Loading...
HomeMy WebLinkAboutNCC205307_NOT Closeout Documents_20220720North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Bertie Project: Hoggard Mill Substation River basin: Roanoke Person financially responsible: Virginia Electric and Power Company - Kevin J Project #: BERTI-2021-002 Fields Address: 10900 Nuckols Rd 4th Floor, Richmond, VA 23060 1. Project Location: Governors Rd, HWY 308, Windsor Pictures: No 2. Weather and soil conditions: Sunny, warm, dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one Title: Inspection report: Sent Report Date given/sent: July 11, 2022 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the 10. Comments: NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deg.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Bradley West Others present: Date of inspection: July 7, 2022 Time arriving on site: 10:30 AM Time leaving site: 11:00 AM cc: