Loading...
HomeMy WebLinkAbout20210448 Ver 2__20220617_Gateway_85_PCN_FINAL_20220617Preliminary ORM Data Entry Fields for New Actions ACTION ID #: SAW- Begin Date (Date Received): Prepare file folder ❑ Assign Action ID Number in ORM ❑ 1. Project Name [PCN Form A2a]: Project Gateway 85 — Aberdeen Blvd. Extension and Lineberger Rd. Rd 2. Work Type: ❑Private ❑ Institutional 0 Government ❑ Commercial 3. Project Description / Purpose [PCN Form B3d and B3e]: The Gateway 85 Project, formerly named The Lineberger Connector Project is a planned public connector located within the Gastonia Logistics Center (GLC) property. The connector will provide independent utility to the residents of Gastonia and Lowell that live and work locally. 4. Property Owner / Applicant [PCN Form A3 or A41: City of Gastonia 5. Agent / Consultant [PNC Form A5 — or ORM Consultant ID Number]: Chris Tinklenberg, PWS (Kimley-Horn) 6. Related Action ID Number(s) [PCN Form B5b]: 7. Project Location —Coordinates, Street Address, and/or Location Description [PCN Form Blb]: The project is located between W 1 st Street and 1-85 in Gastonia and Lowell, Gaston County, NC (35.269412,-81.119264) 8. Project Location— Tax Parcel ID [PCN Form B1a]: 137847, 137876, 300492 9. Project Location — County [PCN Form A2b]: Gaston 10. Project Location — Nearest Municipality or Town [PCN Form A2c]: Gastonia 11. Project Information — Nearest Waterbody [PCN Form 132a]: Duharts Creek 12. Watershed / 8-Digit Hydrologic Unit Code [PCN Form 132c]: South Fork Catawba (03050102) Authorization: Section 10 ❑ Section 404 0 Regulatory Action Type: ❑ Standard Permit 0 Nationwide Permit #13 & 14 Regional General Permit # Jurisdictional Determination Request Section 10 and 404 ❑ Pre -Application Request ❑ Unauthorized Activity ❑ Compliance ❑ No Permit Required Revised 20150602 Kimley>>> Horn June 17, 2022 Mr. Bryan Roden -Reynolds Charlotte Regulatory Field Office US Army Corps of Engineers 8430 University Executive Park Drive Charlotte, NC 28262 Mr. Paul Wojoski NC DWR, 401 & Buffer Permitting 512 North Salisbury Street Raleigh, NC 27604 Re: Pre -Construction Notification (NWP 13 & 14) Project Gateway 85 —Aberdeen Blvd. Extension and Lineberger Rd. Realignment Modification Gastonia, Gaston County, NC Dear Mr. Roden -Reynolds and Mr. Wojoski: On behalf of our client, the City of Gastonia, Kimley-Horn (KH) is submitting the enclosed modification to the joint Section 404/401 Pre -Construction Notification (PCN) for the above -referenced project for your review pursuant to Nationwide Permits 13 & 14 and General 401 Water Quality Certification numbers 4134 & 4135. Authorization is requested to extend Aberdeen Boulevard and realign Lineberger Road. The approximately 13-acre project area consists of the limits of disturbance and a 70-foot roadway right-of-way and is located in Gastonia, Gaston County, NC. The proposed project seeks to construct the roadway infrastructure in two phases. Phase I seeks to extend Aberdeen Boulevard from the terminus of existing Aberdeen Boulevard east to existing Lineberger Road. Phase II seeks to realign Lineberger Road by maintaining its entrance off West 15Y Street and shifting the road west, approximately one -quarter of a mile, and connecting south with Aberdeen Boulevard Extension. The center project area coordinates are 35.269218,-81.119589. The following information is included as part of this PCN submittal: • Project Summary Sheet • Agent Authorization • Pre -Construction Notification Form Project Site Figures ■ Figure 1— Vicinity ■ Figure 2 — USGS 7.5' Topo (Gaston N & Mount Holly Quads) ■ Figure 3 — SSURGO Soils and NWI (2021 Nearmap Aerial) ■ Figure 4 — Existing Conditions (2021 Nearmap Aerial) ■ Figure 5 — Proposed Conditions (2021 Nearmap Aerial) • Infrastructure Construction Plans for Gateway 85 Agency Correspondence • Compensatory Mitigation Kimley>>)Horn Paget PROJECT BACKGROUND The Gateway 85 Project, formerly named The Lineberger Connector Project, is a well-known, previously planned public connector located within the Gastonia Logistics Center (GLC) property. The connector will provide independent utility to the residents of Gastonia and Lowell that live and work locally. The connector will decrease travel time for eastbound/westbound users and eliminate cut - through traffic in adjacent residential communities, providing safer neighborhoods for these residents. In addition to time savings for residents who may no longer need to commute along 1-85, other travelers and the freight industry will benefit from the reduced congestion along the interstate. The "Lineberger Connector" project is currently included in the Gaston -Cleveland -Lincoln Metropolitan Planning Organization's (GCLMPO) Comprehensive Transportation Plan (CTP) and has been included in the MPO's long-range transportation plans for many years. The project is currently listed in the GCLMPO's 2045 Metropolitan Transportation Plan (MTP) for completion in the 2035 horizon year. The owner of the GLC property has donated a 70-foot public right-of-way (ROW) to the City of Gastonia who is the applicant responsible for the design and construction of this project. PROPOSED IMPACTS TO POTENTIALLY JURISDICTIONAL WATERS Authorization is requested to extend Aberdeen Boulevard and realign Lineberger Road. The approximately 13-acre project area consists of the limits of disturbance and a 70-foot roadway right- of-way and is located in Gastonia, Gaston County, NC. The proposed project seeks to construct the roadway infrastructure in two phases. Phase I seeks to extend Aberdeen Boulevard from the terminus of existing Aberdeen Boulevard east to existing Lineberger Road. Phase II seeks to realign Lineberger Road by shifting the road west, approximately one-quater of a mile, while maintaining its connection to West Vt Street and connecting south with Aberdeen Boulevard Extension. Impacts to aquatic resources are proposed to be conducted in two phases at five separate and distant impact sites along both roadway corridors. The following summarizes the proposed impacts: Phase I —Aberdeen Blvd. Extension • Impact Site 1 (1A, 113, & 1C) 0 1A (NWP14) — 168 linear foot (If), 72-inch reinforced concrete pipe (RCP) placed within Stream 3 (Culvert A in plans). The pipe will be buried 12-inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate burial necessary for aquatic passage, to accelerate the reestablishment of the channel bed, and to maintain the width of the stream channel. 10 If riprap dissipator pads will be installed at the inlet and outlet of the pipe to meet non -erosive discharge velocities. 30 If of temporary impacts are necessary to install an impervious dike and pumped diversion to perform the construction activity in dry conditions. 0 113 (NWP14) —127 If, 84-inch RCP placed within Stream 1(Culvert B in plans). The pipe will be buried 12-inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate burial necessary for aquatic passage, to accelerate the reestablishment of the channel bed, and to maintain the width of the stream channel. 10 If riprap dissipator pads will be installed at the inlet and outlet of the pipe to meet non -erosive discharge velocities. 30 If of temporary impacts are necessary to install an impervious dike and pumped diversion to perform the construction activity in dry conditions. Kimley>»Horn Page 3 o 1C (NWP13) — 290 If of bank stabilization is proposed on the left and right banks of S1 and S3 immediately adjacent and downstream of the proposed roadway crossing Culverts A and B. The existing banks in this area are erosive — lacking stable slopes and adequate vegetated cover. The banks will be graded back to a 3:1 slope providing a stable transition between the culverts and the existing channel banks. In addition to stability, the sloped channel banks also offset the impact to the 100-year water surface elevation caused by the encroachment of the roadway fill. • Impact Site 2 (NWP14) - 137 If, 72-inch RCP placed within Stream 5 (Culvert C in plans). The pipe will be buried 12-inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate burial necessary for aquatic passage, to accelerate the reestablishment of the channel bed, and to maintain the width of the stream channel. 10 If riprap dissipator pads will be installed at the inlet and outlet of the pipe to meet non -erosive discharge velocities. 30 If of temporary impacts are necessary to install an impervious dike and pumped diversion to perform the construction activity in dry conditions. • Impact Site 3 (NWP14) — 0.052-ac to Wetland 11 results from grading necessary to construct the Aberdeen Extension. 0.01-ac of temporary impacts are necessary to perform the construction activities. Phase II — Lineberger Rd. Realignment • Impact Site 4 (NWP14) — 0.224-ac to Wetland S results from grading necessary to construct the Aberdeen Extension. 0.01-ac of temporary impacts are necessary to perform the construction activities. • Impact Site 5 (NWP14) — 253 If, 72-inch RCP placed within Stream 5 (Culvert D in plans). The pipe will be buried 12-inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate burial necessary for aquatic passage, to accelerate the reestablishment of the channel bed, and to maintain the width of the stream channel. 10 If riprap dissipator pads will be installed at the inlet and outlet of the pipe to meet non -erosive discharge velocities. 30 If of temporary impacts are necessary to install an impervious dike and pumped diversion to perform the construction activity in dry conditions. • Impact Site 6 (NWP14) — 77 If of permanent stream impact to Stream 6 is requested for grading/fill necessary to realign Lineberger Road. As mentioned above, this portion of the roadway is constrained by site development by others which confines the roadway alignment through this location. Overall, the proposed project seeks authorization to permanently impact 762 If of stream/potential non -wetland WoUS and 0.276-ac wetland/potential wetland WoUS under NWP14 for construction of the roadway. Authorization is requested under NWP13 to perform 290 If of streambank stabilization to reduce bank erosion by grading banks to a more stable slope and planting with native riparian vegetation species. 120 If of temporary stream/potential non -wetland WoUS impacts are necessary to install pump diversion operations at the three proposed culvert locations to allow for work in dry conditions. 0.02-ac of temporary wetland/potential wetland WoUS impacts are necessary for construction activities. Kimley>>)Horn Page AVOIDANCE AND MINIMIZATION The Aberdeen Blvd. Extension alignment is intended and designed to border the existing 68-foot Duke Power Easement which bisects the Gastonia Logistic Center property. Impacts to aquatic resources within this corridor could not be avoided by the proposed roadway; however, the proposed impact locations minimize impacts to higher quality resources since the general quality of each aquatic resource feature adjacent to the Duke Power Easement has been altered or degraded due to construction and regular maintenance of the easement. The dimension, pattern, and profile of the streams above and below the proposed culverts will not be modified by altering the width or depth of the stream profile in connection with the construction activities. The width, height, and gradient of the proposed culverts have been modeled and sized sufficiently to pass the average historical low flow and spring flow without adversely altering flow velocity, as well as flood flows during major storm events. Culverts have been designed and will be constructed in a manner that minimizes destabilization and head cutting to the streams. Destabilizing the channel and head -cutting upstream have been considered and appropriate actions incorporated into the design and placement of the culverts. Culvert lengths have been reduced to the maximum extent practicable by implementing taller headwalls and maximizing side slopes to minimize stream impacts and will be installed in such a manner that the original stream profiles will not be altered. All culverts will be buried 12-inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate burial necessary for aquatic passage, to accelerate the reestablishment of the channel beds, and to maintain the width of the stream channels. Rip -rap outlet dissipation will be placed in a manner that the boulders will be pushed or "keyed" into the channel beds so that the finished top elevation of the riprap will not exceed that of the original stream beds to prevent destabilization of the stream beds or banks downstream of the impact areas and to allow for aquatic life passage. Temporary impacts have been minimized to the greatest extent practicable to meet the needs of the project and do not pose adverse alterations to the existing channels. Erosion control measures implemented during the construction of the roadway will be removed immediately following the activities and any disturbance will be returned to pre -construction conditions. COMPENSATORY MITIGATION Compensatory mitigation will be met by the purchase of credits through the NC Division of Mitigation Services (NCDMS) in -lieu fee program. The following table summarizes the stream and mitigation credits: Kimley>>> Horn Table 1: Stream and Wetland Mitigation Credits Page S Impact Site Impact Size (LF/ac) Flow Regime NCSAM / NCWAM Rating Proposed Mitigation Ratio Required Credits Site 1A—S3 168 LF Perennial Medium 2:1 336 Site 113 — S1 127 LF Perennial Low 1.75:1 222 Site 2 — S5 137 LF Perennial Medium 2:1 274 Site 3 — W11 0.052-ac N/A Low 2:1 0.104 Site 4 — W8 0.224-ac N/A Medium 2:1 0.448 Site 5 — S5 253 LF Perennial Medium 2:1 506 Site 6—S6 77 LF Intermittent Low 1.5:1 116 TOTAL STREAM 762 1,454 TOTAL WETLAND 0.276 0.552 In total, 1,454 stream mitigation credits and 0.552 wetland mitigation credits will be purchased from NCDMS for impacts associated with the proposed roadway project. Quality assessment results and Statement of Availability are included. Please feel free to contact me at (704) 409-1802 if you have any questions or if additional information is necessary. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. Chris Tinklenberg, PWS Environmental Scientist Kimley s>> Horn Project Summary Sheet Project Name: Gateway 85 - Aberdeen Blvd. Extension and Lineberger Rd. Realignment Applicant Name and Address: City of Gastonia (POC: Rusty Bost) 150 South York Street Gastonia, NC 28052 Telephone Number: Type of Request: ® Nationwide PCN (NWP #13 & #14) ❑ Individual Permit Application ❑ Jurisdictional Determination ❑ Other: Included Attachments: ® Project Plans ® USGS Map ® NRCS Soil Survey ® Agent Authorization ❑ Delineation Sketch ® Delineation Survey ❑ Data Forms (Up & Wet) ❑ NCDWR Stream Forms ❑ USACE Stream Forms ❑ NCDMS Confirmation ® Aerial Photo ❑ Site Photos ® Agency Correspondence ❑ Other: ❑ Other: Check if applicable: ❑ CAMA County ❑ Trout County ❑ Isolated Waters ❑ Section 7, ESA ❑ Section 106, NHPA ❑ EFH ❑ Mitigation Proposed (❑ NC EEP ❑ On -Site ❑ Off -Site ❑ Other) County: Gaston Nearest City/Town: Gastonia Waterway: Duharts Creek River Basin: South Fork Catawba H.U.C.: 03050102 USGS Quad Name: Gaston N and Mount Holly Property Size (acres): 13 acres Approx. Size of Jurisdiction on Site (acres): 0.10 Site Coordinates (in decimal degrees): 35.269412' N,-81.119264 °W Project Location: The project is located between W 1 st Street and I-85 in Gastonia and Lowell, Gaston County, NC. Site Description: Existing land use is comprised of undeveloped forested land bound by residential and commercial development. Impact Summary (if applicable): Overall, the proposed project seeks authorization to permanently impact 762 LF of stream/potential non -wetland WoUS and 0.276-ac wetland/potential wetland WoUS under NWP14 for construction of the roadway. Authorization is requested under NWP 13 to perform 290 LF of streambank stabilization to reduce bank erosion by grading banks to a more stable slope and planting with native riparian vegetation species. 120 LF of temporary stream/potential non -wetland WoUS impacts are necessary to install pump diversion operations at the three proposed culvert locations to allow for work in dry conditions. 0.02-ac temporary wetland/potential wetland WoUS impacts are reauested for construction activities. NWP # Open Water (acres) Wetland (acres) Stream Channel Intermittent and/or Unimportant Aquatic Function Perennial and/or Important Aquatic Function Temp. Perm. Temp. Perm. Tem Perm. Tem Perm. if ac if ac if ac if Ac 13 290 14 0.276 77 120 685 Total 0.276 77 120 975 Total Permanent (Loss) Impact to Wetland Waters of the U.S. 0.276 ac Total Permanent (Loss) Impact to Non -Wetland Waters of the U.S 1,052 LF Kimley-Horn Contact: Chris Tinklenberg, PWS Direct Number: (704) 409-1802 Email: chris.tinklenberg(n kimley-horn.com o�p'F�yW�A7E�9QG l 1.Juuv� Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 13 & 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ® Yes ❑ No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes ❑ No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Project Gateway 85 — Aberdeen Blvd. Extension and Lineberger Rd. Realignment 2b. County: Gaston 2c. Nearest municipality / town: Lowell and Gastonia 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: NP Gastonia Industrial, LLC 3b. Deed Book and Page No. 5184 & 1270; 5185 & 0733 3c. Responsible Party (for LLC if applicable): POC: Michael Johnston (formerly Ian McDonald) 3d. Street address: 4825 NW 41st Street, Suite 500 3e. City, state, zip: Riverside, MO, 64150 3f. Telephone no.: 816-384-2292 3g. Fax no.: 3h. Email address: mjohnston@northpointkc.com (formerly imcdonal@northpointkc.com) Page 1 of 15 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ® Other, specify: Municipality 4b. Name: The City of Gastonia (POC: Rusty Bost) 4c. Business name (if applicable): 4d. Street address: 150 South York Street 4e. City, state, zip: Gastonia, NC, 28052 4f. Telephone no.: 704-854-6635 4g. Fax no.: 4h. Email address: Rustyb@cityofgastonia.com 5. Agent/Consultant Information (if applicable) 5a. Name: Chris Tinklenberg, PWS 5b. Business name (if applicable): Kimley-Horn and Associates 5c. Street address: 200 South Tryon Street, Suite 200 5d. City, state, zip: Charlotte, NC 28202 5e. Telephone no.: 704-409-1802 5f. Fax no.: 5g. Email address: Chris.Tinklenberg@kimley-horn.com Page 2 of 15 PCN Form — Version 1.4 January 2009 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 137847, 137876, 300492 1 b. Site coordinates (in decimal degrees): Latitude: 35.269218 Longitude: - 81.119589 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 12.65 acres (Project Boundary — LOD) 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Duharts Creek 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: South Fork Catawba; HUC 03050102 Page 3 of 15 PCN Form — Version 1.4 January 2009 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project area is currently undeveloped and is immediately adjacent to a 68-foot wide Duke Power Easement. Existing land use in the vicinity of the project includes residential neighborhoods, commercial development, and undeveloped forested/maintained properties. 3b. List the total estimated acreage of all existing wetlands on the property: 0.276-ac 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: The total length of all on -site streams is approximately 1,172 linear feet. 3d. Explain the purpose of the proposed project: The Gateway 85 Project, formerly named The Lineberger Connector Project, is a well-known, previously planned public connector located within the Gastonia Logistics Center (GLC) property. The connector will provide independent utility to the residents of Gastonia and Lowell that live and work locally. The connector will decrease travel time for eastbound/westbound users and eliminate cut -through traffic in adjacent residential communities, providing safer neighborhoods for these residents. In addition to time savings for residents who may no longer need to commute along I- 85, other travelers and the freight industry will benefit from the reduced congestion along the interstate. The "Lineberger Connector" project is currently included in the Gaston -Cleveland -Lincoln Metropolitan Planning Organization's (GCLMPO) Comprehensive Transportation Plan (CTP) and has been included in the MPO's long-range transportation plans for many years. The project is currently listed in the GCLMPO's 2045 Metropolitan Transportation Plan (MTP) for completion in the 2035 horizon year. The owner of the GLC property has donated a 70-foot public right-of-way (ROW) to the City of Gastonia who is the applicant responsible for the design and construction of this project. Page 4 of 15 PCN Form — Version 1.4 January 2009 3e. Describe the overall project in detail, including the type of equipment to be used: Authorization is requested to extend Aberdeen Boulevard and realign Lineberger Road. The approximately 13-acre project area consists of the limits of disturbance and a 70-foot roadway right-of-way and is located in Gastonia, Gaston County, NC. The proposed project seeks to construct the roadway infrastructure in two phases. Phase I seeks to extend Aberdeen Boulevard from the terminus of existing Aberdeen Boulevard east to existing Lineberger Road. Phase II seeks to realign Lineberger Road by shifting the road west, approximately one-quater of a mile, while maintaining its connection to West 1st Street and connecting south with Aberdeen Boulevard Extension. Impacts to aquatic resources are proposed to be conducted in two phases at five separate and distant impact sites along both roadway corridors. The following summarizes the proposed impacts: Phase I — Aberdeen Blvd. Extension • Impact Site 1 (1A, 1B, & 1C) 0 1A (NWP14) — 168 linear foot (If), 72-inch reinforced concrete pipe (RCP) placed within Stream 3 (Culvert A in plans). The pipe will be buried 12-inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate burial necessary for aquatic passage, to accelerate the reestablishment of the channel bed, and to maintain the width of the stream channel. 