STATE OF NORTH CAROLINA
DEPARTN�NT OF 1'RANSPORTATION
PA7' L. MCCRORY
GOVERNOR
July 23, 201A
Mr. Steven Kichefski
Asheville Regulatory Field Office
US Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, North Carolina 28801-5006
ANTHONY J. TATA
SECRHTARY
SUBJECT: Bridge #255 Replacement, SR 1207 (Wood Road), Cleveland County
Dear Mr. Kichefski:
The North Carolina Department of Transportation requests authorization To replace a
deteriorating bridge on SR 1207 (Wood Road) in Cleveland County. NCDOT proposes to
replace the existing triple span, 18 foot wide bridge with a 52-foot long, double 8 foot x 8 foot
box culvert. Inlet and outlet riprap-faced floodplain benches (�60 feet) will be constructed to
maintain `naturaP channel dimensions upstream and downstream of the proposed culvert. Coir
fiber matting will be utilized to stabilize the benches. A total of 108 feet of an adjacent side
tributary must relocated due to the culvert conshuction. The constructed channel will tie inTo the
main channel at the end of the upstream bench. The slope of the side tributary is on a�5.6%
slope; therefore, the entire length of the channel will be riprapped. The riprap will be embedded
into the new channel (see detail2 on plan sheets) so as not to impede aquatic passage.
A temporary diversion channel will be used to manage the stream flow stream around the
construction site. Any areas affected by the temporary diversion will be restored To pre-project
conditions.
The total scope of the work will result in 160 feet of permanent impacts to two unnamed
tributaries to Ashworth Creek, which is classified as Class C waters by the N.C. Division of
Water Resources.
The projecY is not located within'/z mile of any critical watershed azea nor is SR 1207 a rural or
urban arterial; therefore, hazardous spill basins are not required. Enclosed is the hazardous spill
basin checklist. The proposed project has been submitted/cleared by the cultural resources office.
(Project Tracking # ll-10-0017). This office has conducted a threatened/endangered species
survey within the project footprint. The federally listed species for Cleveland County (USFWS
Listed date September 22, 2010) include dwarf-flowered heartleaf (Hexastylls nan�ora).
National Heritage Program records document the nearest hearkleaf location 3.4 miles northwest of
the proposed project area. The hearCleaf is usually found on dry to moist ravine slopes
(usually north facing and of the oak-hickory-pine forest type) and in boggy areas near
springheads. There is no suitable habitat in the proposed project area and no heartleaf
species were observed within the project footprint. No unpact on this species is
anticipated.
Bridge #255, SR 1207, Wood Road
Page 2
July 23, 2014
I have enclosed a pre-construclion notification for a NW#lA, sketches of planned activities and
location maps relative to the project.
Project information for fhe 401 Automated Payment Procedure is as follows:
• Work order number: 150455-55120005-17BP12.R.102-3372
• TIP#: NA
• Project Category: $240.00 Fee
If you have any questions or concerns please feel free to contact me at (704) 480-9044. Thank
you for your time and consideration on this matter.
Respectfully yours,
Reuben Chandler, P.E.
Division Engineer
Twelfth Division
BY: �°f��� �'E`C.d-1-�.
C
Trish Beun
Division 12 EnvironmenYal Supervisor
EnclosUres
o�>"� ��F9QG
�i, ;v
n+ 'r
O4-:•�z�*'"'ry,.�� T
�.��
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2005
Pre-Construction Notification PC Form
A. A licant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps: � Section 404 Permit ❑ Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
� 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
❑ Yes � No ❑ Yes � No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes ❑ No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concem (AEC)? ❑ Yes � No
2. Project Information
2a. Name of project: Bridge #255 Replacement, SR 1206 (Wood Road)
2b. County: Cleveland
2c. Nearest municipality / town: Mooresboro
2d. Subdivision name: NA
2e. NCDOT only, T.I.P. or state 17BP.12.R.102
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: NCDOT Right of Way
3b. Deed Book and Page No.
3c. Responsible Party (for LLC i f
applicable):
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no.:
3h. Email address:
Page 1 of 11
PCN Form — Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ❑ Agent ❑ Other, specify:
4b. Name: Reuben Chandler
4c. Busines s name N.C. Department of Transportation, Division 12
(if applicable):
4d. Street address: 1710 East Marion Street
4e. City, state, zip: Shelby, NC 28151
4f. Telephone no.: 704-480-9020
4g. Fax �o.: 704-480-5401
4h. Email address: rchandler@ncdot.gov
5. AgentlConsultant Information (if applicable)
Sa. Name: Trish Beam
5b. Business name N.C. Department of Transportation, Division 12
(if applicable):
5c. Street address: 1710 East Marion Street
5d. City, state, zip: Shelby, NC 28151
Se. Telephone no.: 704-480-9044
Sf. Fax no.: 704-480-5401
Sg. Email address: pdbeam@ncdot.gov
Page 2 of 11
PCN Form — Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): NA
Latitude:35.190375 Longitude: -
1 b. Site coordinates (in decimal degrees): 81.747001
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: 0.10 acres
2. Surtace Waters
2a. Name of nearest body of water (stream, river, etc.) to UT to Ashworth Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: C
2c. River basin: Cleveland
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Site is Iocated on a paved secondary road. Landuse designation is vicinity of project is forested.
3b. List the total estimated acreage of all existing wetlands on the property:
0
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
250
3d. Explain the purpose of the proposed project:
The purpose of the proposed work is to replace a deteriorating bridge for the safety of the travelling public.
3e. Describe the overall project in detail, including the type of equipment to be used:
NCDOT proposes to replace the existing timber tleck bridge with a 52 foot long, double 8' x 8' box culvert. Inlet and outlet
floodplain benches will be constructed to maintain channel dimensions. Due to the culvert construction, 108 feet of an
adjacent tributary will be relocated . A temporary diversion channel will be used to manage the stream flow around the
construction site. Any areas affected by temporary diversion will be restored to pre-project conditions. Ail Best
Management Practices will be utilized during the course of the project. The Project will be constructed using typical
heavy equipment (trackhoe, backhoe, etc.)
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past? ❑ Yes � No ❑ Unknown
Comments: Jurisdictional stream determination made by
Division 12 DEO.
4b. If the Corps made the jurisdictional determination, what type � preliminary 0 Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): Other:
4d. If yes, list the dates of the Corps jurisdictional determinatio�s or State determinations and attach documentation.
5. Project History
Sa. Have permits or certifications been requested or obtained for � yes � No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructio�s.
Page 3 of 11
nn�i c...... �i,....:..., a o n.___....�._. en nnno �i,,..,:....
6. Future Project Plans
6a. Is this a phased project? ❑ Yes � No
6b. If yes, explain.
