Loading...
HomeMy WebLinkAbout090014_Routine Inspection_20220701on 7 1 / s//,- _ Facility Number /Li/ _ —aVivision of Water Resources 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: -Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: ,'Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Farm Name: Arrival Time: 4 /0 c'ee-P-N Departure Time: ri Owner Email: County: Region: Ga4 Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Title: r/ Phone: // 624, Latitude: Integrator: Certification Number: Certification Number: Longitude: /DVC) c/J Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean /LW Farrow to Feeder Farrow to Finish Gilts Boars Layer Non -Layer Design Current Capacity Pop. Design Current Dry Poultry Capacity Pop. Layers Non -Layers Pullets Turkeys Turkey Poults Other Cattle op. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes 2 No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No 0 NA ❑ NE ❑ Yes .1;a*No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page 1 of 3 5/12/2020 Continued Facility Number: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Structure 2 Structure 3 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): a13 ❑ Yes Ja1\10 ❑ NA ❑ NE ❑Yes ❑No ❑NA ❑NE Structure 4 Structure 5 Structure 6 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? 8. Do any of the structures lack adequate markers as required by the permit? (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes -No ❑ NA ❑ NE ❑ Yes ..,No ❑ NA ❑ NE -Yes ❑ No ❑ Yes ,,®No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes ,,124No ❑ NA ❑ NE ❑ Yes � No ❑ NA ❑ NE ❑ Yes ..�No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 0157,0W � 1�91J %,) 446zrid.&414.,,,z4,49/4146/G.4 13. Soil Type(s): frlifyhozAzivilz& l ! o.r.' 4" /I a47,t- .� in the A WP? 14. Do the receiving crops differ from those designated C W 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes .. 10 ❑ NA ❑ NE Yes ❑ No E NA E NE ❑ Yes E'No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes _21' No 0 NA ❑ NE ❑ Yes r To ❑ NA ❑ NE ❑ Yes J No ❑ NA ❑ NE ❑ Other: ❑ Yes ENo ❑ Waste Transfers ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes -ErNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes _..lE'No ❑ NA 0 NE 5/12/2020 Continued Page 2 of 3 Facility Number: 661 Date of Inspection: %,tr,,r)) 24. Did the facility fail to calibrate waste application equipment as required by the permit? 1l) /»fl Yes ,„Ero ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes,'No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes o ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ,,ErNo ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes „No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ,'No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes _O--No ❑ NA 0 NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ YesNo 0 NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ,No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes 1:2No 0 NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes 10 ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). j- eiteu4-el Air,n4v-c IA-ee !s� ey-ei,127 weed ac, /t¢riQ fo Cs7 Pe—r .G 4 4Sfl1( S ee,W-...f ?€5 y�c`Pn�i (aeel Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 e./Le l-b9-4e6o,t) Phone: F/d g3_ Date: 5/12/2020 Wed &AA,/ FACILITY #: t;/ /�* FARM -. NAME: /' D ! DUE EVERY 5 YEARS - EXPERIATION DATE PERMIT (#19) LAGOON LEVEL NUMBER OF ANIMALS CURRENT NUMBER OF ANIMAL OIC CARD YES OR NO WASTE UTILIZATION PLAN (WUP) (#20) SOIL TYPES CROP TYPES - ODOR CONTROL CHECK LIST OR NO - Irrigation Plan Maps YES OR NO WASTE REPORT (#21) -GOOD % FOR 60 DAYS BEFORE OR AFTER DATE 3/j�.� / 2"6)- NITROGEN LEVEL ' F.? ?- U r DATE 3b ` �/ NITROGEN LEVEL ( 2% 3 DATE NITROGEN LEVEL S xi) REPORT ,) (7/?-1 - EVERY 3 YEARS: DATE - P-I (NO MORE THEN 400) - PH (Note if 4 or less) - Cu/ZN (NO MORE THEN 3000) CU (IF PEANUTS NO MORE THEN 300) IRR2 (#21) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) CALBRIATION (#24) - EACH REEL SHOULD BE CALI RATED EVERY OTHER YEAR DATE OF CALIBRATION 57E:,=/0 - FLOW RATES / `j : c7 -INITIAL AFTER 1" RAIN EVENT 4z RAIN FALL (#21) -LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED POA NEEDED. SLUDGE (#21 &25) -DUE EVERY YEAR: DATE 0: 4-/ '(-f P: Li Y % RATIO OF SLUDGE • Cif 0: P: % RATIO OF SLUDGE 0: P: % RATIO OF SLUDGE 0: P: % RATIO OF SLUDGE OTHER FORMS (#22AND#21) RAIN BREAKER FORM 1/1/ ' CROP YEILDS MORTALITY k *If fields are grazed there will be no crop yields VISUAL CHECK FOUNDATION OR PIT LEAKS PIPE LEAKS LAGOON SEEPAGE LAGOON BARE AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES WINTER CROP(OVERSEEDED) HARVESTED FIELDS GOOD HEALTHY CORPS CORRECT CROPS NO PONDING REELS FEED BINS LAGOON GARBAGE Bermuda grass: Opens March 1st- Ends September 30th Small Grain Over seed: Opens October 1st- Ends March 31st Corn: Opens February 15th - Ends June 30th Cotton: Opens March 15th - Ends August lot Rye: Opens September 1st- Ends March 31st Oats: Opens September 1st Ends April 15th Wheat: Opens September 1 St - Ends April 30th Soybeans: Opens April 1st- Ends September 15th Fescue: Opens August 1st- Ends July 31st Sorghum Hay: Opens March 15th - Ends August 31 st