10 If riprap dissipator pads will be installed at the inlet and outlet of the pipe to meet non -erosive discharge velocities. 30 If of temporary impacts are necessary to install an impervious dike and pumped diversion to perform the construction activity in dry conditions. 0 1 B (NWP14) — 127 If, 84-inch RCP placed within Stream 1 (Culvert B in plans). The pipe will be buried 12- inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate burial necessary for aquatic passage, to accelerate the reestablishment of the channel bed, and to maintain the width of the stream channel. 10 If riprap dissipator pads will be installed at the inlet and outlet of the pipe to meet non -erosive discharge velocities. 30 If of temporary impacts are necessary to install an impervious dike and pumped diversion to perform the construction activity in dry conditions. 0 1 C (NWP13) — 290 If of bank stabilization is proposed on the left and right banks of S1 and S3 immediately adjacent and downstream of the proposed roadway crossing Culverts A and B. The existing banks in this area are erosive — lacking stable slopes and adequate vegetated cover. The banks will be graded back to a 3:1 slope providing a stable transition between the culverts and the existing channel banks. In addition to stability, the sloped channel banks also offset the impact to the 100-year water surface elevation caused by the encroachment of the roadway fill. • Impact Site 2 (NWP14) - 137 If, 72-inch RCP placed within Stream 5 (Culvert C in plans). The pipe will be buried 12- inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate burial necessary for aquatic passage, to accelerate the reestablishment of the channel bed, and to maintain the width of the stream channel. 10 If riprap dissipator pads will be installed at the inlet and outlet of the pipe to meet non -erosive discharge velocities. 30 If of temporary impacts are necessary to install an impervious dike and pumped diversion to perform the construction activity in dry conditions. • Impact Site 3 (NWP14) — 0.052-ac to Wetland 11 results from grading necessary to construct the Aberdeen Extension. 0.01-ac of temporary impacts are necessary to perform the construction activities. Phase II — Lineberger Rd. Realignment • Impact Site 4 (NWP14) — 0.224-ac to Wetland 8 results from grading necessary to realign Lineberger Road. This portion of the roadway is constained by site development by others which confines the roadway alignment through this location. 0.01-ac of temporary impacts are necessary to perform the construction activities. • Impact Site 5 (NWP14) — 253 If, 72-inch RCP placed within Stream 5 (Culvert D in plans). The pipe will be buried 12- inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate burial necessary for aquatic passage, to accelerate the reestablishment of the channel bed, and to maintain the width of the stream channel. 10 If riprap dissipator pads will be installed at the inlet and outlet of the pipe to meet non -erosive discharge velocities. 30 If of temporary impacts are necessary to install an impervious dike and pumped diversion to perform the construction activity in dry conditions. • Impact Site 6 (NWP14) — 77 If of permanent stream impact to Stream 6 is requested for grading/fill necessary to realign Lineberger Road. As mentioned above, this portion of the roadway is constained by site development by others which confines the roadway alignment through this location. General construction equipment, including but not limited to bulldozers, excavators, front-end loaders, etc. will be used for construction purposes. Page 5 of 15 PCN Form — Version 1.4 January 2009 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes El No El Unknown project (including all prior phases) in the past? Comments: SAW-2020-00836 4b. If the Corps made the jurisdictional determination, what type ®Preliminary El Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Kimley-Horn Name (if known): Chris Tinklenberg, PWS Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 7/15/2020 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ® Yes ❑ No 6b. If yes, explain. The roadway construction proposes to be conducted in two phases — Phase I — Extension of Aberdeen Blvd. and Phase 11 — Realign Lineberger Road. Page 6 of 15 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) (if known) DWQ — non-404, other) (acres) or Temporary T W11 — Impact 3 ® P ❑ T Fill Headwater Forest ® Yes ❑ No ® Corps ® DWQ 0.052 W11 —Impact 3 ❑P®T Construction Access Headwater Forest ® Yes El No ® Corps ®DWQ 0.01 W8 — Impact 4 ® P El T Fill Headwater Forest El Yes ® No ® Corps ® DWQ 0.224 W8 — Impact 4 ❑ P ®T Construction Access Headwater Forest El Yes ® No ® Corps ® DWQ 0.01 2g. Total wetland impacts 0.29 ac 2h. Comments: Impact Site 3 (NWP14) — 0.052-ac to Wetland 11 results from grading necessary to construct the Aberdeen Extension. 0.01-ac of temporary impacts are necessary to perform the construction activities. Impact Site 4 (NWP14) — 0.224-ac to Wetland 8 results from grading necessary to construct the Lineberger Road realignment. 0.01-ac of temporary impacts are necessary to perform the construction activities. Page 7 of 15 PCN Form — Version 1.4 January 2009 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) intermittent DWQ — non-404, width (linear or Temporary (INT)? other) (feet) feet) (T) S3 — Impact 1A Culvert UT ® PER ® Corps 5 168 ® P ❑ T ❑ INT ® DWQ S3 — Impact 1A Impervious Dike and UT ® PER ® Corps 5 30 ❑ P ® T Pumped Diversion ❑ INT ® DWQ S1 —Impact 1 B Culvert UT to Duharts ® PER ® Corps 6 127 ® P ❑ T Creek ❑ INT ® DWQ S1 —Impact 1 B Impervious Dike and UT to Duharts ® PER ® Corps 6 30 ❑ P ® T Pumped Diversion Creek ❑ INT ® DWQ S3 — Impact 1 C ® P ❑ T Bank Stabilization UT ® PER ❑ INT ® Corps ® DWQ 5 105 S1 — Impact 1C Bank Stabilization UT to Duharts ® PER ® Corps 6 185 ® P ❑ T Creek ❑ INT ®DWQ S5 — Impact 2 Culvert UT ® PER ® Corps 4 137 ® P ❑ T ❑ INT ® DWQ S5 — Impact 2 Impervious Dike and UT ® PER ® Corps 4 30 ❑ P ® T Pumped Diversion ❑ INT ® DWQ S5 — Impact 5 Culvert UT ® PER ® Corps 4 253 ® P ❑ T ❑ INT ® DWQ S5 — Impact 5 Impervious Dike and UT ® PER ® Corps 4 30 ❑ P ❑ T Pumped Diversion ❑ INT ® DWQ S6 — Impact 6 Fill UT ❑ PER ® Corps 3 77 ® P ❑ T ® INT ® DWQ 3h. Total stream and tributary impacts 1,172 LF / 0.124 ac 3i. Comments: The proposed project seeks authorization to permanently impact 762 If of stream/potential non -wetland WoUS under NWP14 for construction of the roadway. Authorization is requested under NWP13 to perform 290 If of streambank stabilization to reduce bank erosion by grading banks to a more stable slope and planting with native riparian vegetation species. 120 If of temporary stream/potential non -wetland WoUS impacts are necessary to install pump diversion operations at the four proposed culvert locations to allow for work in dry conditions. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number (if applicable) Type of impact Waterbody type Area of impact (acres) — Permanent (P) or Temporary T ❑P❑T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. Page 8 of 15 PCN Form — Version 1.4 January 2009 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose of (acres) number pond Flooded Filled Excavated Flooded Filled Excavated Flooded 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse El Tar -Pamlico ❑Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) for impact Stream name mitigation (square feet) (square feet) or Temporary required? T ❑ P ❑ T ❑ Yes ❑ No 6h. Total buffer impacts 6i. Comments: Page 9 of 15 PCN Form — Version 1.4 January 2009 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The Aberdeen Blvd. Extension alignment is intended and designed to border the existing 68-foot Duke Power Easement which bisects the Gastonia Logistic Center property. Impacts to aquatic resources within this corridor could not be avoided by the proposed roadway; however, the proposed impact locations minimize impacts to higher quality resources since the general quality of each aquatic resource feature adjacent to the Duke Power Easement has been altered or degraded due to construction and regular maintenance of the easement. The dimension, pattern, and profile of the streams above and below the proposed culverts will not be modified by altering the width or depth of the stream profile in connection with the construction activities. The width, height, and gradient of the proposed culverts have been modeled and sized sufficiently to pass the average historical low flow and spring flow without adversely altering flow velocity, as well as flood flows during major storm events. Culverts have been designed and will be constructed in a manner that minimizes destabilization and head cutting to the streams. Destabilizing the channel and head -cutting upstream have been considered and appropriate actions incorporated into the design and placement of the culverts. Culvert lengths have been reduced to the maximum extent practicable by implementing taller headwalls and maximizing side slopes to minimize stream impacts and will be installed in such a manner that the original stream profiles will not be altered. All culverts will be buried 12-inches and will include the installation of 12-inch sills at the inlet and outlet of the pipe to indicate burial necessary for aquatic passage, to accelerate the reestablishment of the channel beds, and to maintain the width of the stream channels. Rip -rap outlet dissipation will be placed in a manner that the boulders will be pushed or "keyed" into the channel beds so that the finished top elevation of the riprap will not exceed that of the original stream beds to prevent destabilization of the stream beds or banks downstream of the impact areas and to allow for aquatic life passage. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Temporary impacts have been minimized to the greatest extent practicable to meet the needs of the project and do not pose adverse alterations to the existing channels. Erosion control measures implemented during the construction of the roadway will be removed immediately following the activities and any disturbance will be returned to pre -construction conditions. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ® Yes ❑ No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ® DWQ ® Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this project? ® Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ® Yes 4b. Stream mitigation requested: 762 linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: 0.276 acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres Page 10 of 15 PCN Form — Version 1.4 January 2009 4h. Comments: Compensatory mitigation will be met by the purchase of credits through the NC Division of Mitigation Services (NCDMS) in -lieu fee program. To offset unavoidable impacts to streams 1,454 stream mitigation credits and 0.552 wetland mitigation credits will be purchased from NCDMS for impacts associated with the proposed roadway project (see Table 1 in the Cover Letter). 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 11 of 15 PCN Form — Version 1.4 January 2009 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: The project does not include nor is it adjacent to protected riparian ❑ Yes ❑ No buffers. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 50% 2b. Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Stormwater is mitigated by over detaining within the overall project limits so that the overall development meets the oridinance requirements. Additionally the site has been design to attenuate post development peak flows to pre - development rates for the 25YR-24HR storm event, which is excess of the code requirements. ® Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Gaston County ❑ Phase II 3b. Which of the following locally -implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ® Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HOW 4a. Which of the following state -implemented stormwater management programs apply ❑ ORW (check all that apply): N/A, Certified Local Government Review ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ® No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? N/A ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? N/A ❑ Yes ❑ No Page 12 of 15 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. The roadway project seeks to provide independent utility for local residents of Gastonia and Lowell as well as provide access into and out of the GLC for employees and truck traffic. No additional development is proposed. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Wastewater will not be generated by the municipal roadway project. Page 13 of 15 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ® Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ® Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Kimley-Horn (KH) completed a threatened and endangered species assessment within the project site. Before conducting the field survey, KH reviewed state and federal records to determine if any listed species were known to occur within and/or in the general vicinity of the project area. A review of the U.S. Fish & Wildlife Service Information for Planning and Consultation (IPaC) System and the North Carolina Natural Heritage Program (NCNHP) was conducted to identify species that are known to occur within Gaston County. Following the review of available information, KH conducted a pedestrian survey of the project site to determine the available habitats on -site and the potential occurrence for listed species. Pedestrian surveys were conducted in April and September 2020. No individuals of listed species or critical habitat associated with a listed species were observed during the pedestrian surveys. Results of the pedestrian survey were provided to the USFWS to request their concurrence. Per the USFWS response: According to the information provided, suitable habitats also occur onsite for the federally threatened dwarf -flowered heartleaf (Hexastylis naniflora), and the federally endangered Schweinitz's sunflower (Helianthus schweinitzii). However, targeted surveys for these species conducted during their respective optimal survey windows detected no evidence for these species. See attached USFWS Concurrence Letter). 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NCNHP element occurrence database did not indicate the presence of EFH within the project boundary. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? A request for a review of potential cultural resources was submitted to the North Carolina Department of Natural and Cultural Resources State Historic Preservation Office (NCSHPO) on April 3, 2020 for the Gastonia Logistics Center (GLC) property. NCSHPO responded on June 5, 2020 and stated the proposed project will adversely affect the National Register -eligible Caleb John Lineberger House (GS0327). Additionally, the letter notes that one previously recorded archaeological site (31 GS376) consisting of the remains of an early twentieth-century domestic structure is present within the project area. (ER 20-0882) A Phase I Archaeological Survey and Phase II Testing were conducted per SHPO's recommendation and formal Section 106 consultation with SHPO is underway for the GLC. The above listed cultural resource occurrences are not located within or within the immediate vicinity of The Gateway 85 project area (LOD) and therefore, poses no adverse effects to the cultural resources. Page 14 of 15 PCN Form — Version 1.4 January 2009 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: USACE HEC-RAS version 4.1.0 was used to create the Corrected Effective plan. A model was created based on a surveyed surface and calibrated to the data obtained from North Carolina Flood Risk Information System (FRIS). The criteria for a no -rise certification state that there shall be no more than a 0.00' foot rise within the 100-year BFE in the existing conditions watershed. When compared to the corrective effective model the proposed model does not increase the 100-year BFE. A Conditional Letter of Map Revision and Letter of Map Revision are not required since there is no increase in the 100-year BFE. A floodplain development permit and No-Rise/No-Impact certification will be submitted to satisfy the City of Gastonia permitting requirements for a floodplain development/zoning permit. 8c. What source(s) did you use to make the floodplain determination? FIRM 3710356500J Chris Tinklenberg, PWS - , 6/17/2022 Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided. Page 15 of 15 PCN Form — Version 1.4 January 2009 AGENT AUTHORIZATION FORM Name: Rusty Bost — City of Gastonia Address: 150 South York Street, Gastonia, NC 28052 Phone: 704-854-6635 Email: Rustyb@cityofgastonia.com Project Name/Description: Gateway 85 — Aberdeen Roadway Extension Date: February 10, 2021 The Department of the Army U.S. Army Corps of Engineers, Wilmington District Attention: Mr. Bryan Roden -Reynolds Field Office: Charlotte Regulatory Field Office Re: Wetland Related Consulting and Permitting To Whom It May Concern: The City of Gastonia hereby designates and authorizes Kimley-Horn and Associates, Inc. to act in my/our behalf as my/our agent solely for the purpose of processing Jurisdictional Determinations, Section 404 permits/Section 401 Water Quality Certifications applications and to furnish upon request supplemental information in support of applications, etc. from this day forward until successful completion of the pennitting process or revocation by the owner. In addition, 1, the undersigned, a duly authorized owner of record of the property/properties identified herein, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) to issue a determination associated with Waters of the U.S. subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. Authorized this the y day of 2.0 2A O"A, c f ;a - Print Property Owner's Name Cc: Karen Higgins NC Division of Water Resources 401 & Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Property Owner's Signature FIGURES E spencer Ave- Bwk Srd Ave Fed _a Wiµ+uw or N N W.IrWk Ave S4 �HtivV #� n 411, AVe Rey Ave N LP ar py 5}h Avo ° n rlr:han+ Rd �'n f �Maply Ava ?n k� ■p Ran)* s ° ..311� i G{ W ire f z �r Ranlo Aye G n �y R lnty Rnyne 91 °Iorr61 n � �M w Lowell � Nn �y1¢'4 Gastar•11a _ N � CvofAn`'n• � � '1r Q sr r 3 F Lv a a L E Garr,arie BV.d 'Y 1'irlfk, n.m f3� p Av# M T a bob h R ° 1.n{e SN ✓Y �e411 Y ry W � � p r.r�l fll@I lnn � 4 Erb rr n'G' ear h r m ner �ayry a� o y° c sdmyra d7ky ll, v Rhpnv osxland.� 6gti ire c sf aQ"`dn 3 6 E 'bplarone Ra ,� Mile rr .. pvr ~rarl 14.0 n Cap 9 2 x 9 G1Jy1I . rA A N c C O [� °i N W N 2 G S F A4 � N� J � 0,• R6g0y+n giVA �2. f{.arrw b N +II FarA � r sr n roe ��9r fe s Ebony R•. Q°i b 419> 10�rR Aherder'n Aiytl yr,Y! f q 0�• i y -- -v �- $ f �1 o„nv Ave ��rolry :� f � y ,� SselnUrnYeRd '� E.vweil a r.kiS4°n�AyR vs p' c' ti ar• y M1tc rhelyn JW F Y ne Rl.ii ejl�lrrr je B 3 �X rr r h' p �•Sr slrbrl � r �L� Arrfn,r k,�r.ry F a � OW, n, N 4 n 11R alvtl ae Lr m rc ��r EFr �y� n - o �1•.,lri.iil °j " y dgi .5 �/ y� arrkpn alyd 49 Lynn St pn it iwnko��Sivam _ Sy L"Aa C.1%, +� Avg _ Ray Maplvwnnd Dr �OO ¢ $ Mir.harf A f':.i �1Alvn' a nv°ins 51 t Legend �t� Alan nr 7erF:�R411n d7vd r'aufp 4nn�nE�s 4 ti Limits of Disturbance a0A J k Franrr,nBlvd x Feet a SAW-2020-00836 PJD Project Boundary "°'0„,.