Loading...
HomeMy WebLinkAbout20140776 Ver 1_Application_20140725..�� � � ��+� STATE OF NORTH CAROLINA DEPARTN�NT OF 1'RANSPORTATION PA7' L. MCCRORY GOVERNOR July 23, 201A Mr. Steven Kichefski Asheville Regulatory Field Office US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 ANTHONY J. TATA SECRHTARY SUBJECT: Bridge #255 Replacement, SR 1207 (Wood Road), Cleveland County Dear Mr. Kichefski: The North Carolina Department of Transportation requests authorization To replace a deteriorating bridge on SR 1207 (Wood Road) in Cleveland County. NCDOT proposes to replace the existing triple span, 18 foot wide bridge with a 52-foot long, double 8 foot x 8 foot box culvert. Inlet and outlet riprap-faced floodplain benches (�60 feet) will be constructed to maintain `naturaP channel dimensions upstream and downstream of the proposed culvert. Coir fiber matting will be utilized to stabilize the benches. A total of 108 feet of an adjacent side tributary must relocated due to the culvert conshuction. The constructed channel will tie inTo the main channel at the end of the upstream bench. The slope of the side tributary is on a�5.6% slope; therefore, the entire length of the channel will be riprapped. The riprap will be embedded into the new channel (see detail2 on plan sheets) so as not to impede aquatic passage. A temporary diversion channel will be used to manage the stream flow stream around the construction site. Any areas affected by the temporary diversion will be restored To pre-project conditions. The total scope of the work will result in 160 feet of permanent impacts to two unnamed tributaries to Ashworth Creek, which is classified as Class C waters by the N.C. Division of Water Resources. The projecY is not located within'/z mile of any critical watershed azea nor is SR 1207 a rural or urban arterial; therefore, hazardous spill basins are not required. Enclosed is the hazardous spill basin checklist. The proposed project has been submitted/cleared by the cultural resources office. (Project Tracking # ll-10-0017). This office has conducted a threatened/endangered species survey within the project footprint. The federally listed species for Cleveland County (USFWS Listed date September 22, 2010) include dwarf-flowered heartleaf (Hexastylls nan�ora). National Heritage Program records document the nearest hearkleaf location 3.4 miles northwest of the proposed project area. The hearCleaf is usually found on dry to moist ravine slopes (usually north facing and of the oak-hickory-pine forest type) and in boggy areas near springheads. There is no suitable habitat in the proposed project area and no heartleaf species were observed within the project footprint. No unpact on this species is anticipated. Bridge #255, SR 1207, Wood Road Page 2 July 23, 2014 I have enclosed a pre-construclion notification for a NW#lA, sketches of planned activities and location maps relative to the project. Project information for fhe 401 Automated Payment Procedure is as follows: • Work order number: 150455-55120005-17BP12.R.102-3372 • TIP#: NA • Project Category: $240.00 Fee If you have any questions or concerns please feel free to contact me at (704) 480-9044. Thank you for your time and consideration on this matter. Respectfully yours, Reuben Chandler, P.E. Division Engineer Twelfth Division BY: �°f��� �'E`C.d-1-�. C Trish Beun Division 12 EnvironmenYal Supervisor EnclosUres o�>"� ��F9QG �i, ;v n+ 'r O4-:•�z�*'"'ry,.�� T �.�� Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2005 Pre-Construction Notification PC Form A. A licant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: � Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No 1 d. Type(s) of approval sought from the DWQ (check all that apply): � 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certification: ❑ Yes � No ❑ Yes � No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes ❑ No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No below. 1 h. Is the project located within a NC DCM Area of Environmental Concem (AEC)? ❑ Yes � No 2. Project Information 2a. Name of project: Bridge #255 Replacement, SR 1206 (Wood Road) 2b. County: Cleveland 2c. Nearest municipality / town: Mooresboro 2d. Subdivision name: NA 2e. NCDOT only, T.I.P. or state 17BP.12.R.102 project no: 3. Owner Information 3a. Name(s) on Recorded Deed: NCDOT Right of Way 3b. Deed Book and Page No. 3c. Responsible Party (for LLC i f applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: Reuben Chandler 4c. Busines s name N.C. Department of Transportation, Division 12 (if applicable): 4d. Street address: 1710 East Marion Street 4e. City, state, zip: Shelby, NC 28151 4f. Telephone no.: 704-480-9020 4g. Fax �o.: 704-480-5401 4h. Email address: rchandler@ncdot.gov 5. AgentlConsultant Information (if applicable) Sa. Name: Trish Beam 5b. Business name N.C. Department of Transportation, Division 12 (if applicable): 5c. Street address: 1710 East Marion Street 5d. City, state, zip: Shelby, NC 28151 Se. Telephone no.: 704-480-9044 Sf. Fax no.: 704-480-5401 Sg. Email address: pdbeam@ncdot.gov Page 2 of 11 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): NA Latitude:35.190375 Longitude: - 1 b. Site coordinates (in decimal degrees): 81.747001 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 0.10 acres 2. Surtace Waters 2a. Name of nearest body of water (stream, river, etc.) to UT to Ashworth Creek proposed project: 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Cleveland 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Site is Iocated on a paved secondary road. Landuse designation is vicinity of project is forested. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 250 3d. Explain the purpose of the proposed project: The purpose of the proposed work is to replace a deteriorating bridge for the safety of the travelling public. 3e. Describe the overall project in detail, including the type of equipment to be used: NCDOT proposes to replace the existing timber tleck bridge with a 52 foot long, double 8' x 8' box culvert. Inlet and outlet floodplain benches will be constructed to maintain channel dimensions. Due to the culvert construction, 108 feet of an adjacent tributary will be relocated . A temporary diversion channel will be used to manage the stream flow around the construction site. Any areas affected by temporary diversion will be restored to pre-project conditions. Ail Best Management Practices will be utilized during the course of the project. The Project will be constructed using typical heavy equipment (trackhoe, backhoe, etc.) 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes � No ❑ Unknown Comments: Jurisdictional stream determination made by Division 12 DEO. 4b. If the Corps made the jurisdictional determination, what type � preliminary 0 Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinatio�s or State determinations and attach documentation. 5. Project History Sa. Have permits or certifications been requested or obtained for � yes � No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructio�s. Page 3 of 11 nn�i c...... �i,....:..., a o n.___....�._. en nnno �i,,..,:.... 6. Future Project Plans 6a. Is this a phased project? ❑ Yes � No 6b. If yes, explain. Page 4 of 11 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands � Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type ofjurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Tem orar T W1 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ WZ � P� T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ WS ❑ P � T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total weUand impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type ofjurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non-404, width (linear Temporary (� (INT)? other) (feet) feet) S1 � P❑ T Culvert UT to Ashworth � PER � Corps � 5 "52 Creek ❑ INT � DWQ InIeUOutlet Riprap UT to Ashworth � PER � Corps S2 � P❑ T faced Floodplain Creek ❑ INT � DWQ � 5 "60 benches Stream relocation Z�tl UT to ❑ PER � Corps S3 � P❑ T of adjacent Ashworth Creek � INT � DWQ 2 �108 tributary Bypass pumping UT to Ashworth � PER � Corps S4 ❑ P� T for culvert Creek ❑ INT � DWQ � 5 31 construction S5 ❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts "220 3i. Comments: ` Permanent Impacts: New culvert length = 52 ft. InIeUOutlet riprap faced floodplain benches = 60 ft; 108 feet side tributary relocation. NOTE: 160 feet of "mitigatable impacts". Page 5 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Tem orar T 01 ❑P❑T 02 ❑P�T 03 ❑P�T 04 ❑P❑T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If ond or lake construction ro osed, then com lete the chart below. 5a. Sb. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 SE Total Sg. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): Sj. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require miti ation, then ou MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar-Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number— Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Tem ora T im act re uired? B1 ❑P❑T ❑Yes ❑ No B2 ❑P❑T ❑Yes ❑ No 63 ❑ P ❑ T ❑ Yes ❑ No 6h. Total buffer impacts 6i. Comments: Page 6 of 11 PCN Form — Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Floodplain benches constructed to maintain'natural' channel dimensions and stabilized with coir fiber matting. Stream relocation of adjacent side channel - the 5.5% slope new channel construction to embed riprap in bottom of channel to maintain channel stability and to prevent impedence of aquatic passage. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for � Yes ❑ No impacts to Waters of the U.S. or Waters of the State? 2b. Ifyes, mitigation is required by (check aIl that apply): ❑ DWQ � Corps ❑ Mitigation bank 2c. If yes, which mitigat ion option will be used for this project? � Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: 76 linearfeet 4c. If using stream mitigation, stream temperature: � warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: Mitigation required shall be provided in accordance with the procedures detailed in the USACE letter dated September 1, 2004, from Mr. Ken Jolly to Dr. Gregory J. Thorpe. Attached is a copy of the EEP mitigation acceptance letter for culvert construction and the stream relocation impacts. 