Loading...
HomeMy WebLinkAboutWQCS00121_Compliance Evaluation Inspection_20220721DocuSign Envelope ID: 94226832-7FFC-4999-9347-4C8AAB98BBD0 Compliance Inspection Report Permit: WQCS00121 Effective: 09/28/17 SOC: Effective: County: Duplin Region: Wilmington Contact Person: Andy P Raynor Directions to Facility: System Classifications: CS2, Primary ORC: Andy Paul Raynor Secondary ORC(s): On -Site Representative(s): Related Permits: NC0003450 WQCSD0532 WQCSD0574 WQCS00150 Town of Town of Town of Town of Inspection Date: 07/21/2022 Primary Inspector: Brian S West Secondary Inspector(s): Reason for Inspection: Routine Expiration: 05/31/25 Owner : Town of Wallace Expiration: Facility: Wallace Collection System Title: ORC Phone: 910-285-2812 Certification: 988755 Phone: 910-285-2812 Wallace - Wallace Regional WWTP Teachey - Teachey Deemed Municipal Collection System Greenevers - Greenevers Deemed Municipal Collection System Burgaw - Burgaw Collection System —DenrtigyeTime 09:OOAM Exit Time: 11:30AM ¢v �� 00t,Sf 7/22/2022 2EF61A0A14A2445... DocuSigned by: Tom- 1)AarrlOA, 7F141E73B6F3456... Inspection Type: Collection System Inspect Non Sampling Permit Inspection Type: Collection system management and operation Facility Status: ❑ Compliant II Not Compliant Question Areas: ▪ Miscellaneous Questions ▪ Capital Improvement Plan ▪ Inspections ▪ Lines (See attachment summary) ▪ General ▪ Map ▪ Spill Response Plan ▪ Pump Stations 7/22/2022 Phone: 910-796-7341 ▪ Sewer & FOG Ordinances ▪ Reporting Requirements ▪ Spills Page 1 of 7 DocuSign Envelope ID: 94226832-7FFC-4999-9347-4C8AAB98BBDO Permit: WQCS00121 Owner - Facility:Town of Wallace Inspection Date: 07/21/2022 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Inspection Summary: Routine inspection with Andy Raynor; his assistance during the visit is appreciated. Access to all areas of the system requested was granted. The Town was found to be deficient in the areas of: 10% annual line cleaning (11.8), and grease ordinance-inspections/FOG educational requirements (1.4). Please let this office know how the Town will comply with these requirements in the future. Please see all comments under each section of this report, and let us know if there are further questions/comments Page 2 of 7 DocuSign Envelope ID: 94226832-7FFC-4999-9347-4C8AAB98BBDO Permit: WQCS00121 Owner - Facility:Town of Wallace Inspection Date: 07/21/2022 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine General Is there a properly designated primary ORC and at least one back-up of proper grade? Are logs being reviewed by the system management or owner on a regular basis? # What is that frequency? # Are there any issues being addressed currently or any in the planning stages? Is there a specific pump failure plan available for all pump stations? Does plan indicate if pump parts/new pumps are in spare parts/equipment inventory? Are new/significantly upgraded pump stations equipped with anti -corrosion materials? Does the permittee have a copy of their permit? # Is permit expiring within the next 6 months? If Yes, has the Permittee applied for renewal? Comment: Sewer and FOG Ordinances Is Sewer Use Ordinance (SUO) or other Legal Authority available? Does it appear that the Sewer Use Ordinance is enforced? Is there a Grease Control Program that legally requires grease control devices? What is the standard grease trap cleaning requirement in the FOG ordinance? Is Grease Control Program enforced via periodic inspections/records review? Is action taken against violators? # Have satellite systems adopted an equivalent or more stringent ordinance? Is grease/sewer education program documented with req'd customer distribution? # Are other types of education tools used like websites, booths, special meetings, etc? Yes No NA NE ❑ ❑ ❑ • ▪ ❑ ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • • ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ Yes No NA NE ❑ ❑ ❑ • • ❑ ❑ ❑ ❑ ❑ ❑ • • ❑ ❑ ❑ If Yes, what are they? (This can reduce mailing to annual.) Town has a booth set up a the annual strawberry festival to educate residents on FOG issues. This reduces the permit requirement of direct mailing to customers from biannual to annual. This mailing can be accomplished via wording on bill with instructions on how to access FOG information on the Town's website Comment: Although the Town has legal authority to enforce a grease ordinance, inspection of commercial users and review of pump out records is deficient due to staff shortages Capital Improvement Plan Has a Capital (CIP) or System Improvement Plan been developed and adopted? Is it designated for wastewater only or does it have a dedicated section? Does CIP cover three to five year period of earmarked improvements? Does CIP include description of project area? Does CIP include description of existing facilities? Does CIP include known deficiencies? Does CIP include forecasted future needs? Yes No NA NE • ❑ ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ Page 3 of 7 DocuSign Envelope ID: 94226832-7FFC-4999-9347-4C8AAB98BBDO Permit: WQCS00121 Owner - Facility:Town of Wallace Inspection Date: 07/21/2022 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Comment: CIP is currently being revised and will contain a specific funding allocation for slip lining in the western section of the colleciton system Map Is there a overall sewer system map? Does the map include: Pipe Type (GS/FM) Pipe sizes Pipe materials (PVC, DIP, etc) Pipe location Flow direction Approximate pipe age Pump station ID, location and capacity # Force main air release valve location & type # Location of satellite connections Is the map being updated for changes/additions within 1 year of activation? Comment: Reporting Requirements # Have there been any sewer spills in the past 3 years? If Yes, were they reported to the Division if meeting the reportable criteria? If applicable, is there documentation of press releases and public notices issued? Is an Annual Wastewater Performance Report being filed with the Division, if required? Is the report being made available to all its sewer customers? # How is it being made available? Comment: Town has not had a reportable spill since 2018 Inspections Are adequate maintenance records maintained? Are pump stations being inspected at the required frequency? # Is at least one complete functionality test conducted weekly per pump station? Is there a system or plan in place to observe the entire system annually? Is the annual inspection documented? # Does the system have any high -priority lines/locations? Are inspections of HPL documented at least every 6 months? Are new lines being added to the HPL list when found or created? Yes No NA NE • ❑ ❑ ❑ • ▪ ❑ ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ▪ ❑ ❑ ❑ ❑ ❑ ❑ • ▪ ❑ ❑ ❑ Yes No NA NE ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ • Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • • ❑ ❑ ❑ ❑ ❑❑■ ❑ ❑ ❑ • Comment: SCADA is currently experiencing technical issues; Town has documented agreement with Mobile Communications to repair the system. Town has increased PS visitation in the interim Spill Response Action Plan Yes No NA NE Page4of7 DocuSign Envelope ID: 94226832-7FFC-4999-9347-4C8AAB98BBDO Permit: WQCS00121 Owner - Facility:Town of Wallace Inspection Date: 07/21/2022 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Is a Spill Response Action Plan available? Is a Spill Response Action Plan available for all personnel? Does the plan include: 24-hour contact numbers Response time Equipment list and spare parts inventory Access to cleaning equipment Access to construction crews, contractors, and/or engineers Source of emergency funds Site sanitation and cleanup materials Post-overflow/spill assessment Does the Permittee appear to respond within 2 hours of first knowledge of a spill? • ❑ ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • Comment: Town Public Works has recently moved into a new building and not all records were available for review. Please have required records available for next site visit Spills Is system free of known points of bypass? If No, describe type of bypass and location Are all spills or sewer related issues/complaints documented? # Are there repeated overflows/problems (2 or more in 12 months) at same location? # If Yes, is there a corrective action plan? Comment: Lines/Right-of-Ways/Aerial Lines Please list the Lines/Right of Ways/Aerial Lines Inspected: Visited the aerial crossing at the Boney Mill bridge. Line appeared structurally sound with no evidence of leakage Are right-of-ways/easements maintained for full width for access by staff/equipment? If No, give details on temporary access: Is maintenance documented? Are gravity sewer cleaning records available? Has at least 10% of lines older than 5 yrs been cleaned annually? Were all areas/lines inspected free of issues? Yes No NA NE • ❑ ❑ ❑ ❑ ❑ • ❑ Yes No NA NE ❑ • ❑ ❑ ❑ • ❑ ❑ Comment: Town has not been cleaning 10% of gravity lines per year as required by the permit. The Town is working on plans to install new drying beds at the WWTP in order to provide a location for gravity and PS cleaning pump -out, as the existing beds had to be removed for installation of a force main from River Landing. Also of concern is that the WWTP grit removal system is currently non-functional. The Town has been working with the DWR regional office on this issue Pump Stations Yes No NA NE Page5of7 DocuSign Envelope ID: 94226832-7FFC-4999-9347-4C8AAB98BBDO Permit: WQCS00121 Owner - Facility:Town of Wallace Inspection Date: 07/21/2022 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Please list the Pump Stations Inspected: Wallace Crossing, Teachey Road, Industrial Park, Cardinal Crest # Number of duplex or larger pump stations in system # Number of vacuum stations in system # Number of simplex pump stations in system # Number of simplex pump stations in system serving more than one building How many pump/vacuum stations have: # A two-way "auto polling" communication system (SCADA) installed? # A simple one-way telemetry/communication system (auto -dialer) installed? For pump stations inspected: Are they secure with restricted access? Were they free of by-pass structures/pipes? Were wet wells free of excessive grease/debris? # Do they all have telemetry installed? Is the communication system functional? Is a 24-hour notification sign posted ? Does the sign include: Owner Name? Pump station identifier? # Address? Instructions for notification? 24-hour emergency contact numbers? Are audio and visual alarms present? Are audio and visual alarms operable? # Is there a backup generator or bypass pump connected? If tested during inspection, did it function properly? Is the back-up system tested at least bi-annually under normal operating conditions? # Does it have a dedicated connection for a portable generator? # Is the owner relying on portable units in the event of a power outage? # If Yes, is there a distribution plan? If Yes, what resources (Units/Staff/Vehicles/etc) are included in Plan? All PS either have generator connection or backup pumps in order to meet reliability requirements. High water alarm lights at Wallace Crossing and Teachey Road were not working and in need of repair # Does Permittee have the approved percentage of replacement simplex pumps? Is recordkeeping of pump station inspection and maintenance program adequate? Do pump station logs include at a minimum: Inside and outside cleaning and debris removal? Inspecting and exercising all valves? 23 0 15 0 • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • • ❑ ❑ ❑ ❑ ❑ ❑ • Page6of7 DocuSign Envelope ID: 94226832-7FFC-4999-9347-4C8AAB98BBD0 Permit: WQCS00121 Owner - Facility:Town of Wallace Inspection Date: 07/21/2022 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Inspecting and lubricating pumps and other equipment? Inspecting alarms, telemetry and auxiliary equipment? • ❑ ❑ ❑ Comment: Town has a contract to repair the SCADA system as mentioned previously. Please continue increased visitation as required until the system is repaired Page 7 of 7