Loading...
HomeMy WebLinkAbout20120774 Ver 1_Staff Comments_20140725Strickland, Bev From: Kulz, Eric Sent: Friday, July 25, 2014 1:59 PM To: Tugwell, Todd SAW Cc: Strickland, Bev; Higgins, Karen Subject: RE: Jacobs Ladder (DWR #12 -0774) and Jacobs Landing (DWR #12 -0773) Credit Modificaiton Request Letters (UNCLASSIFIED) Todd DWR has reviewed the requests submitted for the above - referenced projects. These projects included an IRT site visit and review through the EEP portal. The approaches described in the mitigation plans for the referenced reaches were fairly non - quantitative and appeared to represent an Enhancement I approach, which was approved by the IRT. The activities conducted appeared consistent with the descriptions of mitigation measures proposed in the approved mitigation plans. Again, the mitigation plans were not quantitative in nature, and E1 spans a wide variety of mitigation treatments. During the analysis phase of these projects, if the provider and EEP felt the initial assessment and proposal were incorrect /inappropriate, consultation with the IRT and re- review of the project stream conditions and mitigation approaches should have been requested and approval of revisions sought (note process taken with the Pancho bank site). Minor adjustments often occur during construction and are expected, and are described in the as -built report. Linear footage /acreage of mitigation and associated credits are then normally finalized. However, in this case changing the name of the mitigation approach and associated credit after construction does not appear warranted as the activities conducted appear to be fairly consistent with what was described in the approved mitigation plans. Please contact me if you wish to discuss. - - - -- Original Message---- - From: Tugwell, Todd SAW [ mailto :Todd.Tugwell @usace.army.mil] Sent: Friday, July 25, 2014 12:54 PM To: Kulz, Eric Subject: FW: Jacobs Ladder and Jacobs Landing Credit Modificaiton Request Letters (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE - - - -- Original Message---- - From: Tugwell, Todd SAW Sent: Thursday, May 22, 2014 2:41 PM To: Fritz Rohde (Fritz. Rohde @noaa.gov); Amy Chapman (amy.chapman @ncdenr.gov); Baker, Virginia; Beter, Dale E SAW; Biddlecome, William J SAW; bowers.todd @epa.gov; Crumbley, Tyler SAW; Cyndi Karoly (cyndi.karoly @ncdenr.gov); David Cox (david.cox @ncwildlife.org); Emily Jernigan @fws.gov; eric.kulz @ncdenr.gov; Gibby, Jean B SAW; Greer, Emily C SAW; Jones, Scott SAW; Karen Higgins (Karen. Higgins @ncdenr.gov); Kathryn Matthews @fws.gov; Marella Buncick ( Marella Buncick@fws.gov); McLendon, Scott C SAW; 'Steve Sollod'; Travis Wilson (travis.wilson @ncwildlife.org); Wheeler, Tracey L SAW; Wicker, Henry M JR SAW Cc: 'Baumgartner, Tim'; 'Tim Morris' Subject: Jacobs Ladder and Jacobs Landing Credit Modificaiton Request Letters (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE All, Pursuant to our discussions during the last IRT meeting on May 13th, please see the attached letters from Tim Morris with KCI. The letters are requesting a modification to the amount of credit proposed for two of the tributaries that were constructed as part of the project. The presentation that was provided to the IRT during the meeting is also available on the IRT portion of the RI BITS website. As we discussed during the meeting, the attached letters have been prepared to provide justification for the requested credit modification. Please review the attached letters and provide any comments to me within 30 days of this emails (June 20th). Thanks, Todd TugwelI Special Projects Manager Wilmington District, US Army Corps of Engineers 11405 Falls of the Neuse Road Wake Forest, NC 27587 Office: 919 - 846 -2564 Mobile: 919 - 710 -0240 Classification: UNCLASSIFIED Caveats: NONE Classification: UNCLASSIFIED Caveats: NONE