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multipiier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified � yes � No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: ❑ Yes ❑ No 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? NA % 2b. Does this project require a Stormwater Management Plan? ❑ Yes � No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Complies with NCDOT's individual NPDES permit NCS000250. ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program � DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? NA ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs � NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Pro ram Review ❑ Coastal counties ❑ HQW 4a. Which of the following state-implemented stormwater management programs apply � ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1.3 December 10. 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes° to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes � No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ❑ Yes � No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. The project is a minimum criteria project which has low potential for cumulative/indirect impacts and will not result in additional development which could impact water quality. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No sewage generated from project. Page 10 of 11 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or � yes � No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act � yes � No impacts? ❑ Raleigh 5c. If yes, ind icate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC Natural Heritage Program database and onsite survey. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? No salt marshes, oyster reefs, or seagrass beds in the vicinity of the project. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation � Yes � No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Cultural Resources review/clearance pnternal tracking #11-10-0017). 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics coordination with FEMA 8c. What source(s) did you use to make the floodplain determination? FEMA FIRM panel number: 3710157300K , ;K � l- . � h��r�t,. � % i�, l� a (�''���F�. rJd, 7_:�� —i �/ , , � y -Pr- ApplicanUAgenYs Printed Name Applicant/AgenYs Signature Date (Agenfs signature is valid onty if an authorization letter from the applicant is rovided. Page I1 of 11 PCN Form — Version 1.3 December 10, 2008 Version ! "*� � ' 1 ^�� �� �i �" �- z,�.� ,� ti , . v r y � � f Y C�. � l�' ,. i -S � i' T� l f� . . . .. !p �' ��� i x� ✓ . §4�. � . �� .. '`,.,: 5} w �z —�3z�€""� •°v. � ',V 'i � � }' �' } � � P t .� �F .: 1Y �."^� .�� 1J. A. A i Y F �� ::� 1 ��" ��- � R : ?Gutr� ;-.: z �`_ � . � r, ! . ��'� � ` - � � , � " � t�,. , � � � s ,- �� � . �- �� � �- �� � 7 % �-� r � ',:�?� �, '" r ,-,, " � -=? � Y �" ',*' ( � �`s ` s ' �s s ; ,• ti �: � 'i"'�-°--:.� � _ � `?` S �, �4 '`�,,�`' � � .. ��� �R�-� `' ,,; x�.j �, ±�,; � , �4 . ��„*'r-�. �..`k jjj` `_ r�«�, ct # �z�t . `� t -' .. i, > (' '�/ $ Y : :. . :t'3 '. � 'j "� f P� q, �' . : � ?�"-�a,1 � "�. � � ��. _'. � -�;�� _f- . �, 4 ? ° �` �� r ' .�✓ ,= � h �� � �� ����.:�., ';� `� ' ; � '-� � �, � ,�'t ',' ; ,� v�v' °'� �� � i `'?` � � 1 , '`� . ` � , '� �'� � ���� ��`� ' ' `'' ' `°`"_ � �� e : ProjectSite ��" � � � � ����� o � � „ � . � � 4 Lat 36.190441 Long: -81.747027 r�'' �° �' t' N� ( { �,!".s � �t ( °"�-t` �' r � i T � � f� • f%'"� i �i � ;, ''�., 4� e�-k � ".,�, � t � ' v � r -� , , �" rt �1 � • � � r". 1 � � � ' r .� ,/ % . .� :. � � , c r r �`., ��,} �,,,m� t , . � ��[ � 'O`� � � a .—: i' .._, ,.....�.....;-... _. .-..: A ,� £'" -""t .,�� ' i`. �;� � j V�� � ..,� � L ._ � � � � � � s.� � ,�°� � ':_. � A� �e 4 4�'rp '".= "' � _ �,,f 3 � _ O� i �{°� ' � y � v �, `v. � k _ . ., �ru . � � . � > '.�f` � f I � � �y , 1 4! �3, 4� i ({ ,-,F' � '�{' �tnt ' hy.,_ : `f 4 ��uF �,� s� �. 6 �� I � r K ��� 4 . . i. "� }� , E / ' � ti m . � . j..- „,'� �' ;� ��� � 3 ,��` � �. ,$ �� wF ! ' • �i �� � � ,_,,,e� CCA � --- CHER�O1f�E rt�`�. `f :-� ,— _' .. �,:,_„_t�LEI`CC.Atib_�C(3 .: ' '` ` ,°,� . �� f y � L 1 - , � ,X � ,ry - �Riul�f�-�E,E rq ` t"-=— +,.....�, - ) r :'s . � I .1�i �� "1 ` ' ( ;`._" i J .�;� � ��:,� I E �: � ��.� �..�,� . : �' �� � � r � � � � .. � kS v �...�'� lil, n �. i � � � .kie �' I .. r--. A � ; � � �" t��,— ,�, ��t� r � - s��� � s �� �J � .--, ``�, v a� `•� �1 �� -' � � �. \ � �; �� • , ' I -� i, . `� � ' �' . ' ' � �,� � � ��_;,- � t ` �� � s a „� � .�. '' c-`:,�! _� . � ,. . : � � , l r— � �s� � °�� v�.. � � . � �� c,, � �� � ` �� � � � �.�,� �;`�-��" "' ,, � -� .� � �; � . � �,`�"" . +-� „ �,�y ` : "" ' �.,�,�, � � Copyqghi0,2013 National �eographic Soaety, i cwtied _ - .-.� Le end g � �� North Carolina Department of Transportation ''�' Division of Highways � Project Site Location \�:_-.�s�' CLEVELAND COUNTY O 1,000 2,000 N � Feet 1�� = 2,000 � � PROJECT WBS ELEMENT: 176P.12.R.102 STRUCTURE NO. 255 ON SR 7207 USGS Topographic Quadrangle: Boiling Springs South OVER ASHWORTH CREEK TRIBUTARY 5 � 11� ) ./r_..�I� Il�i � ��.