5 C Y U P S T R E A M C H A N N E L EST 30 TONSCLASS I RIP RAPEST DDE=21 CY OUTLET CHANNEL F FF F F F F F (NOT TO SCALE)(NOT TO SCALE)CLASS I RIP RAP1.5:1 1.5:11’WESTERNMOST BARREL #3 OUTLET CHANNELEXCAVATE2’ SILL IN BARREL #3 BARREL #22’ SILL IN BARREL #1 NGSTREAMBED BACKFILL BARRELS WITH NATIVE BED MATERIAL. *PLACE SILLS AT INLET AND OUTLET OF CULVERT ONLY. INLET CHANNELCLASS I RIP RAP1.5:1 1.5:11’EXCAVATE33’2’ SILL IN BARREL #3 WESTERNMOST BARREL #3 BARREL #2STREAMBED2’ SILL IN BARREL #1 NG(NOT TO SCALE)1.5:11.5:1VARIES NG FLOODPLAIN BENCHCLASS I RIP RAP BENCH PROPBENCHPROPCLASS II RIP RAP CLASS II RIP RAP EASTERNMOST BARREL #1EASTERNMOSTBARREL #1 P O T S t a . 1 4 + 2 0 . 5 6 -L- STA. 10+05.00 - L - S T A . 1 4 + 1 5 . 0 0 BEGIN CONSTRUCTION BEGIN PROJECT DB12-010149 E N D C O N S T R U C T I O N E N D P R O J E C T D B 1 2 - 0 1 0 1 4 9 3 @ 10’ X 8’BOX CULVERTREINFORCED CONCRETEBEGIN GR A D E EL = 955 . 7 2 -L- STA. 1 0 + 0 5 . 0 0 E L = 9 5 6 . 6 9 - L - S T A . 1 4 + 1 5 . 0 0 E N D G R A D E D S = 3 5 m p h * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * 8 " S P I K E I N 2 4 " M A P L E N 7 6 7 6 8 2 . E 1 3 7 4 9 6 9 . B M # 1 E L E V A T I O N = 9 5 2 . 3 0 ’ * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * LIMITS MILLING +15.00 L I M I T S M I L L I N G +71.28 P I = 1 0 + 9 0 . 0 0 E L = 9 5 3 . 4 8 ’ (-)2.640 0 % ( + ) 0 . 3 0 0 0 % V C = 1 5 0 ’ K = 5 1 P I = 1 3 + 4 0 . 0 0 E L = 9 5 4 . 2 3 ’ ( + ) 0 . 3 0 0 0 % ( + ) 3 . 2 8 0 0 % V C = 1 5 0 ’ K = 5 0 D S = 3 5 m p h +50.80+05.00 9 4 9 . 8 9 5 0 . 5 9 5 1 . 2 9 5 2 . 1 6 9 5 3 . 2 7 9 5 2 . 2 9 5 1 . 0 9 5 0 . 7 9 4 9 . 6 9 5 0 . 4 9 5 1 . 3 9 5 2 . 8 3 2 4 F T . F R O M U S F A C E O F C U L V E R T @ S E C T I O N 1 2 8 2 6 2 4 F T . F R O M U S F A C E O F C U L V E R T @ S E C T I O N 1 2 8 2 6 9 5 2 . 8 3 9 5 3 . 2 7 9 5 2 . 9 3 9 5 2 . 6 9 5 3 . 6 9 5 3 . 9 2 5 y r . 5 0 y r . 1 0 0 y r . F R E Q U E N C Y 1 0 y r . P E R F O R M A N C E T A B L E N C D O T 1 0 0 y r . P E R F O R M A N C E T A B L E F E M A D U P L I C A T E E F F E C T I V E C O R R E C T E D E F F E C T I V E R E V I S E D 5 0 0 y r . N A T U R A L E X I S T I N G P R O P O S E D P R O P T O B S H E E T 3 O F 5 P E R M I T D R A W I N G 943 944 9 4 4 944 944 944 945 9 4 5 945 945 9 4 5 945 9 4 5 946 946 946 9 4 6 9 4 6 946 9 4 6 9 46 946 947 947 947 9 4 7 947 9 4 7 9 4 7 9 4 7 9 4 7 947 948 9 48 948 9 4 8 948 9 4 8 948 9 4 8 948 948 9 4 9 9 4 9 9 4 9 949 949 9 4 9 9 4 9 9 4 9 949 9 4 9 9 4 9 9 5 0 9 5 0 9 5 0 950 9 5 0 950 950 950 950 950 950 950 9 5 1 9 5 1 9 5 1 951951 951 9 5 1 9 5 1 951 951 951 951 951 951 951951 952 9 5 2 9 5 2 952 952 9 5 2 9 5 2 9 5 2 9 5 2 952 9 5 2 952 952952952 953 9 5 3 953 9 5 3 9 5 3 9 5 3 953 954954 954 9 5 4 954 955955 955 956 956 957 957 E L E V . = 9 7 4 . 