Loading...
HomeMy WebLinkAboutNotice of Initial Credit Release_ NCDMS Cowford Mitigation Site_ SAW-2019-00487_ Onslow CountyFrom: Davis, Erin B To: Baker. Caroline D Subject: FW: [External] Notice of Initial Credit Release/ NCDMS Cowford Mitigation Site/ SAW-2019-00487/ Onslow County Date: Friday, July 22, 2022 8:31:17 AM Attachments: Cowford Proiect 100095 WO 01 STR RW Initial Release KI.odf Laserfiche Upload: Email & Attachment DWR#: 20190495 v.1 Doc Type: Mitigation Evaluation From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Thursday, July 21, 2022 1:38 PM To: Crocker, Lindsay < Lindsay. Crocker@ncdenr.gov>; Matt Butler <mbutler@res.us> Cc: Bradley Breslow <bbreslow@res.us>; Allen, Melonie <melonie.allen@ncdenr.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil>; Fennel, Tommy E CIV USARMY CESAW (USA) <Tommy.E.Fennel@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Haywood, Casey M CIV MVP <Casey.M.Haywood@usace.army.miI>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; kathryn_matthews@fws.gov; Bowers, Todd <bowers.todd@epa.gov> Subject: [External] Notice of Initial Credit Release/ NCDMS Cowford Mitigation Site/ SAW-2019- 00487/ Onslow County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Lindsay and Matt, The 15-Day As-Built/MYO review for the Cowford Mitigation Site (SAW-2019-00487) ended July 13, 2022. This review was done in accordance with Section 332.8(o)(9) of the 2008 Mitigation Rule. All comments received from the NCIRT are incorporated in the email below. Please address IRT concerns in the MY1 Report. There were no objections to issuing the initial (30% ) credit release of 1,061.600 warm SMUs and 0.896 riparian WMUs. Please find attached the current signed ledger. The IRT is not requesting a site visit at this time. I do have some concerns with the six swales that were installed, particularly those that intersect wetland crediting areas. Was a thorough investigation of existing drainage tile performed prior to completing the design plans? Or were these tiles discovered during construction? Lastly, in looking at the cross -sections for the headwater valley restoration on KJ1-A, do you anticipate that the pilot channel that was constructed will function more as a single -thread channel rather than a headwater system? I'd like to visit this site once the wetlands have had a change to rehydrate and establish vegetation. Todd Bowers, USEPA: According to RES, site construction was completed on July 30th, 2021, and planting was completed on March 8th, 2022. The Cowford Site was overall built to design plans and guidelines, as -built stream and wetland areas were only slightly different than proposed. Wetland depressions were designed to be 0.3-0.5 feet deep but As -Built wetland depressions were found to be slightly deeper than proposed ranging from 0.5-1.0 feet deep. During construction additional drain tiles were found, which were then interrupted at the easement boundary. Additionally, extra t-posts were installed around the boundary of the easement in 100-foot intervals to reduce concerns of encroachment by farming practices. Overall, the Site appears to be performing as intended, and is on track to meet vegetation, wetland, and stream interim success criteria. The following items or highlights from the As -Build Condition Assessment were noted: Planted stem densities ranged from 567 to 1,012 planted stems per acre with a mean of 749 planted stems per acre across all plots. A total of ten species were documented within the plots. Morphological surveys conducted throughout the Site (15 cross -sections) show all streams as stable and functioning as designed; no areas of concern noted. Date noted for data collection appears erroneous (January 19, 2021 should be 2022). * One stage recorder on KJ1-C, was installed on January 19th, 2022. One flow gauge, on KJ1- A, was installed on January 19th, 2022. Hydrologic data will be collected and reported during MY1. A total of five groundwater wells with automatic recording pressure transducers were installed throughout the wetland areas on November 2nd, 2021, and April 28th, 2022. These will record water table depths at a frequency of twice per day. Groundwater gage data will be collected and reported during MY1. No adaptive management plan needed at this time. There are currently no vegetation areas of concern; no significant presence of invasive species. Overall, I am very satisfied with the report and the work that RES has completed at the site. Having not been able to visit this location, I really appreciated the detailed ground -level stream and veg plot photos (with stakes to denote planted stems) to illustrate the amount of work implemented. I recommend the appropriate credit release (Milestone 2) for warm stream and riparian wetland mitigation