��( I ,I l (_ A ir ' illi."i L ,f��i � I�4� ,i i'' �� „_ �� �lili �,rory � �h6� I ��I:01`�, L`uectOr �aCNeYtl01 Lt i��t�iTi I�111G'tTi ll I it���ffllll July 17, 2014 Ms. Trish Beam Divisiou 12 Enviionme�tal Supervisor North Carolina Department of Transportation Post Office Box 47 Shelby, North Carolina 28151-0047 Dear Ms. Beam: Subject: EEP Mitigation Acceptance Letter: Jui�� � ; ,;d� ��, ili r�ta;,; Replace Bridge 255 on SR 1207 (Wood Road) over an UT to Asl�worth Creek, Clevelaud County; WBS numUer 17BP.12R.102 'Il�e puipose of this letter is to tlotify you that the Ecosystem E�il�ancement Program (EEP) will provide die compensatory stream mitigation for the subject project. Based on the information supplied by you ou July 15, 2014, the impacts are located in CU 03050105 of the Broad River basin in the Sonthern Piedmont (SP) Eco-Region, and are as follows: Broad 03050105 SP linpacts (feedacres) Stream Cold Cool s'tream impacts may be proposed to Wetlands Wann Ri arian Non- P� o:..,...,.. 160.0 Buffer (Sq. Ft.) Marsh I Zone 1 I Zone 2 at a mttigation ratio Iess than 2:1. See perinit applicetion ti�r deWils. This impact and associated mitigation need were under projeeted by the NCDOT in the 2014 impact data. EEP will commit to implement suffiicient compensatory stream mitigation credits to offset the impacts associaCed wifli this project as detennined by the regulatory agencies using the delivery timeline listed in Section F3.c.iii of tl�e N.G. Department of Emironment and Natural Reeources' Ecosystem Enhancemeut Program in-Lieu Fee Instrument dated July 28, 2010. If fl�e above refereilced impact amow�CS are revised, then this mitigation acceptance letter will no longer be valid az2d a new mitigarion acceptance letter will be required from EEP. If you have any questions or need additional information, please contact Beth Harnion at 919-707-8420. Sincerely, -`yt g ` '� � ,��Una, e�,�� :# .�,frvr ...€�. �..� s James�8. �6tanfi1l EEP Asset Management Supervisor ce: Mc Steve Kiehefslci, USACE—Asl�eville Regulatory Field Office Mr. Alan 7olv�son, Division of Water Quality, Mooresville Office Ms. Linda Fitzpatrick, NCDOT—PDEA File: SR 1207 —Bridge 255 —Division l2 � , � �... . . .� ,. ,.. � _.. �, r' icr;c. i ,r �g , ._ ,. � i �i r NCDOT IIAZARDOUS SPILL BASIN CHECKLIST Division: 1 � County: C`1P�elanrl Project ID: 17BP.12.R.102 River Basin: Broad Bridge No: NA Route: SR 1865 Water Quality Criteria: Stream: UT to Ashworth Creek Yes No Stream Crossing Blue Line On USGS ORW WSI WS II,III OR IV, Crossing Within O.Smi of W.S. Critical Area Roadway Criteria: Route Designation- Arterial Urban Arterial Rural Additional Site Information: Is a Hazardous Spill Basin Required? Yes No �` � � � Yes No � � Criteria Based Upon NCDOT `Best Management Practices for the Protect�qn pf Surface Waters" (March, 1997). 2 @ 8’ X 8’ BOX CULVERT REINFORCED CONCRETE INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS LOCATION: 4 -L- CLEVELAND COUNTY 17BP.12.R.102 PE, R/W, UTLITY & CONST. SR 1207 WOOD RD. ON SR 1207 STRUCTURE NO. 255 OVER ASHWORTH CREEK TRIBUTARY 5 Prepared in the Office of: 2012 STANDARD SPECIFICATIONS F-1084 Professional Corporation License Number: Cary, NC 27518 8000 Regency Parkway, Suite 600 Michael Baker Engineering, Inc. LEVEL IIIA NAME NCDOT Contact: NCDOT DIVISION 12 LEVEL IIIA CERTIFICATION NO. 345 MANAGEMENT UNIT TRANSPORTATION PROGRAM KAREN MCCAULEY, PE TODD H. BUCKNER, PE GRAPHIC SCALE PLANS PROFILE (HORIZONTAL) PROFILE (VERTICAL) STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET DIVISION OF HIGHWAYS DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA STATE OF NORTH CAROLINA 7 / 2 3 / 2 0 14 3 : 3 4 : 12 P M R : \ E r o s i o n C o n t r o l \ 2 2 - 0 2 5 5 _ E C _ T S H _ 0 1 . d g n U S E R : t o d d . b u c k n e r 030 60 030 60 06 12 ROADSIDE ENVIRONMENTAL UNIT PLAN FOR PROPOSED HIGHWAY EROSION CONTROL EROSION AND SEDIMENT CONTROL MEASURES CONSTRUCTION. GRUBBING PHASE OF FOR CLEARING AND EROSION CONTROL PLANS THIS PROJECT CONTAINS Temporary Silt Ditch Temporary Silt Fence Silt Basin Type B Stilling Basin TDTemporary Diversion Temporary Rock Silt Check Type-B Temporary Rock Silt Check Type-A Temporary Rock Sediment Dam Type-A Temporary Rock Sediment Dam Type-B Type A Type B Type C A B C Temporary Silt Fence TSD Std. #Description Symbol Temporary Berms and Slope Drains Rock Inlet Sediment Trap: 1630.03 1630.05 1605.01 1622.01 1633.01 1634.01 1634.02 1635.01 1635.02 1630.04 1632.01 1632.02 1632.03 Rock Pipe Inlet Sediment Trap Type-A Rock Pipe Inlet Sediment Trap Type-B Temporary Rock Sediment Dam Type A Temporary Rock Sediment Dam Type B Temporary Silt Fence Roadway Standard Drawings The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design revison thereto are applicable to this project and by reference hereby are considered a part of these plans. Rock Pipe Inlet Sediment Trap Type A EC-1 1606.01 Special Sediment Control Fence 1634.01 1634.02 1635.01 1605.01 1630.01 Temporary Berms and Slope Drains 1606.01 1622.01 Special Sediment Control Fence Riser Basin T I P P R O J E C T : 1 7 B P . 1 2 . R . 1 0 2 DB12-220255 1635.02 Rock Pipe Inlet Sediment Trap Type B 1604.01 Railroad Erosion Control Detail 1607.01 Gravel Construction Entrance Skimmer Basin Tiered Skimmer Basin Infiltration Basin Special Stilling Basin1630.06 Temporary Rock Silt Check Type-A with Matting and Polyacrylamide (PAM) Wattle/Coir Fiber Wattle Wattle/Coir Fiber Wattle with Polyacrylamide (PAM) 1630.02 1633.02 NATURAL RESOURCES DIVISION OF WATER QUALITY. ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE AUGUST 3, 2011 WITH THE REGULATIONS SET FORTH BY THE THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2012 and the latest 1630.05 Temporary Diversion 1630.04 Stilling Basin 1630.03 Temporary Silt Ditch 1630.02 Silt Basin Type B 1630.06 Special Stilling Basin 1631.01 Matting Installation 1632.02 1632.01 Rock Inlet Sediment Trap Type B Rock Inlet Sediment Trap Type A 1632.03 Rock Inlet Sediment Trap Type C 1633.01 1633.02 Temporary Rock Silt Check Type B Temporary Rock Silt Check Type A 1640.01 Coir Fiber Baffle 1645.01 Temporary Stream Crossing EW CFW -L- PC Sta. 10+00.00 BEGIN CONSTRUCTION BEGIN PROJECT DB12- 220255 -L- POT Sta. 14+85.00 END CONSTRUCTION END PROJECT DB12- 220255 TYPE OF WORK:GRADING, DRAINAGE, PAVING, & STRUCTURE N C G R ID N A D 83/N S R S 2007 EC-2 FLOW A A *T = 12" MIN., 18" MAX. WIDTH *T PLAN SECTION A-A SECTION B-B B B 2/3 CHANNEL STRUCTURAL STONE SEDIMENT CONTROL STONE 2’ MIN 2’ MIN L=3xH 12" H = 12" MIN MATTING EXCELSIOR MATTING EXCELSIOR CLASS B STONE PAM INSET A See Inset A USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE. TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES. MATTING EXCELSIOR CLASS B STONE NOT TO SCALE TEMPORARY ROCK SILT CHECK TYPE ’A’ WITH EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM) TO BE APPLIED TO EACH ROCK SILT CHECK. MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN NOTES INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM) (4 OZ.) R E V I S I O N S DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-220255 7 / 2 3 / 2 0 14 3 : 3 4 : 15 P M R : \ E r o s i o n C o n t r o l \ 2 2 - 0 2 5 5 _ E C _ P S H _ 0 2 . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE EC-3 4 SUBTOTAL MISCELLANEOUS MATTING TO BE INSTALLED AS DIRECTED BY THE ENGINEER TOTAL SAY SIDESTATION TO STATION FROM LINESHEET NO. CONST ESTIMATE (SY)STATION TO SIDESTATION FROM LINE SHEET NO. CONST ESTIMATE (SY) PERMANENT SOIL REINFORCEMENT MAT 4 SUBTOTAL TOTAL SAY ADDITIONAL PSRM TO BE INSTALLED DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA SOIL STABILIZATION SUMMARY SHEET MATTING FOR EROSION CONTROL L 11+00 13+05 RT 135 185LT13+5011+25L4 320 320 320 R E V I S I O N S Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-220255 7 / 2 3 / 2 0 14 3 : 3 4 : 17 P M R : \ E r o s i o n C o n t r o l \ 2 2 - 0 2 5 5 _ E C _ P S H _ 0 3 . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA SITE DESCRIPTION SOIL STABILIZATION TIMEFRAMES STABILIZATION TIME 7 DAYS TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10’ OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. NONE SLOPES 3:1 OR FLATTER 14 DAYS 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50’ IN LENGTH. ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES. EC-3A R E V I S I O N S DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-220255 7 / 2 3 / 2 0 14 3 : 3 4 : 19 P M R : \ E r o s i o n C o n t r o l \ 2 2 - 0 2 5 5 _ E C _ P S H _ 0 3 A . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE BRIDGE #255 WW(TYP.) WOOD N C G R ID N A D 83/N S R S 2007 A/G A S H W O R T H C R K T 5 P O T S t a . 14 + 9 8 . 8 0 GRAU 350 TL-3 CAT-1 GRAU 350 TL-3 -L- PC STA 10+00.00 -L- POT STA 14+85.00 BEGIN CONSTRUCTION BEGIN PROJECT DB12-220255 END CONSTRUCTION END PROJECT DB12-220255 PT Sta. 11+90.68 GRAU 350 TL-3 EXIST. R/W 54.00’ RT +11.50 EXIST. 45.00’ LT +75.00 EXIST. 35.00’ LT +40.00220255-1 220255-2220255-1 EXIST. R/W 45.00’ RT +67.50 F F F F 7 7 0 7 7 0 770 7 7 0 7 7 0 770 7 7 5 775 7 7 5 7 7 5 7 7 5 7 7 5 775 775 780 780 780 7 8 0 780 785 785 7 8 5 7 9 0 795 7 9 5 7 7 0 770 7 7 0 7 7 0 7 7 5 775 7 7 5 7 7 5 775 775 7 7 0 770 7 7 0 7 7 0 7 7 5 775 7 7 5 7 7 5 775 775 EC. 4/CONST. 4CLEARING AND GRUBBING PLAN CONSTRUCTION SHEET 4 EROSION CONTROL FOR CLEARING AND GRUBBING STAGE 1:STAGE 2: CLASS ’I’ RIPRAP CLASS ’I’ RIPRAP OF EXCAVATION LIMITS (TYP.) PLACE SILT FENCE AT TOP B A R R E L # 2 B A R R E L # 2 B A R R E L # 1 ASHWORTH CREEK TRIB. 5 TEMPORARY CHANNEL CHANGE WITH LINER CHANNEL (TYP.) AT TOP OF TEMP. PLACE SILT FENCE DIKE #1 IMPERVIOUS DIKE #2 IMPERVIOUS B A R R E L # 1 CONSTRUCT ROADWAY. REMOVE SPECIAL STILLING BASIN. LIMITS. MAINTAIN SILT FENCE AT TOP OF EXCAVATION DIVERT FLOW TO CULVERT. REMOVE IMPERVIOUS DIKE #1 AND #2 AND WITH CLASS ’I’ RIPRAP. CONSTRUCT CULVERT AND STABILIZE BANKS BASIN. EFFLUENT WATER USING A SPECIAL STILLING DEWATER CONSTRUCTION AREA AND TREAT WATER TO TEMPORARY CHANNEL. INSTALL IMPERVIOUS DIKES #1 & #2 AND DIVERT 2’ DEEP WITH 2:1 SIDESLOPES. CONSTRUCT TEMPORARY 3’ BASE CHANNEL, INSTALL SPECIAL STILLING BASIN. INSTALL SILT FENCE AT TOP OF EXCAVATION LIMITS. REMOVE EXISTING BRIDGE STRUCTURE. NOTE: PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B DRAINAGE OUTLETS. AND TEMPORARY ROCK SILT CHECKS TYPE - A AT R E V I S I O N S DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-220255 7 / 2 3 / 2 0 14 3 : 3 4 : 2 3 P M R : \ E r o s i o n C o n t r o l \ 2 2 - 0 2 5 5 _ E C _ P S H _ 0 4 . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE 770 7 7 0 775 775 7 7 5 7 7 5 775 770 7 7 0 775 775 7 7 5 7 7 5 775 STAGE 1:STAGE 2: UNNAMED ASHWORTH CREEK TRIB. DIKE IMPERVIOUS DIKE IMPERVIOUS STABILIZE CHANNEL WITH COIR FIBER MATTING. BASIN AS NEEDED. EFFLUENT WATER USING A SPECIAL STILLING DEWATER CONSTRUCTION AREA AND TREAT CONSTRUCT 2’ BASE CHANNEL. INSTALL IMPERVIOUS DIKES. INSTALL SPECIAL STILLING BASIN AS NEEDED. GRUBBING PHASE. ACCORDING TO THE CLEARING AND INSTALL EROSION CONTROL MEASURES FILL EXISTING CHANNEL AND STABILIZE. IN THE FINAL GRADING PLAN. MAINTAIN EROSION CONTROL DEVICES AS SHOWN REMOVE IMPERVIOUS AND DIVERT FLOW. AFTER STABILIZATION OF CHANNEL HAS OCCURED EC. 5 CHANNEL FILL EXISTING CHANNEL WITH RIP RAP RELOCATED JURISDICTIONAL CHANNEL WITH RIP RAP RELOCATED JURISDICTIONAL R E V I S I O N S DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-220255 7 / 2 4 / 2 0 1 4 7 : 4 3 : 3 6 A M R : \ E r o s i o n C o n t r o l \ 2 2 - 0 2 5 5 _ E C _ P S H _ 0 5 . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE BRIDGE #255 WW(TYP.) WOOD N C G R ID N A D 83/N S R S 2007 A/G A S H W O R T H C R K T 5 P O T S t a . 14 + 9 8 .8 0 GRAU 350 TL-3 CAT-1 GRAU 350 TL-3 -L- PC STA 10+00.00 -L- POT STA 14+85.00 BEGIN CONSTRUCTION BEGIN PROJECT DB12-220255 END CONSTRUCTION END PROJECT DB12-220255 PT Sta. 11+90.68 GRAU 350 TL-3 EXIST. R/W 54.00’ RT +11.50 EXIST. 45.00’ LT +75.00 EXIST. 35.00’ LT +40.00220255-1 220255-2220255-1 EXIST. R/W 45.00’ RT +67.50 F F F F EST 43 TONS CLASS I RIP RAP EST DDE=15 CY OUTLET CHANNEL CLASS I RIP RAP EST 23 TONS INLET CHANNEL EST DDE=50 CY EC. 6/CONST. 4 EROSION CONTROL FOR FINAL GRADING PLAN R E V I S I O N S DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-220255 7 / 2 3 / 2 0 14 3 : 3 5 : 18 P M R : \ E r o s i o n C o n t r o l \ 2 2 - 0 2 5 5 _ E C _ P S H _ 0 6 . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE on Slope as Work Allows. Place Matting for Erosion Control STA. 10+68 TO 12+12 PROPOSED DITCH LINE. EROSION CONTROL IN THE INSTALL RIPRAP FOR N C G RI D N A D 8 3/ N S R S 2 0 0 7 T O B TOB NO BED MATERIAL REQUIRED T O B TOB (NOT TO SCALE) AND FLOOD PLAIN LOW FLOW CHANNEL,SILLS SKEWED MULTI-BARREL CULVERT ENGINEER. 5) NUMBER OF SILL/BAFFLES DETERMINED BY THE ABOVE BANK FULL. 4) DO NOT SET ELEVATION OF HIGH SILL/BAFFLES FLOW CHANNEL OF STREAM. (THALWEG) MATCH STREAM BED ELEVATION IN LOW 3) TOP OF LOW FLOW SILLS/BAFFLES SHOULD SEPARATELY AND ATTACHED BY DOWELS. 2) SILLS/BAFFLES ARE TO BE 1.0 FT. WIDE, CAST BE SUBJECT TO PERMIT CONDITIONS. TO APPROVAL BY THE ENGINEER AND MAY PASSAGE. NATIVE MATERIAL IS SUBJECT PROVIDE A FLAT SURFACE FOR ANIMAL PLACED ON TOP TO FILL VOIDS AND BARREL(S), NATIVE MATERIAL SHOULD BE IS USED TO LINE THE HIGH FLOW CULVERT HIGH FLOW CULVERT BARREL(S). IF RIP-RAP SUPPLEMENT THE NATIVE MATERIAL IN THE BARREL. RIP-RAP MAY BE USED TO BE USED TO LINE THE LOW FLOW CULVERT EXCAVATED FROM THE STREAM BED MAY CONSTRUCTION. ONLY MATERIAL THAT IS FLOODPLAIN AT THE PROJECT SITE DURING EXCAVATED FROM THE THE STREAM OR MATERIAL CONSISTS OF MATERIAL THAT IS CONTINUOUS LOW FLOW CHANNEL. NATIVE IN THE CULVERT SHALL PROVIDE A 1) NATIVE MATERIAL BETWEEN SILLS/BAFFLES *NOTES: 1.5 :1 1. 5 : 1 (NOT TO SCALE) INLET CHANNEL 18.25’ 1. 5 : 1 1.5 :1 18.25’ CULVERT #2 2@8’X8’ RCBC NATURAL BED MATERIAL CULVERT #1 PROP FLOODPLAIN BENCH STREAMBED CLASS I RIP RAP 2’ SILL 1’ NG SUPPLEMENT WITH CLASS ’B’ RIP RAP IF NECESSARY. BACKFILL BARRELS WITH NATIVE BED MATERIAL AND PLACE SILLS AT INLET AND OUTLET OF CULVERT ONLY. (NOT TO SCALE) OUTLET CHANNEL (WESTERNMOST) BARREL #1 (EASTERNMOST) BARREL #1 NG 1’ 2’ SILL CLASS I RIP RAP EXCAVATE DETAIL (WESTERNMOST) BARREL #1 (EASTERNMOST) BARREL #1 RIP RAP CLASS ’I’ RIP RAP CLASS ’I’ RIP RAP CLASS ’I’ BENCH FLOODPLAIN PROP EC-7 R E V IS IO N S DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-220255 7 / 2 3 / 2 0 14 3 : 3 5 : 2 1 P M R : \ E r o s i o n C o n t r o l \ 2 2 - 0 2 5 5 _ E C _ P S H _ 0 7 . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE 2 @ 8’ X 8’ BOX CULVERT REINFORCED CONCRETE INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS LOCATION: 4 -L- CLEVELAND COUNTY 17BP.12.R.102 PE, R/W, UTLITY & CONST. SR 1207 WOOD RD. ON SR 1207 STRUCTURE NO. 255 OVER ASHWORTH CREEK TRIBUTARY 5 Prepared in the Office of: 2012 STANDARD SPECIFICATIONS F-1084 Professional Corporation License Number: Cary, NC 27518 8000 Regency Parkway, Suite 600 Michael Baker Engineering, Inc. LEVEL IIIA NAME NCDOT Contact: NCDOT DIVISION 12 LEVEL IIIA CERTIFICATION NO. 345 MANAGEMENT UNIT TRANSPORTATION PROGRAM KAREN MCCAULEY, PE TODD H. BUCKNER, PE GRAPHIC SCALE PLANS PROFILE (HORIZONTAL) PROFILE (VERTICAL) STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET DIVISION OF HIGHWAYS DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA STATE OF NORTH CAROLINA 7 / 2 3 / 2 0 14 3 : 3 4 : 12 P M R : \ E r o s i o n C o n t r o l \ 2 2 - 0 2 5 5 _ E C _ T S H _ 0 1 . d g n U S E R : t o d d . b u c k n e r 030 60 030 60 06 12 ROADSIDE ENVIRONMENTAL UNIT PLAN FOR PROPOSED HIGHWAY EROSION CONTROL EROSION AND SEDIMENT CONTROL MEASURES CONSTRUCTION. GRUBBING PHASE OF FOR CLEARING AND EROSION CONTROL PLANS THIS PROJECT CONTAINS Temporary Silt Ditch Temporary Silt Fence Silt Basin Type B Stilling Basin TDTemporary Diversion Temporary Rock Silt Check Type-B Temporary Rock Silt Check Type-A Temporary Rock Sediment Dam Type-A Temporary Rock Sediment Dam Type-B Type A Type B Type C A B C Temporary Silt Fence TSD