¢ o��`� 0 2,000 4,000 pr n, f'arA 4 ardntr 1-6 Figure 1 Vicinity Map Gateway 85 STONIAN Cityof Gastonia . Great Place. Great People. Great Promise. June 2022 � - � �` � - ti • � ■ ' k ', � is Lk����" Legend�� Limits of Disturbance 0 / SAW-2020-00836 PJD Study Area - �` . \ Cb eat ON do SIN • f � of brook . w % 1. � _ • max: � � �i i Feet 0 1,000 2,000 _ Figure 2 USGS Topographic Map (Gaston N and Mount Holly) Gateway 85 STONI City of Gastonia Great Mace. Great People. Great Promise. June 2022 u Summary by Map Unit — Gaston County, North Carolina (NC071) Map unit symbol Map unit name mmB Alamance variant gravelly loam, 2 to 8 percent slopes AmD Alamance variant gravelly loam, 8 to 15 percent slopes CfB Cecil -Urban land complex, 2 to B percent slopes ChA Chewacla loam, 0 to 2 percent slopes, frequently flooded LcE Lloyd loam, 15 to 25 percent slopes LdB2 Lloyd sandy clay loam, 2 to 8 percent slopes, moderately eroded LdD2 Lloyd sandy clay loam, 8 to 15 percent slopes, moderately eroded LgB Lignum silt loam, 1 to 6 percent slopes TaB Tatum gravelly loam, 2 to 8 percent slopes TaD Tatum gravelly loam, 8 to 15 percent slopes WoA Worsham loam, 0 to 2 percent slopes Q&Ra ft YhF r - 0 Limits of Disturbance - ' SAW-2020-00836 PJD Study Area -- SSURGO Soils Tr{: Hydric Ratings'- Not Hydric (0%) �, •,;,�. Hydric (1-32 ) ,r m. t$. Hydric (33-65%)z'No'� Hydric (66-99%) .STONI AN Great Mace. Great People. Great Promise. .c *`A T. .@ GO ailk real( Dr1`�r s' 4 e 'i:y-'r ` _ _ �`�.. _ - ■t•.i-�� ;'j,• '��� ,'i4� qra J .,° Keriw❑rthy. WM Eyrin 5ti y N dNa Feet FIX 0 1,000 2,000 Figure 3 SSURGO Soils Gateway 85 City of Gastonia June 2022 r-^•4-� - ` "µ •. _.. -` _"sR + .��.. . - .. �- -�.. r , -,•i,, cif. -.+i' . • /. '+t !�. ." Legend '�^ h.: .+.,,Q> !.� �y� ` aQ `�'�' :, ti e r ;A ��4 `%' .•� n�. 1 S Y�' 1 Fair DakOr - r O �'r Limits of Disturbance w Ir, Yam; }. w J, f'.`; f - .' r SAW-2020 00836 PJD Project Boundary �� r" " 'r� r ;_-h- - J a• '� Wetlands �c �{Fy r �€: +� {,�_ _� . /y`��. kfar�cl �i'. - .1... Q-I �• k' - !�C+1. i r'•} Streams _ Rd .o ■ .�`:c ^. ti ,. " r. i� :yl _" Tr �� Intermittent �, ,� 4 i 1� F Fy r ! �. 1 *'.Ql r i I fin1 `!i - Perennial flst` ' 'A - . e55 g t one Dr "�io �hA, ...' . .i u R f ► by r O.' ,:ea•'�"F-a•�- ~•- r•... 'r F rr I lr . Fj..`-.k� u,' !r^ �. �4. � � -�� �¢ � 'rt,' � '• .n.'� � ` ` [0 - Yam' - r : •k -� $� 'C.7 �. "t' 'stl,� -� • " p(O� '.� i �r r .� - _ , yr, _ + v �, �• _ rr� - s��= �l; ,den •rw;. � � ,Ak • v, �." • � - • �, w•ia - + • >• ��� � �- � �,. t..r �C aZIF L' land wig tu 4 oil , V;4-A f, ►t ^f enB�vi� y Y � tea,:, j2 `��- S z. y,� C. tsC a+ _ �p r A �� • �k. y*•�, r.• , �1'• r e ,r L• _ �+�,y ''• 1 .,,, , .1 - - �: k� i ',. '� :s Si! h�" • i • �7 d R t.5��i wp., o. �,- •� 1} r ._ .. rr� •w^► t�• •��,9: Y Y - i'.� •7� i;:• -• ^'�.. .. h� _ y,. i .. ;• ul � - •�_ •• k• _ r. r N. `.:"':s• ,�• � 2 •b'r� � ,+. '",� - •� _ W ',► r�" .. �' .Ye .,t. ! •'► - �t},r �`- '�`: a RS TX Ilk _ � '.* . � Y ' �, y . T' � ! •A�" � y., - ..!"' i 1il -� ' . .. f _ 1� f � it � " _ _ •ti ' ". .:l •.:��' it ' _ , - .� �;y ►ten _ 010 �• �►t •��:, s .... �;�: .;�i ,� .. � S10 '•r S �r}11,� '� i �', �' + *; { ,%"V on moUrit Ramp --2 p ----------- Feet- •... 1.�f .t �;d� --' - �-- _.. ,_. _"`l�85'�H.wy N - P R N ,>. BNB N • arc►p _ w _ - - . _ � ►� '� No. Name 200 . ... i. - - - e ; •4•. 'i Ld : ri+ y 't{' �."�C?tii,.^F �, rw�f `;;,• Figure 4 dism Existing Conditions Gateway 85 STONLAN C: City of Gastonia GreatPlace. Great People. C, rr•r�t Promisr. June 2022 C: • "fi r •..s.f_• +i'� s :'T:r rt•. �' �� '-� -- - - - - .� �. i.. � � -4 i� .� • •'i , �. 3� .,fin'. "ti�,�� .. _ U�a[ � L,C.� � off- :Y ?." ��+ � i- •Ir-�. 3. ,.r. � 'trt �pp'2 .�� • :. ;•."���-�' Impact Site 6 •`?, �.+ f��' -. •`,' �. � , -! R_�.. `. j++.� Permanent Grading/Fill -.1 _H d r 253 LF Permanent r _ r` •M :M p^ �F, t i 'Impact Site 1 r .K .-� .r,}, � 4r P.�.: �.:b1' +',__ �` '-�: r' Culvert � rr D . Impact 1A: 168 LF .r$ �. Impact Site 1 y +�� G �':t * �;t • .! • ° Permanent Culvert ?, � �• ^f� � Impact 1B: 127 LF Culvert 30 LF TemporaryAK 30 a ,r •••]]] " ,,, .� 30 LF -Temporary -Temporary I FC' •VF' k v ,,,�����L �`':.� •r.. 1 k -*.. v. a y Y 30 LF r: . C. ,� rr��.: •• +,."�� S3 r �; jr wrj p31 � r� �' . fir' S5 •'�`` � ► � _ �,.t . ArP _qT � � �Y: rY��•.-$'��d,�. 4tp � LJ ;— \ .kTT f. F s \ Impact Site 4 0.224 ac Permanents Grading/Fill N^~ }" ,� I•s y 0.01 ac - Temporaryix `�" r" W3- `• ' r'+` o-x,. t d{ Impact Site 1 Impact 1Q 290 LF �'I = T S8 .. W17 10 Permanent -Bank Stabilization'+ • �. -.,: a ,, III ',y��., � � ,,,. >�+ �� � _ - _ � -� � k�'ns a rs - r M �r ?Z�. '�. '�'. A;•+- 'ram • � y £ r ■ "�l .� I /a.: `+� Nd 't. •t i P y iQ W1g. . + .. Ak • i' r a SS Impact Site 2 Impact Site 3 �" s {' < �.�', y, 137 LF -Permanent }' �� - ,''•• Z� 0.052 ac -Permanent - � � _� •' W9 J }- � '� � . %s"">i:. t Grading/Fill , , r i . Culvert " '::. rp a?i r S5'''F•"�'.-./•: t' '�-y f-" i�[� ; � , t,.fi•n.� _••4. �. - '►'p 'ti t' - • .'F T 01 0.ac -Temporary 30 LF -Temporary R4, �4 :'` ;•.:r W1 •51' ��7 r AN I WO� r ' F x� ;• xit 2'[ Dry Rarrip Feet Z. L)�7'' Legend Figure 5 _ Limits of Disturbance Intermittent Streams Wetlands Proposed Conditions Gateway 85 STONI SAW-2020-00836 PJD Project Boundary Perennial Streams Proposed Wetland Impacts City of Gastonia NC ® Proposed Rip -Rap Apron Proposed Stream Impacts Great PIace. Great People. Great I'ruynise. Proposed Grading June 2022 PERMIT DRAWINGS CONSTRUCTION PLANS FOR PGATEWAY 85 - LINEBERGER ROAD REALIGNMENT CITY OF GASTONIA, GASTON COUNTY, NORTH CAROLINA UTILITY AND GOVERNING AGENCIES CONTACT LIST: PLANNING AND DEVELOPMENT CITY OF GASTONIA 181 S SOUTH STREET GASTONIA, NC 28052 701854-6635 CONTACT: RUSTY BOST RUSTYB@CITYOFGASTONIA.COM 7 A 854- IA, 1 28052 ]04854-6641 CONTACT: KEITH LINEBERGER KEITHL@CITYOFGASTONIA.COM EROSION CONTROL GASTON NATURAL RESOURCES DEPARTMENT 1303 CHERRWILLE HWY. DALLAS, NC 280M 704922-2157 CONTACT: JOSEPH ALM GASTON NATURAL RESOURCES DEPARTMENT 1303 CHERRYVILLE HWY. i DALLAS, NC 28034 o 704-922-2150 E CONTACT: JONATHAN C BOERGER NCDOT (DIVISION 12, DISTRICT 11 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DISTRICT 1 1702 E. MARION STREET SHELBY, NC 28151 980-55241G4 CONTACT: C. BLAKE GUFFEY CBGUFFEY@NCDOT.GOV NCDEQ (UTILITIES) TWO RIVERS UTILITIES 1300 N. BROAD ST. - GASTONIA, NC 28054 70 866-6]68 CONTACT: KYLE BUTLER KYLEB@T WORIVERSUTI LITIES.COM CITY OF GASTONIA PUBLIC WORKS (TRAFFIC) CITY OF GASTONIA 181 S SOUTH STREET GASTONIA, NC 28052 (704) 866-6843 CONTACT: DALE DENTON DALED@CITY OF GASTONIA.COM NCDEQ (WATER QUALITY) NORTH CAROL I NA DEPARTMENT OF ENVIRONMENTAL QUALITY NC DEPARTMENT OF ENVIRONMENTAL QUALITY 610 EAST CENTER AVENUE SUITE 301 MOORESVILLE, NC 28115 COORDINATOR: KELLY PHILLIPS (7M) 663-1699 GASTON COUNTY NATURAL RESORUCES DEPARTMENT _ CITY OF GASTONIA 181 S SOUTH STREET GASTONIA, NC 28052 704-854fi635 CONTACT: JONATHAN C. BOERGER EJONATHAN.BOERGER@GASTONGOV.COM 2 GASTON COUNTY NATURAL RESORUCES DEPARTMENT CITY OF GASTONIA 181 S SOUTH STREET GASTONIA, NC 28052 701 CONTACT: JOSEPH D. ALM JOSEPHALM@GASTONGOV.COM / i l j Impact Site 5 - SS 253 LF - Permanent Culvert (D) 30 LF - Temporary F7�/ CULVERT CROSSING/ STREAM IMPACTS L / \ \ \ m \ X Impact Site 4 - W8 0.224 ac -Permanent r Grading/Fill m \ Impact Site 6 - S6 0.01 ac - Temporary ED 77 LF - Permanent rn Grading/Fill m \ \ O 1 _ _/0 0_.Rn. I (5 / / LBUILjDING5 I I START }ABERDEEN BLVD EXTENSION — I I 9 I I I 6V %i EXISTING WETLAND 30'STREAM BUFFER DRI W 2 II11/ / J / I/ / IBUILDING 7 I/ I ' OVERHEAD POWER LINES k BEGIN PROJECT ABERDEEN BLVD EXTENSION -L- STA 10+15.00 J PREVIOUSLY APPROVED IN SEPARATE PLAN SET PREPARED IN THE OFFICE OF: Kimley)))Horn OWNER NORTHPOINT DEVELOPMENT 4825 NW 41ST STREET SUITE 500 ALL CONSTRUCTION TO CONFORM TO CITY OF RIVERSIDE, MISSOURI 64150 PHONE (816) 888-7380 GASTONIA STANDARDS AND SPECIFICATIONS CONTACT: CALEB MOORE eWmmt of ew AN I, Intended only for tew eowcifc PPfPPBw Pnd cIlwt for whlM it woo Pro ...d. Re of Pnd ImPropa .enPP ENGINEER KIMLEY-HORN AND ASSOCIATES, INC. 200 SOUTH TRYON STREET SUITE 200 CHARLOTTE, NORTH CAROLINA 28203 (704) 333-5131 TEL (704) 333-0845 FAX CONTACT: JOEY RACER, P.E. SURVEYOR GRAPHIC SCALE IN FEET 0 90 180 360 NORTH END PROJECT -L- STA 32+50.00 ATLAS SURVEYING, INC. 10910 SOUTHERN LOOP BOULEVARD UNIT 18 PINEVILLE, NO 28134 PHONE (980) 949-8475 CONTACT: KEITH BURNS, P.L.S c Sheet List Table Sheet No. Sheet Title R100 COVER SHEET R101 GENERAL NOTES R102 LEGEND R200 TYPICAL SECTIONS R201 TYPICAL SECTIONS R202 DETAILS R2W DETAILS R204 DETAILS R205 DETAILS '00 TURNING MOVEMENTS R400 ROAD PLAN AND PROFILE R401 ROAD PLAN AND PROFILE R402 ROAD PLAN AND PROFILE R4W STORM PROFILES R404 PAVEMENT MARKING AND SIGNING R405 PAVEMENT MARKING AND SIGNING R500 LINEBERGER STREAM CROSSING R501 LINEBERGER STREAM CROSSING DETAILS R600 PUBLIC SEWER PLAN AND PROFILE R601 PUBLIC SEWER PLAN AND PROFILE R700 PUBLIC WATER PLAN AND PROFILE R701 PUBLIC WATER PLAN AND PROFILE KIMLEY-HORN SHALL HAVE NO LIABILITY WHATSOEVER FOR ANY COSTS ARISING OUT OF THE CLIENT'S DECISION TO OBTAIN BIDS OR PROCEED WITH CONSTRUCTION BEFORE KIMLEY-HORN HAS ISSUED FINAL, FULLY -APPROVED PLANS AND SPECIFICATIONS. , �uu t R e SEAL 046999 1 - 2j y N1µEEPPVYr�� M'f ?.,. qq, 06-10-2022 N O O N N p O m O 0 - 3 III— W 2 I.L W O U THE CLIENT ACKNOWLEDGES THAT ALL PRELIMINARY PLANS ARE SUBJECT TO SUBSTANTIAL REVISION UNTIL PLANS ARE Z FULLY APPROVED AND ALL PERMITS OBTAINED. Uj LL ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES O SHALL BE PERFORMED PRIOR TO THE FINAL CONNECTIONS OF SERVICES. THE CITY OF GASTONIA WILL REWIRE AS -BUILT DRAWINGS, ENGINEER'S CERTIFICATION AND ALL EASEMENTS RECORDED L.I. BEFORE A CERTIFICATE OF OCCUPANCY CAN BE ISSUED. y [ifC , > DRAWN TO THE FACT THAT THE SCALE OF THESE DRAWINGS MAY HAVE BEEN DISTORTED DURING ENTIODU LU Q IS R /Z !!llllll IIIIVlJJJ1111 Q THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER �L�^//J ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, L.L J LU INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. LU Q d Z THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS PROJECT. CONTRACTOR'S BID SHALL INCLUDE co I 1 I O CONSIDERATION FOR ADDRESSING THIS ISSUE. LU LNLJ LL _J Q z • li O O~ N Q Ky Z L� SHEET NUMBER Knowwhat's below. 1 RA o0 Call before you dig. Y m a a `a o E E o r r 2 0' K W W Q. a z O O O p O w W W m m K y 0 o aaaa®a Q O ZIR Eo - E L O 1-0 r O Q U tt _ o Qcry j - I. O I _ Y' U 1 U a3� O ■ 1. Eo M11 R S /^� OJ = p y 9 SEAL ft - - 046999 4 F 0 %O 4 N E E C _ E IN m1r'106-10-2022 Z 0' Q K Q G O N O O N O I O O Of H N a a N Q\ O Q Q M 0 I � \ � w _ 3o U/ LW o r O Z J NQ - w W Z W Z vo E -; 2 Z cw G^ 1. Q L LL r O O Z Of III o W O w [if 2E LL \ w lt /W/j� Z W L% Q �/ LL a J W w Q' Z co Q d w O w �/ 1 0- LL Z_ I J H Q N Z O_ O O Y) Q Z CD i SHEET NUMBER Know what's below. R.I O.) Thi. document. to8etha with the concept. and de.iI p....nted herein. c. on in.trument of ...Ntt le Intended only for the .peci0c purpo.e and clbnt for which it - prepared. Reu.e of and improper reliance on thi. document without written cuth.H..tlon and adaptation by Kimley-Nom and A..ociote.. In...holl De without IlaDilily to Kimley-Nom and A..oclote.. Inc. GENERAL NOTES 1. ALL NECESSARY PERMITS ARE THE RESPONSIBILITY OF THE CONTRACTOR AND MUST OBTAIN ALL PERMITS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 2. THE CONTRACTOR MUST REVIEW AND MAINTAIN ACOPV OF PERMITS COMPLETE WITH ALL CONDITIONS, ATTACHMENTS, EXHIBITS, AND PERMIT MODIFICATIONS IN GOOD CONDITION AT THE CONSTRUCTION SITE. THE COMPLETE PERMIT MUST BE AVAILABLE FOR REVIEW UPON REQUEST BY REGULATORY AGENCY REPRESENTATIVES. 3. THE CONTRACTOR SHALL PROTECT ALL MONUMENTS, IRON PINS, AND PROPERTY CORNERS DURING CONSTRUCTION. 4. CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME. 5. SITE BOUNDARY TOPOGRAPHY UTILITY AND ROAD INFORMATION TAKEN FROMASURVEY BVA LAND SURVEYOR. ALL INFORMATION IS TO BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. 6. CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED 8V CODES ]. THE CONTRACTOR AND SUBCONTRACTORS SHALL OBTAINACOPV OF THE STATE DEPARTMENT OF TRANSPORTATION STRUCTURE STANDARDS AND REGULATIONS (LATEST EDITION) AND BECOME FAMILIAR WITH THE CONTENTS PRIOR TO COMMENCING WORK, AND, UNLESS OTHERWISE NOTED, ALL WORK SHALL CONFORM AS APPLICABLE TO THESE STANDARDS AND SPECIFICATIONS. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL MATERIAL AND LABOR TO CONSTRUCT THE FACILITY AS SHOWN AND DESCRIBED IN THE CONSTRUCTION DOCUMENTS IN ACCORDANCE WITH THE APPROPRIATE APPROVING AUTHORITIES SPECIFICATIONS AND REQUIREMENTS. CONTRACTOR SHALL CLEAR AND GRUB ALL AREAS UNLESS OTHERWISE INDICATED, REMOVING TREES, STUMPS, ROOTS, MUCK, EXISTING PAVEMENT AND ALL OTHER DELETERIOUS MATERIAL. 9. ALL WORK AND MATERIALS SHALL COMPLY WITH ALL CITY, COUNTVANDSTATE REGULATIONS AND CODES AND O.S.H.A. STANDARDS. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS INCLUDING BUT NOT LIMITED TO ALL UTILITIES STORM DRAINAGE SIGNS ETC. AS REQUIRED. ALL WORK SHALL BE IN ACCORDANCE WITH GOVERNING AUTHORITIES SPECIFICATIONS AND SHALL BE APPROVED BY SUCH. ALL COST SHALL BE INCLUDED IN BASE BID. AREAS TO BE DISTURBED SHALL BE IMPROVED PER THE CIVIL PLANS OR RESTORED TO THEIR ORIGINAL OR BETTER CONDITION. CONTRACTOR SHALL REPAIR ANY EXISTING FEATURES THAT ARE DAMAGED DURING CONSTRUCTION TO THE EXISTING OR BETTER CONDITION. 11. THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE AT ALL TIMES ONE COPY OF THE CONSTRUCTIDN DOCUMENTS INCLUDING PLANS, SPECIFICATIONS, GEOTECHNICAL REPORT AND SPECIAL CONDITIONS AND COPIES OF ANY REQUIRED CONSTRUCTION PERMITS. 12. ANV DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER AND ENGINEER BEFORE COMMENCING WORK. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN ARE TO BE MADE WITHOUT PRIOR APPROVAL OF THE QWNERAND NOTIFICATION TO THE ENGINEER. 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS DO NOT CONFLICT WITH ANV KNOWN EXISTING OR OTHER PROPOSED IMPROVEMENTS. IF ANY CONFLICTS ARE DISCOVERED THE CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO INSTALLATION OF ANY PORTION OF THE SITE WORK THAT WOULD BE AFFECTED. FAILURE TO NOTIFY OWNER OF AN IDENTIFIABLE CONFLICT PRIOR TO PROCEEDING WITH INSTALLATION RELIEVES OWNER OF ANY OBLIGATION TO PAY FOR A RELATED CHANGE ORDER. 14. ALL WELLS DISCOVERED ON SITE THAT WILL HAVE NO USE MUST BE PLUGGED BY ALICENSED WELL DRILLING CONTRACTOR IN A MANNER APPROVED BY ALL JURISDICTIONAL AGENCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY WELL ABANDONMENT PERMITS REpUIRED.ANV WELL DISCOVERED DURING EARTH MOVING OR EXCAVATION SHALL BE REPORTED TO THE APPROPRIATE JURISDICTIONAL AGENCIES WITHIN 24 HOURS AFTER DISCOVERY IS MADE. 15. TRAFFIC CONTROL ON ALL STATE, LOCAL AND COUNTY RIGHTS-0WAY-WAY SHALL MEET THE REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (U.S. DOT/FHA)AND THE REQUIREMENTS OF THE STATE AND ANY LOCAL AGENCY HAVING JURISDICTION. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT THE MOST STRINGENT SHALL GOVERN. SANITARY SEWER NOTES 1. CONTRACTOR TO LOCATE LATERAL CONNECTIONS TO BUILDING PER PLUMBING PLANS. 2. PLACE CLEAN -OUTS ON SANITARY SEWERCATERALS AS REQUIRED BV PLUMBING CODE. 3. PIPE LENGTHS SHOWN ARE MEASURED FROM CENTER TO CENTER OF STRUCTURES AND ARE ROUNDED TO THE NEAREST FOOT. 4. AMINIMUM HORIZONTAL SEPARATION OF 10 FEET BETWEEN WATER LINES AND SEWERS SHALL 8E MAINTAINED AT ALL TIMER. A MINIMUM VERTICAL REPARATION OF 18 INCHES BETWEEN WATER LINES AND SEWERS SHALL BE MAINTAINED AT CROSSINGS. IN THE EVENT THAT MINIMUM REPARATION REQUIREMENTS CANNOT BE MET THE CONTRACTOR SHALL UTILIZE PRESSURE -TYPE WATER PIPE FOR THE SEWER PER DETAIL. 5. SANITARY SEWER PIPE SHALL BE AS FOLLOWR: 8' PVC SDR35 PER ASTM D 3034 FOR PIPER LESS THAN 12' DEEP 8'PVC SDR26 PER ASTM D3034 FOR PIPES MORE THAN I2'DEEP 6' PVC SCHEDULE 40 DUCTILE IRON PIPE PE- WA L150 6. WHENEVER VERTICAL DISTANCE BETWEEN OUTGOING AND INCOMING SEWERS IS MORE THAN2 FEET A OUTSIDE DROP MANHOLE SHALL BE INSTALLED. ]. PRIVATE SANITARY SEWER STRUCTURES SHALL BE AS FOLLOWS: 48" DIAMETER PRECAST CONCRETE MANHOLE PER ASTM C4]8. 48" DIAMETER PRECAST POLYETHYLENE IN ACCORDANCE WITH ASTM D1248. MANHOLES SHALL HAVE A COMPRESSIVE STRENGTH THAT MEETS ASTM D2412. 8. PUBLIC RANITARV SEWER STRUCTURES SHALL CONFORM TO THE CITY OF LOWELL SPECIFICATIONS FOR SANITARY SEWER. 9. ALL MANHOLES AND CLEANOUTS SHALL BE H2O TRAFFIC GRADE AND RATED WITH HEAVY DUTY COVERS AND FRAMES PER THE SAME. STORMWATER NOTES 1. REFER TO GENERAL UTILITY NOTES FOR ADDITIONAL REQUIREMENTS PERTAINING TO UNDERGROUND UTILITY AND STORMWATER PIPE INSTALLATION. 2. ALL NECESSARY PERMITS ARE THE RESPONSIBILITY OF THE CONTRACTOR AND MUST OBTAIN ALL PERMITS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 3. PIPE LENGTHS, GRADES, ELEVATIONS AND LOCATIONS SHOWN ARE APPROXIMATE ONLV.AS DIRECTED BY THE ENGINEER, THEY MY BE ADJUSTED TO ACCOMMODATE UNFORESEEN CONDITIONS. 4. ALL STORM PIPE INSTALLED SHALL BE RCP OR HDPE N-12 WITH CASKETS PER ASTM F4]], UNLESS SPECIFICALLY NOTED OTHERWISE. EXISTING RTORMWATER PIPE MATERIALS, MODIFIED, DAMAGED OR DEFORMED, ETC. SHALL NOT BE REUSED UNLESS SPECIFICALLY DIRECTED BY THE ENGINEER. 5. ALL PIPER SHALL BE LAID ON STRAIGHT ALIGNMENT AND EVEN GRADES USINGAPIPE CARER OR OTHER ACCURATE METHOD. 6. ALL PIPES SHALL BE BEDDED PER MANUFACTURER'S RECOMMENDATIONS. ]. ALL ALL DRAINAGE STRUCTURES SHALL BE CONSTRUCTED WITH (4) SIDED BEARING HEAVY DUTY H-20 RATED TRAFFIC RIMS AND GRATES 8. ALL CLEANOUT COVERS WITHIN THE PAVEMENT SECTIONS SHALL BE RATED FOR HEAVY DUTY TRAFFIC (H-20 RATED). 9. WEEPHOLES ARE TO BE CONSTRUCTED IN ALL DRAINAGE STRUCTURES,AMINIMUM OFI WEEPHOLE PER STRUCTURE. WEEPHOLES ARE TO BE CONSTRUCTED IN THE BOTTOM I/3 OF STRUCTURE AND COVERED ON THE OUTSIDE OF THE STRUCTURE BY A BAG MADE OF FILTER FABRIC AND FILLED WITH N]8 STONE. 10. CONTRACTOR SHALL PROVIDE CATCH BASIN INLET PROTECTION ON ALL E%ISTING AND PROPOSED INLETS UNTIL CONTRIBUTING DRAINAGE AREAS ARE STABILIZED. ALL DRAINAGE STRUCTURES SHALL BE CLEANED OF DEBRIS AS REQUIRED DURING AND AT THE END OF CONSTRUCTION TO PROVIDE POSITIVE DRAINAGE FLOWS. 11. THE CONTRACTOR SHALL INSTALL ALL UNDERGROUND STORM WATER PIPING PER MANUFACTURER'S RECOMMENDATIONS. 12. GRADE ALL AREAS TO MAINTAIN POSITIVE SLOPE AWAY FROM BUILDING. 13. CONTRACTOR SHALL PROVIDE SMOOTH TRANSITION BETWEEN PROPOSED PAVEMENT AND EXISTING PAVEMENT AND STORM STRUCTURES 14. DURING CONSTRUCTION AND AFTER FINAL GRADING, NO SURFACE WATER RUNOFF MAYBE DIRECTED TO ADJACENT PROPERTIES, AND ALL SURFACE WATER RUNOFF MUST 8E ROUTED TO APPROVED DRAINAGE FACILITIES OR BE RETAINED ON SITE. ALL RUNOFF FROM THE SITE BOTH DURING AND AFTER CONSTRUCTION, MUST 8E FREE OF POLLUTANTS, INCLUDING SEDIMENT, PRIOR TO DISCHARGE. GENERAL EROSION CONTROL NOTES 1. REFER TO MASS GRADING AND INFRASTRUCTURE PLANS PREPARED BY KIMLEV-HORN FOR ALL EROSION CONTROL REQUIREMENTS. 2. PRIOR TO CONSTRUCTION THE CONTRACTOR MUST CLEARLY DELINEATE AND MARK OFF AREAS IDENTIFIED IN THE SWPPP OR IN THE FIELD TO BE PROTECTED SUCH AS STREAMSANETLANDS ( NATURAL BUFFERS, TREE, HABITATS OF ENDANGERED/FHREATENEDSPEGIES, HISTORIC PROPERTIES, ETC.) 3. THE CONTRACTOR SHALL PROTECT ALL MONUMENTS, IRON PINS, AND PROPERTY CORNERS DURING CONSTRUCTION. 4. SEDIMENT CONTROL BMPS PROPOSED FOR SITE DEVELOPMENT HAVE BEEN DESIGNED TO ADDRESS CONSTRUCTION STORMWATER RUNOFF. IN THE EVENT THE BMPS BECOME INEFFECTIVE AT PREVENTING SEDIMENT FROM LEAVING THE SITE, IT IS THE CONTRACTORS RESPONSIBILITY TO IMPLEMENT ADDITIONAL BMPR.THE CONTRACTOR SHALL CONTINUOUSLY MAINTAIN BMPS AS DESCRIBED IN THE GENERAL PERMIT .ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BVTHE EROSION CONTROL INSPECTOR. S. CONTRACTOR SHALL REVIEW THE GENERAL PERMIT PRIOR TO COMMENCING CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL KEEPACOPV OF THE APPROVED PLANS AND GENERAL PERMIT ONBITE AT ALL TIMES. 6. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION AND IS SUBJECT TO A FINE. ]. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE STATE WHICH THE WORK IS PERFORMED. 8. THE CONTRACTOR SHALL INSTALL AND MAINTAIN THROUGHOUT THE PROJECT CONSTRUCTION ALL EROSION CONTROL MEASURES SHOWN WITHIN THESE PLANS IN ACCORDANCE WITH APPLICABLE STATE EROSION AND SEDIMENT CONTROL REGULATIONS, 9. ALL CONSTRUCTION WORK SHALL BE IN COMPLIANCE WITH REGULATIONS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM NPoES STORM WATER GENERAL PERMIT. 10. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO CLEARING ANDIOR LAND DISTURBANCE. 11. CONSTRUCTION ENTRANCE SHALL BE LOCATED SO AS TO PROVIDE THE LEAST AMOUNT OF DISTURBANCE TO THE FLOW OF TRAFFIC IN AND OUT OF THE SITE. ADDITIONALLY CONSTRUCTION ENTRANCE SHALL BE LOCATED TO COINCIDE WITH THE PHASING OF THE PAVEMENT REPLACEMENT. 