units for this monitoring milestone. I have no other substantial comments at this time. Erin Davis, NCDWR: Please QAQC the 2021 references throughout page 6. The IRT had initially raised some questions/concerns regarding the single swale proposed from the CE boundary to the stream through the wetland credit area. Looking at the as -built, it appears that six swales were constructed at least partially overlapping the wetland credit area. Were the five additional swales constructed to similar dimensions as the Swale A typical detail/section? If not, please provide more information on the dimensions of the added swales. DWR is concerned with the potential drainage effect of these new swales and may request additional groundwater gauges to demonstrate that wetland credit areas bisected by the swales meet the performance standard. Was the option of diffuse flow through the buffer evaluated as at any of the drain tile outlets, please explain? Also, please confirm that the drain tile outlets and swales will be monitored for stability annually throughout the monitoring period. Since a foot of inundation (vs. designed 6-inch depressions) can affect tree establishment and growth, DWR requests that a random veg plot capture representative depression(s) within the wetland credit area throughout monitoring. 4. DWR appreciates the inclusion of the soil and groundwater data. To confirm, GW1 had a zero hydroperiod in 2021 and this wasn't due to a gauge malfunction or relocation? Moving forward in monitoring, it can be helpful to include data on both the consecutive days/% and the cumulative days/% hydroperiod, as well as note the growing season start/end dates and the minimum hydroperiod performance standard value within the wetland hydrology summary table. Please reach out with any questions. Regards, Kim Kim (Browning) Isenhour Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 1 919.946.5107 Mitigation Project Name Cowford Project USACE Action ID DMS ID 100095 DWR Permit River Basin White Oak Date Project Instituted Cataloging Unit 03030001 Date Prepared County Onslow Stream/Wet. Service Area Signature of Official Approving Credit Release 2019-00487 2019-0495 2/4/2019 6/6/2022 White Oak 03030001 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Project Credits Scheduled Releases % Estimated Scheduled Release # Warm Stream Credits Proposed Not Approved Approved Released # #Releases Credits Anticipated Release Year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1,061.600 1,061.600 0.000 1,061.600 2022 6/6/2022 3 - Year 1 Monitoring 10.00% 353.867 2023 4 - Year 2 Monitoring 10.00% 353.867 2024 5 - Year 3 Monitoring 10.00% 353.867 2025 6 - Year 4 Monitoring 5.00% 176.934 2026 7 - Year 5 Monitoring 10.00% 353.867 2027 8 - Year 6 Monitoring 5.00% 176.934 2028 9 - Year 7 Monitoring 10.00% 353.867 2029 Stream Bankfull Standard 10.00% 353.867 2026 Totals 1,061.600 Total Gross Credits 3,538.670 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1,061.600 Total Percentage Released 30.00% Remaining Unreleased Credits 2,477.070 Credit Release Milestone Riparian Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 0.896 0.896 0.000 0.896 2022 6/6/2022 3 - Year 1 Monitoring 10.00% 0.299 2023 4 - Year 2 Monitoring 10.00% 0.299 2024 5 - Year 3 Monitoring 15.00% 0.449 2025 6 - Year 4 Monitoring 5.00% 0.150 2026 7 - Year 5 Monitoring 15.00% 0.449 2027 8 - Year 6 Monitoring 5.00% 0.150 2028 9 - Year 7 Monitoring 10.00% 0.299 2029 Totals 0.896 Total Gross Credits 2.991 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 0.896 Total Percentage Released 29.96% Remaining Unreleased Credits 2.095 Cowford Project Page 1 of 3 White Oak 03030001 Mitigation Project Name Cowford Project USACE Action ID 2019-00487 DMS ID 100095 DWR Permit 2019-0495 River Basin White Oak Date Project Instituted 2/4/2019 Cataloging Unit 03030001 Date Prepared 6/6/2022 County Onslow Stream/Wet. Service Area White Oak 03030001 Cowford Project Page 2 of 3 White Oak 03030001 Mitigation Project Name Cowford Project USACE Action ID DMS ID 100095 DWR Permit River Basin White Oak Date Project Instituted Cataloging Unit 03030001 Date Prepared County Onslow Stream/Wet. Service Area Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 3,337.000 Riparian Restoration 2.991 2019-00487 2019-0495 2/4/2019 6/6/2022 White Oak 03030001 Debits Warm Stream Restoration Credits Riparian Restoration Credits Beginning Balance (mitigation credits) 3,538.670 2.991 Released Credits 1,061.600 0.896 Unrealized Credits 0.000 0.000 Converted Credits 0.000 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 1,061.600 0.896 Remaining Balance (Unreleased credits) 2,477.070 2.095 Total Remaining Balance (Released and Unreleased credits) 3,538.670 2.991 Cowford Project Page 3 of 3 White Oak 03030001