Page 4 of 11
PCN Form — Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands � Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type ofjurisdiction
number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non-404, other) (acres)
Tem orar T
W1 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
WZ � P� T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W3 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W4 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
WS ❑ P � T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W6 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Total weUand impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type ofjurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ — non-404, width (linear
Temporary (� (INT)? other) (feet) feet)
S1 � P❑ T Culvert UT to Ashworth � PER � Corps � 5 "52
Creek ❑ INT � DWQ
InIeUOutlet Riprap UT to Ashworth � PER � Corps
S2 � P❑ T faced Floodplain Creek ❑ INT � DWQ � 5 "60
benches
Stream relocation Z�tl UT to ❑ PER � Corps
S3 � P❑ T of adjacent Ashworth Creek � INT � DWQ 2 �108
tributary
Bypass pumping UT to Ashworth � PER � Corps
S4 ❑ P� T for culvert Creek ❑ INT � DWQ � 5 31
construction
S5 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S6 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
3h Total stream and tributary impacts "220
3i. Comments: ` Permanent Impacts: New culvert length = 52 ft. InIeUOutlet riprap faced floodplain benches = 60 ft; 108 feet
side tributary relocation. NOTE: 160 feet of "mitigatable impacts".
Page 5 of 11
PCN Form — Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number — (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Tem orar T
01 ❑P❑T
02 ❑P�T
03 ❑P�T
04 ❑P❑T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If ond or lake construction ro osed, then com lete the chart below.
5a. Sb. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
SE Total
Sg. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
Sj. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require miti ation, then ou MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number— Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Tem ora T im act re uired?
B1 ❑P❑T ❑Yes
❑ No
B2 ❑P❑T ❑Yes
❑ No
63 ❑ P ❑ T ❑ Yes
❑ No
6h. Total buffer impacts
6i. Comments:
Page 6 of 11
PCN Form — Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Floodplain benches constructed to maintain'natural' channel dimensions and stabilized with coir fiber matting. Stream
relocation of adjacent side channel - the 5.5% slope new channel construction to embed riprap in bottom of channel to
maintain channel stability and to prevent impedence of aquatic passage.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for � Yes ❑ No
impacts to Waters of the U.S. or Waters of the State?
2b. Ifyes, mitigation is required by (check aIl that apply): ❑ DWQ � Corps
❑ Mitigation bank
2c. If yes, which mitigat ion option will be used for this
project? � Payment to in-lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ❑ Yes
4b. Stream mitigation requested: 76 linearfeet
4c. If using stream mitigation, stream temperature: � warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments: Mitigation required shall be provided in accordance with the procedures detailed in the USACE letter dated
September 1, 2004, from Mr. Ken Jolly to Dr. Gregory J. Thorpe. Attached is a copy of the EEP mitigation acceptance letter
for culvert construction and the stream relocation impacts.
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 7 of 11
PCN Form — Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multipiier Required mitigation
(square feet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 8 of 11
PCN Form — Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified � yes � No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
Comments: ❑ Yes ❑ No
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? NA %
2b. Does this project require a Stormwater Management Plan? ❑ Yes � No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
Complies with NCDOT's individual NPDES permit NCS000250.
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program
� DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? NA
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs � NSW
apply (check all that apply): ❑ USMP
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No
attached?
4. DWQ Stormwater Pro ram Review
❑ Coastal counties
❑ HQW
4a. Which of the following state-implemented stormwater management programs apply � ORW
(check all that apply): ❑ Session Law 2006-246
❑ Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ❑ Yes ❑ No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No
Page 9 of 11
PCN Form — Version 1.3 December 10. 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No
use of public (federal/state) land?
1 b. If you answered "yes° to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ❑ Yes � No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ❑ Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
The project is a minimum criteria project which has low potential for cumulative/indirect impacts and will not result in
additional development which could impact water quality.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
No sewage generated from project.
Page 10 of 11
PCN Form — Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or � yes � No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act � yes � No
impacts?
❑ Raleigh
5c. If yes, ind icate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
NC Natural Heritage Program database and onsite survey.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
No salt marshes, oyster reefs, or seagrass beds in the vicinity of the project.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation � Yes � No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
Cultural Resources review/clearance pnternal tracking #11-10-0017).
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No
8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics coordination with FEMA
8c. What source(s) did you use to make the floodplain determination? FEMA FIRM panel number: 3710157300K
,
;K � l- . � h��r�t,. � % i�, l� a (�''���F�. rJd, 7_:�� —i �/
, ,
� y -Pr-
ApplicanUAgenYs Printed Name Applicant/AgenYs Signature Date
(Agenfs signature is valid onty if an authorization letter from the applicant
is rovided.
Page I1 of 11
PCN Form — Version 1.3 December 10, 2008 Version
! "*� � ' 1 ^�� �� �i �" �- z,�.� ,� ti , . v
r y
� � f Y C�. � l�' ,. i -S � i'
T� l f�
. . . .. !p �' ��� i x� ✓ . §4�. � . �� ..
'`,.,: 5} w �z —�3z�€""� •°v. � ',V 'i � � }' �' } � �
P t .� �F .: 1Y �."^� .�� 1J. A. A i Y
F �� ::� 1
��" ��- � R :
?Gutr� ;-.: z
�`_
� . � r,
! .
��'� � ` - � � , � " � t�,.
, � � �
s ,- �� � . �- �� � �- �� �
7 % �-� r � ',:�?� �, '" r ,-,, " � -=? �
Y
�" ',*' ( � �`s ` s ' �s s ; ,• ti �:
�
'i"'�-°--:.� � _ � `?` S �, �4 '`�,,�`'
� � ..
��� �R�-� `' ,,; x�.j �, ±�,; � , �4 .
��„*'r-�. �..`k jjj` `_ r�«�, ct # �z�t . `� t -' ..
i, > (' '�/ $ Y : :. . :t'3 '.
� 'j "� f P� q, �' . : � ?�"-�a,1 � "�. � � ��. _'.
� -�;�� _f- . �, 4 ? ° �` �� r ' .�✓ ,= � h
�� � �� ����.:�.,
';� `� ' ; � '-� � �, � ,�'t ','
; ,� v�v'
°'� �� � i `'?` � � 1 , '`� . ` � , '� �'� �
���� ��`� ' ' `'' ' `°`"_ � �� e : ProjectSite
��" � � � � ����� o � � „ � . � � 4 Lat 36.190441 Long: -81.747027 r�'' �°
�' t' N� ( { �,!".s � �t ( °"�-t` �' r �
i T � � f� • f%'"� i �i � ;, ''�., 4�
e�-k � ".,�, � t � ' v � r -� , , �" rt
�1 � • � � r". 1 � � � ' r .� ,/ % . .� :.