12. POST CONSTRUCTION STORM WATER POLLUTION CONTROL MEASURES INCLUDE STABILIZATION BY PERMANENT PAVING DRAINAGE SYSTEM STRUCTURE OR LANDSCAPING. 13. TEMPORARY AND PERMANENT STABILIZATION PRACTICES AND BMP'S SHALL BE INSTALLED AT THE EARLIEST POSSIBLE TIME DURING THE CONSTRUCTION SEQUENCE. AS AN EXAMPLE PERIMETER SILT FENCE SHALL BE INSTALLED BEFORE COMMENCEMENT OF ANY GRADING ACTIVITIES. OTHER BMP'S SHALL BE INSTALLED AS SOON AS PRACTICABLE AND SHALL BE MAINTAINED UNTIL FINAL SITE STABILIZATION IS ATTAINED. CONTRACTOR SHALL ALSO REFERENCE CIVIL AND LANDSCAPE PLANS SINCE PERMANENT STABILIZATION IS PROVIDED BY LANDSCAPING THE BUILDINGS AND SITE PAVING. 14. BMP'S HAVE BEEN LOCATED AS INDICATED ON THIS PLAN IN ACCORDANCE WITH GENERALLY ACCEPTED ENGINEERING PRACTICES IN ORDER TO MINIMIZE SEDIMENT TRANSFER. FOR EXAMPLE: SILT FENCES LOCATED AT TOE OF SLOPE AND INLET PROTECTION FOR INLETS RECEIVING SEDIMENT FROM SITE RUN-OFF. 15. ACOPV OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MINIMIZE EROSION. i6. THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE EROSION CONTROL INSPECTOR SO THAT PERIODIC INSPECTIONS CAN BE PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. 1]. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFFSITE GRADING, PERMISSION MUST 8E OBTAINED FROM THE AFFECTED PROPERTY OWNERS. CONTACT PROJECT ENGINEER AND PROJECT EROSION CONTROL INSPECTOR TO ENSURE ADDITIONAL EROSION CONTROL MEASURES ARE INSTALLED PRIOR TOOFF-SITE GRADING. 18. ANV SPILLS OF PETROLEUM PRODUCTS OR HAZARDOUS MATERIALS IN EXCESS OF REPORTABLE QUANTITIES AS DEFINED 8V EPA OR THE STATE OR LOCAL AGENCY REGULATIONS, SHALL BE IMMEDIATELY REPORTED TO THE EPA NATIONAL RESPONSE CENTER (14100-024-8802j, AND AB REQUIRED 8V THE GENERAL PERMIT. 18. THE CONTRACTOR SHALL MAINTAIN JURISOICTIONALLV REQUIRED BUFFERS OF UNDISTURBED NATURAL VEGETATION BETWEEN THE DISTURBED PORTIONS OF THE SITE AND SURFACES WATERS AT ALL TIMES. BUFFERS SHALL BE MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS OF THE JURISDICTION. 20. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFFSITE BORROW OR WASTE AREAS, STAGING OR STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMITA SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND TO THE APPROPRIATE GOVERNING ENTITY FOR APPROVAL CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALL NECESSARY MEASURES AT NO SEPARATE PAYMENT. THE CONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER A COPY OF THE AMENDED PERMIT. 21. CONTRACTOR SHALL PLACE EROSION CONTROL BLANKET NORTH AMERICAN GREEN SCi500R APPROVED EQUAL) ON ALL SITE AREAS WITH SLOPES GREATER THAN 2:1, AND IN THE BOTTOM AND SIDE SLOPES OF ALL SWALES. 22. NO PARKING SHALL BE LOCATED OUTSIDE THE LIMITS OF DISTURBANCE. 23. NO CONSTRUCTION LAVDOWN OR STAGING SHALL BE LOCATED OUTSIDE THE LIMITS OF DISTURBANCE. 24. ALL DRAINAGE SWALES MUST BE GRADED AND RIP -RAP MUST BE REPLACED AS REQUIRED TO CONTROL EROSION. RIP -RAP WILL CONSIST OF 50 -125 POUND STONES PLACED AT ALL HEADWALLS, AND WHERE NOTED ON CONSTRUCTION DRAWINGS. SEE DETAIL SHEET FOR OUTFACE PIPE SIZE CHART. 25. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED FOR ADDITIONAL CONTRACTOR LAVDOWN AREA. CONTRACTOR TO COORDINATE WITH ENGINEER DURING CONSTRUCTION. THE LIMITS OF DISTURBANCE SHOULD CONTAIN ANV ADDITIONAL LAVDOWN AREAS. IF ADDITIONAL LAVDOWN AREA IS NEEDED OUT SIDE THE LIMITS OF DISTURBANCE A REVISED EROSION CONTROL PLAN SHOULD BE REVIEWED AND PERMITTED. A. PUMPING SEDIMENT LADEN WATER INTO ANY STORMWATER FACILITY THAT IS NOT DESIGNATED TO 8E A SEDIMENT TRAP, ORAINAGEWAV, OR OFFSITE AREA EITHER DIRECTLY OR INDIRECTLY WITHOUT FILTRATION IS PROHIBITED. DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO RECENING OUTLET. WATER REMOVED FROM TRAPS BASINS AND OTHER WATER HOLDING DEPRESSIONS OR EXCAVATIONS MUST FIRST PASS THROUGH A SEDIMENT CONTROL AND/OR FILTRATION DEVICE. WHEN DEWATERING DEVICES ARE USED, DISCHARGE LOCATIONS SHALL BE PROTECTED FROM EROSION. 2]. ALL TEMPORARY STORMWATER EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL STABILIZATION IS ALHIEVED.TRAPPED SEDIMENT AND OTHER DISTURBED SOILS RESULTING FROM TEMPORARY MEASURES SHALL BE PROPERLY DISPOSED OF PRIOR TO PERMANENT STABILIZATION. 28. SOIL STOCKPILES SHALL NOT BE LOCATED INADRAINAGEWAV STOCKPILES. FLOOD PLAIN AREA OR A DESIGNATED BUFFER. ALL STOCKPILES SHALL BE IMMEDIATELY STABILIZED AS GENERAL ACCESSIBILITY NOTES 1. THE CONTRACTOR SHALL REVIEW ALL APPLICABLE STATE AND LOCAL GUIDELINES AS THEY APPLY TO THE ACCESSIBILITY AND SIGNAGE. 2. ALL CONSTRUCTION SHALL BE VERIFIED BY THE CONTRACTOR TO BE IN COMPLIANCE WITH LOCALLY ADOPTED ACCESSIBILITY REGULATIONS. ANYTHING FOUND NOT IN COMPLIANCE SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. 3. THE PROPOSED IMPROVEMENTS SHALL BE CONSTRUCTED COMPLIANT WITH THE LATEST EDITION OF THE ADA STANDARDS FOR ACCESSIBILE DESIGN AS PUBLISHED BY THE DEPARTMENT OF JUSTICE. UNLESS AND EXCEPT IN AREAS WHERE AN APPROVED STATEMENT FROM A SITE ENGINEER, SURVEYOR, OR ARCHITECT VERIFIES THAT SITE CONDITIONS EXIST WHERE THE TOPOGRAPHY OF THE SITE IS EXTREME AND ONLY ALTERNATE METHODS OF COMPLIANCE ARE POSSIBLE. 4. CURB RAMPR ALONG PUBLIC STREETS AND IN THE PUBLIC RIGHT-0WAY-WAY SHALL BE CONSTRUCTED BASED ON THE CITY STANDARD CONSTRUCTION DETAILS AND SPECIFICATIONS. 5. PRIVATE CURB RAMPS ON THE RITE(I.E. OUTRIDE PUBLIC STREET RIGHT-0WAY)-WAV)SHALL CONFORM TO THE ADA STANDARDS FOR ACCESSIBLE DESIGN AND SHALL HAVE A DETECTABLE WARNING SURFACE THAT IS FULL WIDTH OF THE CURB RAMP NOT INCLUDING FLARES. 6. ALL ACCESSIBLE ROUTES, GENERAL SITE AND BUILDING ELEMENTS, RAMPS, CURB RAMPS, STRIPING, AND PAVEMENT MARKINGS SHALL CONFORM TO ADA STANDARDS FOR ACCESSIBLE DESIGN, LATEST EDITION. ]. ANV COMPONENTS OF THE PROJECT SERVING MULTIFAMILY DWELLINGS IN BUILDINGS THAT HAVE 40R MORE UNITS PER DWELLING SHALL ALSO CONFORM TO THE FAIR HOUSING ACT FHA AND COMPLY WITH THE FAIR HOUSING ACT DESIGN MANUAL BY THE US DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT. S. BEFORE PLACING PAVEMENT, CONTRACTOR SHALL VERIFY THAT SUITABLE ACCESSIBLE PEDESTRIAN ROUTES (PER ADA AND FHA) EXIST TO AND FROM EVERY DOOR AND ALONG SIDEWALKS, ACCESSIBLE PARKING SPACES, ACCESS AISLES, AND ACCESSIBLE ROUTES. IN NO CASE SHALL AN ACCESSIBLE RAMP SLOPE EXCEED 1 VERTICAL TO 12 HORIZONTAL. IN NO CASE SHALL SIDEWALK CROSS SLOPE EXCEED 2.0 PERCENT. IN NO CASE SHALL LONGITUDINAL SIDEWALK SLOPE EXCEED 5.0 PERCENT. ACCESSIBLE PARKING SPACES AND ACCESS AISLES SHALL NOT EXCEED 2.0 PERCENT SLOPE IN ANY DIRECTION. 9. CONTRACTOR SHALL TAKE FIELD SLOPE MEASUREMENTS ON FINISHED SUeGRADE AND FORM BOARDS PRIOR TO PLACING PAVEMENT TO VERIFY THAT ACCESSIBLE SLOPE REQUIREMENTS ARE PROVIDED. CONTRACTOR SHALL CONTACT ENGINEER PRIOR TO PAVING IF ANV EXCESSIVE SLOPES ARE ENCOUNTERED. NO CONTRACTOR CHANGE ORDERS WILL BE ACCEPTED FOR ADA COMPLIANCE ISSUES. GENERAL DEMOLITION NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN ANY PERMITS AND PAY FEES REQUIRED FOR DEMOLITION AND HAUL-0FF FROM THE APPROPRIATE AUTHORITIES. THESE FEES SHALL BE INCLUDED WITH THE BID. THE CONTRACTOR SHALL PREPARE ALL OOLUMENTR AND ACQUIRE APPROPRIATE PERMITS AS REQUIRED PRIOR TO THE COMMENCEMENT OF DEMOLITION. 2. DEMOLITION AS DEPICTED ON THE DEMOLITION PLAN IS INTENDED TO DESCRIBE GENERAL DEMOLITION AND UTILITY WORK. IT IS NOT INTENDED TO IDENTIFY EACH ELEMENT OF DEMOLITION OR RELOCATION. CONTRACTOR SHALL COORDINATE WITH THE OWNER AND APPROPRIATE UTILITY COMPANY PRIOR TO WORK. 3. THECONTRACTORIS RESPONSIBLE FOR THE DEMOLITION, REMOVAL AND LAWFULDISPOSAL OF ALL STRUCTURES, PAVING, UTILITIES, ETC., SUCH THAT THE IMPROVEMENTS SHOWN ON THE PLANS CAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL MATERIAL AS NECESSARY. 4. ASBESTOS OR ANV OTHER HAZARDOUS MATERIAL, IF FOUND ON SITE, SHALL BE REMOVED BY A LICENSED HAZARDOUS MATERIAL CONTRACTOR ONLY AFTER NOTIFICATION OF THE ENGINEER AND AUTHORIZATION TO PROCEED IS GIVEN BY THE OWNER 5. THE CONTRACTOR SHALL PUMP OUT BUILDING FUEL AND WASTE OIL TANKS (IF ANV ARE ENCOUNTERED) AND REMOVE FUEL TO AN APPROVED DISPOSAL AREA BY AN APPROPRIATELY LICENSED WASTE OIL HANDLING CONTRACTOR IN STRICT ACCORDANCE WITH FEDERAL AND STATE REQUIREMENTS ONLY AFTER NOTIFICATION OF THE ENGINEER AND AUTHORIZATION TO PROCEED IS GIVEN BY THE OWNER. fi. THE CONTRACTOR SHALL MAINTAIN ALL UTILITY SERVICES TO ALL EXISTING FACILITIES AND OUTLETS AT ALL TIMES. UTILITY SERVICES SHALL NOT BE INTERRUPTED WITHOUT APPROVAL FROM THE SERVICE PROVIDERS AND COORDINATION THROUGH THE PROPERTY OWNER(S). THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL UTILITIES TO REMAIN IN PLACE. ]. THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE REMOVAL AND/OR RELOCATION OF UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANY CONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITY COMPANVS FORCES AND ANY FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR SERVICES. THE CONTRACTOR IS RESPONSIBLE FOR PAVING ALL FEES AND CHARGES. 8. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN ON THIS PLAN HAVE BEEN DETERMINED FROM THE BEST INFORMATION AVAILABLE AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THEIR ACCURACY. THE ITEMS SHOWN ARE NOT TO BE INTERPRETED AS THE EXACT LOCATION OR AS THE ONLY OBSTACLES THAT MAY OCCUR ON THE SITE. VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ANV ANTICIPATED FEATURES. PRIOR TO THE START OF ANV DEMOLITION ACTIVITY THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES FOR ONSITE LOCATIONS OF EXISTING UTILITIES. 9. ELECTRICAL TELEPHONE CABLE WATER FIBER OPTIC CABLE AND/OR GAB LINES NEEDING TO BE REMOVED OR RELOCATED SHALL BE COORDINATED WITH THE AFFECTED UTILITY COMPANY. ADEQUATE TIME SHALL BE PROVIDED FOR RELOCATION AND CLOSE COORDINATION WITH THE UTILITY COMPANY IS NECESSARY TO PROVIDE A SMOOTH TRANSITION IN UTILITY SERVICE. CONTRACTOR SHALL PAY GLOBE ATTENTION TO EXISTING UTILITIES WITHIN THE ANY ROAD RIGHT OF WAY DURING CONSTRUCTION f0. SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED EXISTING PIPING OR OTHER UTILITY BE UNCOVERED DURING EXCAVATION CONTRACTOR SHALL CONSULT THE ENGINEER AND OWNER IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING FURTHER WITH WORK IN THIS AREA. 11. CONTRACTORMUSTPROTECT THE PUBLIC AT ALL TIMES WITH FENCING BARRICADES ENCLOSURES ETC. AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES AS APPROVED BY THE OWNER 12. CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING BUSINESSES AND PROPERTIES AT ALL TIMES DURING DEMOLITION OF THE EXISTING IMPROVEMENTS AND CONSTRUCTION OF THE PROPOSED IMPROVEMENTS. CONTRACTOR SHALL COORDINATE WITH THE OWNER(SN LEASEE(Sj PRIOR TO ANY CONSTRUCTION TO ESTABLISH CUSTOMER ACCESS AND TRAFFIC FLOW DURING ALL PHASES. 13. SHOULD CONSTRUCTION ACTIVITIES DAMAGE EXISTING FEATURES THE CONTRACTOR SHALL REPLACE THE FEATURES WITH NEW MATERIALS. DAMAGE TO ANY EXISTING CONDITIONS TO REMAIN WILL BE REPLACED AT CONTRACTOR'S EXPENSE. 14. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS TO AVOID UNNECESSARY DAMAGE TO E%ISTING ROAD SURFACES. FINISHED SURFACES TO BE REMOVED OR DEMOLISHED SHALL BE CUT ALONG LINES OF JOINTS WHICH WILL PERMIT A NEAT SURFACE WHEN RESTORED. SAW CUT AT INTERFACE OF PAVEMENT OR CURB TO REMAIN. SAW CUT EXISTING PAVEMENT AT THE RIGHT-OF-WAY. SAW CUTS SHALL BE MADE FULL DEPTH THROUGH THE EXISTING PAVEMENT. DISCARDED PAVEMENT SHALL BE REMOVED WITHOUT UNDERMINING THE EXISTING PAVEMENT. IF ANY DAMAGE IS INCURRED ON ANY OF THE SURROUNDING PAVEMENT, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ITS REMOVAL AND REPAIR. 15. CONTRACTOR SHALL MAINTAIN ALL EXISTING PARKING SIDEWALKS DRIVES ETC. CLEAR AND FREE FROM ANY CONSTRUCTION ACTIVITYAND/OR MATERIAL TO ENSURE EASY AND SAFE PEDESTRIAN AND VEHICULAR TRAFFIC TO AND FROM THE SITE. CONTRACTOR SHALL COORDINATE/PHASE ALL CONSTRUCTION ACTIVITY WITHIN PROXIMITY OF THE BUILDING AND UTILITY INTERRUPTIONS WITH THE PROPERTY OWNERS AND UTILITY PROVIDERS TO MINIMIZE DISTURBANCE AND INCONVENIENCE. 18. ALL EXISTING ITEMS TO REMAIN WHICH ARE DAMAGED DURING CONSTRUCTION SHALL BE RESTORED TO ITS ORIGINAL CONDITION AT THE SOLE EXPENSE OF THE CONTRACTOR. 1]. SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED EXISTING PIPING OR OTHER UTILITY BE UNCOVERED DURING EXCAVATION, CONTRACTOR SHALL CONSULT THE ENGINEER AND OWNER IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING FURTHER WITH WORK IN THIS AREA. 18. ANV WATER WELLS ENCOUNTERED ARE TO BE BROUGHT TO THE PROJECT ENGINEER ATTENTION IMMEDIATELY AND PROPERLY ABANDONED BV ALICENSED WELL DRILLER. 19. ANY SEPTIC SYSTEMS ENCOUNTERED SHALL BE BROUGHT TO THE THE PROJECT ENGINEER ATTENTION IMMEDIATELY AND SHALL BE PROPERLY DEMOLISHED. GENERAL PAVING NOTES 1. CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NELERSARV TO ASRUREA SMOOTH FIT AND CONTINUOUS GRADE. CONTRACTOR SHALL PROVIDE SMOOTH TRANSITION BETWEEN PROPOSED PAVEMENT, EXISTING PAVEMENT AND ANY STRUCTURES. 2. THE PROPOSED SPOT ELEVATIONS SHOWN ARE FINISHED ELEVATIONS INCLUDING ASPHALT AND CONCRETE. REFER TO PAVEMENT SECTIONS AND CURB DETAILS TO ESTABLISH CORRECT SUBBASE OR AGGREGATE BASE COURSE ELEVATIONS TO BE COMPLETED UNDER THIS CONTRACT. 3. ALL AREAS INDICATED AS PAVEMENT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TYPICAL PAVEMENT SECTIONS AS INDICATED ON THE DRAWINGS. CONTRACTOR SHALL REVIEW THE RECCOMENDATIONS OF THE GEOTECHNICAL ENGINEER PRIOR TO PAVING. 4. WHERE EXISTING PAVEMENT IS INDICATED TO BE REMOVED AND REPLACED THE CONTRACTOR SHALL SAW CUT A MINIMUM 2" DEEP FOR A SMOOTH AND STRAIGHT JOINT AND REPLACE THE PAVEMENT WITH THE SAME TYPE AND DEPTH OF MATERIAL AS EXISTING OR AS INDICATED. 5. ALL PAVING CONSTRUCTION MATERIALS AND WORKMANSHIP WITHIN JURISDICTIONAL RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH LOCAL OR COUNTY SPECIFICATIONS AND STANDARDS (LATEST EDITION) OR STATE DEPT.OF TRANSPORTATION SPECIFICATIONS AND STANDARDS (EATERY EDITION) IF NOT COVERED BY LOCAL OR COUNTY REGULATIONS. fi. ALL ON -SITE STRIPING IS TO BE PAINTED UNLESS OTHERWISE NOTED. ALL STRIPING IN PUBLIC RIGHT-OF-WAY TO BE THERMOPLASTIC STRIPING. ]. TRANSVERSE EXPANSION JOINTS ARE TO BE PROVIDED IN CONCRETE SIDEWALKS AND COMBINED WALKSICURBS WHERE SHOWN AND AT INTERVALS NOT TO EXCEED 12 X THE WIDTH OF THE WALK. 8. EXPANSION JOINTS SHALL BE INSTALLED IN CONCRETE PAVEMENTS AND WALKS AT ALL LOCATIONS WHERE PAVEMENTS AND WALKS ABUT A VERTICAL SURFACE SUCH AS A CURB, WALL, COLUMN, ETC. 9. CONTRACTION JOINTS SHALL BE PROVIDED AT EQUAL INTERVALS BETWEEN EXPANSION JOINTS IN CONCRETE WALKS. INSTALL CONTRACTION JOINTS AS SHOWN BUT IN NO CARE AT INTERVALS GREATER THAN 1.5 X THE WIDTH OF THE WALK. f0. CONTRACTOR SHALL COORDINATE PAVING IMPROVEMENTS TO AVOID TIRE MARKS FROM CONSTRUCTION ACTIVITY. FINAL PAVING SHALL BE AS SMOOTH AS POSSIBLE AND FREE FROM ANY CRACKS, SCRAPES, GOUGES, TIRE MARKS, ETC. CAUSED DURING CONSTRUCTION. 11. ALL NEW CONCRETE SHALL BE DOWELED INTO ALL EXISTING CONCRETE (PAVING, SIDEWALKS, CURB, ETC.). TRANSVERSE EXPANSION JOINTS ARE TO BE PROVIDED IN CONCRETE SIDEWALKS AND COMBINED WALKS/CURBS AS SHOWN ON THE DETAILS AND AT INTERVALS NOT TO EXCEED 12 TIMES THE WIDTH OF THE WALK. 12. ALL STRUCTURES SHALL BE ADJUSTED AS NECESSARY TO BE FLUSH WITH FINAL PAVEMENT. CONSTRUCTION TESTING 1. IT IS THE CONTRACTORS RESPONSIBILITY TO OBTAIN ALL TESTS REQUIRED BY THE JURIRDILTIONAL AGENCIES HAVING AUTHORITY. 2. IF DETERMINED 8V THE OWNER, THE CONTRACTOR SHALL PROVIDE ADDITIONAL CONSTRUCTION TESTING. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER FOR REQUIRED CONSTRUCTION TESTING. 3. TESTING OF MATERIALS REQUIRED FOR THE CONSTRUCTION OF THE PAVING IMPROVEMENTS SHALL BE PERFORMED BY AN APPROVED AGENCY FOR TESTING MATERIALS. THE TESTING LABORATORY AND THE PAYMENT OF SUCH TESTING SERVICES SHALL BE MADE BY THE OWNER. IT SHALL 8E THE CONTRACTOR'S RESPONSIBILITYTO SHOW BYSTANDARD TESTING PROCEDURES THAT THE WORK CONSTRUCTED DOER MEET THE REQUIREMENTS OF THE SPECIFICATIONS. 4. ALL COPIES OF COMPACTION, CONCRETE AND OTHER REQUIRED TEST RESULTS ARE TO BE SENT TO THE OWNER AND DESIGN ENGINEER OF RECORD DIRECTLY FROM THE TESTING AGENCY. 5. EACH BACKFLOW PREVENTION ASSEMBLY IS REQUIRED TO BE TESTED BV A JURISDICTIONALLV-APPROVED CERTIFIED TESTER PRIOR TO PLACING THE WATER SYSTEM IN SERVICE. GENERAL UTILITY NOTES 1. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR OBTAINING AN ENCROACHMENT AGREEMENT PERMIT, AS REQUIRED TO CONSTRUCT UTILITY CONNECTIONS. 2. REFER TO ARCHITECTURAL MECHANICAL, ELECTRICAL AND PLUMBING PLANS FOR CONTINUATION OF UTILITIES WITHIN 5 FEET OF STRUCTURES. 3. THE CONTRACTOR IS RESPONSIBLE FOR HORIZONTALLY AND VERTILALLV LOCATING AND PROTECTING ALL PUBLIC OR PRIVATE UTILITIES (SHOWN OR NOT SHOWN) WHICH LIE IN OR ADJACENT TO THE CONSTRUCTION SITE. AT LEAST 48 HOURS PRIOR TO ANV DEMOLITION, GRADING, OR CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL CONTACT 811 FOR THE IDENTIFICATION OF EXISTING UTILITIES WITHIN THE SITE. 4. EXISTING UTILITIES SHOWN ARE LOCATED ACCORDING TO THE INFORMATION AVAILABLE TO THE ENGINEER AT THE TIME OF THE TOPOGRAPHIC SURVEY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR THE ENGINEER. GUARANTEE IS NOT MADE THAT ALL EXISTING UNDERGROUND UTILITIES ARE SHOWN OR THAT THE LOCATION OF THOSE SHOWN ARE ENTIRELY ACCURATE. FINDING THE ACTUAL LOCATION OF ANY EXISTING UTILITIES IS THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE DONE BEFORE COMMENCING ANY WORK IN THE VICINITY. FURTHERMORE, THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES DUE TO THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANV AND ALL UNDERGROUND UTILITIES. THE OWNER OR ENGINEER WILL ASSUME NO LIABILITY FOR ANY DAMAGES SUSTAINED OR LOST INCURRED BECAUSE OF THE OPERATIONS IN THE VICINITY OF EXISTING UTILITIES OR STRUCTURES, NOR FOR TEMPORARY BRACING AND SHORING OF SAME. IF IT IS NECESSARY TO SHORE, BRACE, SWING OR RELOCATE A UTILITY, THE UTILITY COMPANY OR DEPARTMENT AFFECTED SHALL BE CONTACTED AND THEIR PERMISSION OBTAINED REGARDING THE METHOD TO USE FOR SUCH WORK. 5. SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED UTILITIES BE ENCOUNTERED THE CONTRACTOR SHALL CONTACT THE OWNER IMMEDIATELY FOR DIRECTIONS. fi. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES DURING CONSTRUCTION. AT LEAST 48 HOURS PRIOR TO ANV DEMOLITION, GRADING, OR CONSTRUCTION ACTIVITY THE CONTRACTOR SHALL NOTIFY THE UTILITY PROVIDER FOR PROPER IDENTIFICATION OF EXISTING UTILITIES WITHIN THE PROJECT SITE. THE CONTRACTOR SHALL COORDINATE ANY INTERRUPTION OF UTILITY SERVICE WITH OWNER(S) AND RESPECTIVE UTILITY COMPANY REPRESENTATIVE. ]. CONTRACTOR SHALL NOTIFY THE UTILITYAUTHORITIES INSPECTORS ]2 HOURS BEFORE CONNECTING TO ANY EXISTING LINE. 8. CONTRACTOR SHALL SAW CUT, REMOVE, AND REPLACE ASPHALT PAVEMENT AS NECESSARY TO INSTALL UNDERGROUND ELECTRIC TELEPHONE SEWER WATER AND COMMUNICATION CONDUITS.PAVEMENTS WALKS CURBS AND OTHER SURFACE IMPROVEMENTS REQUIRING REMOVAL FOR INSTALLATION OF UNDERGROUND UTILITIES SHALL BE RESTORED TO THEIR PRESENT CONDITION UNLESS OTHERWISE SHOWN. 9. ALL ELECTRICAL WORK SHALL BE DONE IN ACCORDANCE WITH LOCAL POWER COMPANY STANDARDS. f0. CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS.CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES. 11. PRESSURE UTILITY MAINS AND SERVICE LINES MY NEED TO BE INSTALLED ATA DEPTH GREATER THAN THAT SPECIFIED OR SHOWN ON THE DRAWINGS TO CLEAR EXISTING AND PROPOSED CROSSING UTILITIES. IN SUCH CASES, THE CONTRACTOR SHALL INSTALL VERTICAL BENDS AS REQUIRED TO ACHIEVE APPROPRIATE CLEARANCE BETWEEN THE CROSSING UTILITIES. 12. WHERE GRADE MODIFICATIONS CUT OR FILL ARESHOWNADJACENT TO EXISTING VALVE BOX COVERS AND MANHOLE CASTINGS, THE VALVE BOX COVERS AND MANHOLE CASTINGS SHALL BE ADJUSTED FLUSH WITH THE PROPOSED GRADE. 13. THE CONTRACTOR SHALL MAINTAIN ALL FLOWS AND UTILITY CONNECTIONS TO EXISTING BUILDINGS, ETC. WITHOUT INTERRUPTION UNLESSNNTIL AUTHORIZED TO DISCONNECT BY THE OWNER, UTILITY COMPANIES, AND GOVERNING AUTHORITIES. THE CONTRACTOR SHALL INSTALL AS NECESSARY, TEMPORARY SITE LIGHTING, GAS, SANITARY, WATER, STORM, ELECTRIC, TELEPHONE, AND CABLE SERVICES TO SERVICE BUILDING(S) TO REMAIN OPEN. 14. ALL PROPOSED STUBS SHALL BE CAPPED AND SHALL BE PROVIDED WITH FIELD MARKERS. 15. CONTRACTOR TO PROVIDE AND INSTALL CONDUIT FOR SITE LIGHTING PER SITE LIGHTING PLAN (BV OTHERS). i6. CONTRACTOR TO PROVIDE AND INSTALL CONDUIT FOR IRRIGATION PER IRRIGATION PLAN (BY OTHERS. 1]. LINES UNDERGROUND SHALL BE INSTALLED, SURVEYED, AND BACKFILLING. 18. MINIMUM TRENCH WIDTH SHALL BE2FEET. 19. ALL CHANGES IN DIRECTION OF THE CONDUIT SHALL UTILIZE STANDARD SWEEPS WITHA MINIMUM BENDING RADIUS LISTED IN THE NEC. NO MORE THAN (2j 90.DEGREE BENDS WILL BE ALLOWED BETWEEN PULLING POINTS, OR A TOTAL OF 180 DEGREES COMBINED IN SEVERAL BENDS. PULL BOXES SHALL BE LOCATED EVERY 400 FEET UNLESS THE COMBINED TOTAL OF BENDS REQUIRE ADDITIONAL MANHOLES. 