Std. #Description Symbol Temporary Berms and Slope Drains Rock Inlet Sediment Trap: 1630.03 1630.05 1605.01 1622.01 1633.01 1634.01 1634.02 1635.01 1635.02 1630.04 1632.01 1632.02 1632.03 Rock Pipe Inlet Sediment Trap Type-A Rock Pipe Inlet Sediment Trap Type-B Temporary Rock Sediment Dam Type A Temporary Rock Sediment Dam Type B Temporary Silt Fence Roadway Standard Drawings The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design revison thereto are applicable to this project and by reference hereby are considered a part of these plans. Rock Pipe Inlet Sediment Trap Type A EC-1 1606.01 Special Sediment Control Fence 1634.01 1634.02 1635.01 1605.01 1630.01 Temporary Berms and Slope Drains 1606.01 1622.01 Special Sediment Control Fence Riser Basin T I P P R O J E C T : 1 7 B P . 1 2 . R . 1 0 2 DB12-220255 1635.02 Rock Pipe Inlet Sediment Trap Type B 1604.01 Railroad Erosion Control Detail 1607.01 Gravel Construction Entrance Skimmer Basin Tiered Skimmer Basin Infiltration Basin Special Stilling Basin1630.06 Temporary Rock Silt Check Type-A with Matting and Polyacrylamide (PAM) Wattle/Coir Fiber Wattle Wattle/Coir Fiber Wattle with Polyacrylamide (PAM) 1630.02 1633.02 NATURAL RESOURCES DIVISION OF WATER QUALITY. ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE AUGUST 3, 2011 WITH THE REGULATIONS SET FORTH BY THE THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2012 and the latest 1630.05 Temporary Diversion 1630.04 Stilling Basin 1630.03 Temporary Silt Ditch 1630.02 Silt Basin Type B 1630.06 Special Stilling Basin 1631.01 Matting Installation 1632.02 1632.01 Rock Inlet Sediment Trap Type B Rock Inlet Sediment Trap Type A 1632.03 Rock Inlet Sediment Trap Type C 1633.01 1633.02 Temporary Rock Silt Check Type B Temporary Rock Silt Check Type A 1640.01 Coir Fiber Baffle 1645.01 Temporary Stream Crossing EW CFW -L- PC Sta. 10+00.00 BEGIN CONSTRUCTION BEGIN PROJECT DB12- 220255 -L- POT Sta. 14+85.00 END CONSTRUCTION END PROJECT DB12- 220255 TYPE OF WORK:GRADING, DRAINAGE, PAVING, & STRUCTURE N C G R ID N A D 83/N S R S 2007 EC-2 FLOW A A *T = 12" MIN., 18" MAX. WIDTH *T PLAN SECTION A-A SECTION B-B B B 2/3 CHANNEL STRUCTURAL STONE SEDIMENT CONTROL STONE 2’ MIN 2’ MIN L=3xH 12" H = 12" MIN MATTING EXCELSIOR MATTING EXCELSIOR CLASS B STONE PAM INSET A See Inset A USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE. TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES. MATTING EXCELSIOR CLASS B STONE NOT TO SCALE TEMPORARY ROCK SILT CHECK TYPE ’A’ WITH EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM) TO BE APPLIED TO EACH ROCK SILT CHECK. MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN NOTES INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM) (4 OZ.) R E V I S I O N S DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-220255 7 / 2 3 / 2 0 14 3 : 3 4 : 15 P M R : \ E r o s i o n C o n t r o l \ 2 2 - 0 2 5 5 _ E C _ P S H _ 0 2 . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE EC-3 4 SUBTOTAL MISCELLANEOUS MATTING TO BE INSTALLED AS DIRECTED BY THE ENGINEER TOTAL SAY SIDESTATION TO STATION FROM LINESHEET NO. CONST ESTIMATE (SY)STATION TO SIDESTATION FROM LINE SHEET NO. CONST ESTIMATE (SY) PERMANENT SOIL REINFORCEMENT MAT 4 SUBTOTAL TOTAL SAY ADDITIONAL PSRM TO BE INSTALLED DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA SOIL STABILIZATION SUMMARY SHEET MATTING FOR EROSION CONTROL L 11+00 13+05 RT 135 185LT13+5011+25L4 320 320 320 R E V I S I O N S Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-220255 7 / 2 3 / 2 0 14 3 : 3 4 : 17 P M R : \ E r o s i o n C o n t r o l \ 2 2 - 0 2 5 5 _ E C _ P S H _ 0 3 . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA SITE DESCRIPTION SOIL STABILIZATION TIMEFRAMES STABILIZATION TIME 7 DAYS TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10’ OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. NONE SLOPES 3:1 OR FLATTER 14 DAYS 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50’ IN LENGTH. ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES. EC-3A R E V I S I O N S DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-220255 7 / 2 3 / 2 0 14 3 : 3 4 : 19 P M R : \ E r o s i o n C o n t r o l \ 2 2 - 0 2 5 5 _ E C _ P S H _ 0 3 A . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE BRIDGE #255 WW(TYP.) WOOD N C G R ID N A D 83/N S R S 2007 A/G A S H W O R T H C R K T 5 P O T S t a . 14 + 9 8 . 8 0 GRAU 350 TL-3 CAT-1 GRAU 350 TL-3 -L- PC STA 10+00.00 -L- POT STA 14+85.00 BEGIN CONSTRUCTION BEGIN PROJECT DB12-220255 END CONSTRUCTION END PROJECT DB12-220255 PT Sta. 11+90.68 GRAU 350 TL-3 EXIST. R/W 54.00’ RT +11.50 EXIST. 45.00’ LT +75.00 EXIST. 35.00’ LT +40.00220255-1 220255-2220255-1 EXIST. R/W 45.00’ RT +67.50 F F F F 7 7 0 7 7 0 770 7 7 0 7 7 0 770 7 7 5 775 7 7 5 7 7 5 7 7 5 7 7 5 775 775 780 780 780 7 8 0 780 785 785 7 8 5 7 9 0 795 7 9 5 7 7 0 770 7 7 0 7 7 0 7 7 5 775 7 7 5 7 7 5 775 775 7 7 0 770 7 7 0 7 7 0 7 7 5 775 7 7 5 7 7 5 775 775 EC. 4/CONST. 