� � , c r r �`., ��,} �,,,m� t , .
� ��[ � 'O`� � � a .—: i' .._, ,.....�.....;-... _. .-..: A ,� £'" -""t .,�� ' i`.
�;� � j V�� � ..,� � L ._ � � � � � � s.� � ,�°� � ':_.
� A�
�e 4 4�'rp '".= "' � _ �,,f 3 � _
O� i �{°� ' � y � v �, `v.
� k _ . ., �ru . � � .
� >
'.�f` � f I � � �y , 1
4! �3, 4� i ({ ,-,F' � '�{' �tnt ' hy.,_ :
`f 4
��uF �,� s� �. 6 �� I � r K ��� 4
. . i. "� }� , E / ' � ti m . � . j..- „,'�
�' ;� ��� � 3 ,��` � �. ,$ �� wF
! ' •
�i �� � � ,_,,,e�
CCA � ---
CHER�O1f�E rt�`�. `f :-� ,— _' .. �,:,_„_t�LEI`CC.Atib_�C(3 .: ' '` ` ,°,� .
�� f
y � L 1 - , � ,X � ,ry - �Riul�f�-�E,E rq ` t"-=— +,.....�, -
) r :'s . � I .1�i �� "1 ` ' ( ;`._"
i J
.�;� � ��:,� I E �: � ��.� �..�,� .
: �'
�� � � r � � � � .. �
kS v
�...�'� lil, n �. i � � � .kie �' I .. r--. A �
;
� � �" t��,— ,�, ��t�
r � -
s��� � s �� �J � .--, ``�,
v
a� `•� �1 �� -' � � �. \
� �; �� • , ' I -� i, . `� � ' �' . ' ' � �,� �
� ��_;,- � t ` �� � s
a „� � .�. '' c-`:,�! _�
.
� ,. .
:
�
� , l r— � �s� � °�� v�.. � � . � �� c,, � ��
� ` ��
� � � �.�,� �;`�-��" "' ,, � -� .� �
�; � . �
�,`�"" . +-� „ �,�y ` : "" ' �.,�,�, � � Copyqghi0,2013 National �eographic Soaety, i cwtied
_ - .-.�
Le end
g � �� North Carolina Department of Transportation
''�' Division of Highways
� Project Site Location \�:_-.�s�'
CLEVELAND COUNTY
O 1,000 2,000 N
� Feet 1�� = 2,000 � � PROJECT WBS ELEMENT: 176P.12.R.102
STRUCTURE NO. 255 ON SR 7207
USGS Topographic Quadrangle: Boiling Springs South OVER ASHWORTH CREEK TRIBUTARY 5
� 11� ) ./r_..�I� Il�i � ��.��( I ,I l (_ A ir ' illi."i L ,f��i � I�4� ,i i'' �� „_
�� �lili �,rory � �h6� I ��I:01`�, L`uectOr
�aCNeYtl01 Lt i��t�iTi I�111G'tTi ll I it���ffllll
July 17, 2014
Ms. Trish Beam
Divisiou 12 Enviionme�tal Supervisor
North Carolina Department of Transportation
Post Office Box 47
Shelby, North Carolina 28151-0047
Dear Ms. Beam:
Subject: EEP Mitigation Acceptance Letter:
Jui�� � ; ,;d� ��, ili
r�ta;,;
Replace Bridge 255 on SR 1207 (Wood Road) over an UT to Asl�worth Creek, Clevelaud
County; WBS numUer 17BP.12R.102
'Il�e puipose of this letter is to tlotify you that the Ecosystem E�il�ancement Program (EEP) will provide die
compensatory stream mitigation for the subject project. Based on the information supplied by you ou July 15, 2014, the
impacts are located in CU 03050105 of the Broad River basin in the Sonthern Piedmont (SP) Eco-Region, and are as
follows:
Broad
03050105
SP
linpacts (feedacres)
Stream
Cold Cool
s'tream impacts may be proposed to
Wetlands
Wann Ri arian Non-
P� o:..,...,..
160.0
Buffer (Sq. Ft.)
Marsh I Zone 1 I Zone 2
at a mttigation ratio Iess than 2:1. See perinit applicetion ti�r deWils.
This impact and associated mitigation need were under projeeted by the NCDOT in the 2014 impact data. EEP
will commit to implement suffiicient compensatory stream mitigation credits to offset the impacts associaCed wifli this
project as detennined by the regulatory agencies using the delivery timeline listed in Section F3.c.iii of tl�e N.G.
Department of Emironment and Natural Reeources' Ecosystem Enhancemeut Program in-Lieu Fee Instrument dated
July 28, 2010. If fl�e above refereilced impact amow�CS are revised, then this mitigation acceptance letter will no longer
be valid az2d a new mitigarion acceptance letter will be required from EEP.
If you have any questions or need additional information, please contact Beth Harnion at 919-707-8420.
Sincerely,
-`yt g
` '� � ,��Una, e�,�� :#
.�,frvr ...€�. �..�
s
James�8. �6tanfi1l
EEP Asset Management Supervisor
ce: Mc Steve Kiehefslci, USACE—Asl�eville Regulatory Field Office
Mr. Alan 7olv�son, Division of Water Quality, Mooresville Office
Ms. Linda Fitzpatrick, NCDOT—PDEA
File: SR 1207 —Bridge 255 —Division l2
� , � �... . . .� ,. ,.. � _..
�,
r' icr;c. i ,r �g , ._ ,. � i �i r
NCDOT
IIAZARDOUS SPILL BASIN CHECKLIST
Division: 1 � County: C`1P�elanrl Project ID: 17BP.12.R.102
River Basin: Broad Bridge No: NA
Route: SR 1865
Water Quality Criteria:
Stream: UT to Ashworth Creek
Yes No
Stream Crossing Blue Line On USGS
ORW
WSI
WS II,III OR IV, Crossing Within O.Smi of W.S. Critical Area
Roadway Criteria:
Route Designation-
Arterial Urban
Arterial Rural
Additional Site Information:
Is a Hazardous Spill Basin Required?
Yes No
�` �
� �
Yes No
� �
Criteria Based Upon NCDOT `Best Management Practices for the
Protect�qn pf Surface Waters" (March, 1997).
2 @ 8’ X 8’
BOX CULVERT
REINFORCED CONCRETE
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
LOCATION:
4
-L-
CLEVELAND COUNTY
17BP.12.R.102 PE, R/W, UTLITY & CONST.
SR 1207
WOOD RD.
