HomeMy WebLinkAboutSite Inspection 7.21.22 Br 209 Mt Harmony RoadWetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20210304
NCDOT - Replace Bridge 209 on SR1623
Burke
NCDOT - Replace Bridge 209 on SR1623
NC DOT Division 13
7/21/2022
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-81° 26' 54''+35° 43' 40''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
- Outlet of culvert needs to be stabilized. Impervious dike needs to be rebuilt/repaired and sediment directly above it
should be removed (This is within the footprint of the impacts). Recommend cover on slopes of the downstream
headwall to prevent additional loss into work area.
- Outlet of culvert - Right Bank Descending - Silt fence outlet at top of bank needs maintenance.
- Stock piles need to be completely covered.
- Before the water is turned into the box culverts, any sediment from the site that is in the culvert will need to be
removed.
NPDES records were up to date.
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on July 21, 2022. Jamie Romine
and Cody Bartlett were present during the inspection. The following are items that need attention:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20210304
7/21/2022
Bryan, Roger D
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Work continues on the culvert. Water is still being diverted.Comment:
page:2