Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GW1-2022-06644_Well Construction - GW1_20220711
EII,— a�NS i'iRUC1T��1�T 11�Jd-'�C ➢ � �1-1� For Internal Use Only: 1.Well Contractor Information: �aA i C� (nit) vT 14.WATER ZONES Well Contractor ame F®fit ft. ftTO DO�� ��c A '� ft. � � NC Well Coatractor CertificationNnmber 15,OUTER CASING for multi-rased SYells ORLINER if a linable YADKIN WELL COMPANY,INC. FROM To D1kW=Tr tt- THICKNEss MATERIAL ft. ft. in. Company Name /� 16.INNER CASING OR TUB eothermal dosed-too 2.Well Construction Permit#: Al/A FROM TO DIAML+TER TMCICNM, 5 MATERIAL List all applicable well construction permits(Ia.EUC ounty,State,Variance,etc) ft in. 3.Well Use(checkwell use): f,- ft. in. 17.SCREEN Water Supply Well: PPY FRo➢s To DIAMEMR SLOT SIZE mclaYLss MATERAL ❑Agricultural ❑Municipal/Public ft. ft. in. ❑Geothermal(Heating/Cooling Supply) 91 //esidential Water Supply(single) ft. ft. in. ❑Industrial/Commeroial ❑Residential Wafer Supply(shared) 1B.GROUT ❑Irrigation ❑Wells>100,000 GPD FROM TO MATERIAL FWRLACEMENTAM,TROD&AMOUNT Non-Water Supply Well: ft ft. ❑Monitoring ❑Recovery it ft. Injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK If 2 livable ❑Aquifer Storage and Recovery ❑Salinity Barrier moil TO MATERIAL 7FEMYLACEMRNTM=011 ❑Aquifer Test ❑Stormwater Drainage ft I ❑Experimental Technology ❑Subsidence Control ft it ❑Geothermal(Closed Loop) []Tracer 20.DRILLINGLOG attach additional sheets ifnecessa ❑Geothermal(Heating/CoolingRetum) ❑Other(explain under#21 Remarks) FROM zot. DEsc Tiox tutor, ,ragas,sui0rock a gm in sae ete 5,1a 4.Date Well(s)Completed: � Well ID#�� ® l' ft ft �}ant 5a Well Location: Phone ft ft '. Pr o�.( Facility/OwnerName ,r FacilityM#(if applicable) ft ft ft. ft Physical Address,City;and Zip - ft ft g '�L � County (� Parcel Identification No.(PIN) Cum; ?Leae 7 5b.Latitude and longitgde in degrees/minutes/seconds or decimal degrees: �ds4ti w RIG t. (ifwell field,one lat/longis sufficient) y 22.Certification: N 371�i e S 7�c� 6.Ware)the well(s): 24'rmanent or ❑Temporary Si e o ed Well Contractor Date By signing thisform,l hereby certify that the wells)was(were)constructed in accordance with G 7.Is this a repair to an existing well: OYes or llto 15ANCAC 02C.0100 or 15A NCAC 02C.0200 Fell Construction,Standards and that a ropy If IhIs is a repair,fdl out known well construction rhformation and explain the nature of the of this retard has been provided to the well owner repair under 121 remarks section or.an fhe back of this form. 23.Site diagram or additional-well details: S.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 OW I is needed, Indicate TOTAL NUMBER of wells (add See Over`in Remarlcs Box).You may also attach additional pages if necessary. drilled: I 24.SUBW=AL INSTRUCTIONS 9.Total well depth below land surface: For multiple wells list all depths lfdifferent(emmple-3©200'and 2@1000 �Submit this GW-1 within 30 days of well completion per the following: 24a. For All Wells: Original form to Division of Water Resources (DWR), if Static water level below top of casing: (ft) Information Processing UA 1617 MSC,Raleigh,NC 27699-1617 Tjwoter level Is above casing,use"+" �7 Bit Off. 7 L 24b.For Injection Wells:Copy to DVA;,Underground Injection Control(IUQ 11.Borehole diameter: (IL) Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: AIR ROTARY 24c.For Water Supply and Open-L'oop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct pusb,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d,For Water Wells producinglmIover 100,000 GPD:Copy to DWR,,CCPCUA �` Permit Pmgram,1611 MSC,Raleigh,,NC 27699-1611 13a.Yield(gpm)�_ 1Iethod oftest: 76%HTH OZ DATE SITE VISITED: 13b.Disinfection type: Amount: _ tn ,/