Loading...
HomeMy WebLinkAbout20120774 Ver 1_Other Agency Correspondence_20140725Strickland, Bev From: Kulz, Eric Sent: Friday, July 25, 2014 1:37 PM To: Strickland, Bev Subject: FW: Jacobs Ladder and Jacobs Landing Credit Modificaiton Request Letters (UNCLASSIFIED) Attachments: Ladder - Credit Request.pdf; Landing - Credit Request.pdf Bev: For 12 -0773 (Jacobs Landing) and 12 -0774 (Jacobs Landing) - - - -- Original Message---- - From: Tugwell, Todd SAW [ mailto :Todd.Tugwell @usace.army.mil] Sent: Friday, July 25, 2014 12:54 PM To: Kulz, Eric Subject: FW: Jacobs Ladder and Jacobs Landing Credit Modificaiton Request Letters (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE - - - -- Original Message---- - From: Tugwell, Todd SAW Sent: Thursday, May 22, 2014 2:41 PM To: Fritz Rohde (Fritz. Rohde @noaa.gov); Amy Chapman (amy.chapman @ncdenr.gov); Baker, Virginia; Beter, Dale E SAW; Biddlecome, William J SAW; bowers.todd @epa.gov; Crumbley, Tyler SAW; Cyndi Karoly (cyndi.karoly @ncdenr.gov); David Cox (david.cox @ncwildlife.org); Emily Jernigan @fws.gov; eric.kulz @ncdenr.gov; Gibby, Jean B SAW; Greer, Emily C SAW; Jones, Scott SAW; Karen Higgins (Karen. Higgins @ncdenr.gov); Kathryn Matthews @fws.gov; Marella Buncick ( Marella Buncick@fws.gov); McLendon, Scott C SAW; 'Steve Sollod'; Travis Wilson (travis.wilson @ncwildlife.org); Wheeler, Tracey L SAW; Wicker, Henry M JR SAW Cc: 'Baumgartner, Tim'; 'Tim Morris' Subject: Jacobs Ladder and Jacobs Landing Credit Modificaiton Request Letters (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE All, Pursuant to our discussions during the last IRT meeting on May 13th, please see the attached letters from Tim Morris with KCI. The letters are requesting a modification to the amount of credit proposed for two of the tributaries that were constructed as part of the project. The presentation that was provided to the IRT during the meeting is also available on the IRT portion of the RI BITS website. As we discussed during the meeting, the attached letters have been prepared to provide justification for the requested credit modification. Please review the attached letters and provide any comments to me within 30 days of this emails (June 20th). Thanks, Todd TugwelI Special Projects Manager Wilmington District, US Army Corps of Engineers 11405 Falls of the Neuse Road Wake Forest, NC 27587 Office: 919 - 846 -2564 Mobile: 919 - 710 -0240 Classification: UNCLASSIFIED Caveats: NONE Classification: UNCLASSIFIED Caveats: NONE KC1 NOW11 °1 CAROLINA, P May 22, 2014 ENGINEERS • SCIENTISTS • SURVEYORS • CONSTRUCTION MANAGERS Landmark Center 11, Suite 220 4601 Six Forks Road Raleigh, NC 27609 (919) 783 -9214 (919) 783 -9266 Fax Mr. Todd Tugwell Regulatory Division Wilmington District U.S. Army Corps of Engineers 11405 Falls of Neuse Road Wake Forest, NC 27587 And: Mr. Tim Baumgartner Deputy Director NC DENR Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699 Subject: Jacob's Ladder (95023) Stream Restoration Project Request for Mitigation Plan Amendment Dear Mr. Tugwell and Mr. McDonald, This letter is in response to the discussions at an Interagency Review Team (IRT) meeting attended by KCI on May 13, 2014. During this meeting KCI presented a request to modify the allocation of stream mitigation credits on the Jacob's Ladder stream restoration project. Citing procedural reasons, the IRT requested that KCI submit a formal request to reallocate credits. This letter will serve as that request. Request KCI requests the following changes to the credit table provided in the Jacob's Ladder Stream Restoration Site - Final Mitigation Plan dated September 2012 (requested changes shown in red). KCI ASSOCIATES OF NORTH CAROLINA, P.A. www.kci.com Employee -Owned Since 1988 Reach Miti g ation Type Priority Approach Existing Linear Footage Designed Linear Footage Mitigation units T1 -1 Restoration 111 587 739 739 T1 -2 Restoration 111 1,592 1,622* 1,622 T2 -1 Restoration 111 837 750* 750 T2 -2 Restoration 111 1,246 1,334* 1,334 T1A -1 Enhancement - 306 306 204 T1A -2 Enhancement II - 140 140 56 T1A -3 Restoration 111 470 498 498 Total Stream Enhancement 306 306 204 Total Stream Enhancement II 140 140 56 Total Stream Restoration 4,732 4,943 4,943 Total Mitigation Units 5,203 7usti fi cnti on The 837 linear feet of stream channel associated with reach T2 was identified during the Proposal Stage (including an IRT site walk) as Enhancement Level 1 at a 1.5:1 ratio. As a matter of practice, KCI attempts to be consistent with the credit -types requested in the Proposal during the assessment and the design stages of the project. Initial thoughts during the proposal stage were to install periodic structures to stabilize the grade and direct flow, selectively grade banks and retrofit a cross section where practical. During the assessment and design stage for Reach T2, a more aggressive restoration approach was utilized. This was primary due to the need to rework the grade on both banks, to create a floodplain bench and to properly tie -in the on -line restoration work with the existing bedrock control and the offline restoration section downstream. These reasons and others resulted in ultimate decision to completely change the stream type from a G -type channel to a C -type channel. This approach was a restoration approach, although it never was properly identified as such in the Mitigation Plan. The approach included the following restoration initiatives: Channel type changed from a G channel to a C channel by installing a typical riffle cross section with a 10.0' bankfull bench and a 1.8' bank height. Adjusted thalweg and centerline (planform) slightly throughout most of the reach and significantly in several areas to allow for the incorporation of the bankfull bench. Bench location and width varied from cross section depending on condition of valley and the ability to accommodate the full bankfull width given the valley condition. Installed significant number of structures (1 step pools, 2 soil lifts, 17 riffle enhancements) to stabilize the profile and create in- stream habitat. Added bedform diversity and stabilized the planform. All of the items mentioned above support the reallocation of credit type to restoration (or enhancement at a higher ratio). KCI requests that the IRT support the correction of the 1.5:1 Enhancement I ratio proposed for Reach 2 in the Final Mitigation Plan to 1:1 ratio. KCI can provide amended copies of the KCI ASSOCIATES OF NORTH CAROLINA, P.A. www.kci.com Employee -Owned Since 1988 Mitigation Plan, if desired. Please understand that the exact number of credits may vary slightly when the as -built plans are analyzed. These numbers are based on the modification of the mitigation plan, not the actual, constructed condition. We hope you find this information appropriate in order to move forward with your decision. If you have further questions or comments, feel free to contact me at 919 - 278 -2511 or tim.morris(a�kci.com . Sincerely, Timothy J. Morris Senior Environmental Scientist cc: Joe Pfeiffer, KCI (email) Adam Spiller (email) Mike McDonald, EEP (email) KCI ASSOCIATES OF NORTH CAROLINA, P.A. www.kci.com Employee -Owned Since 1988