Loading...
HomeMy WebLinkAbout20181249 Ver 10_R-2721A Permit Changes Summary 07172022_20220621 July 18, 2022 R-2721A Summary of Permit Changes During the approval process for the Design Noise Report noise walls were added that affected four permitted wetland sites. The four permitted wetland sites affected are Sites 6, 12, 13, and 38. The addition of the noise wall increased the shoulder width causing the fill slope to extend further into wetland areas than it had previously. For all four sites the quantity of wetland area impacted did not change but rather the area of the type of impacts changed. In-depth site location and a description of the changes can be found below. Updated stream and wetland permit drawings that illustrate the changes are included. Site 6 --LREV- Station 55+47 LT to -LREV- Station 57+00 LT—0.01 acres that were previously permitted as excavation in wetland impacts are now permitted as fill in wetland impacts. Site 12 -LREV- Station 79+90 LT to -LREV- Station 80+97 LT—0.02 acres that were previously permitted as mechanized clearing impacts are now permitted as fill in wetland impacts. Site 13 -LREV- Station 81+20 LT to -LREV- Station 81+81 LT—0.01 acres that were previously permitted as mechanized clearing impacts are now permitted as fill in wetland impacts. Site 38 -L- Station 211+06 LT to -L- Station 211+70 LT — 0.01 acres that were previously permitted as mechanized clearing impacts are now permitted as fill in wetland impacts. The permanent wetland impact acreage in the Neuse River Basin (HUC 03020201) remains the same at 14.60 acres (which includes 0.02 acres of isolated wetlands) and the permanent wetland impact acreage in the Cape Fear River Basin (HUC 03030004) remains the same at 0.01 acres. The impacts to isolated wetlands remain the same at 0.02 acres.Revised Table 8 has been included to reflect changes in impacts to R-272 1A and illustrate the jurisdictional resources impact. There are no changes to the mitigation requirements. Changes to impacts are shown in bold font. Please note that impacts previously permitted are not shown as a deduction in Table 8 since they were already constructed. Only new impacts are shown to account for what will be happening during construction. However, the impacts listed on the Permit Summary Sheets do reflect the deduction from the original permitted type amounts and the addition of the new requested permit type amounts. Table 8 shows what is being changed, while the Permit Summary Sheets record the actual impact tally. Table 8. R-2721A Wetland Impacts Permit Drawing Site NRTR Number Label Impact Type Wetland Type Permanent Impacts(ac) 1 (Y3DET) WS Fill Riparian 0** 1 (Y3DET) WS Mechanized Clearing Riparian 0** 2(Y3DET) WR Fill Riparian 0** 2(Y3DET) WR Mechanized Clearing Riparian 0** 33 (Y3DET) WAK Fill Riparian 0.06 33 (Y3DET) WAK Mechanized Clearing Riparian 0.05 3 WVZ* Fill Non-Riparian <0.01 3 WVZ* Excavation Non-Riparian <0.01 3 WVZ* Mechanized Clearing Non-Riparian <0.01 5 WF Fill Riparian <0.01 5 WF Mechanized Clearing Riparian 0.09 5 WF Excavation Riparian <0.01 5 WF Hand Clearing Riparian 0.03 6 WG Fill Riparian 1.58***(1.57) 6 WG Excavation Riparian 0.04 6 WG Mechanized Clearing Riparian 0.06 6 WG Hand Clearing