4CLEARING AND GRUBBING PLAN CONSTRUCTION SHEET 4 EROSION CONTROL FOR CLEARING AND GRUBBING STAGE 1:STAGE 2: CLASS ’I’ RIPRAP CLASS ’I’ RIPRAP OF EXCAVATION LIMITS (TYP.) PLACE SILT FENCE AT TOP B A R R E L # 2 B A R R E L # 2 B A R R E L # 1 ASHWORTH CREEK TRIB. 5 TEMPORARY CHANNEL CHANGE WITH LINER CHANNEL (TYP.) AT TOP OF TEMP. PLACE SILT FENCE DIKE #1 IMPERVIOUS DIKE #2 IMPERVIOUS B A R R E L # 1 CONSTRUCT ROADWAY. REMOVE SPECIAL STILLING BASIN. LIMITS. MAINTAIN SILT FENCE AT TOP OF EXCAVATION DIVERT FLOW TO CULVERT. REMOVE IMPERVIOUS DIKE #1 AND #2 AND WITH CLASS ’I’ RIPRAP. CONSTRUCT CULVERT AND STABILIZE BANKS BASIN. EFFLUENT WATER USING A SPECIAL STILLING DEWATER CONSTRUCTION AREA AND TREAT WATER TO TEMPORARY CHANNEL. INSTALL IMPERVIOUS DIKES #1 & #2 AND DIVERT 2’ DEEP WITH 2:1 SIDESLOPES. CONSTRUCT TEMPORARY 3’ BASE CHANNEL, INSTALL SPECIAL STILLING BASIN. INSTALL SILT FENCE AT TOP OF EXCAVATION LIMITS. REMOVE EXISTING BRIDGE STRUCTURE. NOTE: PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B DRAINAGE OUTLETS. AND TEMPORARY ROCK SILT CHECKS TYPE - A AT R E V I S I O N S DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-220255 7 / 2 3 / 2 0 14 3 : 3 4 : 2 3 P M R : \ E r o s i o n C o n t r o l \ 2 2 - 0 2 5 5 _ E C _ P S H _ 0 4 . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE 770 7 7 0 775 775 7 7 5 7 7 5 775 770 7 7 0 775 775 7 7 5 7 7 5 775 STAGE 1:STAGE 2: UNNAMED ASHWORTH CREEK TRIB. DIKE IMPERVIOUS DIKE IMPERVIOUS STABILIZE CHANNEL WITH COIR FIBER MATTING. BASIN AS NEEDED. EFFLUENT WATER USING A SPECIAL STILLING DEWATER CONSTRUCTION AREA AND TREAT CONSTRUCT 2’ BASE CHANNEL. INSTALL IMPERVIOUS DIKES. INSTALL SPECIAL STILLING BASIN AS NEEDED. GRUBBING PHASE. ACCORDING TO THE CLEARING AND INSTALL EROSION CONTROL MEASURES FILL EXISTING CHANNEL AND STABILIZE. IN THE FINAL GRADING PLAN. MAINTAIN EROSION CONTROL DEVICES AS SHOWN REMOVE IMPERVIOUS AND DIVERT FLOW. AFTER STABILIZATION OF CHANNEL HAS OCCURED EC. 5 CHANNEL FILL EXISTING CHANNEL WITH RIP RAP RELOCATED JURISDICTIONAL CHANNEL WITH RIP RAP RELOCATED JURISDICTIONAL R E V I S I O N S DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-220255 7 / 2 4 / 2 0 1 4 7 : 4 3 : 3 6 A M R : \ E r o s i o n C o n t r o l \ 2 2 - 0 2 5 5 _ E C _ P S H _ 0 5 . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE BRIDGE #255 WW(TYP.) WOOD N C G R ID N A D 83/N S R S 2007 A/G A S H W O R T H C R K T 5 P O T S t a . 14 + 9 8 .8 0 GRAU 350 TL-3 CAT-1 GRAU 350 TL-3 -L- PC STA 10+00.00 -L- POT STA 14+85.00 BEGIN CONSTRUCTION BEGIN PROJECT DB12-220255 END CONSTRUCTION END PROJECT DB12-220255 PT Sta. 11+90.68 GRAU 350 TL-3 EXIST. R/W 54.00’ RT +11.50 EXIST. 45.00’ LT +75.00 EXIST. 35.00’ LT +40.00220255-1 220255-2220255-1 EXIST. R/W 45.00’ RT +67.50 F F F F EST 43 TONS CLASS I RIP RAP EST DDE=15 CY OUTLET CHANNEL CLASS I RIP RAP EST 23 TONS INLET CHANNEL EST DDE=50 CY EC. 6/CONST. 4 EROSION CONTROL FOR FINAL GRADING PLAN R E V I S I O N S DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-220255 7 / 2 3 / 2 0 14 3 : 3 5 : 18 P M R : \ E r o s i o n C o n t r o l \ 2 2 - 0 2 5 5 _ E C _ P S H _ 0 6 . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE on Slope as Work Allows. Place Matting for Erosion Control STA. 10+68 TO 12+12 PROPOSED DITCH LINE. EROSION CONTROL IN THE INSTALL RIPRAP FOR N C G RI D N A D 8 3/ N S R S 2 0 0 7 T O B TOB NO BED MATERIAL REQUIRED T O B TOB (NOT TO SCALE) AND FLOOD PLAIN LOW FLOW CHANNEL,SILLS SKEWED MULTI-BARREL CULVERT ENGINEER. 5) NUMBER OF SILL/BAFFLES DETERMINED BY THE ABOVE BANK FULL. 4) DO NOT SET ELEVATION OF HIGH SILL/BAFFLES FLOW CHANNEL OF STREAM. (THALWEG) MATCH STREAM BED ELEVATION IN LOW 3) TOP OF LOW FLOW SILLS/BAFFLES SHOULD SEPARATELY AND ATTACHED BY DOWELS. 2) SILLS/BAFFLES ARE TO BE 1.0 FT. WIDE, CAST BE SUBJECT TO PERMIT CONDITIONS. TO APPROVAL BY THE ENGINEER AND MAY PASSAGE. NATIVE MATERIAL IS SUBJECT PROVIDE A FLAT SURFACE FOR ANIMAL PLACED ON TOP TO FILL VOIDS AND BARREL(S), NATIVE MATERIAL SHOULD BE IS USED TO LINE THE HIGH FLOW CULVERT HIGH FLOW CULVERT BARREL(S). IF RIP-RAP SUPPLEMENT THE NATIVE MATERIAL IN THE BARREL. RIP-RAP MAY BE USED TO BE USED TO LINE THE LOW FLOW CULVERT EXCAVATED FROM THE STREAM BED MAY CONSTRUCTION. ONLY MATERIAL THAT IS FLOODPLAIN AT THE PROJECT SITE DURING EXCAVATED FROM THE THE STREAM OR MATERIAL CONSISTS OF MATERIAL THAT IS CONTINUOUS LOW FLOW CHANNEL. NATIVE IN THE CULVERT SHALL PROVIDE A 1) NATIVE MATERIAL BETWEEN SILLS/BAFFLES *NOTES: 1.5 :1 1. 5 : 1 (NOT TO SCALE) INLET CHANNEL 18.25’ 1. 5 : 1 1.5 :1 18.25’ CULVERT #2 2@8’X8’ RCBC NATURAL BED MATERIAL CULVERT #1 PROP FLOODPLAIN BENCH STREAMBED CLASS I RIP RAP 2’ SILL 1’ NG SUPPLEMENT WITH CLASS ’B’ RIP RAP IF NECESSARY. BACKFILL BARRELS WITH NATIVE BED MATERIAL AND PLACE SILLS AT INLET AND OUTLET OF CULVERT ONLY. (NOT TO SCALE) OUTLET CHANNEL (WESTERNMOST) BARREL #1 (EASTERNMOST) BARREL #1 NG 1’ 2’ SILL CLASS I RIP RAP EXCAVATE DETAIL (WESTERNMOST) BARREL #1 (EASTERNMOST) BARREL #1 RIP RAP CLASS ’I’ RIP RAP CLASS ’I’ RIP RAP CLASS ’I’ BENCH FLOODPLAIN PROP EC-7 R E V IS IO N S DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION Michael Baker Engineering, Inc. NC License: F-1084 Cary, NC 27518 Suite 600 8000 Regency Parkway DB12-220255 7 / 2 3 / 2 0 14 3 : 3 5 : 2 1 P M R : \ E r o s i o n C o n t r o l \ 2 2 - 0 2 5 5 _ E C _ P S H _ 0 7 . d g n U S E R : t o d d . b u c k n e r R/W SHEET NO.5 / 1 4 / 9 9 SHEET NO.PROJECT REFERENCE NO. LEVEL IIIA CERTIFICATION NO. 345 LEVEL IIIA NAME TODD H. BUCKNER, PE