20. ALL UTILITIES SHOULD BE KEPT TEN (10')APART (PARALLEL) DR WHEN CROSSING 18" VERTICAL CLEARANCE OUTSIDE EDGE OF PIPE TO OUTSIDE EDGE OF PIPE. 21. THE CONTRACTOR SHALL CONSTRUCT GRAVITY SEWER LATERALS, MANHOLES GRAVITY SEWER LINES AND DOMESTIC WATER AND FIRE PROTECTION SYSTEM AS SHOWN ON THESE PLANS. THE CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIALS EQUIPMENT MACHINERY TOOLS MEANS OF TRANSPORTATION AND LABOR NECESSARY TO COMPLETE THE WORK IN FULL AND COMPLETE ACCORDANCE WITH THE SHOWN, DESCRIBED AND REARONABLV INTENDED REQUIREMENTS OF THE CONTRACT DOCUMENTS AND JURISDICTIONAL AGENCY REQUIREMENTS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN. 22. DEFLECTION OF PIPE JOINTS AND CURVATURE OF PIPE SHALL NOT EXCEED THE MANUFACTURER'S SPECIFICATIONS. SECURELY CLOSE ALL OPEN ENDS OF PIPE AND FITTINGS WITHA WATERTIGHT PLUG WHEN WORK IS NOT IN PROGRESS. THE INTERIOR OF ALL PIPES SHALL BE CLEAN AND JOINT SURFACES WIPED CLEAN AND DRV AFTER THE PIPE HAS BEEN LOWERED INTO THE TRENCH. VALVES SHALL BE PLUMB AND LOCATED ACCORDING TO THE PLANS. MAXIMUM PIPE JOINT DEFLECTION FOR CITY MAINTAINED LINES IS 3OF THE MANUFACTURER'S RECOMMENDATION. 23. ALL PHASES OF INSTALLATION, INCLUDING UNLOADING, TRENCHING, LAVING AND BACK FILLING, SHALL BE GONE INAFIRST CLASS WORKMANLIKE MANNER. ALL PIPE AND FITTINGS SHALL BE CAREFULLY STORED FOLLOWING MANUFACTURER'S RECOMMENDATIONS. CARE SHALL BE TAKEN TO AVOID DAMAGE TO THE COATING OR LINING IN ANY DUCTILE IRON PIPE FITTINGS. ANV PIPE OR FITTING WHICH IS DAMAGED OR WHICH HAS FLAWS OR IMPERFECTIONS WHICH, IN THE OPINION OF THE ENGINEER OR OWNER RENDERS IT UNFIT FOR USE SHALL NOT BE USED. ANV PIPE NOT SATISFACTORY FOR USE SHALL BE CLEARLY MARKED AND IMMEDIATELY REMOVED FROM THE JOB SITE, AND SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. 24. WATER FOR FIRE FIGHTING SHALL BE AVAILABLE FOR USE PRIOR TO COMBUSTIBLES BEING BROUGHT ON SITE. 25. ALL UTILITY AND STORM DRAIN TRENCHES LOCATED UNDER AREAS TO RECEIVE PAVING SHALL BE COMPLETELY BACK FILLED IN ACCORDANCE WITH THE GOVERNING JURISDICTIONAL AGENCY'S SPECIFICATIONS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN. 2fi. UNDERGROUND WATER AND SANITARY SEWER LINER SHALL BE SURVEYED BY STATE LICENSED PROFESSIONAL LAND SURVEYOR PRIOR TO BACK FILLING. 2]. CONTRACTOR SHALL PERFORM AT HIS OWN EXPENSE, ANY AND ALL TESTS REQUIRED BY THE SPECIFICATIONS AND/OR ANY AGENCY HAVING JURISDICTION. THESE TESTS MY INCLUDE, BUT MAY NOT BE LIMITED TO INFILTRATION AND E%FILTRATION TELEVISION INSPECTION AND A MANDREL TEST ON GRAVITY SEWER. ACOPV OF THE TEST RESULTS SHALL BE PROVIDED TO THE UTILITY PROVIDERS, OWNER AND JURISDICTIONAL AGENCY AS REQUIRED. 28. IF DETERMINED NECESSARY BY THE LOCAL JURISDICTION, THE CONTRACTOR SHALL ABANDON EXISTING WATER METERS. CUT THE CORPS OFF, AND AIR -GAP THE SERVICES. 29. UNDERGROUND UTILITY, INCLUDING STORMWATER PIPES, SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS: A. NO MORE THAN 500 LF OF TRENCH MAV BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE LACED ON THE UPHILL SIDE OF TRENCHES. AS-BUILTS/RECORD DRAWINGS 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DOCUMENTING AND MAINTAINING AS -BUILT INFORMATION WHICH SHALL BE RECORDED AS CONSTRUCTION PROGRESSES OR AT THE COMPLETION OF APPROPRIATE CONSTRUCTION INTERVALS AND SHALL BE RESPONSIBLE FOR PROVIDING AS -BUILT DRAWINGS TO THE OWNER FOR THE PURPOSE OF CERTIFICATION TO JURISDICTIONAL AGENCIES AS REQUIRED. ALL AS -BUILT DATA SHALL BE COLLECTED BY A STATE OF NORTH CAROLINA PROFESSIONAL LAND SURVEYOR WHOSE SERVICES ARE ENGAGED BY THE CONTRACTOR. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING TO THE ENGINEER CERTIFIED RECORD SURVEYS SEALED BY A STATE REGISTERED PROFESSIONAL LAND SURVEYOR DEPICTING THE ACTUAL FIELD LOCATION OF ALL CONSTRUCTED IMPROVEMENTS. THE RECORD DRAWINGS SHALL BE PREPARED TO THE SAME LEVEL OF DETAILS AS PROVIDED ON THE DESIGN DRAWINGS. 3. THE CONTRACTOR SHALL PROVIDE TO THE ENGINEER AND OWNER RECORD DRAWINGS IN BOTH PDF AND AUTOLAD FORMAT FOR ALL PAVING, GRADING, AND STORMWATER BMPS, AND STORMWATER DRAINAGE PIPER AND STRUCTURES. 4. THE CONTRACTOR SHALL PROVIDEAREPARATE UTILITY RETARD DRAWING IN AUTOLAD AND PDF FORMAT. THE RECORD DRAWINGS SHALL VERIFY ALL DESIGN INFORMATION INCLUDED ON THE DESIGN PLANS. 5. IN ADDITION TO THE OWNER AND ENGINEER REQUIRED SURVEYS, THE CONTRACTOR SHALL PROVIDE ADDITIONAL RECORD DRAWINGR AND -BUILT INFORMATION AS REQUIRED BY THE JURISDICTION. GENERAL GRADING NOTES 1. ALL NECESSARY PERMITS ARE THE RESPONSIBILITY OF THE CONTRACTOR AND MUST OBTAIN ALL PERMITS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 2. BEFORE ANV EARTHWORK IS DONE, THE CONTRACTOR SHALL STAKE OUT AND MARK THE LIMITS OF PAVEMENT AND OTHER ITEMS ESTABLISHED IN THE PLANS. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY ENGINEERING AND SURVEYING FOR LINE AND GRADE CONTROL POINTS RELATED TO EARTHWORK. 3. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST ]2 HOURS BEFORE ANV EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 4. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS REFLECT FINISHED GRADES. ALL ELEVATIONS ARE IN REFERENCE TO THE BENCHMARK, AND THIS MUST BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO GROUND BREAKING. 5. CONTRACTOR SHALL REVIEW, UNDERSTAND AND IMPLEMENT ALL REQUIRED EROSION AND SEDIMENTATION CONTROL MEASURES PRIOR TO ANY DISTURBANCE. 8. THE CONTRACTOR SHALL GRADE THE SITE TO THE ELEVATIONS INDICATED AND SHALL REGRADE WASHOUTS WHERE THEY OCCUR AFTER EVERY RAINFALL UNTIL A GRASS STAND IS WELL ESTABLISHED OR ADEQUATE STABILIZATION OCCURS. ]. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR BLASTING ROCK IF BLAST ROCK IS ENCOUNTERED. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COMPLYING WITH ALL BLASTING AND SAFETY REQUIREMENTS S. ALL UNPAVED AREAS IN EXISTING RIGHTS-0OF-WAY DISTURBED BY CONSTRUCTION SHALL BE REGRADED AND SEEDED. 9. THE CONTRACTOR SHALL CLEAR AND GRUB THE SITE AND PLACE, COMPACT, AND MOISTURE CONDITION ALL FILL PER THE GEOTECHNICAL ENGINEERS SPECIFICATIONS. FILL MATERIAL SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT. 10. THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF ALL SHEETING, SHORING, BRACING AND SPECIAL EXCAVATION MEASURES REQUIRED TO MEET OSHA, FEDERAL, STATE AND LOCAL REGULATIONS PURSUANT TO THE INSTALLATION OF THE WORK INDICATED ON THESE DRAWINGS. THE DESIGN ENGINEER ACCEPTS NO RESPONSIBILITY FOR THE DESIGN(S) TO INSTALL SAID ITEMS. 11. FIELD ADJUSTMENTS OF RIM ELEVATIONS OF STRUCTURES MAY BE REQUIRED TO MEET FIELD CONDITIONS. MAXIMUM HEIGHT OF ADJUSTING RINGS SHALL NOT EXCEED 12-INCHES. ADJUSTMENTS OF CASTINGS WHERE THE TOTAL HEIGHT OF ADJUSTING RINGS WOULD EXCEED 12 INCHES SHALL BE MADE BY REPLACING THE LONE AND/OR BARREL SECTION OF THE STRUCTURE. 12. WHERE GRADE MODIFICATIONS ARE SHOWN ADJACENT TO EXISTING VALVE BOX LOVERS AND MANHOLE CASTINGS, THE VALVE BOX COVERS AND MANHOLE CASTINGS SHALL BE ADJUSTED FLUSH WITH THE PROPOSED GRADE. 13. ALL OPEN AREAS WITHIN THE PROJECT SITE SHALL BE SEEDED UNLESS INDICATED OTHERWISE ON THE LANDSCAPE PLAN. 14. IF DEWATERING IS REQUIRED THE CONTRACTOR SHALL OBTAIN ANV APPLICABLE REpUIRED PERMITS. THE CONTRACTOR IS TO COORDINATE WITH THE OWNER AND THE DESIGN ENGINEER PRIOR TO ANV EXCAVATION. 15. STRIP TOPSOIL AND ORGANIC MATTER FROM ALL AREAS OF THE SITE AS REQUIRED. IN SOME CASES TOPSOIL MAY BE STOCKPILED ON SITE FOR PLACEMENT WITHIN LANDSCAPED AREAS BUT ONLY AS DIRECTED BY THE OWNER. 16. FIELD DENSITY TESTS SHALL BE TAKEN AT INTERVALS IN ACCORDANCE WITH THE LOCAL JURISDICTIONAL AGENCY OR TO STATE DEPARTMENT OF TRANSPORTATION STANDARDS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT THE MOST STRINGENT SHALL GOVERN. 1]. ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED AS PER PUNS. THE AREAS SHALL THEN BE SEEDDED AS SPECIFIED IN THE PLANS, FERTILIZED, MULCHED, WATERED AND MAINTAINED UNTIL HARDY GRASS GROWTH IS ESTABLISHED IN ALL AREAS. ANY AREAS DISTURBED FOR ANV REASON PRIOR TO FINAL ACCEPTANCE OF THE JOB SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. ALL EARTHEN AREAS WILL BE SEEDDED AND MULCHED AS SHOWN ON THE LANDSCAPING PLAN. 18. ALL CUT OR FILL SLOPES SHALL BE3 HORIZONTAL :1 (VERTICAL) OR FLATTER UNLESS OTHERWISE SHOWN. THE CONTRACTOR SHALL COORDINATE WITH THE GEOTECHNICAL ENGINEER FOR APPROPRIATE SLOPE STABILIZATION ON ALL SLOPES STEEPER THAN 31. CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHEN TO TRANSITION BACK TO EXISTING GRADE. 19. SEED MUST BE INSTALLED AND MAINTAINED ON EXPOSED SLOPES WITHIN 48 HOURS OF COMPLETING FINAL GRADING AND AT ANY OTHER TIME AS NECESSARY TO PREVENT ERASION SEDIMENTATION OR TURBID DISCHARGES. 20. THE CONTRACTOR SHALL ENSURE THAT ISLAND PLANTING AREAS AND OTHER PLANTING AREAS ARE NOT COMPACTED AND DO NOT CONTAIN ROAD BABE MATERIALS. THE CONTRACTOR SHALL ALSO EXCAVATE AND REMOVE ALL UNDESIRABLE MATERIAL FROM ALL AREAS ON THE SITE TO BE PLANTED AND PROPERLY DISPOSED OF IN A LEGAL MANNER. 21. UNLESS OTHERWISE RECAMMENDED BY THE GEOTECHNICAL ENGINEER. REFER TO THE GEOTECHNICAL REPORT OF ALL REQUIREMENTS. GENERAL FILL COMPACTION MUST MEET A MINIMUM OF 95%OF THE MATERIAL'S MAXIMUM STANDARD PROCTOR DRY DENSITY (ASTM D898). THE UPPER 12 INCHES OF BUBGRADE IN PAVEMENT AREAS SHOULD BE COMPACTED TO AT LEAST 100% OF THE MATERIALS MAXIMUM STANDARD PROCTDR DRY DENSTIV (ASTM Ofi98j OR AS DIRECTED BVAGEOTECHNICAL ENGINEER. FILL SHALL BE PLACED AND COMPACTED IN MAXIMUM 8' LIFTS. THE WATER CONTENT RANGE SHOULD BE WITHIN 3% OF OPTIMUM MOISTURE CONTENT. 22. GRADE ALL AREAS TO MAINTAIN POSITIVE SLOPE AWAY FROM BUILDING. 23. ALL SOIL USED FOR PLANTING SHALL CONSIST OF REGIONALLY APPROPRIATE SOILS. 24. UNSUITABLE FILL BENEATH BUILDING PADS AND PAVED SURFACES MUST BE EXCAVATED AND WATER D18TRIBUTION NOTES 1. CONTRACTOR TO LOCATE TIE-INS TO ALL BUILDINGS BASED ON ARCH/MECHANICAL, ELECTRICAL AND PLUMBING PLANS. 2. AMINIMUM HORIZONTAL SEPARATION OF IO FEET BETWEEN WATER LINES AND SEWERS SHALL BE MAINTAINED AT ALL TIMES. A MINIMUM VERTICAL SEPARATION OF 181NCHES BETWEEN WATER LINES AND SANITARVISTORM SEWERS SHALL BE MAINTAINED AT CROSSINGS. 3. IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATER LINES, SANITARY LINES, STORM LINES AND GAS LINER EXISTING AND PROPOSED THE SANITARY LINE SHALL BE DUCTILE IRON PIPE WITH MECHANICAL JOINTS AT LEAST 10 FEET ON BOTH SIDES OF CROSSING THE WATERLINE SHALL HAVE MECHANICAL JOINTS WITH APPROPRIATE THRUST BLOCKING AS REQUIRED TO PROVIDE A MINIMUM OF 18' CLEARANCE. MEETING REQUIREMENTS OF ANSI A21.10 OR AN5121.11 (AW WA C-151) (GEARS 50j. 4. WATER MAINS 10 INCHES AND SMALLER SHALL BE INSTALLED WITHAMINIMUM OF 361NCHES OF COVER AS MEASURED FROM THE TOP OF THE PIPE TO THE FINAL FINISH GRADE ABOVE THE PIPE. WATER MAINS 12 INCHES AND LARGER SHALL BE INSTALLED WITH A MINIMUM OF 421NCHES OF COVER AS MEASURED FROM THE TOP OF THE PIPE TO THE FINAL FINISH GRADE ABOVE THE PIPE. S. THRUST BLOCKS OR JOINT RESTRAINTS SHALL BE INSTALLED ON ALL WATER LINES AT ALL BENDS, TEES AND HYDRANTS PER THE DETAILS. 6. PIPE LENGTHS SHOWN ARE MEASURED FROM CENTER TO CENTER OF FITTINGS AND APPURTENANCES ROUNDED TO THE NEAREST FOOT. ]. WATER LINES SHALL BE AS FOLLOWS: 6"AND LARGER, PVC C-900, DR-14, PER ARTM D 2241 8"AND LARGER DUCTILE IRON PIPE PER AW WA L150 SMALLER THAN fi' EITHER COPPER TUBE TYPE "L" (SOFT) PER AN51816.22 OR PVC, 200 P.S.I., PER ASTM Df ]84 AND D2241. 8. ALL WATER JOINTS ARE TO BE MECHANICAL JOINTS WITH THRUST BLOCKING. 9. THERE SHALL BE NO TAPS, PIPING BRANCHES, UNAPPROVED BYPASS PIPING, HYDRANTS, FIRE DEPT. CONNECTION POINTS, OR OTHER WATER USING APPURTENANCES CONNECTED TO THE SUPPLY LINE BETWEEN ANY WATER METER AND ITS REQUIRED BACKFLOW PREVENTER. 10. BACKFLOW PREVENTION ASSEMBLIES TO BE INSTALLED ABOVE -GROUND SHALL BE INSTALLED WITHIN INSULATED ENCLOSURE AND PER JURISDICTIONAL REQUIREMENTS. ENCLOSURES SHALL INCLUDE DRAIN PORTS) FOR DISCHARGE WATER. CONTRACTOR SHALL ENSURE THE BACKFLOW PREVENTION ASSEMBLY AND ENCLOSURE IS INSTALLED OUTRIDE OF SIGHT DISTANCE TRIANGLES AT INTERSECTIONS WITH VEHICULAR TRAVEL WAYS. 11. ALL BALKFLOW PREVENTERR SHALL BE HEATED. Y m a a E i E r w r w 0 o 0 LU ww w w w m rn � aaaaa®a Z - O ¢ r o f ¢ U r i a3� o Y ■E ® o E SEAL ft '. 046999 c y �G��`ON E NIµEEPPVYr HrHM .. Pow �r' 06-10-2022 U U, N O Q Q N 0 o vz 0 O M 4 m I _ 3 Z /W \/ W J Z 2 Z SW L Q O Z O O > W LL V LU W Q d Z_ W W O z J H a z FloKnowwhat's O In quo Z� E SHEET NUMBER below. R1 �2 1p Mile document. together with the concept. and design. presented herein. ae on Instrument of eerWtt. le Intended only for the ep-If. purpo.e and client for which it wa. prepared. Reu.e of and Improper reliance on thi. document without written authorization and ad.ptation by Kimley-Hom and A.sociate.. Inc..hall De without liability to Kimley-Hom and A.soclate.. Inc. PROPOSED BOUNDARY INFORMATION BEARING � DISTANCE � PROPOSED PROPERTY LINE �lA�^ PROPOSED ROW e e PROPOSED EASEMENT 30' - SETBACK PROPOSED SETBACK too - BUFFER PROPOSED BUFFER PROPOSED UTILITY urE urE urE EASEMENT soe soe soe PROPOSED STORM EASEMENT e e e PROPOSED TCE EASEMENT PROPOSED SIDEWALK SE SE EASEMENT PROPOSED SIDEWALK/ SUE SUE SUE UTILITY EASEMENT CE PROPOSED CONSERVATION EASEMENT PROPOSED LIMITS OF goo goo goo DISTURBANCE PROPOSED SANITARY SEWER SSE SSE EASEMENT PROPOSED WATERLINE wLE wLE EASEMENT PROPOSED OVERHEAD UTILI ouE ouE WE EASEMENT PROPOSED UNDERGROUND uuE uuE uuE UTILITY EASEMENT PROPOSED GREENWAY GE GE EASEMENT PCC PROPOSED CONSTRUCTION CONTROL EASEMENT PROPOSED PAVEMENT INFORMATION 234+00 N2258'12'W PROPOSED CENTERLINE 852.23' PROPOSED CURB PROPOSED EDGE OF PAVEMENT PROPOSED SIDEWALK/CONC PROPOSED DRIVEWAY '> PROPOSED FENCE �' �' �' PROPOSED RETAINING WALL PROPOSED SIGNAL CONDUIT ' PROPOSED SAWCUT PAVEMENT PROPOSED GRAVEL ROAD PROPOSED PAVEMENT HATCH PROPOSED CONCRETE HATCH PROPOSED PAVEMENT REMOVAL HATCH PROPOSED GRAVEL HATCH PROPOSED MILL AND OVERLAY PROPOSED LIMITS OF OVERLAY PROPOSED PAVEMENTMARK/NGS PROPOSED STRIPING SYMBOLS PROPOSED GUIDE RAIL �0 PROPOSED FUTURE SYMBOLOGY PROPOSED S/GNAGE 4QG' � PP -TEXT PLANTING INFORMATION (AR) OCTOBER GLORY RED MAPLE • (QP)WILLOW OAK (CJ) JAPANESE CEDAR (10) GREENLEAF AMERICAN HOLLY (MG) D.D. BLANCHARD' SOUTHERN MAGNOLIA (P'n LOBLOLLYPINE (IA) SAVANNAH HOLLY .�� (J(CL) LEYLAND CYPRESS ILIA) ALBA' CRAPE MYRTLE Q (BT) CRIMSON PYGMY BARBERRY 9 (LJ) JAPANESE PRIVET (MC)WAXMYRTLE HL YELLOWDAYLILY (LS) LIRIOPE PV-TREELINE 30.2 � PV-TXT ROPOSED UTILITY INFORMATION L—P TV�S7U6 PROPOSED CAREEN 0� of of � PROPOSED ELECTRIC u� UNDERGROUND ELECTRIC F�� STUB PROPOSED FIBER OPTIC cAs � gN8 PROPOSED GAS UT PROPOSED TELEPHONE C���1SiUB PROPOSED SANITARY I�B FES �� ♦" � 51! R� SNB PROPOSED STORM — — — — — — PROPOSED STORM UNDER DRAIN STUB PROPOSED DOMESTIC WATER IR��STUB PROPOSED IRRIGATION �$.D. H1 PROPOSED SOFT DIG PU-TXT PROPOSED STRUCTURAL INFORMATION PROPOSED STRUCTURE PROPOSED BUILDING HATCH 57.4' � PS-TXT PROPOSED TOPO INFORMATION �B-100? PROPOSED BORING PROPOSED DETENTION PROPOSED GRADING LIMITS 644 PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR �100.00 PROPOSED SPOT ELEVATION c c PROPOSED CUT LIMITS F F PROPOSED CUT LIMITS PROPOSED EROSION CONTROL INFO > > TEMPORARY DIVERSION DITCH DISTURBED AREA 644 PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR SILT FENCE PF TREE PROTECTION FENCE SF-PF SILT FENCE/TREE PROTECTION FENCE II 11 BAFFLES SLOPE (�) TEMPORARY SLOPE CALL OUT TEMPORARY SLOPE DRAIN (� -L- LINEBERGER ROAD I EXISTING GROUND GUARDRAIL PER NCI EXISTING GROUND FOR ALL SLOPES 2:1 OR STEEPER, -L- STA 15+00.00 TO STA 19+50.00 CONTRACTOR SHALL PROVIDE PERMANENT SLOPE STABILIZATION AS DESIGNED BY A GEOTECHNICAL ENGINEER. TYPICAL SECTION NO. 1 TIE TO SITE SURFACE -L- STA 10+50 TO STA 19+50.00 -L- LINEBERGER ROAD 1 6' 6' 4' 4' 11' 11' 6' 2' 4, GUARDRAIL PER NCDOT STD. 862.01 `B ke4 RETAINING WALL EXISTING GROUND '3'1 3:1 ,3,1 SEE DETAIL 7 FOR CONCRETE DITCH T GUARDRAIL PER NCDOT STD. 862.01, EXISTING GROUND FOR ALL SLOPES 2:1 OR STEEPER, -L- STA 19+50.00 TO STA 20+46.77 CONTRACTOR SHALL PROVIDE PERMANENT SLOPE STABILIZATION NEDBYA TYPICAL SECTION NO. 2 GEOTECHNICALHNICAL EENGINEER. -L- STA 19+50.00 TO STA 23+04.81 FOR ALL SLOPES 2:1 OR STEEPER, �/ -L- LINEBERGER ROAD CONTRACTOR SHALL PROVIDE PERMANENT SLOPE STABILIZATION AS DESIGNED BY A GEOTECHNICAL ENGINEER. EXISTING GROUND 0�OB 0.02 0.02 EXISTING GROUND �T E1 D1 C2 I C2 D1 E1 T� GUARDRAIL PER NCDOT STD. 862.01 EXISTING 3.1 SEE SITE PLANS FOR POND GRADES GROUND -L- STA 26+19.74 to STA 29+06.15 -L- STA 28+31.33 TO STA 31+00.00 LINEBERGER ROAD TYPICAL SECTION NO. 3 DESIGN SPEED = 30 MPH -L- STA 23+04.81 TO STA 31+00.00 POSTED SPEED LIMIT = 25 MPH T-t. t—th« .Rh the <o -t. -d E..i— o.... ot.d herein. a. oo m.wmeRt of ...A— I. IM-d.d only 1« me .COCifC Pure,., -d abet for whits it woo P—... d. R— of and ITDFOPx r<6.R« m PAVEMENT SCHEDULE (PRELIMINARY PAVEMENT DESIGN) PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.6C, AT AN AVERAGE C9 RATE OF 168 LBS. PER SQ. YARD. APPROX. 2.0" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, AT AN AVERAGE OPROP. C2 RATE OF 224 LBS. PER SQ. YARD. PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 119.OB, AT AN D1 AVERAGE RATE OF 448 LBS PER SQ. YARD (ONE LIFT). Ei 8" AGGREGATE BASE COURSE R1 2'- 0" CONCRETE CURB AND GUTTER OCOMPACTED EARTH MATERIAL OEXISTING PAVEMENT MILL APPROX.1.5"AND REPLACE WITH I.5"ASPHALT CONCRETE SURFACE COURSE, TYPE V1 S9.5C, AT AN AVERAGE RATE OF 168 LBS. PER SQ. YARD. OWEDGING DETAIL FOR RESURFACING NOTES: 1) PAVEMENT EDGE SLOPES ARE 1:1 UNLESS OTHERWISE NOTED. 2) SEE CROSS SECTIONS FOR SUPERELEVATION RATES. 3) USE REINFORCED SOIL SLOPES WHERE SLOPE IS GREATER THAN 2:1. C1 OR C2 D2 D1 E2 C3 --- ___ 21/2"MIN. ---------------- --- 3" MIN. U DETAIL 1 - METHOD OF WEDGING PROPOSED C1 GRADE N r---------- EECH L----------------------—-50' 1 1/2" (L^r`J ' AS DIRECTED BY ENGINE R DETAIL 2 - INCIDENTAL MILLING DETAIL MIN. MILLING LIMITS WHERE REQUIRED TO SAWCUT EXISTING PAVEMENT TO INSTALL FULL DEPTH MILNDOVERLAY ADJACENT 1' PAVEMENT, MILL FROM SAWCUT LOCATION TIE NLAEW PAVEMENT LANE WIDTH MIN TO NEXT ADJACENT LANE PRIOR TO TO EXISTING SAWCUTTING EXISTING PAVEMENTAND INSTALLATION OF NEW PAVEMENT AND / O ---------- r�!N NEW CURBAND GUTTER. EW PAVEMENT-FULLDEPTH SAWCUT EXISTING(SEECORRESPONDING TYPICAL SECTION PAVEMENTFOR REQUIRED PAVEMENT STRUCTURE) DETAIL 3 — MILLING AND SAWCUT DIMENSIONS Z'O' S1i.p^ ,Miy EXISTING 2'-6" Ak C&� CURB &GUTTER ALh NOT TO SCALE DETAIL 4 - CURB AND GUTTER END TREATMENT 6IN 61N. EXCAVATION LINE t'1 61N. MIN. E1 R1 r)FTAII R - r..r)N('RFTF ('.I IRR P. rt ITTFR R=20' C&G ��FULLDEPTH ASPHALT �r 20' TRANSITION TOP OF CURB TO GUTTER ELEVATION DETAIL 5 — CURB TRANSITION Unpevetl Natural Shoulder 3:1 3:1 Ground Front Ditch Slope 2>, DETAIL 7 - CONCRETE DITCH • Knowwhat's below. Call before you I L _ O a r o ¢U � dw - W a 3 � Y o °ti mR /Oy9 .p y SEAL 046999 1 " mr o Xr M.r �. r m 06-10-2022 N I a°' aka M 0 O 4 m Z O r //LU/� V, J Q U a Z cWc G D_ CE O Z O ILL 2' 2E LL i LU LU coQ d Z W O LU Z _ J H a z 0 O ~ Za SHEET NUMBER R200 LINEBERGER ROAD DESIGN SPEED = 30 MPH POSTED SPEED LIMIT = 25 MPH (� -L- LINEBERGER ROAD I r 11' 11' EXISTING q I q' GROUND GUARDRAIL PER NCDOT STD. 862.01 7 D.o15 0 oz 0.02 0. 5 `/ TIE TO SITE GRADING T R1 E1 D1 C2 I C2 D1 E1 R1 T TYPICAL SECTION NO. 4 -L- STA 31+00 TO STA 32+50 PAVEMENT SCHEDULE (PRELIMINARY PAVEMENT DESIGN) PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.6C, AT AN AVERAGE C1 RATE OF 168 LBS. PER SQ. YARD. PROP. APPROX. 2.0" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.513, AT AN AVERAGE C2 RATE OF 224 LBS. PER SQ. YARD. PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 119.10B, AT AN D9 AVERAGE RATE OF 448 LEIS PER SQ. YARD (ONE LIFT). Ei 8" AGGREGATE BASE COURSE R1 2'- 0' CONCRETE CURB AND GUTTER OCOMPACTED EARTH MATERIAL OEXISTING PAVEMENT MILL APPROX. 1.5" AND REPLACE WITH 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE V1 S9.5C, AT AN AVERAGE RATE OF 168 LBS. PER SQ. YARD. OWEDGING DETAIL FOR RESURFACING NOTES: 1) PAVEMENT EDGE SLOPES ARE 1:1 UNLESS OTHERWISE NOTED. 2) SEE CROSS SECTIONS FOR SUPERELEVATION RATES. 3) USE REINFORCED SOIL SLOPES WHERE SLOPE IS GREATER THAN 2:1. C1 OR C2 D2 D1 E2 C3 3"MIN. U DETAIL 1 - METHOD OF WEDGING PROPOSED MILL NOTCH C1 GRADE TO KEY IN r---------- L__________ 11/2" ____ ______ MILL 25. TO 50' AS DIRECTED BY ENGINE R I DETAIL 2 - INCIDENTAL MILLING DETAIL MIN. MILLING LIMITS WHERE REQUIRED TO SAWCUT EXISTING PAVE MENTTOINSTALLFULLDEPTH MILNDOVERLAY ADJACENT 1' PAVEMENT, MILL FROM SAWCUT LOCATION TIE NLAEW PAVEMENT LANE WIDTH MIN TO NEXT ADJACENT LANE PRIOR TO TO E%ISTING SAWCUTTING EXISTING PAVEMENTAND ___L5 INSTALLATION OF NEW PAVEMENT AND / O --_____rfF.ERRE..