3 4 L O W W I R E NC GRID NAD 83/2011 D O N O T U S E F O R C O N S T R U C T I O N P R E L I M I N A R Y P L A N S I N C O M P L E T E P L A N S D O N O T U S E F O R R / W A C Q U I S I T I O N 5/14/99 S H E E T N O . P R O J E C T R E F E R E N C E N O . H Y D R A U L I C S R O A D W A Y D E S I G N E N G I N E E R E N G I N E E R 17-JUL-2014 10:15R:\Hydraulics\PERM ITS_Environm ental\Drawings\01-0149_hyd_perm it_xsection_X-1.dgncaamaya AT CHABW CAM AYA2 D B 1 2 - 0 1 0 1 4 9 GRAPHIC SCALE 0’20’40’60’20’10 1 1 940 944 948 952EAS T B A N K W E S T B A N K 1011 940 944 948 952 956 1 0 1 1 9 4 0 9 4 4 9 4 8 9 5 2 G R O U N D E X I S T I N G BENCH SECTION UPSTREAM FLOODPLAIN B E N C H S E C T I O N D O W N S T R E A M F L O O D P L A I N G R O U N D P R O P O S E D @ N W S E L W=9 . 5 ’ ( E X I S T ) GROUND PROPOSED R E A C H S E C T I O N UPS T R E A M R E F E R E N C E E A S T B A N K W E S T B A N K R E A C H S E C T I O N R E F E R E N C E D O W N S T R E A M 1 0 1 1 9 4 0 9 4 4 9 4 8 9 5 2 G R O U N D E X I S T I N G @ N W S E L W = 1 1 . 5 ’ ( E X I S T ) BASE FLOW W=10’ @ B A S E F L O W W = 1 0 ’ @ G R A U 3 5 0 T L - 3 G R A U 3 5 0 T L - 3 C A T - 1 G R A U 3 5 0 T L - 3 BCL = BRIDGE DECK CENTER LINE POINT BD = BRIDGE DECK CORNER S R 16 6 4 M I D D L E R D . TO PAUL PAYNE STORE RD. SR 1605 B S T 40.00’EXISTING R/W EXISTING R/W E X I S T I N G R / W E X I S T I N G R / W 40.00’ T O M T . W E S L E Y C H U R C H R D . S R 1 6 3 0 BI G B R A N C H D B 5 6 7 P G 12 6 3 A N D W IF E D E B O R A H T . S IN K J A C O B S C O T T S IN K D B 5 6 7 P G 12 6 3 A N D W IF E D E B O R A H T . S IN K J A C O B S C O T T S IN K E S T 3 5 T O N S C LA S S I R I P R A P E S T D D E = 2 5 C Y I N LE T C H A N N E L E S T 4 7 T O N S C LA S S I R I P R A P E S T D D E 1 0 5 C Y U P S T R E A M C H A N N E L EST 3 0 T O N S CLASS I R I P R A P EST DD E = 2 1 C Y OUTLET C H A N N E L F FF F F F F F 1.5:1 1.5:1 1 . 5 :1 1.5:1 ( 2 4 2 LF F R O M - L- A LO N G T H A LW A G ) U P S T R E A M R E F E R E N C E R E A C H S E C T I O N (4 8 LF F R O M - L- A LO N G T H A LW A G ) T R A N S I T I O N F R O M 1 . 5 : 1 T O 3 : 1 B E G I N W E S T S I D E S LO P E (218 LF FROM -L- ALONG THALWAG)REACH SECTIONDOWNSTREAM REFERENCE L E N G T H O F P R O P O S E D S T R E A M C O N S T R U C T E D = 2 1 5 L F L E N G T H O F E X I S T I N G S T R E A M L O S T = 1 7 L F P R O P T O B S H E E T 4 O F 5 P E R M I T D R A W I N G Ha n d Ex i s t i n g E x i s t i n g Pe r m a n e n t T e m p . E x c a v a t i o n M e c h a n i z e d C l e a r i n g P e r m a n e n t T e m p . C h a n n e l C h a n n e l N a t u r a l Si t e S t a t i o n S t r u c t u r e F i l l I n F i l l I n i n C l e a r i n g i n S W S W I m p a c t s I m p a c t s S t r e a m No . ( F r o m / T o ) S i z e / T y p e W e t l a n d s W e t l a n d s W e t l a n d s i n W e t l a n d s W e t l a n d s i m p a c t s i m p a c t s P e r m a n e n t T e