Riparian 0.18 9 WI Fill Riparian 0.28 9 WI Excavation Riparian 0.00 11 WK Fill Riparian 0.08 11 WK Excavation Riparian 0.03 12 WL Fill Riparian 0.49****(0.47) 12 WL Mechanized Clearing Riparian 0.03 13 WL Fill Riparian 0.18****(0.17) 13 WL Mechanized Clearing Riparian 0.03 15 WR Fill Riparian 1.80 15 WR Excavation Riparian <0.01 15 WR Mechanized Clearing Riparian 0.16 16 WU Excavation Riparian 0.51 16 WU Mechanized Clearing Riparian 0.15 17 WV Fill Riparian 0.10 17 WV Excavation Riparian <0.01 17 WV Mechanized Clearing Riparian 0.02 18 WX Fill Riparian 0.88 18 WX Excavation Riparian 0.01 18 WX Mechanized Clearing Riparian 0.15 19 WY Fill Riparian 0.02 19 WY Excavation Riparian 0.05 19 WY Mechanized Clearing Riparian 0.09 20 WZ Fill Riparian 0.10 20 WZ Excavation Riparian 0.02 20 WZ Mechanized Clearing Riparian 0.08 21 WAB Excavation Riparian <0.01 21 WAB Mechanized Clearing Riparian 0.02 Permit Drawing Site NRTR Number Label Impact Type Wetland Type Permanent Impacts(ac) 23 WAB Excavation Riparian 0.00 23 WAB Mechanized Clearing Riparian 0.01 24 WAC Fill Riparian 1.25 24 WAC Excavation Riparian 0.05 24 WAC Mechanized Clearing Riparian 0.08 26 WAE Fill Riparian 1.25 26 WAE Mechanized Clearing Riparian 0.15 27 WAE Mechanized Clearing Riparian <0.01 28 WAF Fill Riparian 0.00 28 WAF Mechanized Clearing Riparian <0.01 30 WAF Fill Riparian 1.38 30 WAF Mechanized Clearing Riparian 0.05 31 WAL Fill Riparian 0.20 32 WAM Fill Riparian 0.03 32 WAM Mechanized Clearing Riparian 0.01 33 WAK Fill Riparian 0.25 33 WAK Excavation Riparian 0.05 33 WAK Mechanized Clearing Riparian 0.08 34 WAK Fill Riparian 0.11 34 WAK Excavation Riparian 0.01 34 WAK Mechanized Clearing Riparian 0.07 35 WAI Fill Riparian <0.01 35 WAI Excavation Riparian <0.01 35 WAI Mechanized Clearing Riparian <0.01 37 WAO(1) Fill Riparian 0.20 37 WAO(1) Excavation Riparian 0.03 37 WAO(1) Mechanized Clearing Riparian 0.09 38 WAO(2) Fill Riparian 0.31****(0.30) 38 WAO(2) Excavation Riparian 0.01 38 WAO(2) Mechanized Clearing Riparian 0.05 39 WAQ Fill Riparian 0.19 39 WAQ Excavation Riparian <0.01 39 WAQ Mechanized Clearing Riparian 0.09 40 WAQ Fill Riparian 0.24 40 WAQ Excavation Riparian <0.01 40 WAQ Mechanized Clearing Riparian 0.06 42 WS Fill Riparian 0.03 42 WS Mechanized Clearing Riparian 0.13 42 WS Hand Clearing Riparian 0.16 43 WS Fill Riparian 0.17 43 WS Mechanized Clearing Riparian 0.06 44 WS _ Mechanized Clearing Riparian 0.02 44 WT _ Mechanized Clearing Riparian <0.01 46 WAG Fill Riparian 0.07 46 WAG Mechanized Clearing Riparian 0.07 Permit Drawing Site NRTR Number Label Impact Type Wetland Type Permanent Impacts(ac) 47 WAH Fill Riparian 0.06 47 WAH Mechanized Clearing Riparian 0.03 48 WAJ Fill Riparian 0.08 Total Riparian Impacts HUC 03020201: 14.58 Total Non-Riparian Impacts HUC 03030004: 0.01 *Impacts in HUC 03030004, **Impacts have been removed from previous permit modification packages. ***Impact was previously permitted as excavation in wetland impacts. ****Impacts were previously permitted as mechanized clearing impacts. Bolded impact amounts represent a change from the permit modification issued on April 29, 2020 of the originally issued 404 (SAW- 2009-02240)/401 WQC (4179) with the previous amount provided in parenthesis.