�VUR�MRE"IDPA�EMENTST�U.TUREI NEW CURB AND GUTTER. NEWET-FULLDEPTH SAWCUT EXISTING(SE SPONDING TYPICAL SECTION PAVEMENT DETAIL 3 — MILLING AND SAWCUT DIMENSIONS ZN�k, Ak EXISTING 2'fi'CURBS GUTTERiiW�� NOT TO SCALE DETAIL 4 -CURB AND GUTTER END TREATMENT 61N, 61N. EXCAVATION LINE 61N. N. E1 R1 R=20' C&G ��FULLDEPTH ASPHALT 20' TRANSITION TOP OF CURB TO GUTTER ELEVATION DETAIL 5 — CURB TRANSITION Unpavetl Natural Shoultler 9 Ground Front Ditch Slope 2>, I DETAIL 7 - CONCRETE DITCH • Knowwhat's below. Call before you I Y' �ti rmR /py SEAL 046999 ft c 2j 4� Od, NIµEEP p� iCpH M 110, N I a° �a M 0 O 4 m I < _ 3 z LLcu G D_ CE w LLJ O O 2' 2 o > Lu LU coQ d z W O Lu z_� _ J Q z 0 O~ 7 � SHEET NUMBER R200 Pure,,, and abet for whim it woo Y m 0 0 R y ..- -. _. _ - .. .. ... .r ._:. -:.. ROADWAY PAVEMENT o W a a...- .- ... ... .... ..._ _... __ o ' REMOVE ALL EXIST CIRB BETWEEN THESE EXIST. CONSTRUCTION JOINTS SEE NOTE 2 0-16 o 1 1 :. IT11 ':: ..............: :: :: .-:: ..' :: I u GEN E 1\ AL NOTES SAW-WT/REIWVE EAST. ASPHALT & S1TXE. PATCH AREA AFTER 1)" COHS7RUC71di _ _:......... _ CURB pLL5 OUT AT RADIUS". •- - • . AT OR SIDEWALK (WHICHEVER • FACE OF CURB < q - ~ r = IS CLOSER) f- ° .°. 1. Before doing any construction, grading, curb cutting, or removing existing curbing within the street a a z rig ht-af-way, the contractor must hcve a driveway construction permit issued by the City Engineer as o o 3 specified in the City of Gastonia Code of Ordinances, Sections 7-21, thru 71-25. o o w _?�.• .., ••,a;• �. 2. The contractor will be required to remove curb and gutter as per 71D-17. - - Alternate driveway instcllation as per 71D-17A may be allowed, but will require special approvo by City staff. aaaa®a <ii I 4. Contractor may be required to remove & replace curb and gutter to nearest joint. i R/W LINE 1i1LL - -./2' EVANSIOI JT. MATERIAL,, • g-g• R 91 R 5. If the gutter section is damaged or cracked while removing the curb, the existing gutter section must i OF DRIVEWAY ENTRANCE (APPROVED W1Dhl COMMERCIAL DRIVEWAY WIDTH 24'-36') T be removed and repoured with the new driveway section. z " O w _ tIAI1� NOTE, FOR GENERAL NOTES, SEE S1D. DETAIL 71D-18 do 71D-19. 6. The contractor shall sufficiently compact all subgrade before pouring driveway and gutter section. `- F = o — PLAN — ��= z 7. Where the driveway is to be continued across the right-of-way line onto private property, the contractor Q o n ^ _ 10' MINIMUM CONCRETE (W/10' RADIUS) FLOW LINE shall be required to install 1 / 2"expansion joint material the entire width of the drive. < `o - SEE 71D-21 174--1' PER FT.- ^ 0 FROM1•_0- FOR GRADES T F• E70SIN0 ROADWAY 1J m E!77 o � z w Wil o �_1/r EXPANSION JOINT MATERIAL IS. .:..-. E o SAW-CUTjREMOVE EXIST. ASPHALT & STONE FULL DEPTH PATCH WITH S9.58 (COMPACTION REWIRED) - SECTION A -A _FCR awe AM GUTTER DETAIL SEE STANDARD CURB AND GUTTER SHEET 1 OF 2 REVISED DATE: 2-7-74 Standard Detail OFFICE OF THE REVISED DATE: 4-15-74 Standard Detail OFFICE OF THE _ - SEAL - 9/6/fig 2/D4/1s SCALE: NONE SCALE: IJONE CITY ENGINEER CITY ENGINEER 046999 + DRAWN BY: DAM,EZ, MB Concrete Driveway Entrance DRAWN BY: PMB, MB General Notes for Concrete 0 E 9/7 2/,/74 /23/ 85 GASTONI.A, H.C. 12/0/g5 12/01 /00 3 1, 05 /'/ GASTONIA, N.C. Q: %0J `NG»IµEE¢ CHECKED BY: NBM, FAP,TAJ CHECKED BY: DFD, GVS, TAJ a 1/5/95 1/U7/15 """° CITY ENGINEER: JPB, CCB CITY ENGINEER: JPB, CCB 5/30/97 1 OI RaC11U8 rFio� 71D-16 DI7VeWay Entrance FILEp 71 D-1 8 °' os-:o-zozz S. The contractor shall notify the City Engineer and request an inspection of his forms and subgrade not w o o less than TWENTY-FOUR (24) HOURS before he is ready to pour any portion of the driveway entrance. m N 4 M oo a m 9. Where there are existing sidewalks the contractor shall be required to remove all existing four inch Y a - < (4") sidewalk within the driveway strip and one section immediately each side of the driveway strip- the contractor shall replace the sidewalk within the driveway strip with six inches (6") of concrete and replace the sections of sidewalk immediately each side of the driveway strip with four inches (4") of concrete to grades f specified on City Standard Detail 71D-21. ! I 10. The contractor shall use standard curb and gutter forms at all times when curb and gutter is replaced. I oW 1 L1 -11 ° 11. The allowable width of the driveway entrance shall be determined b' the City Y y y Engineer when the driveway construction permit is issued. Y P = Icl LI III , ¢ I� 1 + J " • Q o e--- entrances must be reviewed and -approved b theI 12. Any changes or alterations in the standard drivewayy City Engineer. I� r li ' _ Y g i � N z I � �J,J z I I ILA � Q DEPARTMENT 13. The curing methods for concrete shall conform to the NORTH CAROLINA rAT 0 IONS FOR RODS ND STRUCTURES,SETION700.Cleiuiduig I be STANDARDSPECIFICATSTRUCTURES, compound z � �'MaT'TERIAL ° substituted owhite pigmentedgdcuring compound- 0 H~ _J w USEd IFOR WEYWAY. " 14. The edges of the curb and gutter section and/or driveway section shall be finished with an approved- CAN BEICDNCRETEI'JIR BRICK " edging tool of 1/2" radius. 2 - 15. Construction joints will be required as necessary to reduce uncontrolled cracking, especially in wider NOTE& TOI BEI USED ;ONLY IFDR Lz o width driveway entrances. - I ,(PIPES 136' QR i9_ES� TIN lDIAMETER 0 � 16. Joints are to be spaced according to the concrete streets rules of practice and Design of Concrete Overlays Q W guide lines as published by the Portland Cement Association IS211.01P (1980) and PA153.01P. In general Z longitudinal joint spacing is not to exceed 12.5 ft. and transverse joints shall not exceed 30 times the slab W p W thickness or 15 ft. maximum. Joints should be laid out in square panels, when not practical, rectangular [if 2E I i panels can be used if the long dimension is no more than 1 1/2 times the short. See guide lines and W Z w W rules for full requirements and optional joint types. Any questions as to joint spacing shall be as U (� determined by the Engineer. W' o LU Q a Z 17. Close all existing curb cuts not being utilized to match existing curb and gutter to be tied into. m W W SHEET 2 of 2 s Z J REVISED DATE: 4-15-74 Standard Detail OFFICE of THE REVISED :.FlIIL.i F ,ii PAT pi-25-741 I I STANDARD, DETAIL DrFTCE'� T HE s/z3/gs SCALE: NONE DBD +- SCALE; NONE m CITY ENGINEER CITY CNGI'TIFFF z o DRAWN BY: DFD, MB General Notes for Concrete DRAWN' `BY:f PNR, ID1AD: a ' 6,107/01 GASTONIA, N.C. S�SS� I IGASTONIA,'i N.L . O Q CHECKED BY: DFD, GVS, T AJ FILE WEEKED ;By, IBHD,_I FAP ' 0 1/07/15 Driveway Entrance I : +_ i F I XE.YQAY IF ol1 f LARED EN'D 'SECTION Z CITY ENGINEER: JPB, CCB T p G�.T Y�:ENGiNEERi FRW;„;JP$; SHEET NUMBER rac. 7 1 D-19 "FILE. NU.+ + i Je 2Call I what's below. L R204 1, before you dig. JJ I.,- with the concept. anal —Ig- pr... —d nerem. ale an Newman( of ..r . 1. Intended only - Ne .p ,. purpose anal client for wnl. R ... prepares. Rw of anal improper reliance on WI. d... mwI wilnout -1— autnotlzaUon and adaptation D, R, ley—Hom anal Aaeoclalea. Inc. .nail D..1— IbDinty to Ri .l Hom anal Y m a a ¢ E E o o PAVEMENT , SURFACE gRAp, HAD. RAD, PAVEMENT RA D. 3R RAD. RAD. 7SURFACE �' RAD. a RAD. .. YB" RAD. Z OtA Q QW zsej F-r Y.7 LLJar-aZ O O x .02 08rr2_0H - 0.3 -•0 0. D /•01 03 •07 3Fo 5 OB 2g 0 =� QO- :?: _ °•.•� •. - I.•o:_>.��. OB �_'•.�•.� _� •:o i. Tffi� 12" r .10-- .04 Z Hy HH¢C,U3" LL_Jo r r w w 0Y2" o w _¢ .'.u•.' WaLL= 12u .03� WALL= rmn '.o•.°.• C,� °.' •.o..'°.Hx~ZW- ••.�.'°. ..o D •o•: •:: o 1$$" ''J1- - RAD. •.•;a:, , ;0 1 "HAD' 2' 6rr 1r_Br, ,..•. c'::.• v)�or-'� z rN4 = 04 -.02 pT3 _02 0_2 i•02 .02� L- y¢OQ z H°c 2'-6" CURB AND GUTTER 1'-S" CURB AND GUTTER 8' � � � 9" X 12 OR 18" > in 0 0._�5 05 7��--^� 7 - 02 .91- "'• °'• o•' •:o 12" 09 }_ 02-Lr I. o o a a a a ®a z E 8" X 12 OR 18" CONCRETE CURB CONCRETE CURB 4'-0" PROPOSED EDGE OF 12rr pq L' 2'-0" 2'-0" x9 PAVEMENT 2" HAD. 2'.0" 4:zi _ ?' 4:1 8" _ r yBnRADIUS 1r_OR 1r_OP o'd: /d"m ...::� �- 44° ---TTT r, •::✓ .02 03 � 09 L5 -_ 0�3F -.02 0.25 -02 NORMAL 01 04 .04 (o' •' CROWN2•`•�ri 12" .08 12-'007n •per /056 . . :•0:4':. .4':. v•-o.. - Mr. . `Q:v '.¢. iv ¢ O� 7" ¢ O0: o MAN T l.. 8 HIc f10CCD EXPRESSWAY GUTTER SHOULDER BERM GUTTER MEDIAN CURB VALLEY GUTTER nz11- . p F •02 0, .02 -.03 i.04 00 ".10 ­ 06 - - 32 - - 0.25 nz" � F 3 f T 03 03 -,04 - _ o co F OC w SECTION VIEW OF CURBS OR CURBS AND GUTTERS op 1co 2" 07� 12" 00 7" -.Do pg GENERAL NOTES: FILL " x 1" DEEP o: 00 o 5 G➢ c CC aU o v m t_W Y o `'- -PLACE CONTRACTION JOINTS AT 10' INTERVALS, EXCEPT THAT GROOVED OR SAWN A 15' SPACING MAY BE USED WHEN A MACHINE IS USED OR WHEN JOINT WITH JOINT SEALER SATISFACTORY SUPPORT FOR THE FACE FORM CAN BE OBTAINED JOINT SEALER z D: Q F W O F v W .02 01 /•07 _ - OT3j 02 _ 02 0.25 -.04 - /.05 1 .11 .. - �'- a•.��� _• ;o n:,• o• l •„ - 02 - Tffi� :o; •' •' z d: Q H W O �v WWITHOUT o ■ THE USE OF TEMPLATES AT 10' INTERVALS. „ " �• GUTTER06 �`D• .' .' 0 ,o .,. 12" 12" OO 7" Q -JOINT SPACING MAY BE ALTERED IF REQUIRED BY THE ENGINEER. •,o., PAVEMENT SURFACE '••. v Z Z Q 7r' / •01 /•07 0 Z a -CONTRACTION JOINTS MAY BE INSTALLED WITH THE USE OF SURFACE .-•o•v O Q 2'-0" 2'.0" C rrrrR TEMPLATES OR FORMED BY OTHER APPROVED METHODS. .':o;;, ;v;;,•e - - CONSTRUCT NON -TEMPLATE FORMED JOINTS A MIN. OF 1L¢" DEEP. ' a-' : •: • a• '' •o. •.P •',G,• •, °'. D,' •' `'. c •' -FILL ALL CONSTRUCTION JOINTS, EXCEPT IN 8"x6" MEDIAN CURB, . ,• •o•• ° • :. '• ' •... .o.q. .o'•:°:o.='::°:'o x BERM VARIES 8'-0" NORMALI .02 /.02 / 12 /•OB -- 0.30 0.25 -.OS .0 ° - WITH JOINT FILLER AND SEALER. PROPOSED -SPACE EXPANSION JOINTS AT 90' INTERVALS AND ADJACENT TO CURB & GUTTER PROP. r, �� JOINT FILLER 01 .01 -.02 -.04 �,01 - - - o ,.,..• n p_-. •'• :. • p`,.�.•"'°`,.�.• •,•-o.,•.o•,� SOS +o f•v-, y ^ PAVEMENT ALL RIGID OBJECTS. JOINT L •00 12�^_0 12" 7' 7" i•02 i. 08 _ SEAL - _ 046999 + - o E TRANSVERSE EXPANSION JOINT LONGITUDINAL JOINT IN CURB AND GUTTER o SECTION VIEW OF JOINTS SHEET 1 OF S SECTION VIEWS OF SECTION VIEWS OF EXPRESSWAY GUTTER IN SUPER ELEVATION 2'-6" CURB AND GUTTER SUPERELEVATION RATES 06-10-2G22 tAt A A C C FHCC7V OONxz TOTAL SHOULDER�H�' WIDTH WIDTH N11 N 3' EDGE OF EDGE OF OOyxz aN aM o\ \ a W m wa ZLL LANE LANE U1¢zLL ^ _ L L a U g o Q O= O H- x Z +y VARIABLE SLOPE H- x Z W CURB AND GUTTER OR AS NRR�A SIT��1000N�����,,, PAY DIRECTED BY ENGINEER )- _) y�LL�J OOco ` r I_ �� L O¢LLN_J OOy = LIMITS I APRON SLOPES U Z > NORMAL DITCH SLOPE Z •> IN RADII (r+ ., PAY LIMITS RADII EE <, ,:f ,•;`� PLANS) (AS SHOWN I IL > a0 f A ,(tr•' t,f'y 2,-D„y;s�'::i< IN RADII D" PLA"3) o FILL SECTION CUT SECTION _ +iUi; „i.�f�,i �;fJ' �,'(; �'��`+', �•`+-UTTER 2'_0" �� FACE OF CURB i"�;,�•,, ;i% 4'-0" •tj; `>%,i,;y, ,, "N"= DISTANCE FROM EDGE OF LANE TO FACE OF GUARDRAIL WHERE GUARDRAIL IS PARALLEL TO LANE. `,,: L•_/+ L_A DRIVEWAY WITH EXPRESSWAY GUTTER TRANSITION DRIVEWAY WITH 2'-6" CURB AND GUTTER x WARRANT POINT Q W PLAN VIEW OF TYPICAL CURB AND GUTTER OCCURENCES LL W LENGTH OF NEED 2El MIN. OLL Q 25'-0" Z 1­ W z W 50:1 TAPER 3 W z o®� 2 O_,_ 0 15" 2r 0" f -"2 D.oa o ¢ D: ■I{ Qp ----- I - ---- -----�SHOULDEfl LINE --- -------------------- 2 0 It 8:1 TAPER ---------`-- Q U O J ¢ O. QO E VARIABLE - 10' SUGGESTED VARIABLE - 1D' SUGGESTED T" g" T" 7" (,� OD z N+I' + J `- 0 A SECTION A -A SECTION B-B SECTION C-C C GUTTER TRANSITION GUTTER 2'-fi CURTTER ZOZ Q W= - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -. Z N Q Q 2' OR 4' PAVED SHOULDER EXPRESSWAY - - - - - - - - - - - - - - -B - - - - - - - - - H co I••T r m W JOINT SEALER JOINT SEALER W } OC p Q EDGE OF LANE 10' PAVED SHOULDER } - SURFACE OF a flAD 0 UTTER GUTTER 0 Z 3 Z 4 0 Q � TRAFFIC �+ Q co Q L O H O EDGE OF PAVEMENT C ... �, .. 10" TO 12 -,.•o ,....o'•, " ¢ FOR POSTED SPEEDS >_ 45mph USE GREU TYPE TL-3 FOR POSTED SPEEDS < 45mph USE GREU TYPE TL-2 cc Z J - B 1" it n/ � LJ- W W A EXPANSION JOINT CONTRACTION JOINT LL PLAN VIEW OF TRANSITION NOTES: W z w LLI EXPRESSWAY GUTTER TO 2'-6" CURB AND GUTTER -IN THE TRANSITION FROM 4'-0" CONCRETE EXPRESSWAY GUTTER TO 2'-6" CONCRETE CURB AND GUTTER, PLACE It" EXPANSION JOINTS AT 25' INTERVALS. DETAIL OF BEGINNING OF GUARDRAIL IN CUT OR FILL SECTION Ur a M -PLACE GROOVE JOINTS 1" DEEP AT 12'-B" INTERVALS BETWEEN EXPANSION JOINTS. -FILL AND SEAL THE TOP 7'2" OF THE EXPANSION JOINTS AND 1" OF CONTRACTION 0_ JOINTS WITH APPROVED JOINT SEALING COMPOUND. HEET 9 OF 8 SHEET 8 OF 11 LU Lij Q Of z 846.01 coW O W room Z_ _ J Q z o O~ z 0 SHEET NUMBER Knowwhat's below. L R2U? V Call before you dig. JJ logelner with the concept. and deagn. pr... -d ne . a. an In.W of eerWce. 1. Intended mly - Ne .P ,. Purpose and come for whl. R ... prepared. Reuse of and impropm ,Ii.... m WI. document wilnout w"tten autnotlzaUon and -P-1- °y Ki ,l Hom and A. -te., Inc. .nail °e without Ii-lity to Ki ,l Hom and Y w a a E E o s_ z O HH r r e---------------------- z O = Q~¢ Q~¢ o o - GUARDRAIL END UNIT I R=20` TO 75' SEE NOTES z U LLJdHaz OOOpC�y= z¢ U 1iJaltiz OOy= ? n w m W _ - TYPE TL-3 or TL-2 I (50:1 TAPER) wQ LL F-U O� VARIABLE 3' wcr - HU�O� y m - - I SHOP CURVED I AT-1 Q �HIyOJ VARIABLE 3' - GUARDRAIL I NOTES: oO ¢ O y¢ tnHwOJ v, CEO" 10' PAVED VARIABLE O co _ 4' OFFSET SHOP CURVED GUARDRAIL IS DEFINED AS HAVING A RADIUS I OF 150'OR LESS. llt z I••I ♦- % p\1 i z >m SHOULDER l/, ♦- GUARDRAIL POST HOLE 10' PAVED VARIABLE v, W G a z° .ra WHEN RADIUS IS LESS THAN 20' REFER TO SHEET 9. f x^GUARDRAIL W ❑ (SEE NOTE) SHOULDER ��l O POST HOLE i zoo I WHENEVER SHOP CURVED GUARDRAIL IS USED AS AN ANCHOR w AND THE RADIUS I3 FROM 20' TO 75', USE A MINIMUM m r I (SEE NOTE) SURFACE COURSE CONCRETE LENGTH OF 50' OF SHOP CURVED GUARDRAIL AND FLARE r I SHOULDER CRS-2P L " E WITH AN AT-1 ANCHOR UNIT. REFER TO DETAIL 1. p w n I WHENEVER SHOP CURVED GUARDRAIL RADIUS IS MORE THAN �... 7 I EMULSION ' ' • ' w - O _ 75, REFER TO DETAIL 2. p i - >•---_'•.• -BASE -I II t O'er MAINTAIN CLEAR SIGHT DISTANCE. O LL COURSE O LL FOR POSTED SPEEDS 3 45mph USE GREU TYPE TL-3 FOR POSTED SPEE05 < 45mph USE GREN TYPE TL-2 \ Q DETAIL -1 Z z w V II II' II Z !i II EARTH ABC III II Z LU 0 - \ \\ Lu �y 11 II III II 3 W Y w � ❑ ¢ llJl II II ❑ oz \ � a cc IL JI cc a 3 o 'R' IS GREATER THAN 75' SEE NOTES z FLEXIBLE PAVED SHOULDER CONCRETE PAVED SHOULDER z 1J'1 Y o - GUARDNAIL END UNIT \\ TYPE TL-3 or TL-2 \1 en ® EARTH MATERIAL N W } (50:1 TAPER) \ } 3 NOTE' 3 Q " \ ❑ = WHEN WOODEN GUARDRAIL POSTS ARE USED, DRILL HOLES THROUGH EARTH MATERIAL AND BASE ❑ 7 W ~ ¢ C7 COURSE.THE POST MAY THEN BE DRIVEN TO THE PROPER DEPTH. DRILL THE HOLE OF SUFFICIENT ¢ y' — — — — — — — — — — — — — — — — — — — — — — — — — — — —— — — — — - y y `\\\ Q SIZE TO ACCOMMODATE THE PARTICULAR POST BEING USED. BACKFILL AND TAMP HOLES USING THE ¢ EXCAVATED MATERIAL. \„ f o \\ DETAIL-2 SEAL = 046999 f € E \ y `os�FN NIµEtPPVA,•� GUARDRAIL TREATMENT AT INTERSECTIONS sHEEr eoF„ SHEET 100E 11 !pH HM„0 - 862.01 862.01 06-I0-2D22 - Utz+q" OTTOP OF CUB O N N z o N r, a a I svt FTi r ¢¢ 9 D, 'm- V A PCROUS BED OF STONE 12' X 12' X 4' FOR SNBGRA➢E DRAIN ASPHALT a m a\ O O Q m m 4 C U. H•1 O oc4v5�,,,=Z a M IOLu OC ZQ x _ �` "DIA. X BOLr alms gsPox zhLT sLma HOLES i �Lm m� N g J _ T ILL ZoH¢ 2 STANDARD W-BEAM GUARDRAIL Z14�- �-FROM INSIDEVAL - o Lu m Lum TO HACK OF CURB , � PLAN a e „ 6B„ 6„ B„ A - U DICE ONN6ERSIDE__ _... .... ......_._.... 4-- 36' w 12" ING 1N WALL APPROX. 4 V/ s f DIA. _ !, + Y. ! a• ixl N E 15' OR IB' PIP DIAMETER LQ Er ... `o� 2 '+ Y ,• - DIA- WOOD OFFSET BLOCK D,. HOLESi 2 Q ILL.ri 4' Nix 'I I p o" co (FOR WOOD POSTS) 1 g_� 3_� £LAN G7 + e ' r o 212".R5" o� 3 /i Q Q ❑ A 3090 PSI CONCRETE u n SLOT = J Y r SOIL PLATE IA. (� H ¢ FRONT VIEW SECTI❑N SECTI❑N A -A ' 0 1••1 NOTE: 1. EITHER BRICK MASONRY OR CLASS 'A' CONCRETE MAY BE USED TO CONSTRUCT CATCH BASIN. Z ¢ w _ j 2. CONCRETE WALLS ARE TO BE 6' THICK & FLOOR 6' THICK OF 3000 PSI CONCRETE. of "DIA. 5 7� Q 0: o c 3, BRICK WALLS ARE TO BE 8' THICK & THE FLOOR 6' THICK OF 3000 PSI CONCRETE. 4, STEPS ARE REQUIRED WHERE DEPTH EXCEEDS 4'. Q / n SIZE FRONT °C *5. 24' RCP AND LARGER USE PIPE DIAMETER PLUS 10' (SLAB REQUIRED SEE DETAIL 71C-5) O ~0 G. PRECAST CATCH BASIN ALLOWED WITH APPROVAL FROM CITY ENGINEER, DRAWING/DETAILS CE Z J LLI LJJ STANDARD SHORT WOOD ROUTED SIDE FRONT OFFSET BLOCK TO BE SEALED BY NC PROFESSIONAL ENGINEER, (NO 'KNOCKOUT' TYPE BOXES ALLOWED.) O [ LL i _ LINE POST BREAKAWAY POST "W6" STEEL POST LLI Z w W REVISED FT. PG. DATE: ApA 15 1974 �.�•� Stamla d Detafl OFFICE OF THE IM6 SCALE: NM STEEL TUBE CITY ENGINEER �a UI1mDRAWN BY1 NEKEZ TS 6^x8"x0.1675" GASTONIA, N.C. LL J a- SYSTEM PARTS SHEET 6 OF a y1 CHECKED BY: REDI y Cali Basin Deta11S 71C-4 LLI Q d Z 862D02 CITY ENGINEER IPB NOE CO w O Lu � Z _ J Q z o O~ Z SHEET NUMBER a Knowwhat's below. L R20? Call before you dig. J logelner with the concept. and deagn. pr... —d --. a. an In.Wmmt o1 eerWce. 1. Intended mly - me . -,. Purpose and come for whI. R ... prepared. Nm.e of and impropm ,Ii.... m — document witnoup -tten autnotlzaUon and —P-1- Dy K-,: Hom and AaeocImea. Inc. .nail De without li-lity to K-,: Hom and PLACE 4—#.5 AROUND PIPE IN BOTH PACES TO PROTECT AGAINST DIAGONAL TENSION z oco �Q 4 CIO lr_JI MZ OO c_ LLIQZL " BTE£L LIM PDSIS F- O K o Q F I„ a to F-' O W Z LL In [7 ExD —TI.N PAY LIMITS "W" BEAM HAIL I PLAN Burrow NE I ' LUNN I BUTTDN H r ( RD LDNG THRU MIL AND PDBT MI..— AND S WASHR PDST WITH AND STD. WASH R Q z ILL Z ^vET \ p-6EPAa MUBPAN I Q N (BEE SHEET BYDF 81 .ABEDE 0.9E L1 Sm. LINE PORT PANEL BPLI.E Q cc OR ND E PDBr SLEEVE EVE o N z Ex ' TENDS Q L;,I D n y;: •EL O G R D. RDIL PLAT­i±:: � I I � l Z N FWLTS ��EEEELL.IIyy@@�� WITH r2 w RWRE orr.z I srEEL LT :.;•,: I I PaBTS N£ I I } O a _. ELEVATION Q C5 TRAILING END UNIT ASSEMBLY C.A.T.-1 SYSTEM SHEEI 1 OF e 862.02 TEMPERATURE RE —BARS FRONT FACE I 5" 3" 1 W.W.REIN. TOP ELEV, NOTE: SEE FILE NO. 71C-18 & 19 FOR DIMENSIONS SEE 71C-12 FOR FRONT ELEV. NOTE: 1 (ONE) CUBIC FOOT (MINIMUM) OF #57 WASHED STONE IS REQUIRED BEHIND EACH WEEP HOLE. REVISED F.B. PG. DATE: 311W4 Standard Detail 9n4090 SCALE: Noce DRAWN BY: X CHECKED BY: FAP Standard Reinforced Concrete CITY ENGGNEER: DEC Headwall With Wing Walls Dmp and cIlwt for whl N it W 40xBAR DIA. ,,, 4 c 12" O.C. BOTH FACES F091ZI )NTAL & VERTICAL TYPICAL SECTION A —A 017=10E OF THE CITY ENGINEER GASTONIA, N.C. No 71C-13 j 4_41 I DIA. PIPE I I I \ I I WEEP HOLES USED WITH 15"-42" PIPE WALL BE PLACED 6" INSIDE WING; 48"-96" WILL BE PLACED B" INSIDE WING — FRONT ELEV. NOTE: SEE FILE NO. 71C-18 & 19 FOR DIMENSIONS SEE 71C-13 FOR TOP ELEV. NOTE: 1 (ONE) CUBLIC FOOT MINIMUM OF #57 WASHED STONE IS REQUIRED BEHIND EACH WEEP HOLE. SIDE ELEV. REVISED F.B. PG. DATE: =Sn4 Standard 7-��}��1 OFFICE OF THE 9n490 SCALE: Nano Detail CITY ENGINEER DRAWN BY: PAIR Reinforced Concrete Headwall GnsrcwlA. N.C. CHECKED BY: NBK FAP FILu CITY ENGINEER: DEC With Wing Walls NO. 71C-12 t R SEAL 046999 ft c me W1a, M .L 101 aaa 06-10-2022 N I 0 4� M 0 O E m O p a _ 3 Z cwc G p0_ W o JO LLJ [if go> M �U LU Q a D- Of Z w O EL z_� _ J Q 0-1 z o O Q Z 0 Knowwhat's below. Call before you dig. SHEET NUMBER R20? L J \\ 1\\ \ \ \ -L- LINEBERGER ROAD \\ _ \ \ I A/E A/E t MEN �\ A/E EXISTING LINEBERGER ROAD TO PROPOSED LINEBERGER ROAD RIGHT TURN DESIGN VEHICLE: FIRE TRUCK (n I � Z Qz0 a 0- M I: i Lu J ~ 5 LLJ J \ � In \\ w Y- i v/ O m \ �6N, c \\ \ Z U Of Z 0i < PIE ll / Lu� L}j.J y H 5 \ LINEBERGER ROAD S Cn pp J \ Lu — � LL \ i `--- — — — I / _ Jam\ EXISTING LINEBERGER ROAD TO PROPOSED LINEBERGER ROAD LEFT TURN DESIGN VEHICLE: FIRE TRUCK GRAPHIC SCALE IN FEET 0 10 20 E 71 ■® 1 SEAL 046999 ft e; y d�FN 06-10-2022 N I N p O m (M \ J Y1 Z W p W o Lu [if go> U (D a 0 Lu a d Z coQ w Z O m J � • O Z SHEET NUMBER R300 Knowwhat's below. Cell before you dio. GRAPHIC SCALE IN FEET Z 0 20 40 80 p 0 L - -BEGI ONSTRL --' STAR( \ Of / LTJ' 1 -L EXTJ5 RDEEyELVD 765 — � CURVE 1 DATA DITCH STANDARD'V'DITCH \-L- LINEBERGERROAD �40'x40'SIGHTTRIANGL _ — \ — ----- =�Na��i PI Sta=14+23.83 _CITE' OFZiAST$)Nf 3TB.\74C !/ �/ _ _ - \ L \� \ \ \ \ / 4 13°12'11" rRe�_t As s°oo D=3°49'11 T F-NSLUDED WITH- �, � .. \\D \ Z � � ',� \� \\ � \- _ L = 345.66' PQ(FR�Vi�S`I0N_— _�Kfr�U�428_ _ _ — / J� / /'. \ _ ` \ - _ —_— _ _ _ _ EXlsr sT�EAM BUFFE r \ T = 173.60' _ _- - --FiiQMTOp�f BANK \ 1 TON CLASS B RIP RAP WITH -L- STA 10+50 TO STA 19+50 i/ - _ - PROPOSED SANITARY SEWER. SEE SHEETS R600 AND R601 \ \ \ -- 5 SY OF GEOTEXILE FABRIC / R = 1500.00' \ \ I 9 _ �--------�P IX E G�-_� PER NCDOT STD. 676.02 \ / ROPOS€BC+TV-06 GP�STO�IFA- \ �2 uVA SEMENT :" / - -'c. - - /CD>bT$T . 