Loading...
HomeMy WebLinkAboutJuly inspection E_SectionWetland Inspection Report Project Num: 20140762 Proiect Name: TPB NCDOT- US 221 (R-2915E) County: Watauga Location: TPB NCDOT- US 221 (R-2915E) Latitude: +350 16' 05" SW Plan Location: Site Owner Name: NC DOT PDEA Inspection Date: 7/19/2022 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Version: 6 Status: Issued Proiect Type: Road intena c /repair/improveme Region: nston- ayem Longitude: -81 ° 30' 10" Title: Phone: Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Phone: 336-776-9703 page 1 Site Number: 20140762 Owner: Thorpe, Greizory Inspection Date: 7/19/2022 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WOO Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: I met with DEO and other DOT staff to review ongoing construction at multiple permit sites. We reviewed Sites 2, 4,6,15,17,24,28, and 29 inlets and outlets. All sites were built to plans with some sligh modifications at 24A and 29 but all were within permitted areas and made sense to do (ripM additions and remove pipe). One concern was the stilling basin at Station 717. It was not quite built correctly with the weir at too low an elevation. That created a turbidi discharge. Roadside was working with DOT and crew to make corrections. I will follow-up in a few weeks. There were sediment losses at a few sites of which were being recovered and EC measures repaired. This was all due to the previous evening storm event. All else looked to be in good shape. page 2