m p . D e s i g n (a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( f t ) ( f t ) ( f t ) 1 -L - 1 2 + 1 0 L T De w a t e r i n g 28 1 -L - 1 2 + 1 0 L T Fl o o d p l a i n Be n c h / S t r e a m b a n k St a b i l i z a t i o n 122 1 -L - 1 2 + 1 0 3 @ 1 0 ' X 8 ' R C B C 46 1 -L - 1 2 + 1 0 R T Fl o o d p l a i n Be n c h / S t r e a m b a n k St a b i l i z a t i o n 60 1 -L - 1 2 + 1 0 R T De w a t e r i n g 10 1 -L - 1 2 + 1 0 Ex i s t i n g v s P r o p o s e d 17 TO T A L S : 24538 PE R M I T D R A W I N G SH E E T 5 O F 5 AT N R e v i s e d 3 / 3 1 / 0 5 SH E E T 5 o f 5 AL E X A N D E R C O U N T Y NC D E P A R T M E N T O F T R A N S P O R T A T I O N DI V I S I O N O F H I G H W A Y S WB S - 1 7 B P . 1 2 . R . 1 0 2 ( D B 1 2 - 0 1 0 1 4 9 ) W E T L A N D P E R M I T I M P A C T S U M M A R Y SU R F A C E W A T E R I M P A C T S WE T L A N D I M P A C T S 7/18/2014 BCL = BRIDGE DECK CENTER LINE POINT BD = BRIDGE DECK CORNER NORTHING: 767705.5355(ft) EASTING: 1374911.4070(ft) THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM "GPS-2" TO -L- STATION IS ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM USED IS NAVD 88 ************************************************* that 952.30’ is the correct elevation on BM#1. contacted Div 11 L&S. it was confirmed with them ESP found the error when verifiying control and BM #1 elevation in original FS file was incorrect. ************************************************* N C G RI D N A D 83/2011 B IG B R A N C H ALEXANDER COUNTY STRUCTURE NO. 149 OVER BIG BRANCH CREEK ON SR 1664 GRADING, DRAINAGE, PAVING, & STRUCTURETYPE OF WORK: LOCATION: GRAPHIC SCALE PLANS PROFILE (HORIZONTAL) PROFILE (VERTICAL) STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET DIVISION OF HIGHWAYS DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA STATE OF NORTH CAROLINA 7 / 2 5 / 2 0 14 12 : 4 0 : 2 4 P M R : \ E r o s i o n C o n t r o l \ 0 1 0 1 4 9 _ E C _ T S H _ 0 1 . d g n U S E R : t o d d . b u c k n e r 015 30 0 0 ROADSIDE ENVIRONMENTAL UNIT PLAN FOR PROPOSED HIGHWAY EROSION CONTROL EROSION AND SEDIMENT CONTROL MEASURES CONSTRUCTION. GRUBBING PHASE OF FOR CLEARING AND EROSION CONTROL PLANS THIS PROJECT CONTAINS Temporary Silt Ditch Temporary Silt Fence Silt Basin Type B TSD Stilling Basin TDTemporary Diversion Temporary Rock Silt Check Type-B Temporary Rock Silt Check Type-A Temporary Rock Sediment Dam Type-A Temporary Rock Sediment Dam Type-B Type A Type B Type C A B C Temporary Silt Fence TSD Std. #Description Symbol Temporary Berms and Slope Drains Rock Inlet Sediment Trap: 1630.03 1630.05 1605.01 1622.01 1633.01 1634.01 1634.02 1635.01 1635.02 1630.04 1632.01 1632.02 1632.03 Rock Pipe Inlet Sediment Trap Type-A Rock Pipe Inlet Sediment Trap Type-B Temporary Rock Sediment Dam Type A Temporary Rock Sediment Dam Type B Temporary Silt Fence Roadway Standard Drawings The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design revison thereto are applicable to this project and by reference hereby are considered a part of these plans. Rock Pipe Inlet Sediment Trap Type A EC-1 1606.01 Special Sediment Control Fence 1634.01 1634.02 1635.01 1605.01 1630.01 Temporary Berms and Slope Drains 1606.01 1622.01 Special Sediment Control Fence Riser Basin T I P P R O J E C T : 1 7 B P . 1 2 . R . 1 0 2 1635.02 Rock Pipe Inlet Sediment Trap Type B 1604.01 Railroad Erosion Control Detail 1607.01 Gravel Construction Entrance Skimmer Basin Tiered Skimmer Basin Infiltration Basin Special Stilling Basin1630.06 Temporary Rock Silt Check Type-A with Matting and Polyacrylamide (PAM) Wattle/Coir Fiber Wattle Wattle/Coir Fiber Wattle with Polyacrylamide (PAM) 1630.02 1633.02 NATURAL RESOURCES DIVISION OF WATER QUALITY. ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE AUGUST 3, 2011 WITH THE REGULATIONS SET FORTH BY THE THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2012 and the latest 1630.05 Temporary Diversion 1630.04 Stilling Basin 1630.03 Temporary Silt Ditch 1630.02 Silt Basin Type B 1630.06 Special Stilling Basin 1631.01 Matting Installation 1632.02 1632.01 Rock Inlet Sediment Trap Type B Rock Inlet Sediment Trap Type A 1632.03 Rock Inlet Sediment Trap Type C 1633.01 1633.02 Temporary Rock Silt Check Type B Temporary Rock Silt Check Type A 1640.01 Coir Fiber Baffle 1645.01 Temporary Stream Crossing DB12-010149 17BP.12.R.102 CONST. C O N T R A C T : C 2 0 3 2 7 5 B IG B R A N C H C R E E K -L- Sta. 11+95.17 BEGIN RCBC -L- Sta. 12+26.67 END RCBC -L- (SR 1627) MARTIN ROAD TO JOHNNY (SR 1605) STORE ROAD TO PAUL PAYNE SR 1664 MIDDLE ROAD -L- POT Sta. 10+05.00 BEGIN CONSTRUCTION BEGIN PROJECT DB12-010149 -L- POT Sta. 14+15.00 END CONSTRUCTION END PROJECT DB12-010149 Prepared in the Office of: 2012 STANDARD SPECIFICATIONS F-1084 Professional Corporation License Number: Cary, NC 27518 8000 Regency Parkway, Suite 600 Michael Baker Engineering, Inc. LEVEL IIIA NAME NCDOT Contact: NCDOT DIVISION 12 LEVEL IIIA CERTIFICATION NO. 345 MANAGEMENT UNIT TRANSPORTATION PROGRAM KAREN MCCAULEY, PE TODD H. BUCKNER, PE DATE: NOVEMBER 25, 2013 CONTROL PLANS EROSION AND SEDIMENTATION SUBMITTAL: D-030 PROP TOB EC-2 FLOW A A *T = 12" MIN., 18" MAX. WIDTH *T PLAN SECTION A-A SECTION B-B B B 2/3 CHANNEL STRUCTURAL STONE SEDIMENT CONTROL STONE 2’ MIN 2’ MIN L=3xH 12" H = 12" MIN MATTING EXCELSIOR MATTING EXCELSIOR CLASS B STONE PAM INSET A See Inset A USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE. TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES. MATTING EXCELSIOR CLASS B STONE HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER NOT TO SCALE TEMPORARY ROCK SILT CHECK TYPE ’A’ WITH EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM) TO BE APPLIED TO EACH ROCK SILT CHECK. MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN NOTES INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM) (4 OZ.) R E V I S I O N S DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-010149 7 / 2 5 / 2 0 14 12 : 4 0 : 2 7 P M R : \ E r o s i o n C o n t r o l \ 0 1 - 0 1 4 9 _ E C _ P S H _ 0 2 . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA SOIL STABILIZATION SUMMARY SHEET 4 SUBTOTAL MISCELLANEOUS MATTING TO BE INSTALLED AS DIRECTED BY THE ENGINEER TOTAL SAY SIDESTATION TO STATION FROM LINESHEET NO. CONST ESTIMATE (SY)STATION TO SIDESTATION FROM LINE SHEET NO. CONST ESTIMATE (SY) MATTING FOR EROSION CONTROL PERMANENT SOIL REINFORCEMENT MAT 4 SUBTOTAL TOTAL SAY ADDITIONAL PSRM TO BE INSTALLED L L 11+20 11+30 12+80 13+00 RT LT 140 175 315 315 315 4 EC-3 R E V I S I O N S Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-010149 7 / 2 5 / 2 0 14 12 : 4 0 : 2 9 P M R : \ E r o s i o n C o n t r o l \ 0 1 - 0 1 4 9 _ E C _ P S H _ 0 3 . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA EC-3A SITE DESCRIPTION STABILIZATION TIME 7 DAYS TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10’ OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. NONE SLOPES 3:1 OR FLATTER 14 DAYS 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50’ IN LENGTH. ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES. SOIL STABILIZATION TIMEFRAMES R E V I S I O N S Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-010149 7 / 2 5 / 2 0 14 12 : 4 0 : 3 1 P M R : \ E r o s i o n C o n t r o l \ 0 1 - 0 1 4 9 _ E C _ P S H _ 0 3 A . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE BCL = BRIDGE DECK CENTER LINE POINT BD = BRIDGE DECK CORNER ************************************************* that 952.30’ is the correct elevation on BM#1. contacted Div 11 L&S. it was confirmed with them ESP found the error when verifiying control and BM #1 elevation in original FS file was incorrect. ************************************************* N C G RI D N A D 83/2011 B IG B R A N C H POT Sta. 14+20.56 -L- STA. 10+05.00 -L- STA. 14+15.00 . 0 2 . 0 1 . 0 0 5 . 0 1 . 0 0 BEGIN CONSTRUCTION BEGIN PROJECT DB12-010149 END CONSTRUCTION END PROJECT DB12-010149 . 0 1 . 0 1 7 3 @ 10’ X 8’ BOX CULVERT REINFORCED CONCRETE GRAU 350 TL-3 GRAU 350 TL-3 CAT-1 . 0 2 GRAU 350 TL-3 . 0 1 . 0 2 . 0 1 . 0 2 . 0 0 -L- STA. 9+00.00 945 9 4 5 9 4 5 945 9 4 5 945 945 950 9 5 0 950 950 9 5 0 950 950 9 5 0 9 5 0 9 5 0 950 9 5 0 9 5 0 955 9 5 5 955 40.00’ RT +50.00 EXIST. R/W 40.00’ LT +75.00 EXIST. R/W +50.00 40.00’ RT +40.00 EXIST. R/W +40.00 55.00’ LT +00.00 20.00’ LT +80.00 F F FF F F F F 9 4 5 9 4 59 4 5 945 945 950 9 5 0 950 9 5 0 9 5 0 40.00’ RT +50.00 EXIST. R/W 40.00’ LT +75.00 EXIST. R/W +50.00 40.00’ RT +40.00 EXIST. R/W +40.00 55.00’ LT +00.00 20.00’ LT +80.00 F F F F 9 4 5 9 4 59 4 5 945 945 950 9 5 0 950 9 5 0 9 5 0 40.00’ RT +50.00 EXIST. R/W 40.00’ LT +75.00 EXIST. R/W +50.00 40.00’ RT +40.00 EXIST. R/W +40.00 55.00’ LT +00.00 20.00’ LT +80.00 F F F F EC. 4/CONST. 