HomeMy WebLinkAboutCAMA permitI- ofo
Permit Class
NEW
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
t
for
flA'r 12 c 0 ',1
X Ma
j or Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Permit Number
67-11
Issued to N.C. Department of Transportation, 1598 Mail Service Center, Raleigh, NC 27699-1598
Authorizing development in Chowan County at _Queen Anne Creek, Bridge No. 12 on
NC 32 , as requested in the permittee's application dated 1/24/11, including the
attached work -plan drawings (18) as referenced in Condition No. 1 of this permit.
This permit, issued on 5/10/2011 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
TIP N_o._B-4463, Bridge Replacement
1) All work authorized by this permit shall be carried out in accordance with the following attached
workplan drawings (18), except as modified herein: 2 dated 9/20/10. 1 dated 8/25/10; 9 dated
8/24/10; 1 dated 1/26/11; 1 dated 3/29/10; and 4 dated 1/25/11.
2) In order to protect spawning adult and juvenile anadromous fisheries resources in Queen Anne Creek
and its adjacent wetlands, no in -water work shall be conducted between February 15 to June 15 of
any year without prior approval of the N.C. Division of Coastal Management (DCM), in consultation
with the N.C. Wildlife Resources Commission (WRC). For the purposes of this moratorium, in -
water is defined as those areas within Queen Anne Creek and its adjacent wetlands that during
periods of inundation have an active connection to Queen Anne Creek.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
No expiration date, pursuant to GS 136-44.7B
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
.-J'6- vx/,"at LL-
James H. Gregson, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
-pa.rinbaz oq hugs WDC[ woj uoiltzi.Toglnu Ituoilippt `uoilorulsuoo :Utgs pollirp so Rill )f se Bans
`uoiltlltlsui olld jo ad,�I aaglout ozTITIn of osodozd zolaualuoo sIT jo/put oallTuuad oql pinogs -iQw req
Xroltagin t jo asn agl 10/puu'RuTnizp alTd Xq pagsildwooau aq Ilugs solid a2pizq agl jo uoilelltlsui *qj (91
•Aup OuWom Quo uTglTm oouojynaao gota
jo p;)Upou oq lltgs WD(I pu-e `.Kpoq .zaltm a li jo poq agI glim gsnlj jjo Ino aq kom 2uilid agl `f4oillua
sIT ul panourax aq louueo pue Itnouias $utrnp s7a iq 2uilld e Iegl Iuana oql ui Iugl Idooxo ` (10iTlua riagl uY
panouzar aq Iltgs `sa2pt.iq snoTnaJd uz0.z3 s2uilld lututuai but se Ilam st `04liq fuTlsixa agl mog s2uilid G I
-sainpaoozd uoilon4suoo adpTiq
Put' JUAOLU01 o2pliq Ouiznp pamolloj aq llugs (£00Z Isn2ny) ,soil!ATIOV aou-tualuiuIN put u0113rulsu03
zoj saoTlmt d lu3ui02fuutjN Isag„ lu;nunoop S110GON agl `uTaxaq parallt XIieoigloods ssalun (t7I
•uoisiniQ aql uzozj uoTltzrioglnt Ituoilippu Dimbai Xtux poglaui uononrlsuoo aaglo
Xuy •snolop olts jjo ut gllm satfolopoglauz uoiloniisuoa umop dol fuisn palonilsuoo oq llugs a2puq oq_L (£I
.al.els
aql jo slaitm xo spuellom UT IOU put `stoju pueldn uT filuo paleooi aq Ilegs sure Buifels uotlonrlsuoD (61
•sputllam Iuaotfpe
oql jo `3Iaa.zj auuy uaano olut 2utlalua ro uc xalem agl loeluoo of pomollt oq Iou Begs opmoo aniZ (1 I
•ao.anos putldn uu maid pauitlgo aq Ilugs Iviol-em IIII 11 v' (01
-saxlguenb ooesl uY Idaoxa sluelnllod but jo aiq put uealo oq Iltgs Imigitm IIIJ iiTv' (6
-sluilolt a paluiaossu put lltgdsu kempt0l
`a�ippq 2ugsrxa agl jo Ienouzaz agI of saTldde osle uoTlTpuoo sign •pazuoglne Iou st spuullam palela&n
30 szalenn uTglTm Itualtuz IJU do paleneoxa Cue jo 2uTlputq algnop put luomould Xmioduzal oq.L (8
-s.iowm $uipunoirns io sputliom Xut olui spllos
Jo ranoll!ds luanamd of saznloruls guiuielai .raglo ro swilp altnbapt puigaq sputllam papooU 1,ImItit)ni
.ao xIruln�laz 3o prumpuul put lanai ralem Ieturou anogt pauguoo aq Iletls sleyoIrT r poltntoxa II`d (L
-uoYltaol punoiS g2Tg t oil ua7l pue
arts oql uzoij paAou-mi oq llugs io loafoad agl glTm polmossu start IIT3 ut pasn aq Xtui pajtntoxa IeTzaleW (9
-uorleogipour ITuuad
InoglTm `sSuimtrp ueldNiom pagatllu aql uo pol-nipui su seam iIg aql jo luo=filu aql jo optslno sialtm
2utptmo.rms .io sputllam paltla$an Xue ui ;mm Xuu It paoeld aq iiegs iepaltUI iig zo palenuaxa oN (5
uoiWoUlpotu ITuuad InogjIm `palunuoxa aq Ilegs alels oql jo sialem zo sputllam p31u1020n ON (v
•messed gsT3 snotuoapeuV aoj sauTlapTnD
OuissojD uitarlS (s,lpQDN) s,uotltlrodsutiy jo IuourlrtdaQ •D•N oqI luauzaldmi Iltqs aalpuuod aqs (£
SNOI,LIQAI03 rlvNoLLIQQv
S 3o Z a2ud
T T-L9# I!Iulad uoilepodsutad'„Io IuaiuvvdaQ -3-K
N.C. Department of Transportation
ADDITIONAL CONDITIONS
Permit #67-11
Page 3 of 5
17) All materials and debris associated with the removal and/or construction of the existing and/or new
bridge, existing and/or new causeway, other existing structures within the Right -of -Way as authorized
by the permit and associated materials shall not enter wetlands or Waters of the State, even temporarily.
Any such material shall be disposed of at an approved upland site or shall be recycled in an
environmentally appropriate mariner provided appropriate authorizations from any relevant state,
federal, or local authorities are obtained.
NOTE: The bridge demolition debris may be suitable for use as artificial reef material. The permittee is
encouraged to contact the Artificial Reef Coordinator at the DMF Morehead City Office at (252)
726-7021 to coordinate review of the suitability of the material and arrangements for such use.
18) The perrriittee did not propose the use of deck drains in the permit application package. Any future
proposal to utilize deck drains shall require additional authorization from. DCM.
19) The placement of riprap shall be limited to the areas as depicted on the attached workplan drawings.
The riprap material shall be clean and free from loose dirt or any pollutant except in trace quantities.
The riprap material shall consist of clean rock or masonry materials such as, but not limited to, granite,
marl or broken concrete.
Utility Impacts
NOTE: The construction of the new bridge will also require the following: relocation of utility poles for
overhead powerline, telephone and CATV; relocation of the waterline and gas line by directional
bore; and removal of an existing waterline.
20) Any relocation of utility lines that is not specifically depicted on the attached workplan drawings, or
described within the attached permit application, shall require approval from DCM, either under the
authority of this permit, or by the utility company obtaining separate authorization
21) The water line and gas line shall be installed using a horizontal directional bore drilling method. Entry
and exit points of this activity, including disposal of material from the drilling activity, shall be outside
of all wetlands and Waters of the State.
22) There shall be no resultant change in preconstruction bottom contours due to utility line installation.
NOTE: Plans and specifications for the relocation and/or replacement of water mains must be submitted
to the N.C. Division of Environmental Health Public Water Supply Plan Review Section for
approval prior to construction. Final approval must be issued before water lines are placed into
service.
Impacts to Wetlands and Waters of the State and Compensatory Mitization
23) Fill slopes in wetlands shall be 3:1 or steeper.
24) There shall be no clearing of wetlands outside of the areas indicated on the attached workplan drawings
without prior approval from the Division.
-papuoum su `000I' HZ DVDN Vs I oliTl iopun
solnu xaipmurtols oq) pup `8Q0Z `I aagoloo aATTaadJa `I IZ-800Z mB'I uotssas Jo (I)(p)Z uoTToas
ut gpoj Tas su sivauzaxinba.t 2uTllTuuod raiumut-Tois alpTS ruorj papnlaxa sT loofond laafgns agi TpgT
(ZOSOOILA' S) OII9IIL PaluP aaTlal u ui PaurtUuoo (0&Q) Xiileno aaluA� jo uolslnlQ D•N aqj =:4j OR
1UaM;) ;9U191l.1alUesui101s
.Snj- m Juao'efpe ui sluawipos papuadsns
3o Tunomu oip asuarout AlglsiA lou hugs uotlaTulsuoo wog jjouni `/,itlunb taiem loolord oT npzo ul (ZE
«sralu , aoej.Ins Jo uoTToaloxd agi roj sooTloErd Tuauufeu-eW Isog„ molloj Ilegs aaiTTuuad oq_l (l
•sooznosaX puu7
jo uols,A Cf agi gTTm luauraa1�3V jo umpuuToruaW (s,ZO(IaN) s,uopeliodsuu.is jo luatuirudaQ •D.N
agl pup Toy loiluoD uorinllod uoiluluaruipas •0•N agT jo sluauzaimboi Iie of uuojuoo llugs loofoid siq.L (0£
•(-olo `suuaq jo solems uoTszanlp
`aauaj Tits •2•3) sati.Tado.id pun sasxnooraipm `spuullam luoou(pu Taluo lou op spymiem popon jap arnsuo
of paluouialdmi aq Ilpgs sarnlonxls zo sainsuoui `saotnap loaluoo uoTsoaa puu uotTeluouTTpos olupdoiddV (6Z
•sloAol luoigrue sagouaz sui-elino aril utglim Xl!plgjnl
uagm panoura.t ag hugs suTelrno ,�lTpjgxnj oqj . •sueauz aaglo zo uoiiula2aA Xq pozil!quis uaaq suq suielino
,�4TpYgznT aqI Xq pouiuTuoo von, oql jo IIu pun alaldmoo si uotlonrisuoo lilun aalnm atp ui pauiula.r
pup pautBluTuuz ,�Iradord oq hugs suirpno flTplginl oqZ -�Iaaso ouuV mono ssorau puaixa ro uz)xc Isom
aql alauouo Y�Iln3 lou llugs sum mo Xiiplq.Tm oqZ •sjalum luaaufpe ui sluauzipos papuadsns jo lunouzu
agi ut osimoui olgisin u Iuanaad oT ssauanilaaJJa pue gT2ual TuaioTjjns jo oq Ilugs sutulrno iClTpTgmi
oql -*ITS )lzom agi Sulutuluoo saouaj Tlis oip of paga-eTie aq pup silmil uoilonxisuoo aqi Tsud puaixa Ilugs
sutulxno ,iiTpTgsnT agZ -joara oqT jo apis goua uo s luuq aqT of iallexed polTelsui oq hugs surplrno Xjjpigrnl
aqj -aipis oql jo s.Talum zo spuullam oI Tuaopfpu zo uTgllm 2uTI11j io uoilpnuaxo `duzdu jo luouzaould
`Iunouzax pup uoTlpllulsuT olid `ol poliruii XITxess000u lou are Inq `opnlout saTitntiou �uigmisip uzollog
•31a3. D auuy mono oI uotloauuoa aATTau Ue aAeg uoiTppunut jo spouod 2fuianp lugT spuepom luoopfpu
STT pFre auuv uaana ruoxJ suoxe -lton& TIE alelosi of pasn oq hugs saauaj;p& pue suitpno. STip!grn1, (8Z
loalu03 uoisoad pup u01luluauupas
spupipm, luzni-eu Tuaaufpu :) T Jo uoTlunala olmixoidde aqI of
popwJ oq hugs afpuq mou aqI illuoumpun paluneoxa aq of lepoluut Ilij kemosnuo Eutisixo jo stare ou (LZ
•siopduzT puullam ,�rezoduzai azTuziuiru of
satlTnTTau f?uTaealo OuTinp spare puellom uiglTm luoLudTnbo lroddns oT pazTliin aq llugs sleuz uollotulsuoc) {9Z
-paggnA aq lou llegs Ouijualo Xq palaudtut XITmiodmoT aq of scan PuullaAA, (sZ
SNOiiYQuoD ZvuolsiQav
S 3o I, a�ud
IT-L9## Mm"d uoilupodsuuad, jo luamijudaQ -D-M
N.C. Department of Transportation
ADDITIONAL CONDITIONS
General
Permit #67-11
Page 5 of 5
NOTE: The permittee is strongly encouraged to take all precautions to prevent the spreading of Hydrilla
which is found in the basins and canals in the project area. Hydrilla is an invasive species that
will out compete native sub -aquatic vegetation (SAV) species. In order to prevent further
spreading of Hydrilla, the permittee is strongly encouraged to remove all plant fragments from
the construction equipment that has been in contact with Queen Anne Creek and its adjacent
wetlands, as well as rinse the equipment before using it in other locations. For more information,
the permittee should contact the N.C. Division of Marine Fisheries (DMF) at (252) 946-6481 or
the N.C. Division of Water Resources (DWR) at (919) 715-5451.
33) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work following completion of construction activities.
34) During bridge construction, the permittee shall make every attempt to maintain the same navigation that
is currently possible in Queen Anne Creek, upstream and downstream of the existing bridge.
35) The permittee shall exercise all available precautions in the day-to-day operation of the facility to
prevent waste from entering the adjacent waters and wetlands.
36) If it is determined that additional permanent and/or -temporary impacts (such as but not limited to
temporary access roads, detours, or matting to transport equipment across wetlands) are necessary that
are not shown on the attached workplan drawings or described in the authorized permit application, a
permit modification and/or additional authorization from DCM shall be required. In addition, any
changes in the approved plan may also require a permit modification and/or additional authorization
from DCM. The permittee shall contact a representative of DCM prior to commencement of any such
activity for this determination and any permit modification.
37) Development authorized by this permit shall only be conducted on lands owned by the NCDOT and/or
its Right -of -Ways and/or easements.
38) The permittee and/or his contractor shall contact the DCM Transportation Field Representative in
Morehead City at (252) 264-3901 to request a preconstraction conference prior to project initiation.
39) The N.C. Division of Water Quality (DWQ) authorized the proposed project on 1/31/11 (DWQ Project
No. 110100) under General Water Quality Certification No. 3701. Any violation of the Certification
approved by DWQ shall be considered a violation of this CAMA permit.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project under Nationwide Permit
Number 23 (COE Action ID No. SAW-2005-11635), which was issued on 2/25/11.
NOTE: This permit does not eliminate the need to obtain any additional permits, approvals or
authorizations that may be required.