ON SR 1207
STRUCTURE NO. 255 OVER ASHWORTH CREEK TRIBUTARY 5
Prepared in the Office of:
2012 STANDARD SPECIFICATIONS
F-1084
Professional Corporation License Number:
Cary, NC 27518
8000 Regency Parkway, Suite 600
Michael Baker Engineering, Inc.
LEVEL IIIA NAME
NCDOT Contact:
NCDOT DIVISION 12
LEVEL IIIA CERTIFICATION NO.
345
MANAGEMENT UNIT
TRANSPORTATION PROGRAM
KAREN MCCAULEY, PE
TODD H. BUCKNER, PE
GRAPHIC SCALE
PLANS
PROFILE (HORIZONTAL)
PROFILE (VERTICAL)
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
DIVISION OF HIGHWAYS
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
STATE OF NORTH CAROLINA
7
/
2
3
/
2
0
14
3
:
3
4
:
12
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
T
S
H
_
0
1
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
030 60
030 60
06 12
ROADSIDE ENVIRONMENTAL UNIT
PLAN FOR PROPOSED
HIGHWAY EROSION CONTROL
EROSION AND SEDIMENT CONTROL MEASURES
CONSTRUCTION.
GRUBBING PHASE OF
FOR CLEARING AND
EROSION CONTROL PLANS
THIS PROJECT CONTAINS
Temporary Silt Ditch
Temporary Silt Fence
Silt Basin Type B
Stilling Basin
TDTemporary Diversion
Temporary Rock Silt Check Type-B
Temporary Rock Silt Check Type-A
Temporary Rock Sediment Dam Type-A
Temporary Rock Sediment Dam Type-B
Type A
Type B
Type C
A
B
C
Temporary Silt Fence
TSD
Std. #Description Symbol
Temporary Berms and Slope Drains
Rock Inlet Sediment Trap:
1630.03
1630.05
1605.01
1622.01
1633.01
1634.01
1634.02
1635.01
1635.02
1630.04
1632.01
1632.02
1632.03
Rock Pipe Inlet Sediment Trap Type-A
Rock Pipe Inlet Sediment Trap Type-B
Temporary Rock Sediment Dam Type A
Temporary Rock Sediment Dam Type B
Temporary Silt Fence
Roadway Standard Drawings
The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design
revison thereto are applicable to this project and by reference hereby are considered a part of
these plans.
Rock Pipe Inlet Sediment Trap Type A
EC-1
1606.01 Special Sediment Control Fence
1634.01
1634.02
1635.01
1605.01
1630.01
Temporary Berms and Slope Drains
1606.01
1622.01
Special Sediment Control Fence
Riser Basin
T
I
P
P
R
O
J
E
C
T
:
1
7
B
P
.
1
2
.
R
.
1
0
2 DB12-220255
1635.02 Rock Pipe Inlet Sediment Trap Type B
1604.01 Railroad Erosion Control Detail
1607.01 Gravel Construction Entrance
Skimmer Basin
Tiered Skimmer Basin
Infiltration Basin
Special Stilling Basin1630.06
Temporary Rock Silt Check Type-A with
Matting and Polyacrylamide (PAM)
Wattle/Coir Fiber Wattle
Wattle/Coir Fiber Wattle
with Polyacrylamide (PAM)
1630.02
1633.02
NATURAL RESOURCES DIVISION OF WATER QUALITY.
ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND
NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE AUGUST 3, 2011
WITH THE REGULATIONS SET FORTH BY THE
THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY
Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2012 and the latest
1630.05 Temporary Diversion
1630.04 Stilling Basin
1630.03 Temporary Silt Ditch
1630.02 Silt Basin Type B
1630.06 Special Stilling Basin
1631.01 Matting Installation
1632.02
1632.01
Rock Inlet Sediment Trap Type B
Rock Inlet Sediment Trap Type A
1632.03 Rock Inlet Sediment Trap Type C
1633.01
1633.02 Temporary Rock Silt Check Type B
Temporary Rock Silt Check Type A
1640.01 Coir Fiber Baffle
1645.01 Temporary Stream Crossing
EW
CFW
-L- PC Sta. 10+00.00
BEGIN CONSTRUCTION
BEGIN PROJECT DB12- 220255
-L- POT Sta. 14+85.00
END CONSTRUCTION
END PROJECT DB12- 220255
TYPE OF WORK:GRADING, DRAINAGE, PAVING, & STRUCTURE
N C G R ID
N A D 83/N S R S 2007
EC-2
FLOW
A A
*T = 12" MIN., 18" MAX.
WIDTH
*T
PLAN
SECTION A-A
SECTION B-B
B
B
2/3 CHANNEL
STRUCTURAL STONE
SEDIMENT CONTROL STONE
2’ MIN
2’ MIN
L=3xH
12"
H = 12" MIN
MATTING
EXCELSIOR
MATTING
EXCELSIOR
CLASS B STONE
PAM
INSET A
See Inset A
USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR
MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE.
TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL
EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES.
MATTING
EXCELSIOR
CLASS B STONE
NOT TO SCALE
TEMPORARY ROCK SILT CHECK TYPE ’A’ WITH
EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM)
TO BE APPLIED TO EACH ROCK SILT CHECK.
MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT
A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE
PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN
NOTES
INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM)
(4 OZ.)
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
4
:
15
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
2
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
EC-3
4
SUBTOTAL
MISCELLANEOUS MATTING TO BE INSTALLED AS DIRECTED BY THE ENGINEER
TOTAL
SAY
SIDESTATION
TO
STATION
FROM
LINESHEET NO.
CONST
ESTIMATE (SY)STATION
TO
SIDESTATION
FROM
LINE
SHEET NO.
CONST
ESTIMATE (SY)
PERMANENT SOIL REINFORCEMENT MAT
4
SUBTOTAL
TOTAL
SAY
ADDITIONAL PSRM TO BE INSTALLED
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
SOIL STABILIZATION SUMMARY SHEET
MATTING FOR EROSION CONTROL
L 11+00 13+05 RT 135
185LT13+5011+25L4
320
320
320
R
E
V
I
S
I
O
N
S
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
4
:
17
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
3
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
SITE DESCRIPTION
SOIL STABILIZATION TIMEFRAMES
STABILIZATION TIME
7 DAYS
TIMEFRAME EXCEPTIONS
PERIMETER DIKES, SWALES, DITCHES AND SLOPES
HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE
SLOPES STEEPER THAN 3:1 7 DAYS
IF SLOPES ARE 10’ OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED.
NONE
SLOPES 3:1 OR FLATTER 14 DAYS
14 DAYS
7 DAYS FOR SLOPES GREATER THAN 50’ IN
LENGTH.
ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES.
EC-3A
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
4
:
19
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
3
A
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
BRIDGE #255
WW(TYP.)
WOOD
N C G R ID
N A D 83/N S R S 2007
A/G
A
S
H
W
O
R
T
H
C
R
K
T
5
P
O
T
S
t
a
. 14
+
9
8
.
8
0
GRAU 350 TL-3 CAT-1
GRAU 350 TL-3
-L- PC STA 10+00.00
-L- POT STA 14+85.00
BEGIN CONSTRUCTION
BEGIN PROJECT DB12-220255
END CONSTRUCTION
END PROJECT DB12-220255
PT Sta. 11+90.68
GRAU 350 TL-3
EXIST. R/W
54.00’ RT
+11.50
EXIST.
45.00’ LT
+75.00
EXIST.
35.00’ LT
+40.00220255-1
220255-2220255-1
EXIST. R/W
45.00’ RT
+67.50
F
F
F
F
7
7
0
7
7
0
770
7
7
0
7
7
0
770
7
7
5
775
7
7
5
7
7
5
7
7
5
7
7
5
775
775
780
780
780
7
8
0
780
785
785
7
8
5
7
9
0
795
7
9
5
7
7
0
770
7
7
0
7
7
0
7
7
5
775
7
7
5
7
7
5
775
775
7
7
0
770
7
7
0
7
7
0
7
7
5
775
7
7
5
7
7
5
775
775
EC. 4/CONST. 4CLEARING AND GRUBBING PLAN
CONSTRUCTION SHEET 4
EROSION CONTROL FOR
CLEARING AND GRUBBING
STAGE 1:STAGE 2:
CLASS ’I’ RIPRAP
CLASS ’I’ RIPRAP
OF EXCAVATION LIMITS (TYP.)
PLACE SILT FENCE AT TOP
B
A
R
R
E
L
#
2
B
A
R
R
E
L
#
2
B
A
R
R
E
L
#
1
ASHWORTH CREEK TRIB. 5
TEMPORARY CHANNEL
CHANGE WITH LINER
CHANNEL (TYP.)
AT TOP OF TEMP.
PLACE SILT FENCE
DIKE #1
IMPERVIOUS
DIKE #2
IMPERVIOUS
B
A
R
R
E
L
#
1
CONSTRUCT ROADWAY.
REMOVE SPECIAL STILLING BASIN.
LIMITS.
MAINTAIN SILT FENCE AT TOP OF EXCAVATION
DIVERT FLOW TO CULVERT.
REMOVE IMPERVIOUS DIKE #1 AND #2 AND
WITH CLASS ’I’ RIPRAP.
CONSTRUCT CULVERT AND STABILIZE BANKS
BASIN.
EFFLUENT WATER USING A SPECIAL STILLING
DEWATER CONSTRUCTION AREA AND TREAT
WATER TO TEMPORARY CHANNEL.
INSTALL IMPERVIOUS DIKES #1 & #2 AND DIVERT
2’ DEEP WITH 2:1 SIDESLOPES.
CONSTRUCT TEMPORARY 3’ BASE CHANNEL,
INSTALL SPECIAL STILLING BASIN.
INSTALL SILT FENCE AT TOP OF EXCAVATION LIMITS.
REMOVE EXISTING BRIDGE STRUCTURE.
NOTE:
PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B
DRAINAGE OUTLETS.
AND TEMPORARY ROCK SILT CHECKS TYPE - A AT
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
4
:
2
3
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
4
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
770
7
7
0
775
775
7
7
5
7
7
5
775
770
7
7
0
775
775
7
7
5
7
7
5
775
STAGE 1:STAGE 2:
UNNAMED ASHWORTH CREEK TRIB.
DIKE
IMPERVIOUS DIKE
IMPERVIOUS
STABILIZE CHANNEL WITH COIR FIBER MATTING.
BASIN AS NEEDED.
EFFLUENT WATER USING A SPECIAL STILLING
DEWATER CONSTRUCTION AREA AND TREAT
CONSTRUCT 2’ BASE CHANNEL.
INSTALL IMPERVIOUS DIKES.
INSTALL SPECIAL STILLING BASIN AS NEEDED.
GRUBBING PHASE.
ACCORDING TO THE CLEARING AND
INSTALL EROSION CONTROL MEASURES
FILL EXISTING CHANNEL AND STABILIZE.
IN THE FINAL GRADING PLAN.
MAINTAIN EROSION CONTROL DEVICES AS SHOWN
REMOVE IMPERVIOUS AND DIVERT FLOW.
AFTER STABILIZATION OF CHANNEL HAS OCCURED
EC. 5
CHANNEL
FILL EXISTING
CHANNEL WITH RIP RAP
RELOCATED JURISDICTIONAL
CHANNEL WITH RIP RAP
RELOCATED JURISDICTIONAL
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
4
/
2
0
1
4
7
:
4
3
:
3
6
A
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
5
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
BRIDGE #255
WW(TYP.)
WOOD
N C G R ID
N A D 83/N S R S 2007
A/G
A
S
H
W
O
R
T
H
C
R
K
T
5
P
O
T
S
t
a
. 14
+
9
8
.8
0
GRAU 350 TL-3 CAT-1
GRAU 350 TL-3
-L- PC STA 10+00.00
-L- POT STA 14+85.00
BEGIN CONSTRUCTION
BEGIN PROJECT DB12-220255
END CONSTRUCTION
END PROJECT DB12-220255
PT Sta. 11+90.68
GRAU 350 TL-3
EXIST. R/W
54.00’ RT
+11.50
EXIST.
45.00’ LT
+75.00
EXIST.
35.00’ LT
+40.00220255-1
220255-2220255-1
EXIST. R/W
45.00’ RT
+67.50
F
F
F
F
EST 43 TONS
CLASS I RIP RAP
EST DDE=15 CY
OUTLET CHANNEL
CLASS I RIP RAP EST 23 TONS
INLET CHANNEL EST DDE=50 CY
EC. 6/CONST. 4
EROSION CONTROL FOR FINAL GRADING PLAN
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
5
:
18
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
6
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
on Slope as Work Allows.
Place Matting for Erosion Control
STA. 10+68 TO 12+12
PROPOSED DITCH LINE.
EROSION CONTROL IN THE
INSTALL RIPRAP FOR
N
C
G
RI
D
N
A
D
8
3/
N
S
R
S
2
0
0
7
T
O
B
TOB
NO BED MATERIAL REQUIRED
T
O
B
TOB
(NOT TO SCALE)
AND FLOOD PLAIN
LOW FLOW CHANNEL,SILLS
SKEWED MULTI-BARREL CULVERT
ENGINEER.
5) NUMBER OF SILL/BAFFLES DETERMINED BY THE
ABOVE BANK FULL.