4 CLEARING AND GRUBBING PLAN CONSTRUCTION SHEET 4 EROSION CONTROL FOR CLEARING AND GRUBBING STAGE 1:STAGE 2: TB T B TB TB IMPERVIOUS DIKE #1 BARRE L # 1 CLASS ’I’ RIPRAP CLASS ’I’ RIPRAP BA RRE L # 3 BA RRE L # 2 BA RRE L # 1 T B TB TB TB IMPERVIOUS DIKE #2 IMPERVIOUS DIKE #3 BIG BRANCH CREEK CONSTRUCT BARREL #1 AND WINGWALL. BASIN. EFFLUENT WATER USING A SPECIAL STILLING DEWATER CONSTRUCTION AREA AND TREAT BARREL #1. TO DIVERT STREAM FLOW TO THE WEST OF CONSTRUCT TEMPORARY IMPERVIOUS DIKE #1 INSTALL SPECIAL STILLING BASIN. INSTALL SILT FENCE AT TOP OF EXCAVATION LIMITS. REMOVE EXISTING BRIDGE STRUCTURE. CONSTRUCT ROADWAY. CLASS ’I’ RIPRAP. STABILIZE DOWNSTREAM BANKS WITH REMOVE SPECIAL STILLING BASIN AND REMOVE IMPERVIOUS DIKES #2 AND #3. CONSTRUCT BARREL #2 AND #3 AND WINGWALL. BASIN. EFFLUENT WATER USING A SPECIAL STILLING DEWATER CONSTRUCTION AREA AND TREAT INSTALL SPECIAL STILLING BASIN. LIMITS. MAINTAIN SILT FENCE AT TOP OF EXCAVATION BARREL #1. #2 AND #3 AS SHOWN TO DIVERT STREAM INTO STILLING BASIN #1. INSTALL IMPERVIOUS DIKES REMOVE IMPERVIOUS DIKE #1 AND SPECIAL OF EXCAVATION LIMITS (TYP.) PLACE SILT FENCE AT TOP OF EXCAVATION LIMITS (TYP.) PLACE SILT FENCE AT TOP NOTE: PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B DRAINAGE OUTLETS. AND TEMPORARY ROCK SILT CHECKS TYPE - A AT R E V I S I O N S DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-010149 7 / 2 5 / 2 0 14 12 : 4 0 : 3 5 P M R : \ E r o s i o n C o n t r o l \ 0 1 - 0 1 4 9 _ E C _ P S H _ 0 4 . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE BCL = BRIDGE DECK CENTER LINE POINT BD = BRIDGE DECK CORNER ************************************************* that 952.30’ is the correct elevation on BM#1. contacted Div 11 L&S. it was confirmed with them ESP found the error when verifiying control and BM #1 elevation in original FS file was incorrect. ************************************************* N C G RI D N A D 83/2011 B IG B R A N C H POT Sta. 14+20.56 -L- STA. 10+05.00 -L- STA. 14+15.00 1 0 ’ 1 0 ’ 1 0 ’ 1 0 ’ 11+90.95 -L- BEGIN RCBC 12+29.05 -L- END RCBC . 0 2 . 0 1 . 0 0 5 . 0 1 . 0 0 BEGIN CONSTRUCTION BEGIN PROJECT DB12-010149 END CONSTRUCTION END PROJECT DB12-010149 . 0 1 . 0 1 7 3 @ 10’ X 8’ BOX CULVERT REINFORCED CONCRETE GRAU 350 TL-3 GRAU 350 TL-3 CAT-1 . 0 2 GRAU 350 TL-3 . 0 1 . 0 2 . 0 1 . 0 2 . 0 0 -L- STA. 9+00.00 8:1 8:18 : 1 8 : 1 40.00’ RT +50.00 EXIST. R/W 40.00’ LT +75.00 EXIST. R/W +50.00 40.00’ RT +40.00 EXIST. R/W +40.00 55.00’ LT +00.00 20.00’ LT +80.00 F F FF F F F F PROP TOB EC. 5/CONST. 4 EROSION CONTROL FOR FINAL GRADING PLAN R E V I S I O N S DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-010149 7 / 2 5 / 2 0 14 12 : 4 0 : 3 8 P M R : \ E r o s i o n C o n t r o l \ 0 1 - 0 1 4 9 _ E C _ P S H _ 0 5 . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE on Slope as Work Allows. Place Matting for Erosion Control STA. 10+91 TO 12+15 PROPOSED DITCH LINE. EROSION CONTROL IN THE IINSTALL RIPRAP FOR N C G R ID N A D 8 3 / 2 0 11 3@10’X8’ RCBC BARREL #1 BENCH PROP FLOODPLAIN CONDITIONS. BY THE ENGINEER AND MAY BE SUBJECT TO PERMIT ANIMAL PASSAGE. NATIVE MATERIAL IS SUBJECT TO APPROVAL TOP TO FILL VOIDS AND PROVIDE A FLAT SURFACE FOR CULVERT BARREL(S), NATIVE MATERIAL SHOULD BE PLACED ON CULVERT(S). IF RIP RAP IS USED TO LINE THE HIGH FLOW TO SUPPLEMENT THE NATIVE MATERIAL IN THE HIGH FLOW LINE THE LOW FLOW CULVERT BARREL. RIP RAP MAY BE USED IS EXCAVATED FROM THE STREAM BED MAY BE USED TO SITE DURING CULVERT CONSTRUCTION. ONLY MATERIAL THAT FROM THE STREAM BED OR FLOODPLAIN AT THE PROJECT NATIVE MATERIAL CONSISTS OF MATERIAL THAT IS EXCAVATED * NOTE: CLASS I RIP RAP 1. 5 : 1 STREAMBED 1.5 :1 1’ EASTERNMOST BARREL #1 WESTERNMOST BARREL #3 OUTLET CHANNEL (NOT TO SCALE) NG EXCAVATE BARREL #2 2’ SILL IN BARREL #3 2’ SILL IN BARREL #1 BENCH PROP FLOODPLAIN TOB TO B T O B TOB (NOT TO SCALE) SKEWED MULTI-BARREL CULVERT LOW FLOW CHANNEL,SILLS AND FLOOD PLAIN ENGINEER. 5) NUMBER OF SILL/BAFFLES DETERMINED BY THE ABOVE BANK FULL. 4) DO NOT SET ELEVATION OF HIGH SILL/BAFFLES FLOW CHANNEL OF STREAM. (THALWEG) MATCH STREAM BED ELEVATION IN LOW 3) TOP OF LOW FLOW SILLS/BAFFLES SHOULD SEPARATELY AND ATTACHED BY DOWELS. 2) SILLS/BAFFLES ARE TO BE 1.0 FT. WIDE, CAST BE SUBJECT TO PERMIT CONDITIONS. TO APPROVAL BY THE ENGINEER AND MAY PASSAGE. NATIVE MATERIAL IS SUBJECT PROVIDE A FLAT SURFACE FOR ANIMAL PLACED ON TOP TO FILL VOIDS AND BARREL(S), NATIVE MATERIAL SHOULD BE IS USED TO LINE THE HIGH FLOW CULVERT HIGH FLOW CULVERT BARREL(S). IF RIP-RAP SUPPLEMENT THE NATIVE MATERIAL IN THE BARREL. RIP-RAP MAY BE USED TO BE USED TO LINE THE LOW FLOW CULVERT EXCAVATED FROM THE STREAM BED MAY CONSTRUCTION. ONLY MATERIAL THAT IS FLOODPLAIN AT THE PROJECT SITE DURING EXCAVATED FROM THE THE STREAM OR MATERIAL CONSISTS OF MATERIAL THAT IS CONTINUOUS LOW FLOW CHANNEL. NATIVE IN THE CULVERT SHALL PROVIDE A 1) NATIVE MATERIAL BETWEEN SILLS/BAFFLES *NOTES: DETAIL BARREL #3 BARREL #2 INLET CHANNEL (NOT TO SCALE) CLASS I RIP RAP 1. 5 : 1 1.5 :1 1’ WESTERNMOST BARREL #3 EXCAVATE BARREL #2 STREAMBED EASTERNMOST BARREL #1 NG 33’ 2’ SILL IN BARREL #3 2’ SILL IN BARREL #1 BACKFILL BARRELS WITH NATIVE BED MATERIAL. * PLACE SILLS AT INLET AND OUTLET OF CULVERT ONLY. CLASS ’I’ RIP RAP CLASS ’I’ RIP RAP NATURAL BED MATERIAL NO BED MATERIAL REQUIRED CLASS ’I’ RIP RAP NO BED MATERIAL REQUIRED EC-6 PROP. TOB R E V I S I O N S DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-010149 7 / 2 5 / 2 0 14 12 : 4 0 : 4 1 P M R : \ E r o s i o n C o n t r o l \ 0 1 0 1 4 9 _ E C _ P S H _ 0 6 . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE