Loading...
HomeMy WebLinkAbout20140673 Ver 1_More Info Received_20140723Strickland, Bev From: Smith, Cherri L Sent: Thursday, July 24, 2014 11:13 AM To: Strickland, Bev; Montalvo, Sheri A Subject: FW: Riparian Buffer Application Attachments: MADISON OAKS LOT 7 LEVEL SPREADER PLAN revl sheet 3 of Auth Form.pdf From: Steve Smalto [mai Ito: steveCcbhomequestnc.com] Sent: Wednesday, July 23, 2014 2:24 PM To: Smith, Cherri L Subject: Re: Riparian Buffer Application Hi Cherri, I have attached page 3 per your request. Let me know if you need anything else. Thanks for your help. Steve On Tue, Jul 22, 2014 at 10:19 AM, Smith, Cherri L <cherri. smithgncdenr. gov> wrote: Hi Steve, I was reviewing your application for a Riparian Buffer Authorization for new home construction at 847 Madison Avenue, and I just need for you to make a correction to the application. The deck portion of this house is "allowable" not "exempt" so if you could just revise page 3 of the application and email it to me, that would be great. Be certain to include the square footage of the deck on this page as well. I'll need to include the total square footage of the house and deck in the Buffer Authorization. Otherwise, all looks good. Thank you. Cherri Cherri Smith NCDENR Division of Water Resources 1 Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699 -1628 ph. 919 -791 -4251 E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties Steve Smalto HOMEQUEST BUILDERS INC 919 819 1418 C. Proposed Impacts Inventory Impact Justification and Mitigation 1. Avoidance and Minimization 1. Buffer Impacts Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Move dwelling close to front, minimize footprint and construction on side rather than rear of house. Elevate deck to above 8' from finished grade in Zone 2. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Work site by hand as much as possible and use smaller mechanized equipment when necessary 1a. Project is in which protected basin? ® Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. form. If any impacts require mitigation, then you MUST fill out Section D of this Buffer impact number— Permanent (P) or Temporary T Reason for impact Type of impact (exempt, allowable, allowable w/ mitigation) Stream name Buffer mitigation required? Zone 1 impact (sq ft) Zone 2 impact (sq ft) B1 ® P ❑ T House allowable UT Coles Branch ❑ Yes ® No 0 500 132 ® P ❑ T Deck allowable Same ❑ Yes ® No 0 168 133 ❑ P ❑ T 2c. If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed? ❑ Yes ® No ❑ Yes ❑ No If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. 134 ❑ P ❑ T 2f. Comments: ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No 136 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 0 668 1c. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Move dwelling close to front, minimize footprint and construction on side rather than rear of house. Elevate deck to above 8' from finished grade in Zone 2. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Work site by hand as much as possible and use smaller mechanized equipment when necessary 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑Yes ® No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact (square feet Multiplier Required mitigation (square feet Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed? ❑ Yes ® No 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: BA 10 -2013 Page 3 of 4