4) DO NOT SET ELEVATION OF HIGH SILL/BAFFLES
FLOW CHANNEL OF STREAM. (THALWEG)
MATCH STREAM BED ELEVATION IN LOW
3) TOP OF LOW FLOW SILLS/BAFFLES SHOULD
SEPARATELY AND ATTACHED BY DOWELS.
2) SILLS/BAFFLES ARE TO BE 1.0 FT. WIDE, CAST
BE SUBJECT TO PERMIT CONDITIONS.
TO APPROVAL BY THE ENGINEER AND MAY
PASSAGE. NATIVE MATERIAL IS SUBJECT
PROVIDE A FLAT SURFACE FOR ANIMAL
PLACED ON TOP TO FILL VOIDS AND
BARREL(S), NATIVE MATERIAL SHOULD BE
IS USED TO LINE THE HIGH FLOW CULVERT
HIGH FLOW CULVERT BARREL(S). IF RIP-RAP
SUPPLEMENT THE NATIVE MATERIAL IN THE
BARREL. RIP-RAP MAY BE USED TO
BE USED TO LINE THE LOW FLOW CULVERT
EXCAVATED FROM THE STREAM BED MAY
CONSTRUCTION. ONLY MATERIAL THAT IS
FLOODPLAIN AT THE PROJECT SITE DURING
EXCAVATED FROM THE THE STREAM OR
MATERIAL CONSISTS OF MATERIAL THAT IS
CONTINUOUS LOW FLOW CHANNEL. NATIVE
IN THE CULVERT SHALL PROVIDE A
1) NATIVE MATERIAL BETWEEN SILLS/BAFFLES
*NOTES:
1.5
:1
1.
5
:
1
(NOT TO SCALE)
INLET CHANNEL
18.25’
1.
5
:
1
1.5
:1
18.25’
CULVERT #2
2@8’X8’ RCBC
NATURAL BED MATERIAL
CULVERT #1
PROP FLOODPLAIN BENCH
STREAMBED
CLASS I RIP RAP
2’ SILL 1’
NG
SUPPLEMENT WITH CLASS ’B’ RIP RAP IF NECESSARY.
BACKFILL BARRELS WITH NATIVE BED MATERIAL AND
PLACE SILLS AT INLET AND OUTLET OF CULVERT ONLY.
(NOT TO SCALE)
OUTLET CHANNEL
(WESTERNMOST)
BARREL #1
(EASTERNMOST)
BARREL #1
NG
1’
2’ SILL
CLASS I RIP RAP
EXCAVATE
DETAIL
(WESTERNMOST)
BARREL #1
(EASTERNMOST)
BARREL #1
RIP RAP
CLASS ’I’
RIP RAP
CLASS ’I’
RIP RAP
CLASS ’I’
BENCH
FLOODPLAIN
PROP
EC-7
R
E
V
IS
IO
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
5
:
2
1
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
7
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
2 @ 8’ X 8’
BOX CULVERT
REINFORCED CONCRETE
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
LOCATION:
4
-L-
CLEVELAND COUNTY
17BP.12.R.102 PE, R/W, UTLITY & CONST.
SR 1207
WOOD RD.
ON SR 1207
STRUCTURE NO. 255 OVER ASHWORTH CREEK TRIBUTARY 5
Prepared in the Office of:
2012 STANDARD SPECIFICATIONS
F-1084
Professional Corporation License Number:
Cary, NC 27518
8000 Regency Parkway, Suite 600
Michael Baker Engineering, Inc.
LEVEL IIIA NAME
NCDOT Contact:
NCDOT DIVISION 12
LEVEL IIIA CERTIFICATION NO.
345
MANAGEMENT UNIT
TRANSPORTATION PROGRAM
KAREN MCCAULEY, PE
TODD H. BUCKNER, PE
GRAPHIC SCALE
PLANS
PROFILE (HORIZONTAL)
PROFILE (VERTICAL)
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
DIVISION OF HIGHWAYS
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
STATE OF NORTH CAROLINA
7
/
2
3
/
2
0
14
3
:
3
4
:
12
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
T
S
H
_
0
1
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
030 60
030 60
06 12
ROADSIDE ENVIRONMENTAL UNIT
PLAN FOR PROPOSED
HIGHWAY EROSION CONTROL
EROSION AND SEDIMENT CONTROL MEASURES
CONSTRUCTION.
GRUBBING PHASE OF
FOR CLEARING AND
EROSION CONTROL PLANS
THIS PROJECT CONTAINS
Temporary Silt Ditch
Temporary Silt Fence
Silt Basin Type B
Stilling Basin
TDTemporary Diversion
Temporary Rock Silt Check Type-B
Temporary Rock Silt Check Type-A
Temporary Rock Sediment Dam Type-A
Temporary Rock Sediment Dam Type-B
Type A
Type B
Type C
A
B
C
Temporary Silt Fence
TSD
Std. #Description Symbol
Temporary Berms and Slope Drains
Rock Inlet Sediment Trap:
1630.03
1630.05
1605.01
1622.01
1633.01
1634.01
1634.02
1635.01
1635.02
1630.04
1632.01
1632.02
1632.03
Rock Pipe Inlet Sediment Trap Type-A
Rock Pipe Inlet Sediment Trap Type-B
Temporary Rock Sediment Dam Type A
Temporary Rock Sediment Dam Type B
Temporary Silt Fence
Roadway Standard Drawings
The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design
revison thereto are applicable to this project and by reference hereby are considered a part of
these plans.
Rock Pipe Inlet Sediment Trap Type A
EC-1
1606.01 Special Sediment Control Fence
1634.01
1634.02
1635.01
1605.01
1630.01
Temporary Berms and Slope Drains
1606.01
1622.01
Special Sediment Control Fence
Riser Basin
T
I
P
P
R
O
J
E
C
T
:
1
7
B
P
.
1
2
.
R
.
1
0
2 DB12-220255
1635.02 Rock Pipe Inlet Sediment Trap Type B
1604.01 Railroad Erosion Control Detail
1607.01 Gravel Construction Entrance
Skimmer Basin
Tiered Skimmer Basin
Infiltration Basin
Special Stilling Basin1630.06
Temporary Rock Silt Check Type-A with
Matting and Polyacrylamide (PAM)
Wattle/Coir Fiber Wattle
Wattle/Coir Fiber Wattle
with Polyacrylamide (PAM)
1630.02
1633.02
NATURAL RESOURCES DIVISION OF WATER QUALITY.
ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND
NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE AUGUST 3, 2011
WITH THE REGULATIONS SET FORTH BY THE
THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY
Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2012 and the latest
1630.05 Temporary Diversion
1630.04 Stilling Basin
1630.03 Temporary Silt Ditch
1630.02 Silt Basin Type B
1630.06 Special Stilling Basin
1631.01 Matting Installation
1632.02
1632.01
Rock Inlet Sediment Trap Type B
Rock Inlet Sediment Trap Type A
1632.03 Rock Inlet Sediment Trap Type C
1633.01
1633.02 Temporary Rock Silt Check Type B
Temporary Rock Silt Check Type A
1640.01 Coir Fiber Baffle
1645.01 Temporary Stream Crossing
EW
CFW
-L- PC Sta. 10+00.00
BEGIN CONSTRUCTION
BEGIN PROJECT DB12- 220255
-L- POT Sta. 14+85.00
END CONSTRUCTION
END PROJECT DB12- 220255
TYPE OF WORK:GRADING, DRAINAGE, PAVING, & STRUCTURE
N C G R ID
N A D 83/N S R S 2007
EC-2
FLOW
A A
*T = 12" MIN., 18" MAX.
WIDTH
*T
PLAN
SECTION A-A
SECTION B-B
B
B
2/3 CHANNEL
STRUCTURAL STONE
SEDIMENT CONTROL STONE
2’ MIN
2’ MIN
L=3xH
12"
H = 12" MIN
MATTING
EXCELSIOR
MATTING
EXCELSIOR
CLASS B STONE
PAM
INSET A
See Inset A
USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR
MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE.
TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL
EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES.
MATTING
EXCELSIOR
CLASS B STONE
NOT TO SCALE
TEMPORARY ROCK SILT CHECK TYPE ’A’ WITH
EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM)
TO BE APPLIED TO EACH ROCK SILT CHECK.
MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT
A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE
PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN
NOTES
INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM)
(4 OZ.)
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
4
:
15
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
2
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
EC-3
4
SUBTOTAL
MISCELLANEOUS MATTING TO BE INSTALLED AS DIRECTED BY THE ENGINEER
TOTAL
SAY
SIDESTATION
TO
STATION
FROM
LINESHEET NO.
CONST
ESTIMATE (SY)STATION
TO
SIDESTATION
FROM
LINE
SHEET NO.
CONST
ESTIMATE (SY)
PERMANENT SOIL REINFORCEMENT MAT
4
SUBTOTAL
TOTAL
SAY
ADDITIONAL PSRM TO BE INSTALLED
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
SOIL STABILIZATION SUMMARY SHEET
MATTING FOR EROSION CONTROL
L 11+00 13+05 RT 135
185LT13+5011+25L4
320
320
320
R
E
V
I
S
I
O
N
S
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
4
:
17
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
3
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
SITE DESCRIPTION
SOIL STABILIZATION TIMEFRAMES
STABILIZATION TIME
7 DAYS
TIMEFRAME EXCEPTIONS
PERIMETER DIKES, SWALES, DITCHES AND SLOPES
HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE
SLOPES STEEPER THAN 3:1 7 DAYS
IF SLOPES ARE 10’ OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED.
NONE
SLOPES 3:1 OR FLATTER 14 DAYS
14 DAYS
7 DAYS FOR SLOPES GREATER THAN 50’ IN
LENGTH.
ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES.
EC-3A
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
4
:
19
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
3
A
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
BRIDGE #255
WW(TYP.)
WOOD
N C G R ID
N A D 83/N S R S 2007
A/G
A
S
H
W
O
R
T
H
C
R
K
T
5
P
O
T
S
t
a
. 14
+
9
8
.
8
0
GRAU 350 TL-3 CAT-1
GRAU 350 TL-3
-L- PC STA 10+00.00
-L- POT STA 14+85.00
BEGIN CONSTRUCTION
BEGIN PROJECT DB12-220255
END CONSTRUCTION
END PROJECT DB12-220255
PT Sta. 11+90.68
GRAU 350 TL-3
EXIST. R/W
54.00’ RT
+11.50
EXIST.
45.00’ LT
+75.00
EXIST.
35.00’ LT
+40.00220255-1
220255-2220255-1
EXIST. R/W
45.00’ RT
+67.50
F
F
F
F
7
7
0
7
7
0
770
7
7
0
7
7
0
770
7
7
5
775
7
7
5
7
7
5
7
7
5
7
7
5
775
775
780
780
780
7
8
0
780
785
785
7
8
5
7
9
0
795
7
9
5
7
7
0
770
7
7
0
7
7
0
7
7
5
775
7
7
5
7
7
5
775
775
7
7
0
770
7
7
0
7
7
0
7
7
5
775
7
7
5
7
7
5
775
775
EC. 4/CONST. 4CLEARING AND GRUBBING PLAN
CONSTRUCTION SHEET 4
EROSION CONTROL FOR
CLEARING AND GRUBBING
STAGE 1:STAGE 2:
CLASS ’I’ RIPRAP
CLASS ’I’ RIPRAP
OF EXCAVATION LIMITS (TYP.)
PLACE SILT FENCE AT TOP
B
A
R
R
E
L
#
2
B
A
R
R
E
L
#
2
B
A
R
R
E
L
#
1
ASHWORTH CREEK TRIB. 5
TEMPORARY CHANNEL
CHANGE WITH LINER
CHANNEL (TYP.)
AT TOP OF TEMP.
PLACE SILT FENCE
DIKE #1
IMPERVIOUS
DIKE #2
IMPERVIOUS
B
A
R
R
E
L
#
1
CONSTRUCT ROADWAY.
REMOVE SPECIAL STILLING BASIN.
LIMITS.
MAINTAIN SILT FENCE AT TOP OF EXCAVATION
DIVERT FLOW TO CULVERT.
REMOVE IMPERVIOUS DIKE #1 AND #2 AND
WITH CLASS ’I’ RIPRAP.
CONSTRUCT CULVERT AND STABILIZE BANKS
BASIN.
EFFLUENT WATER USING A SPECIAL STILLING
DEWATER CONSTRUCTION AREA AND TREAT
WATER TO TEMPORARY CHANNEL.
INSTALL IMPERVIOUS DIKES #1 & #2 AND DIVERT
2’ DEEP WITH 2:1 SIDESLOPES.
CONSTRUCT TEMPORARY 3’ BASE CHANNEL,
INSTALL SPECIAL STILLING BASIN.
INSTALL SILT FENCE AT TOP OF EXCAVATION LIMITS.
REMOVE EXISTING BRIDGE STRUCTURE.
NOTE:
PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B
DRAINAGE OUTLETS.
AND TEMPORARY ROCK SILT CHECKS TYPE - A AT
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
4
:
2
3
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
4
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
770
7
7
0
775
775
7
7
5
7
7
5
775
770
7
7
0
775
775
7
7
5
7
7
5
775
STAGE 1:STAGE 2:
UNNAMED ASHWORTH CREEK TRIB.
DIKE
IMPERVIOUS DIKE
IMPERVIOUS
STABILIZE CHANNEL WITH COIR FIBER MATTING.
BASIN AS NEEDED.
EFFLUENT WATER USING A SPECIAL STILLING
DEWATER CONSTRUCTION AREA AND TREAT
CONSTRUCT 2’ BASE CHANNEL.
INSTALL IMPERVIOUS DIKES.
INSTALL SPECIAL STILLING BASIN AS NEEDED.
GRUBBING PHASE.
ACCORDING TO THE CLEARING AND
INSTALL EROSION CONTROL MEASURES
FILL EXISTING CHANNEL AND STABILIZE.
IN THE FINAL GRADING PLAN.
MAINTAIN EROSION CONTROL DEVICES AS SHOWN
REMOVE IMPERVIOUS AND DIVERT FLOW.
AFTER STABILIZATION OF CHANNEL HAS OCCURED
EC. 5
CHANNEL
FILL EXISTING
CHANNEL WITH RIP RAP
RELOCATED JURISDICTIONAL
CHANNEL WITH RIP RAP
RELOCATED JURISDICTIONAL
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
4
/
2
0
1
4
7
:
4
3
:
3
6
A
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
5
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
BRIDGE #255
WW(TYP.)
WOOD
N C G R ID
N A D 83/N S R S 2007
A/G
A
S
H
W
O
R
T
H
C
R
K
T
5
P
O
T
S
t
a
. 14
+
9
8
.8
0
GRAU 350 TL-3 CAT-1
GRAU 350 TL-3
-L- PC STA 10+00.00
-L- POT STA 14+85.00
BEGIN CONSTRUCTION
BEGIN PROJECT DB12-220255
END CONSTRUCTION
END PROJECT DB12-220255
PT Sta. 11+90.68
GRAU 350 TL-3
EXIST. R/W
54.00’ RT
+11.50
EXIST.
45.00’ LT
+75.00
EXIST.
35.00’ LT
+40.00220255-1
220255-2220255-1
EXIST. R/W
45.00’ RT
+67.50
F
F
F
F
EST 43 TONS
CLASS I RIP RAP
EST DDE=15 CY
OUTLET CHANNEL
CLASS I RIP RAP EST 23 TONS
INLET CHANNEL EST DDE=50 CY
EC. 6/CONST. 4
EROSION CONTROL FOR FINAL GRADING PLAN
R
E
V
I
S
I
O
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
5
:
18
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
6
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE
on Slope as Work Allows.
Place Matting for Erosion Control
STA. 10+68 TO 12+12
PROPOSED DITCH LINE.
EROSION CONTROL IN THE
INSTALL RIPRAP FOR
N
C
G
RI
D
N
A
D
8
3/
N
S
R
S
2
0
0
7
T
O
B
TOB
NO BED MATERIAL REQUIRED
T
O
B
TOB
(NOT TO SCALE)
AND FLOOD PLAIN
LOW FLOW CHANNEL,SILLS
SKEWED MULTI-BARREL CULVERT
ENGINEER.
5) NUMBER OF SILL/BAFFLES DETERMINED BY THE
ABOVE BANK FULL.
4) DO NOT SET ELEVATION OF HIGH SILL/BAFFLES
FLOW CHANNEL OF STREAM. (THALWEG)
MATCH STREAM BED ELEVATION IN LOW
3) TOP OF LOW FLOW SILLS/BAFFLES SHOULD
SEPARATELY AND ATTACHED BY DOWELS.
2) SILLS/BAFFLES ARE TO BE 1.0 FT. WIDE, CAST
BE SUBJECT TO PERMIT CONDITIONS.
TO APPROVAL BY THE ENGINEER AND MAY
PASSAGE. NATIVE MATERIAL IS SUBJECT
PROVIDE A FLAT SURFACE FOR ANIMAL
PLACED ON TOP TO FILL VOIDS AND
BARREL(S), NATIVE MATERIAL SHOULD BE
IS USED TO LINE THE HIGH FLOW CULVERT
HIGH FLOW CULVERT BARREL(S). IF RIP-RAP
SUPPLEMENT THE NATIVE MATERIAL IN THE
BARREL. RIP-RAP MAY BE USED TO
BE USED TO LINE THE LOW FLOW CULVERT
EXCAVATED FROM THE STREAM BED MAY
CONSTRUCTION. ONLY MATERIAL THAT IS
FLOODPLAIN AT THE PROJECT SITE DURING
EXCAVATED FROM THE THE STREAM OR
MATERIAL CONSISTS OF MATERIAL THAT IS
CONTINUOUS LOW FLOW CHANNEL. NATIVE
IN THE CULVERT SHALL PROVIDE A
1) NATIVE MATERIAL BETWEEN SILLS/BAFFLES
*NOTES:
1.5
:1
1.
5
:
1
(NOT TO SCALE)
INLET CHANNEL
18.25’
1.
5
:
1
1.5
:1
18.25’
CULVERT #2
2@8’X8’ RCBC
NATURAL BED MATERIAL
CULVERT #1
PROP FLOODPLAIN BENCH
STREAMBED
CLASS I RIP RAP
2’ SILL 1’
NG
SUPPLEMENT WITH CLASS ’B’ RIP RAP IF NECESSARY.
BACKFILL BARRELS WITH NATIVE BED MATERIAL AND
PLACE SILLS AT INLET AND OUTLET OF CULVERT ONLY.
(NOT TO SCALE)
OUTLET CHANNEL
(WESTERNMOST)
BARREL #1
(EASTERNMOST)
BARREL #1
NG
1’
2’ SILL
CLASS I RIP RAP
EXCAVATE
DETAIL
(WESTERNMOST)
BARREL #1
(EASTERNMOST)
BARREL #1
RIP RAP
CLASS ’I’
RIP RAP
CLASS ’I’
RIP RAP
CLASS ’I’
BENCH
FLOODPLAIN
PROP
EC-7
R
E
V
IS
IO
N
S
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
Michael Baker Engineering, Inc.
NC License: F-1084
Cary, NC 27518
Suite 600
8000 Regency Parkway
DB12-220255
7
/
2
3
/
2
0
14
3
:
3
5
:
2
1
P
M
R
:
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
2
2
-
0
2
5
5
_
E
C
_
P
S
H
_
0
7
.
d
g
n
U
S
E
R
:
t
o
d
d
.
b
u
c
k
n
e
r
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
LEVEL IIIA CERTIFICATION NO.
345
LEVEL IIIA NAME
TODD H. BUCKNER, PE