862 02 \ \ \\ \ \ \\ a�T� \ \ \ - _ _-_ IROPOSED GENEf�AL RAIAAG / ' - - _/ \ CONiR7tC/TORE NT�'GFf�R ✓ / 01 4 � \ \ \ 07'FES �� -__ � PER THE ON�ITELANDS "PI k 'r _ F-GQS-TONIA'SiD. 71G8 'C/--- AN�UT TY SMSNT )\ NS AND BUFFER REPLANiI / / /' \ a� — C. CB PR \\E)(ISTING WETANO�- 25 FD \ \ OPjCI� PER'NCDOTCB J N7 093 fw6q.4 y se. 040 _ _ — - '�_ / —a„ �_•1 \ i� _— —����� — .:.T- _ ' �~ \ '� - - z- SEE SITE PLANS FOR BUILDING 7 ... s _ „ 1a5 -- _ _-SEE-SHEET R500 FOR " 5 A.1o+ KIMLEV-HORN DI - By - „LL - ' �! - - &TREAIs1C120SSING-\ C I .6o $ 0411 / OFF:I5. OIR / // �- � - -- --' PROPOSED WATER LINE SEE --- -- s SHEETS R700 AND R701 _ --- SEE 9fTCH DETAILI \ � - 0404 - 0405 - r 40 x40'SIGHT TRIANGLE _ _- DRIVEWAY PER CITY OF -0' [ _ \ a GAS70NIA STA YiII 96� �ASTTOAIA-RI6 OF WAY_ - - - ------ -- — R E \\ DUKE 'POWER EASEMENT ----_-- T g % PEXISINGOWER EASEMENT _ C U --BK,96 P \\\ \ \\ \\\\\\ S E6T�Hi3tTA1L9 ��/j//^ �► — % PG-126/i \'"\ _=1\` _— 7F P LEGEND FOR PROPOSED IMPR OVEMENTS PROPOSED 2'-0" CURB AND GUTTER PROPOSED TRAFFIC FLOW PROPOSED CONCRETE/C&G PROPOSED MILL AND INLAY LIMITS PROPOSED FULL DEPTH PAVEMENT/SAWCUT PROPOSED RIP RAP —"• "•— PROPOSED DITCH ter— PROPOSED GUARDRAIL PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR Y" J II I 1 11 1\ II I I I I I I \ I \ \ \ 1\l l l \ GRLU # P�TL-2 \\ \ \ \\ \\ \ ]35_TA:210+3a.]6 \ 1 I FF.13.50'L ]ao IIII II � I ]45 ]50 � � 7g �4/ T\'�\kl'17\FK OR /v/lO/ry� by — — — — _ SEE SITE PLANS FOR BUILDING �\ \ \\\� /�'� \\` ❑ Z: �Q 7BY KIMLEV-HORN_—� 02 DRIVEWAY TO PER CITY OF GASTONIA STD. 71D-16. l / — __ \ \ — — --- -'\ —_' SEOGENER DRAINAGE �`\\ /`_AND UTILITY SEMENT\\\ 765 HIGH PC INT ELEV i 41.20 LOW PO NT ELEV:7 1IGH POINI ELEV: 757. 1 PVI TA:12+59. 7 PVI STA:15+58. PVI ST :19+77.25 D:1..00% D:5.75% AD:.75% 50.00• VC 50.00• VC 250 X VC 76Ct 8 m 8 m M *L 760 vt _JJ 755 755 3j6Wo 750 750 -2°e% /\ 745 745 740 _ — — / 740 PROPOE ED GROL IND 0 735 / / \ 735 wo \ I 730 \ 730 / \ - ELEV TION R PRESEN S rELIfVATION EPRES NTS 725 1LAST Pir GROU D PR POSED PROUNDI 725 10+00 11+00 12+00 13+00 14+00 15+00 16+00 -L- LINEBERGER ROAD H. Scale:1"=40' j V. Scale: 1'=4' 17+00 18+00 19+00 20+00 20+50 room ow Knowwhars below. Call before you I �ti ffuR /py SEAL 046999 1 mr y FN NfµEEPP4.c, c of mF06-10-2022 N I M 0 O ( m z LU L Q Lu L O Q 0 a W Q o z co w O Z_ _ J Q N Z Ll O O~ N z< SHEET NUMBER R400 wpe Prepared. Reuse of and Imp,— reliance on DITCH DETAIL 1 STANDARD V DITCH Dilh D 2Ft. $ -L- STA 10+50 TO STA 19+50 DITCH DETAIL 2 uSTANDARD'V' DITCH fr since D=zFt. -L- STA 20+46 TO STA 23+04 DITCH DETAIL 3 o STANDARD'V' DITCH o pa �� fr - smp D=2Ft. -L- STA 23+04 TO STA 26+19 -L- STA 29+06 TO STA 31+00 DITCH DETAIL o STANDARD'V' DITCH fr �� Frwn cmun s i.p slope 8 o Mm.D=2F[. E -L- STA 23+04 TO STA 28+31 \ _ I - A\ -- ------_----- 780 780 OW POINT KEV: 753.8 PVI STA: 2+99.65 P I STA :27+3 .04 AD: 751 AD:3.69% 250. -VC 200.00'VC 775 S 775 770 770 765 765 760 760 755 — 755 i PROPO ED GRO ND EXISTI G GRO ND 750 — 750 745 — — / 745 / / / ELEV kTION RE FRESEN S EL NATION EPRES NTS 740 EXISTINP GROU I PR POSED ROUND 740 20+50 21+00 22+00 23+00 24+00 25+00 -L- LINEBERGER ROAD H. Sc Ie:V=40' 1 V. Scale: V=4' 26+00 27+00 28+00 GRAPHIC SCALE IN FEET 0 20 40 80 ��RrN CURVE 2 DATA -L- LINEBERGER ROAD PI Sta = 21+62.84 A = 63°08'28" D = 22°55'06" L = 275.51' T = 153.62' R = 250.00' LEGEND FOR PROPOSED IMPROVEMENTS PROPOSED T-O" CURB AND GUTTER PROPOSED TRAFFIC FLOW PROPOSED CONCRETE/C&G PROPOSED MILL AND INLAY LIMITS PROPOSED FULL DEPTH PAVEMENT/SAWCUT PROPOSED RIP RAP PROPOSED DITCH PROPOSED GUARDRAIL PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR • r ow Knowwhars below. Call before you I Y ' ti 1tuR /py9 ,p y SEAL 046999 ft c 4: y `mod' NIµEE�'P4y,,c M. P. 06-10-2022 N I w O O O O N Q N p O G M m 0 Z Q Z J J� aW as O W z SW L Q � W O 0 0 LU W Q o z CID w O Z_ _ J � O z SHEET NUMBER R401 i GRAPHIC SCALE IN FEET 0 20 40 80 rO DITCH DETAIL 1 STANDARD'V• DITCH mnt G u DI I slope mm. D =2 Fi -L- STA 10+50 TO STA 19+50 CURVE 3 DATA -L- LINEBERGER ROAD PI Sta = 29+80.27 A = 50°01'37" D = 22°55'06" L = 218.28' T = 116.65' R = 250.00' �!------_— nETO-EMI TINctlN€egR�E�vE i— �\ OUTFALL6�\X \ \--CITY OF GASTONIA STD. 71 C-8\ \ \ 2 TONS CLASS B RIP RAP WITH- / 7 SY OF GEOTEXILE FABRIC PERNCDOTSTD.876.02 �P!�Q\ RTY Ii EA � \\ � \ \ OFF, \ \ PROPOSED GENERAL DRAINAGt-- \ I I I AND UTILITY EASEMENT - PROPOSED-C!'PI GAS\T9N�A RIGHT OF WAVE \ \ LEGEND FOR PROPOSED IMPROVEMENTS PROPOSED2'-0'CURBANDGUTTER PROPOSED TRAFFIC FLOW PROPOSED CONCRETE/C&G PROPOSED MILL AND INLAY LIMITS PROPOSED FULL DEPTH PAVEMENT/SAWCUT PROPOSED RIP RAP PROPOSED DITCH ter'— PROPOSED GUARDRAIL PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR —RAtLRBAD STREET. / %— — — — — — — — — — — — — i E�"(ISTING LI�EBERG R- w --w`�— J_ w EXISTWATER� \ I _- /- - -�-� \ - - - - -�--- 11x GFF:000\ \\ram\ - \ EXIS ING 2Z�/ATER LINE TO BE ABANDONED. \--``� \\\�\ —1 / / oxF °� — oxP \\ \ CJ FLOWELL TO'BE NOTIFI oD BEFO oxF o EMfLPROC "r- ox- (hxP �oH = o�w �' xrs \= oxv I naxa \ S DI OVERHEAD POWER TO BE ABANDONEDJ \ / DUKE ENERGY TO BE NOTIFIED BEFORE CC22 1 nE�-gUAury ABANDONME PROCESS \STA30+89.]4 tM ING LINEElEgGER- �I - - � -2V A OFF:166 780 TYPE III BARRICADE I rg e4 \ 0416 ins-2.5'FLIPS znz N� 1� z+oo -ao6 554°4 2" i6 .0^" �s�\ \ — CB 2.5FIDW / I 1 \ �_ a•FDPs o 1 I \ an // //I // / v �v �'"� v �� vI V 1 / �v 20• R20' A / 20' DRAINAGE — q EX NCDOT RIGHT //- - I >o \- OF WAY TO BE END'CONS /_- \ EASEMENT \ \ -L-STA: D \ \ I I I I I / /— — �� •.' RR P_S ICITV OF _`_ \ \ ABANDONED OkF:0 /�\ 11 1 �/-L�`AS ONIGHT OF WAY t \ OUTFALLS I� ( / \J\\ 0418 FES I GASTO41A STD. 71 C-8 PR P�RTY LINE AS 2 TONS CLASS B RIP RAP WITH ED ON PLAT BI(9 PCi128-- — \ 7 Sy OF GEOTEXILE FABRIC ,1- P Pi \ Q \ PER NCDOT STD. 876.02 'V gP RDRAIL / \-- - �ER DOT STD. 362.9\ '9 SEE rq�TC DETAIL 4' ♦ \\ \ \ - -���� \ *�O \ \ \ / �i/ /// / // / \\ /� `-- - \v\ 765 HIGIL�nP?0I1 30+ 4.25 785 PVI LEV:]80.1fi 780 / 780 775 775 PRO OSED GI OUND / res 770 /� EXI TING GR 3UND 770 e SEE FOR KIMLEY-HORN SITE BUILDING PLANS 7 BY / / / 765 / 765 760 f 760 / / 755 755 ELEV TION R PRESEN S EL ATION ERR ES NTS 750 750 28+00 29+00 30+00 31+00 32+00 33+00 -L- LINEBERGER ROAD H. Scale:1"=40' j V. Scale: 1'=4' • ow Knowwhars below. Call before you I °\ SEAL c 046999 1 2 y `od. NIµEEPP4.c, c 06-10-2022 N o Q N I rn 4\ M 0 O ( m Z Q Z J J� aW Q W 1-- -; W ` Q L >O 0 LU m Q o z w O Z� _ J Q z 0 O~ Z Q c� SHEET NUMBER R402 n"rpoae and client for whlM it woo ■■■■■■■■ ■■■■1■I mm m■■■1m■■= ■WA■Ili\■ = r11ffi1■I1■■■■ ■■11�11•II■1�■■ m m■� Imp = ■■■■■■mm ■■■■■■11A-■ ■■mmAiWYt1A.1�C1■ ■ IIILSJ■■Il�l�� l�� l� mlllli 11 ■■Illllli 1/ 1 0411 to 0413 H. Scale:l"=40'lV. Scale: 1"=4' ■Il umm ■■■ ■mu19m■■■ ■� ■■■■ ■■m, ■■■I�■■ ■■■�■■ mm■SEEM ■■■ 111 ■■ ■■■l�l,i■■■ ■■■�mm■■ ■■■■�■�Ilan■■ 11®" ■■m►i"�. mE ■■■■■■■■ ■■■■■■■■ ■■■■■7 mm ®■■■Illllli 11 ■® =®W- 0408 TO 0410 H. SmIe:l"=40' i V. Scale: 1"=4' e� 750 - - 750 T PROP SED G E FOR LI EBERG RROAD 745 745 LF pr 15 H ea LG OF HOPa 740 740 735 1735 E STING G DE 730 0 00 1 1 00 1 2 00 3 00 1 730 Pipe love. Elevations 0401 TO 0405 H. Scale:l"=40' l V. Scale: 1"=4' Pipe Invert m m m Eleven... �i 9i 9i 785 785 EXISTING 3RADE rc= 780 780 \ a@,Fpa�� 775 775 PROPO 3ED GRA E FOR LI EBERGE ROAD 770 770 Plpelnvert Elevations � ■■■■■■■■■ ■■■■■mmmm ■■■■®■ ■■■ ■iili�■■lily\■�■� ■■1■1■1�1■�■■ ■■■■1■CHI■fll�■■ ®■Illli 11 ■■11111 11 0404 to Outfall H. Scale:l"=40'l V. Scale: 1"=4' 760 0 00 1 00 760 Pipe Imre Elevations r r Z w w a a z o 0 0 � J �' I11 tmi_J rm/_) L _ O � a 3 Y O �ti LfuR /py SEAL 046999 fl c 4: mnLL06-10-2022 N I a rn 4 M 0 O 4 m I E V/ W J LL O a '0 V/ Z SW L pO Z 4413 0419 TO 0420 416 TO OUTFALL g ° > Ld H. Scale:i"=40' V. Scale: 1'=4' W Z W H. Srale:l"=40' i V. Scale: 1"=4' H. Scale:1"=40' i V. Scale: 1"=4' / I� C) Q � Q N,Lu a d Z coQ w O Z_ _ J � Q z � o � O~ n Q KY Z SHEET NUMBER Know what'sbelow. R403 Call before you dig. pu — and client for whl. it wa, prepared. Reuse of antl improper reliance m this tlocum,nt without written authorization and adaptalim by Kimlev—Hom antl Aaeoclalea. Inc. ,hall Le without liability to Kimlev—Hom antl Aaeociclea. Inc. �m m Dy II II I � I I I I o m ° m I = z� ITl m II I I E = I I — z I GJ O I z I I � � F l I I -------------' N3.. ROW 1i9 * 1s+oo ---- a+oo L- LINEBERGER ROAD SEE SITE PLANS FOR BUILDING 7 � BV KIMLEV-HORN ' � STOP � � o NJm ^�C` /i1�`` RI ,s.00 -i ` \ __� GRAPHIC SCALE IN FEET 0 20 40 80 I I TA TI \ s,00 o° SEE SITE PLANS FOR BUILDING 7 BV KIMLEV-HORN SEE SITE p�NS F II 11 I I I I I I I I �l BYKIMLOR � ORN LD/NG7 - a �O � x 3 TI �^ Q STOP R7-1 �v QO g PAVEMENT MARKING LEGEND: PAVEMENT MARKING LINES TA THERMOPLASTIC (4" WHITE, 90 MILS) WHITE EDGE LINE TB THERMOPLASTIC (4-YELLOW, 90 MILS) YELLOW EDGE LINE TC THERMOPLASTIC (4" WHITE, 90 MILS) 10 FT. WHITE SKIP TD THERMOPLASTIC (4- WHITE, 90 MILS) 3 FT. -9 FT./SP WHITE MINISKIP TE THERMOPLASTIC (4" WHITE, 90 MILS) WHITE SOLID LANE LINE TH THERMOPLASTIC (4-YELLOW, 90 MILS) YELLOW SINGLE CENTER TI THERMOPLASTIC (4" YELLOW, 90 MILS) YELLOW DOUBLE CENTER TN THERMOPLASTIC (8- WHITE, 90 MILS) WHITE GORELINE TO THERMOPLASTIC (8- WHITE, 90 MILS) WHITE DIAGONAL TP THERMOPLASTIC (8-YELLOW, 90 MILS) YELLOW DIAGONAL Q THERMOPLASTIC (8- WHITE, 90 MILS) WHITE CROSSWALK LINE T2 THERMOPLASTIC (24" WHITE, 90 MILS) WHITE STOP BAR T8 THERMOPLASTIC (4- WHITE, 90 MILS) 2 FT. -6 FT./SP WHITE MINISKIP T9 THERMOPLASTIC (4" YELLOW, 90 MILS) 2 FT. -6 FT./SP YELLOW MINISKIP PAVEMENT MARKING SYMBOLS �fA THERMOPLASTIC (LEFT TURN ARROW, 90 MILS) UB THERMOPLASTIC (RIGHT TURN ARROW, 90 MILS) UC THERMOPLASTIC (STRAIGHT ARROW, 90 MILS) UG THERMOPLASTIC (WORD, 90 MILS) UT THERMOPLASTIC (U-TURN ARROW, 90 MILS) (fI THERMOPLASTIC (ALPHANUMERIC CHAR. 120 MIL) STATIONS FOR SIGNS ARE APPROXIMATE. ACTUAL LOCATIONS SHOULD BE ADJUSTED IN THE FIELD TO MEET ACTUAL CONDITIONS. CONTRACTOR TO REMOVE ALL EXISTING SIGNS IN CONFLICT AND COORDINATE RELOCATION WITH DESIGNER. NOTES: 1. CONTRACTOR SHALL TIE PROPOSED MARKINGS TO EXISTING MARKINGS AT PROJECT LIMITS. 2. CONTRACTOR SHALL MILL EXISTING MARKINGS SHOWN TO BE REMOVED OR IN CONFLICT WITH PROPOSED. 3. ALL PAVEMENT MARKINGS PER 2018 NCDOT STANDARDS. 4. CONTRACTOR SHALL MILL EXISTING MARKINGS SHOWN TO BE REMOVED OR IN CONFLICT WITH PROPOSED. 5. SEE NCDOT STANDARD DETAIL 1250.01 FOR PERMANENT RAISED PAVEMENT MARKER LOCATIONS. INSTALL PER DETAIL FOR ENTIRE PROJECT STRIPING LIMITS. neon Knowwhat's below. Call before you t fR /py99 046999 1 4: M" qq, 06-10-2022 N z io �N M 0 O m _Z Y � � Z Z LU Q \G Z LU m z SW L CE Wc O O [ifG Q UJ m UJ LU Q o z W O z J F— Q �y Z LL O O~ N z Q C� SHEET NUMBER R404 as oo h.t—t of ...A— m mlenaaa Dolt 1« me .—ific Pure,,, -d abnt fc, .1,1rn R woo o.eco..d. R— of and Improper .<na.« m sT 9� 0 1 y� 1 F� 02310/0 6.00 26+00 "I x A/E — � TI 31� CIS pl" p- W o I / �--Are--� / e/E C i PAVEMENT MARKING LEGEND: PAVEMENT MARKING LINES STATIONS FOR SIGNS ARE APPROXIMATE. ACTUAL LOCATIONS SHOULD BE ADJUSTED TA THERMOPLASTIC (4" WHITE, 90 MILS) WHITE EDGE LINE IN THE FIELD TO MEET ACTUAL CONDITIONS. TB THERMOPLASTIC (4' YELLOW, 90 MILS) YELLOW EDGE LINE CONTRACTOR TO REMOVE ALL EXISTING SIGNS IN CONFLICT AND COORDINATE RELOCATION WITH DESIGNER. / NOTES: 1. CONTRACTOR SHALL TIE PROPOSED MARKINGS TO EXISTING MARKINGS AT PROJECT LIMITS. 2. CONTRACTOR SHALL MILL EXISTING MARKINGS SHOWN TO BE REMOVED OR IN CONFLICT WITH PROPOSED. 3. ALL PAVEMENT MARKINGS PER 2018 NCDOT STANDARDS. 4. CONTRACTOR SHALL MILL EXISTING MARKINGS SHOWN TO BE REMOVED OR IN CONFLICT WITH PROPOSED. 5. SEE NCDOT STANDARD DETAIL 1250.01 FOR PERMANENT RAISED PAVEMENT MARKER LOCATIONS. INSTALL PER DETAIL FOR ENTIRE PROJECT STRIPING LIMITS. TC THERMOPLASTIC (4" WHITE, 90 MILS) 10 FT. WHITE SKIP TD THERMOPLASTIC (4'WHITE, 90MILS) 3FT. -9FT./SPWHITE MINISKIP TE THERMOPLASTIC (4" WHITE, 90 MILS) WHITE SOLID LANE LINE TH THERMOPLASTIC (4' YELLOW, 90 MILS) YELLOW SINGLE CENTER TI THERMOPLASTIC (4' YELLOW, 90 MILS) YELLOW DOUBLE CENTER TN THERMOPLASTIC (8' WHITE, 90 MILS) WHITE GORELINE TO THERMOPLASTIC (8" WHITE, 90 MILS) WHITE DIAGONAL TP THERMOPLASTIC (8' YELLOW, 90 MILS) YELLOW DIAGONAL Q THERMOPLASTIC (8" WHITE, 90 MILS) WHITE CROSSWALK LINE TZ THERMOPLASTIC (24" WHITE, 90 MILS) WHITE STOP BAR TB THERMOPLASTIC (4' WHITE, 90 MILS) 2 FT. -6 FT./SP WHITE MINISKIP T9 THERMOPLASTIC (4" YELLOW, 90 MILS) 2 FT. -6 FT./SP YELLOW MINISKIP PAVEMENT MARKING SYMBOLS �JA THERMOPLASTIC (LEFT TURN ARROW, 90 MILS) UB THERMOPLASTIC (RIGHT TURN ARROW, 90 MILS) UC THERMOPLASTIC (STRAIGHT ARROW, 90 MILS) IJtj THERMOPLASTIC (WORD, 90 MILS) OJT THERMOPLASTIC (U-TURN ARROW, 90 MILS) IJI THERMOPLASTIC (ALPHANUMERIC CHAR. 120 MIL) 3 GRAPHIC SCALE IN FEET � 0 20 40 80 a a \ r r \ w w fn a a z 0 \ o 0 0 o w A w � � w m y � \ aaaa®a � Ow = a� o� ^ o�n oE; a 3 Y o X ti z G) w� 7 _ SELL � c i \ 096999 + " k 2� I I \ 4 06-10-2022 Q� � w N 0 o vzi g M O O m \ \���'t\ \ \ Z '^ \ \� LJ.I Qv/ \ W \ \e9 d z SW L N� W O O L.1_ Q / C, Lu a cKy oQ o_ z w O z L J F— Q �Z room ly O � O~ N z Q C� SHEET NUMBER Know what's below. C811 before you di4. ­ mooe a^9 al-c ro^ .nlrn it... Y m a a E a a z w o' \�\\ �— gas \��\ QQQQ®Q z° a � _ Na, \ 1 „\ a « i\ n w 4mj �`.: S�Hi Es°a.e i o / GRAPHIC SCALE IN FEET ® � 0 20 40 F;' 760 760 _ SEAL 0 046999 1 E od�`ON NfµEEPPVYr WEBER ER ROA 11 Gr.mdSl.hlnx.tiee• 6.w AnaA 9r.ey1[arlon 4nhxla.lyn Ti. One M—F— Er Ea Ho Penmeler d.$ci nnaln.ixhm vM .I idyx �eIV • H%a fwe>hr wwvltfQ+vl X TaaNy xeno I r.hdN..m ID• 11 x 3 t e�ppr ImR :t 71,' kct lrc lrrupn and R31 s�zprehul 14 Nn lbw tilopez 1:[ m IiJeYR 1.d,, roc dope pTpac�rlvrA i06 dmcer hl lmplh All aTa rlw�� L¢xeegl lei arnh ejppee RadQr I4 rkrA oMmeren aw nvn.:r m] "i31v4nw Ntlnr Wn bC�MN'byRr: prrmNliryrnWWmF Eaxd y. ryN . m nl6n vleHpaine. nd'niunr Nn aiN. nvpli M1q..car.Ne"f Saunin 1I 1C=%h ll �.tyi.m�ieo aey.immaah • swaa,r..awaed; LPpeillm�krns^win n.ar Irtapeerconr bLe xlr rrgercu w.eq ^nafnaL r>m�oe� hoard' • InipceLvin ognnsnniu¢be a�vi>nbb rin.sae derm6 binldess haun ixlm n rNe.rpe<i0e eNern)Axn ar = RecndN murx be lrpl f •] n�uM nrmLLk nxni _ =a IrwwcrInblr rworda mas bo W NAlwlgl nMu cwr.win ­M— SI InEieuml.lb. N M1en AnamH LLndtllm. TroJccu permallra wJn the Lrcrwap:nal.ao -En N N f ll^dly W!aiw_sl!,wnioL [LcLo l m • C.n dW .PpM:ercen, —ki near W Anp IMLI _ 'l!w wmlNioen e[ _ IisJe_a. _ AMI l $.2 .Wa¢q 01 mural 6rNWY — —rrifh n+x lrlmi rwdwmz STREAM STABILIZATION DETAIL Not to Swle .,r+l.aen mrcepuxr 61 C:eMRrO�n I. r]nxwrn x!SWN�pcice Co.a.l W..• •w�hpmpn�sr4rhe b­d Ti B MLe,Nv ,n H.MH.g Na r.lnr afmd I—M.nn am1.a 1. JNi OnQearr.l ate. rm dermliliun. eeaaBu�lLal end mm� -aria bedN 50' Sinn >.arm 3aim.ed u:emm nvku Nsloa.wetda N]rvsval�wi6 bk • Lvleduouaia[xwekpiksbcixd.50'frpm amrm drape w[ae ran rerag.Nbk anrlvalNm a�dYnb. • 4'meant mn jp[e nupl ra.annllea nrmld eanrcn wiie vvrlhu n-amr-KeW Lrc G.IT 61 'Jed)�eiJ 6fJn. - esAln wKlioes iNR•I wiu.lrax Itm�l hhnlrn.N:ee . Ux 1m D7q-aM4 dfo u1ann. I PERMANENT SEEDING (ROADWAY) OVERALL SITE SEEDING, SPRIGGING, AND SODDING SEED ALL DISTURBED AREAS IN ACCORDANCE WITH LAWNS AND GRASSES SPECIFICATIONS AND L104 (SODDING AND SPRIGGING PLAN). PERMANENT SEEDING IN AREAS RECEIVING EROSION CONTROL MATTING PREPARE SEEDBED BY RIPPING, CHISELING, HARROWING, OR PLOWING TO DEPTH OF SIX INCHES SO AS TO PRODUCE A LOOSE, FRIABLE SURFACE. REMOVE ALL STONES, BOULDERS, STUMPS, OR DEBRIS FROM THE SURFACE WHICH WOULD PROHIBIT GERMINATION OR PLANT GROWTH. INCORPORATE INTO THE SOIL 800 TO 1,000 POUNDS OF 10-10-10 FERTILIZER PLUS 500 POUNDS OF 20-PERCENT SUPERPHOSPHATE PER ACRE AND TWO TONS OF DOLOMITIC LIME PER ACRE UNLESS SOIL TESTS INDICATE THAT A LOWER RATE OF LIME CAN BE USED. SEED AREA AND INSTALL EROSION CONTROL MATTING PER MANUFACTURER'S DETAIL. MULCH AFTER SEEDING WITH 1.5 TONS OF GRAIN STRAW PER ACRE AND EITHER CRIMP STRAW INTO SOIL OR TACK WITH LIQUID ASPHALT AT 400 GALLONS PER ACRE OR EMULSIFIED ASPHALT AT 300 GALLONS PER ACRE. PERMANENT SEEDING (NON -RIPARIAN) SEEDING MIXTURE "COOL SEASON" SEPTMEBER I-FEBRUARY 28 SPECIES RATE (Ib/ACRE) SOFT RED WINTER WHEAT 50 RIVIERA BERMUDA (HULLED) 25 RIVIERA BERMUDA(UNHULLED) 25 "WARM SEASON" MARCH 1 -AUGUST 31 SPECIES RATE (WACRE) GERMAN, BROWN TOP, 50 OR FOX TAIL MULLET RIVIERA BERMUDA(HULLED) 50 'SEE SHEET 13 FOR RIPARIAN SEED MIX TEMPORARY SEEDING LATE WINTEWEARLY SPRING TEMPORARY SEEDING FALL TEMPORARY SEEDING SUMMER SEEDING MIXTURE SEEDING MIXTURE SEEDING MIXTURE SPECIES RATE (Ih/ACRE) SPECIES RATE (Ib/ACRE) SPECIES RATE (IbTACRE) w w In RYE (GRAIN) 120 RYE (GRAIN) 120 GERMAN MILLET 40 a a z ANNUAL LESPEDEZA (KOBE IN PIEDMONT AND COASTAL PLAIN, 0 0 o KOREAN IN MOUNTAINS) 50 SEEDING DATES IN THE PIEDMONT AND MOUNTAINS, ASMALL-STEMMED SUDANGRASS MAYBE SUBSTITUTED AT A RATE OF 50 Ib/ACRE. w w rr MOUNTANS-AUG. 15 -DEC. 15 COASTAL PLAIN AND PIEDMONT-AUG. 15 -DEC. 30 SEEDING DATES rn SOIL AMENDMENTS MOUNTAINS -MAY 15 -AUG. 15 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER PIEDMONT -MAY 1 - AUG. 15 IS NOT TO EXTEND BEYOND JUNE. FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY ZOOO Ib/ACRE COASTAL PLAIN -APR. 15 -AUG. 15 GROUND AGRICULTURAL LIMESTONE AND 1,000 Ib/ACRE 16110-10 FERTILIZER. a a a a ®a Z SEEDING DATES SOIL AMENDMENTS MOUNTAINS - ABOVE 2500 FT FEB. 15 - MAY 15 MULCH BELOW 2500 FT FEB. 1 - MAY 1 FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 Ib/ACRE PIEDMONT- JAN. 1 -MAY1 APPLY 4,0001b/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT GROUND AGRICULTURAL LIMESTONE AND 7501b/ACRE 10-10-10 COASTAL PLAIN -DEC. 1 - APR. 15 AT A RATE OF 0.10 GALLONS PER SQUARE YARD, NETTING SUCH AS FERTILIZER. LIGHTWEIGHT PLASTIC, COTTON, JUTE, WIRE, OR PAPER NETS STAPLED SOIL AMENDMENTS OVER THE MULCH ACCORDING TO THE MANUFACTURERS MULCH RECOMMENDATIONS, OR A MULCH ANCHORING TOOL SUCH AS A DISK SET FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 NEARLY STRAIGHT. APPLY 4,000 WACRE STRAW. ANCHOR STRAW BY TACKING WITH Ib/ACRE GROUND AGRICULTURAL LIMESTONE AND 7501b/ACRE ASPHALT AT A RATE OF 0.10 GALLONS PER SQUARE YARD, NETTING w - 10-10-IO FERTILIZER. MAINTENANCE SUCH AS LIGHTWEIGHTPLASTIC, COTTON, JUTE, WIRE, OR PAPER NETS STAPLED OVER THE MULCH ACCORDING TO THE MULCH REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH MANUFACTURERS RECOMMENDATIONS, OR A MULCH ANCHORING o p r' 50 LBIACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TOOL SUCH AS A DISK SET NEARLY STRAIGHT. < eJ z APPLY4,0001b/ACRE STRAW. ANCHOR STRAW BY TACKING WITH TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50LBIACRE KOBE ! ASPHALT AT A RATE OF 0.10 GALLONS PER SQUARE YARD, NETTING (PIEDMONT AND COASTAL PLAIN) OR KOREAN (MOUNTAINS) LESPEDEZA IN MAINTENANCE SUCH AS LIGHTWEIGHT PLASTIC, COTTON, JUTE, WIRE, OR PAPER LATE FEBRUARY OR EARLY MARCH. w NETS STAPLED OVER THE MULCH ACCORDING TO THE REFERTILIZE IF GROWTH IS NOT FULLYADEQUATE. RESEED, �o MANUFACTURERS RECOMMENDATIONS, OR A MULCH ANCHORING REFERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR _ r TOOL SUCH AS A DISK SET NEARLY STRAIGHT. OTHER DAMAGE. w a MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLYADEQUATE. RESEED, REFERTILIZE, AND MULCH IMMEDIATELYFOLLOWING EROSION OR OTHER DAMAGE. SOIL STABILIZATION SHALL BE ACHIEVED ON ANYAREA OF A SITE WHERE LAND -DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE: ALL PERIMETER DIKES, S WALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3: 1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. UPSTREAM DETAIL DOWNSTREAM DETAIL a REFER TO CIT1, STANDARD DETAIL ON SHEET R205 REFER TOCITYSTANDARDDETAIL ONSHEET 1 FOR HEADWALL DIMENSIONS FOR HEADWALL DIMENSIONS CONTRACTORTO SUBMITSIGNEO AND SEALED SHOP CONTRACTOR TO SUBMITSIONEO ANO SEALED ORAWINGSBEFORE CONSTRUCTION SHOPDR—GSBEFORECONSTRUCTION TY RCP T2= RCP gRCULNN WL4ERT gRWLNN CUL�4RT FINISHED GRADE FINISHED GRADE T3S20 ]2J. ]2 EL. II I1 1 1 11 11 1 1 11 III 1=11=11=1 111 F —111 111 111-111 11 FINISHEDGRADE TOMATCHEXISTINGGRADEATPIPEOUTLET INVERT=1'BELOWFINISHEDGRADE FOOTER PER FINISHEDGRADE TOMATCHEXISTINGGRADEATPIPEOUTLET. INVERT=1'SELOWFINISHED GRADE FOOTEft PER CONCRETE SILL TO BE INSTALLED TO VABOVEPIPEINVERT CITYDETAIL CONCRETE SILL TO BE INSTALLED TO VABOVEPIPEINVERT CITY DETAIL TYPICAL HEADWALL INSTALLATION TYPICAL HEADWALL INSTALLATION NOT TO SCALE NOT TO SCALE ANEADWALL DETAIL SCALE: NOT TO SCALE room Know what's below. Call before you, �N rrrR I� 6EI L 046999 ft 2j a''o R MM ..10, Po• n.O6-10-2022 N O a Y o o vzi io �N aka M 0 O r m V ''Z I.L V / ////�� V/ V� 0 J W U < CO W Z `Q 0 J W H cn r Z LULU LL CE W O O LLJ [if2E o > � U a � w m Q of Z W O LU Z _ J � Q 0-1 z O O~ Z Q 0 SHEET NUMBER R501 eurpoa, end dint for whlM it woo r 1 All OR'`-` x ' PROPI.ZsEDd6•SmiUTTILITY E RRMNAG€ / / _ \ / _ ( .- __ \`, \ �I 9 AND UTILITY EASE ENT -- f%/ " �y \\X�\\ \ 730i I I I I�i%i \`— 0 0LU 0 LDRAI E///__iii --- _____��_—' /\ �. \ _ __I\ \ I 1 \ \� / \���i� // — • vNi y u m 730_-\\�� _ 728 '� ��� ��- - - - - - PROPLMEO S-84NIT RfYY SEWSR LME \ •\ \ \ n \ . ' �,� L` - -� - y- _'µ': L PHOP.OSFP sr hUIN WATER UK = Tzs i LLI a - - • 4, LLI 'I s 4 130 -\�_.- it III •' iG / — ��---_---���- v f�eY -J I.LI LLJ Q i _ __�yyl �i• - G,�S-OY'ARIi Ii OF W.Vv- \ PROPpSED -AIC 1 : ! /yam( _ _ - _ I"111-- - GASTONIA IGH it Ili _ �•+' ~+ ./, - - _ - _ _ II Jr-_ -[ _-_-- _ Y 03z Y Ay .i - - _ / I 3 'i •'.�; j,; I //` .'1.,�� Y SEE SITE PLANS FOR oa3 _ / I r 1 I �I, ;�►T�. BUI LOIN, 7 BY KIMLEY-MORN _ ___ y ^ } J��W l - _ _ IN, _ Ti E ,�, / �°A h N M e ±�1' •I �� — .. + I+PI. fY-_�, PLAN VIEW - LINEBERGER REALIGNMENT (27+00.00 - 35+00.00) WALR:,- • w E I ••, Fpry NI �P .; 760 u u x••••• 760 •�06-10-2022 O M O z Q Q ~ J W IZ W z J _ W LL U O rW^ vJ Q _j Q s �1� L.L � z= SW L Q pz O W o w LL LJ o W Q a W Q a Z COW O ui Z I J a o z � aU ~ LINEBERGER REALIGNMENT STA 27+00 - 35+00 SHEET NUMBER o H. Scale:1"=4O' I V. Scale: 1'�' Know What's b2�OW. OO s<76S CB�� before you dig. RGU IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■�IIIII■IIIIIIII■IIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■ ________� � i � ►.��/IA�WVAN��//71�/I�:IfI�J%I��W�B►JJ/. ■ �-,_ i®J.V� -� i I IIIIIIII■IIIIIIIII��IIIIIIII■IIIIIIIII,�Ay/� '►y/yV�IIIIIIIII■IIIIIIIII■IIIIII■1 �IIIIIIII■1111- IIIIIIII■IIIIIIII■�III�, :: IIIIIIIII■IIIIIIIII■IIIIIIIII■ �y/�►/y�� ►�®�IIIIIIIII� IIIIIIII■IIIIIIIIII�iY�ll— � IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIII��®�IIIIII■1 IIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■ IIIIIIII■IIIIIIII■�i, i .f�Il� ,�®, IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■-' IIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIII■IIIIIIII■IIIIII' '. IIIII■ ��Iltll� �IIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■ IIIIII��IIIII�:III�I�IIIIIIII■IIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIII■IIIIIIII■IIIII� ��vN-�,_ � �IIIII■IIIIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIII■IIIIIIII■IIIIIIIIII� IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■ IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIII■IIIIIIII■IIIIIIIIII� IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIIII■IIIIIIII■IIIIIIII■IIIIIIIIII� I'�IIIII� 11 IIIIIIII■IIIIIIII■IIIIIIII� I I IIIIIIII■IIIIIIIII■IIIIIIIII� I I IIIIIIIII■IIIIIIIII■IIIIIIII� 11 IIIIIIII■IIIIIIII■IIIIIIII� 11 IIIIIIII■IIIIIIII■IIIIIIII� 11 IIIIIIII■IIIIIIIII■IIIIIIII� I I IIIIIIIII■IIIIIIIII■IIIIIIII� 11 IIIIIIII■IIIIIIII■IIIII� PROPOSED SANITARY PROFILE LEGEND ------------ EXISTING GROUND PROPOSED GRADE \\ FILL PER GE TECHNICAL REPORT REQUIREMENTS RIM: MIT: CENTER OF LID ELEVATION INV: PIPE INVERT ELEVATION MH: MANHOLE DI: DUCTILE IRON SANITARY SEWER KEYNOTE DROP IN MANHOLE GREATER THAN 6" BUT LESS THAN OR EQUAL TO 30" SHALL HAVE A CONCRETE SLIDE. IF DROP IS S1 GREATER THAN 30" PROVIDE AN OUTSIDE DROP MANHOLE. OUTSIDE DROPS SHALL BE DUCTILE IRON PIPE PER THE CITY OF GI STANDARD DETAILS AND SPECIFICATIONS 71 B-3. CONNECT DUCTILE IRON OUTSIDE DROP PIPES TO MANHOLES BY CORE AND BOOT PER THE CITY OF S2 GASTONIA'S STANDARD DETAILS AND SPECIFICATIONS. TRANS TION FROM PVC TO DUCTILE IRON PIPE WITH FERNCO COUPLING. ROOF DRAINS, FOUNDATION DRAINS, AND OTHER CLEAN WATER CONNECTIONS TO THE BANITARY SYSTEM ARE PROHIBITED PLAN NOTES NOTES: 1. CONSTRUCTION SHALL NOT BEGIN UNTILAPRE-CONSTRUCTION MEETING HAS BEEN HELD WITH THE CITY OF GASTONIA STAFF. 2. fANSTRULTION SHALL NOT BEGIN UNTILA PRELIMINARY CONSTRUCTION INSPECTION OF THE SITE IS COMPLETED. CONTACT THE OFFICE OF THE CONSTRUCTION ENGINEERIRIGHT-OF-WAY ADMINISTRATOR AT (]04j SE88016 AT LEAST ONE (1) WORKING DAY PRIOR TO BEGINNING CONSTRUCTION FOR INSPECTION. 3. THE CITY OF GASTONIA WILL REQUIRE AS -BUILT DRAWINGS, ENGINEER'S CERTIFICATION, AND ALL EASEMENTS RECORDED BEFORE A CERTIFICATE OF OCCUPANCY CAN BE ISSUED. 4. CONTRACTOR TO PROVIDE VIDEO OF COMPLETED SANITARY SEWER AS REQUIRED BY THE CITY OF GASTONIA. 6. CONTRACTOR IS TO PROVIDE COMPACTION TESTING FOR THE INSTALLATION OF ALL SANITARY SEWER LINES IN FILL AREAS. 6. CONTRACTOR TO PROVIDE"COMPETENT-CARD CARRYING INDIVIDUALS FOR OSHA REGULATIONS. 0 0 + o uo CD QD H � LLI W = Z Cn J --735 i /%✓� // /III// //' 1 1 / �/ I / / �/ / //// / ///_ / / / / / / / A,` / 41 BUFFER 'ST �iEAp1 EI(ISTILJGWET > i �GENEFAL DTCAINAGE \ ` 740- /ANDIITILITY EASEMENT. -� I I I ElJ 6°�AN\rARY S ewt=nWER LINE / - ' AND UANOUNTILI LDRAINA TY EAEEMENi PROPp8E0 IE MAIN ^y WAiRiLINE GENERA'. ORAINarg �. AND UT1U-EAaEVENT V III v � PLAN VIEW- LINEBERGER REALIGNMENT (35+00.00 - 38+77.96 ) �1�1_9Tii7i�eT7�i��i:Ic1N�1111♦1111♦1111♦1111♦■L��I�1111♦1111♦1111♦1111♦1111♦1111♦ ��������■Erb"-®������■ply 111■ 111■1111♦1111♦1111♦1111♦1111♦1111♦1111♦■1■1111♦1111♦1111♦1111♦1111♦1■F1i� „' �LyO�iI�'� ®IM 1�6�Os?i1® G\■� 111111 :�©'�v,Rll■� ���',►�C�S����L��`" �1�%�IC�I,��G2�75�: ®111! %11■�1�� � ''�i:�18'�i.►i`.��►�►%�i 'DIM ■1�� ��___��� I��11,� 11♦____ 111■ 1111111111■1111■1111■1111■1111�� , I1111■1111■1111■1111■1111■1111■ 1�1111■1111■1111■1111■1111■1111■ ��1111■1111■1111■1111■11111� �1111■1111■1111■1111■1111■1111■1■11� 1111■1111■1111■1111■1111■1111■1111■ 111■ 1111111111■1111■1111■1111■1111■1111■1■.I1111■1111■1111■1111■1111■1111■1111■ �1111■1111■1111■1111■1111■1111■1■ :. .,I:I�1111■1111■1111■1111■1111■1111■111� 1/'llll■1111■1111■1111■1111■1111■1111■1111■ _�_IIII■1111■1111■1111■ �1111■1111■1111■1111■1111■1111■1111■1111■1111■1111■1111■1111■1111■1111■1111■ ® 1111111111■1111■11111��1111■1111■1111��1111■1111■1111��1111■1111■111� LINEBERGER REALIGNMENT STA 35+00 - 38+77.26 H. SwII V. Scale: 1"=4' PROPOSED SANITARY PROFILE LEGEND II ------------ EXISTING GROUND PROPOSED GRADE FILL PER GEOTECHNICAL �1��1��GLL�LL REPORT REQUIREMENTS RIM: MH: CENTER OF LID ELEVATION INV: PIPE INVERT ELEVATION MH: MANHOLE DI: DUCTILE IRON SANITARY SEWER KEYNOTE DROP IN MANHOLE GREATER THAN 6" BUT LESS THAN OR EQUAL TO 30" SHALL HAVE A CONCRETE SLIDE. IF DROP IS S1 GREATER THAN 30" PROVIDE AN OUTSIDE DROP MANHOLE. 3� OUTSIDE DROPS SHALL BE DUCTILE IRON PIPE PER THE CITY OF GASTONIA'S STANDARD DETAILS AND SPECIFICATIONS 71 B-3. CONNECT DUCTILE IRON OUTSIDE DROP PIPES TO MANHOLES BY CORE AND BOOT PER THE CITY OF S2 GASTONIA'S STANDARD DETAILS AND SPECIFICATIONS. TRANSITION FROM PVC TO DUCTILE IRON PIPE WITH FERNCO COUPLNG. ROOF DRAINS, FOUNDATION DRAINS, AND OTHER CLEAN WATER CONNECTIONS TO THE BANRARY SYSTEM ARE PROHIBITED I PLAN NOTES NOTES: 1. CONSTRUCTION SHALL NOT BEGIN UNTIL PRE -CONSTRUCTION MEETING HAS BEEN HELD WITH THE CITY OF GASTONIA STAFF. 2. CONSTRUCTION SHALL NOT BEGIN UNTIL A PRELIMINARY CONSTRUCTION INSPECTION OF THE SITE IS COMPLETED. CONTACT THE OFFICE OF THE CONSTRUCTION ENGINEER/RIGHT-OF-WAY ADMINISTRATOR AT (704) 866-6015 AT LEAST ONE (1) WORKING DAY PRIOR TO BEGINNING CONSTRUCTION FOR!NSPECTION. 3. THE CITY OF GASTONA WILL REQUIRE AS -BUILT DRAWINGS, ENGINEER'S CERTIFICATION, AND ALL EASEMENTS RECORDED BEFORE A CERTIFICATE OF OCCUPANCY CAN BE ISSUED. 4. CONTRACTOR TO PROVIDE VIDEO OF COMPLETED SANITARY SEWER AS REQUIRED BY THE CITY OF GASTONIA. 5. CONTRACTORISTOPROVIOE COMPACTION TESTING FOR THE INSTALLATION OF ALL SANITARY SEWER LINES IN FILL AREAS. 6. CONTRACTOR TO PROVIDE "COMPETENT" CARD CARRYING INDIVIDUALS FOR OSHA REGULATIONS. • • Knowwhafs below. Cell before you L L a a rn 0 0 0 15 REAL D4RBBB Q a- Lu J_ LU LL �0 rrLU^ LL a^^ vJ � U J Q m a_ Z- W Q 0o z Qf w O > LL Lu W Q a Z LLJ Z� J a z 0 U~ ZCD ..I 1- II,. VBER R601 r WATER LINE RESTRAINED LENGTH LEGEND PROPOSED RESTRAINED LENGTH OF PIPE 3 § ~ Q � C, y F F a a N = 0 oo1 _ ww N N - _ o + as®a - o z a� a U� w w � L x Lu - M o U _ 00 _ 0 N - p3U to Y 3 z PLAN VIEW - LINEBERGER ROAD REALIGNMENT (10+00 - 16+50) n w SCALE 1-= 40' E - 765 1...•. In Y� REAL rj = + Q46BBB c E Z M"06'a0-2022 755 0 755 x i) M w o y U a s Q750 750 .- uU z a 745 745 0— W e /J LL _ 740 < 740 t00 GATE VA E ` f: GAT O W Q 735 735 co W I..L. 0+00 0+50 z BUILDING 7 SERVICE STUB Lu H. Scale:)"=40' i V. Scale: 1"=4' = o Oz w LLI o PLAN NOTES LLI Z Ow LLI NOTES: Ua d 1. CONSTRUCTION SHALL NOT BEGIN UNTIL PRE -CONSTRUCTION MEETING HAS BEEN HELD I 1 I uMi z WITHTHE CITY OF GASTONIA STAFF. < ll 2. CONSTRUCTION SHALL NOT BEGIN UNTIL A PRELIMINARY CONSTRUCTION INSPECTION OF THE W 111 O LJJ 10+Qp 11+00 12+op 13+pp 14+00 15+00 fS+QQ SITE IS COMPLETED. CONTACT THE OFFICE OF THE CONSTRUCTION ENGINEEWRIGHT-OF-WAY LINEBERGER ROAD REALIGNMENT WATER MAIN ADMINISTRATOR AT(704) 866fi015 AT LEAST ONE WORKING DAY PRIOR TO BEGINNING z T 1 STA:9+00 to STA:16+50 CONSTRUCTION FOR INSPECTION. 3. THE CITY OFGASTONIAWILLREQUIREAS-BUILT-INGS,ENGINEER'S CERTIFICATION, AND Q J Z ALL EASEMENTS RECORDED BEFORE A CERTIFICATE OF OCCUPANCY CAN BE ISSUED. N H. Scale)"=40' i V. Scale: 1'=4' 4. CONTRACTOR IS TO PROVIDE COMPACTION TESTING FOR THE INSTALLATION OF ALL WATER • 10 O N LINES IN FILL AREAS. Q Z U 5. CONTRACTOR TO PROVIDE"COMPETENT'CARD CARRYING INDIVIDUALS FOR OSHA SHEET NUMBER c REGULATIONS. KnoCall s R I R700 11 ore yo CB�� before you dig. f YR yt /1 III I i Ilr'r. III h�!►-.� �;:J � iiiiiiiiiiiiiiiiii!!I■i�iiiiiiiiiii iiiiiiiiiiiiiiiiii®■iiiiiiiiiiiii �iiiiiiiiiiiiiiiii�■i�iiiiiiiiEl©!� iiiiiiiiiiiiiiiiii■��ii�biiiiiiiiilC�i iiiiiiiiiiiiiiiiii�illi���iiiiiii'ilL7•i iiiiiiiiiiiiii►�iii�lll'iliii�iiiiilil� iiiiiillii ill■ii��iiiiiiliiiill'liiiiiii iiiiiiiiiiiii■'t�iYrWiiiiiiiiiiiiii WATER LINE RESTRAINED LENGTH LEGEND PROPOSED RESTRAINED LENGTH OF PIPE CD +25 �F- U) ~ W W Z co J W H U) iiiiiiiiiiiiiiiiii . .. � -_ • iiiE�li■iiiiiiiiii ®iiiiiiiiiiiiii�l�■iiiiiiiiii® liiiiiiiiii�i�i■ri���i■ii�rrii�iii��ii ®ii■r■iiiiii�iii■��iui■ii�ii��ii��i® 'iiii■iiiiiiiiii■I�illi■iilii��iilii liii�■iiiiiiiiiiiii�li� �iiliiiiiiii iii�i6iiiiii%iiii■I�iiiil I ill�iiiil ii iii��iiii_%iii�Ii■I�iiiil��ll�ii_i�! �� iiii■iii/iiii/Ii■liiii���llii�i� � iii iiii■i�/iiiiil�i■li�iii±�Iliii�:�lii ii■ PIPE /iiiiiiiiIICi3�ii miiiimMm ii11iG�/iiii�ii�iiiii\�ii�F! ►iiiii�ii ii11i/iiii�ii'i�Iiiii��iill���iii�� iPFiliiiiy ®ii■iiiiiiiiii�l.Viiiiiiiiiiii® iiiiiiiiiiiiiii■Iliiiiiiiiiiiii iiiiiiiiiiiiiii■Iliiiiiiiiiiiii ®iiiiiiiiiiiii■I�iiiiiiiiiiii® 17+00 18+00 19+00 20+00 21+00 22+00 LINEBERGER ROAD REALIGNMENT WATER MAIN STA:16+50 to STA:23+00 H. Scale:1"=40' 1 V. Scale: 1"=4' 0+00 0+50 BUILDING 6 SERVICE STUB H. Scalel"=40' 1 V. Scale: 1"=4' PLAN NOTES NOTES: 1. CONSTRUCTION SHALL NOT BEGIN UNTIL PRE -CONSTRUCTION MEETING HAS BEEN HELD WITH THE CITY OF GASTONIA STAFF. 2. CONSTRUCTION SHALL NOT BEGIN UNTIL A PRELIMINARY CONSTRUCTION INSPECTION OF THE SITE IS COMPLETED. CONTACT THE OFFICE OF THE CONSTRUCTION ENGINEERIRIGHT-OF-WAY ADMINISTRATOR AT (704) 86I 6015 AT LEAST ONE (1) WORKING DAY PRIOR TO BEGINNING CONSTRUCTION FOR INSPECTION. 3. THE CITY OF GASTONIA WILL REQUIRE AS-BU ILT DRAWINGS, ENGINEER'S CERTIFICATION, AND ALL EASEMENTS RECORDED BEFORE A CERTIFICATE OF OCCUPANCY CAN BE ISSUED. 4. CONTRACTOR IS TO PROVIDE COMPACTION TESTI NG FOR THE INSTALLATION OF ALL WATER LINES IN FILL AREAS. 5. CONTRACTOR TO PROVIDE"COMPETENT'CARD CARRYING INDIVIDUALS FOR OSHA REGULATIONS. T� a o � a3 � Y o ■w fix. W�999 {� t '11411"06-0-2022 2 _ - r N r z a J LU � J W LL �O a� U_z J a m tl z= w Q O z O / LPL/ Wc 0 W LA_ G Q (DU a a W ILL] Lu a z �Q Lu z LL J a N Z LL O O N Q U' z ..1 1- I.L.. MBER R7o� I I Knowwhafs below. Call before you dig. INFRASTRUCTURE CONSTRUCTION PLANS FOR GATEWAY 85 — ABERDEEN ROADWAY EXTENSION CITY OF GASTONIA, GASTON COUNTY, NORTH CAROLINA UTILITY AND GOVERNING AGENCIES (`()NITAI-T I I4ZT- PLANNING AND DEVELOPMENT CITY OF GASTONIA 181 S SOUTH STREET GASTONIA, NC 28052 704854-6635 CONTACT: RUSTY BOST RUSTYBQCITYOFGASTONIACOM ENGINEERING CITY OF GASTONIA 181 S SOUTH STREET GASTONIA, NC 28052 7o 854-6641 CONTACT: KEITH LINEBERGER KEITHL@01 rYOFGASTONIA.COM EROSION CONTROL GASTON NATURAL RESOURCES DEPARTMENT 1303 CHERRYVILLE HWY. DALLAS, NC 28034 704922-2157 CONTACT: JOSEPH ALM GASTON NATURAL RESOURCES DEPARTMENT 1303 CHERRYVILLE HWY. DALLAS, NC 280M 704-922-2150 CONTACT: JONATHAN C BOERGER NCDOT (DIVISION 12, DISTRICT 1) NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DISTRICT 1 1702 E. MARION STREET SHELBY, NC 28151 980-552d104 CONTACT: C. BLAKE GUFFEY CBGUFFEY@NCDOT.GOV NCDEQ (UTILITIES) TWO RIVERS UTILITIES 1300 N. BROAD ST. GASTONIA, NC 28054 704866-6043 CONTACT: MIKE BYNUM MI KEB®T W ORIVERSUTILITIES.COM CITY OF GASTONIA PUBLIC WORKS (TRAFFIC) CITY OF GASTONIA 181 S SOUTH STREET GASTONIA, NC 28052 (7N) 8666 3 CONTACT: DALE DENTON DALED@CITY OF GASTONIA.COM NCDEQ (WATER QUALITY) NORTH CAROL I NA DEPARTMENT OF ENVIRONMENTAL QUALITY NC DEPARTMENT OF ENVIRONMENTAL QUALITY 610 EAST CENTER AVENUE SUITE 301 MOORESVILLE, NC 28115 COORDINATOR: KELLY PHILLIPS RN) 663-1699 GASTON COUNTY NATURAL RESORUCES DEPARTMENT CITY OF GASTONIA 181 S SOUTH STREET GASTONIA, NC 28052 704-854E635 CONTACT: JONATHAN C. BOERGER JONATHAN.BOERGER@GASTONGOV.COM GASTON COUNTY NATURAL RESORUCES DEPARTMENT CITY OF GASTONIA 181 S SOUTH STREET GASTONIA, NC 28052 704-854-6635 CONTACT: JOSEPH D. ALM JOSEPHALM@GASTONGOV.COM KIMLEY-HORN SHALL HAVE NO LIABILITY \ WHATSOEVER FOR ANY COSTS ARISING OUT OF THE CLIENT'S DECISION TO OBTAIN BIDS OR \ \ NORTH PROCEED WITH CONSTRUCTION BEFORE KIMLEY-HORN HAS ISSUED FINAL, FULLY -APPROVED PLANS AND SPECIFICATIONS. THE CLIENT ACKNOWLEDGES THAT ALL \ f PRELIMINARY PLANS ARE SUBJECT TO SUBSTANTIAL REVISION UNTIL PLANS ARE FULLY APPROVED AND ALL PERMITS OBTAINED. y /�q,�� NOTES: wqY>J ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REWIRED BY CODES AND/OR UTILITY SERVICE COMPANIES / \� �\ SHALL BE PERFORMED PRIOR TO THE FINAL CONNECTIONS OF SERVICES. / / \ \F lv, THE CITY OF GASTONIA WILL REQUIRE AS -BUILT DRAWINGS, ENGINEER'S CERTIFICATION AND ALL EASEMENTS RECORDED BEFORE A CERTIFICATE OF OCCUPANCY CAN BE ISSUED. ATTENTION IS DRAWN TO THE FACT THAT THE SCALE— THESE DRAWINGS MAY HAVE BEEN DISTORTED DURING REPRODUCTION PROCESS. 'f// CkSO \ THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNH�REJiEREIN, AS AN INSTRUMENT OF SERVICE, 1// / / INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR ,WHICH WAS PREPARED. REUSE OF AND IMPROPER S/S/S//// RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATIgqNC AND A, APTATION BY KIMLEY-HORN AND ASSOCIATE / INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSQCIATES, INC. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED 0(1 THIS PROJJE7CON�CT0W5 BID SHALL INCLUDE CONSIDERATION FOR ADDRESSING THIS ISSUE. I .( \((/ / / THECITYOFGASTONIAWILLREQUIRE AS -BUILT \ \ \ DRAWINGS, ENGINEER'S CERTIFICATION AND ALL \ EASEMENTS RECORDED BEFORE A CERTIFICATE OF \ I I / OCCUPANCY CAN BE ISSUED. I I / / III / / I / SEE OFFSITE ROADWAY CONSTRUCTION PLANS TITLED"PROJECT GASTONIA PREPARED BY KIMLEY HORN / -�� •'� I/ / ABERDEEN BLVD 27+00 TO 48+20 PIE BEGIN PROJECT -L- STA. 48+20.00 IL" f j / j ..l �1 ' - - / /L A/E n/E Impact Site 1 - S1 Impact (B, 127 LF - Permanent Culvert B W I 30 LF - Temporary EXISTING I j �% J /� Impact Site 2 - S5 m SANITARY SEWER / ' / / �' W 137 LF - Permanent W / (/ Culvert (C) 1' EXISTING POWER UTILITIES. '�`�'�, 30 LF -TImpact Site 3 - W11 emporary Impact Site 1 - S3 Impact 1A: 168 LF - Permanent Culvert (A) 30 LF - Temporary ' Impact Site 1 - S1 & S3 Impact 1C: 290 LF - Permanent Bank Stabilization REFER TO GASTONIA LOGISTICS CENTER — GATEWAY 85 AREA 1 PLANS PREPARED BY m' `KIMLEY-HORN M``CV \ VA.— /� CONTRACTOR SHALL �, I COORDINATE WITH DUKE ENERGY FOR THE -i I 1 I REMOVAL/RELOCATION OF EXISTING UTILITIES AND VACATION OF EASEMENT. INSTALL TO HERE I 12V-, ABERDEEN BOULEVARD EXTEN N I I ?I CULVERT CROSSING/ j STREAMIMPACTS ITN ; I I I`.,IIjIIII I I I I I I CULVERT CROSSING/ STREAMIMPACTS PROPOSED SANITARY SEWER EXTENSION -T 0.052 ac -Permanent I Grading/Fill FUTURE SANITARY 0.01 ac-Temporary SEWER EXTENSION PROPOSED SANITARY SEWER & WATER LINE EXTENSION R403 � / WETLAND IMPACTS A 30' STREAM BUFFER EXISTING STREAM EXISTING WETLAND Sheet List Table Sheet Number Sheet Title REV No. REV N. R100 COVER SHEET R101 GENERAL NOTES R102 GENERAL NOTES R103 CITY UTILITY SPECIFICATIONS R104 CITY UTILITY SPECIFICATIONS R105 CITY UTILITY SPECIFICATIONS R106 LEGEND R200 TYPICAL SECTIONS R201 DETAILS R202 DETAILS R203 DETAILS R301 SUPPLEMENTAL EROSION CONTROL PLANS - AREA A 0 R302 SUPPLEMENTAL EROSION CONTROL PLANS - AREA B 0 R303 ESCP DETAILS R304 ESCP DETAILS R401 ROADWAY PLAN AND PROFILE 0 R402 ROADWAY PLAN AND PROFILE +0 R403 ROADWAY PLAN AND PROFILE R410 PAVEMENT MARKING AND SIGNAGE R411 PAVEMENT MARKING AND SIGNAGE R412 PAVEMENT MARKING AND SIGNAGE R500 STREAM IMPACTS PLAN 8 R501 ABERDEEN STREAM CROSSING 1 R502 ABERDEEN & LINEBERGER STREAM CROSSING R503 STREAM CROSSING DETAILS R504 STREAM CROSSING DETAILS R600 PUBLIC SEWER AND WATER OVERVIEW R601 PUBLIC SEWER PLAN AND PROFILE R602 PUBLIC SEWER PLAN AND PROFILE R603 PUBLIC SEWER PLAN AND PROFILE 0 R604 PUBLIC SEWER PLAN AND PROFILE R605 PUBLIC SEWER PLAN AND PROFILE R700 PUBLIC WATER PLAN AND PROFILE R701 PUBLIC WATER PLAN AND PROFILE 1 R702 PUBLIC WATER PLAN AND PROFILE R801 PUBLIC STORM PLAN AND PROFILE R802 PUBLIC STORM PROFILES A R901 CITY UTILITY DETAILS (SEWER) R902 CITY UTILITY DETAILS (WATER) L100 ABERDEEN EXTENSION LANDSCAPE PLAN 8 L101 ABERDEEN EXTENSION LANDSCAPE PLAN 8 L102 ABERDEEN EXTENSION LANDSCAPE PLAN PROJECT OWNER AND CONSULTANT INFORMATION DEVELOPER: ENGINEER: NORTHPOINT DEVELOPMENT KIMLEY-HORN AND ASSOCIATES, INC. 4825 NW 41 ST STREET 200 SOUTH TRYON STREET SUITE 500 SUITE 200 RIVERSIDE, MISSOURI 64150 CHARLOTTE, NORTH CAROLINA 28202 PHONE (816) 888-7380 PHONE (704) 333-5131 CONTACT: CALEB MOORE CONTACT: BLAKE DAY, P.E. SURVEYOR: ATLAS SURVEYING, INC. 10810 SOUTHERN LOOP BOULEVARD UNIT 18 PINEVILLE, NC 28134 PHONE (980) 949-8475 CONTACT: KEITH BURNS, P.L.S. Z p Q I H N N p 0 Y a O N 0� ao dN pN3 ¢ m x � K ~ LU z W LU OO U 0_ O �U o > p W Ur Q LU a ~ �_ a z Q o Q Z D- (D° a o O z LOCATION MAP SCALE: V = 200' SHEET NUMBER R100 m � a � , -8 c o S X r 5 _ E O - N 3 O N _ O O f 3 O C Z a a a a a a a Zo K L O 0 Q r U O O J 4. Q U Q QN 2 O cJ _ z3 O V Z 3 a3Z O - � O1. O a ■ ® N N N U O02 Z Q 2 a° 3 Y N N O a U O O , 2 O w N O O , \ V Q O Q d o N p 2 Y O - O y% E ui O O Z Ro J M< Q li W 2 Q �wI•�� w V O K I ZO Z z W ♦- WWc Z G W 0- 1 M U O m W J U W O > L K `JQ`J ❑ W N / ^ Q /wV TI O d Z O C'/ _ Z 0- (� O = LL Q O C� Z a 0 R101 a GENERAL NOTES 1. ALL NECESSARY PERMITS ARE THE RESPONSIBILITY OF THE CONTRACTOR AND MUST OBTAIN ALL PERMITS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 2. THE CONTRACTOR MUST REVIEW AND MAINTAIN ACOPV OF PERMITS COMPLETE WITH ALL CONDITIONS ATTACHMENTS EXHIBITS AND PERMIT MODIFICATIONS IN GOOD CONDITION AT THE CONSTRUCTION SITE. THE COMPLETE PERMIT MUST BE AVAILABLE FOR REVIEW UPON REQUEST BY REGULATORYAGENCY REPRESENTATIVES. 3. THE CONTRACTOR SHALL PROTECT ALL MONUMENTS, IRON PING, AND PROPERTY CORNERS DURING CONSTRUCTION. 4. CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODER AND BE CONSTRUCTED TO SAME. 5. SITE BOUNDARY TOPOGRAPHY UTILITY AND ROAD INFORMATION TAKEN FRRMA SURVEY BVA LAND SURVEYOR. ALL INFORMATION IS TO BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. fi. CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES ]. THE CONTRACTOR AND SUBCONTRACTORS SHALL 08TAINACOPV OF THE STATE DEPARTMENT OF TRANSPORTATION STRUCTURE STANDARDS AND REGULATIONS LATEST EDITION AND BECOME FAMILIAR WITH THE CONTENTS PRIOR TO COMMENCING WORK, AND, UNLESS OTHERWISE NOTED, ALL WORK SHALL CONFORM AS APPLICABLE TO THESE STANDARDS AND SPECIFICATIONS. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL MATERIAL AND LABOR TO CONSTRUCT THE FACILITY AS SHOWN AND DESCRIBED IN THE CONSTRUCTION DOCUMENTS IN ACCORDANCE WITH THE APPROPRIATE APPROVING AUTHORITIES, SPECIFICATIONS AND REpUIREMENTS. CONTRACTOR SHALL CLEAR AND GRUB ALL AREAS UNLESS OTHERWISE INDICATED, REMOVING TREES, STUMPS, ROOTS, MUCK, EXISTING PAVEMENT AND ALL OTHER DELETERIOUS MATERIAL. 9. ALL WORK AND MATERIALS SHALL COMPLY WITH ALL CITY COUNTYAND STATE REGULATIONS AND CODES AND O.S.H.A. STANDARDS. f0. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS INCLUDING BUT NOT LIMITED TO ALL UTILITIES, STORM DRAINAGE, SIGNS, ETC. AS REQUIRED. ALL WORK SHALL BE IN ACCORDANCE WITH GOVERNING AUTHORITIES SPECIFICATIONS AND SHALL BE APPROVED BY SUCH. ALL COST SHALL BE INCLUDED IN BASE BID. AREAS TO BE DISTURBED SHALL BE IMPROVED PER THE CIVIL PLANS OR RESTORED TO THEIR ORIGINAL OR BETTER CONDITION. CONTRACTOR SHALL REPAIR ANV EXISTING FEATURES THAT ARE DAMAGED DURING CONSTRUCTION TO THE EXISTING OR BETTER CONDITION. 11. THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE AT ALL TIMES ONE COPY OF THE CONSTRUCTION DOCUMENTS INCLUDING PLANS SPECIFICATIONS GEOTECHNICAL REPORT AND SPECIAL CONDITIONS AND COPIES OF ANY REQUIRED CONSTRUCTION PERMITS. 12. ANV DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER AND ENGINEER BEFORE COMMENCING WORK. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN ARE TO BE MADE WITHOUT PRIORAPPROVAL OF THE OWNER AND NOTIFICATION TO THE ENGINEER. 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANE DO NOT CONFLICT WITH ANV KNOWN EXISTING OR OTHER PROPOSED IMPROVEMENTS. IF ANY CONFLICTS ARE DISCOVERED THE CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO INSTALLATION OF ANY PORTION OF THE SITE WORK THAT WOULD BE AFFECTED. FAILURE TO NOTIFY OWNER OF AN IDENTIFIABLE CONFLICT PRIOR TO PROCEEDING WITH INSTALLATION RELIEVES OWNER OF ANY OBLIGATION TO PAV FORA RELATED CHANGE ORDER. 14. ALL WELLS DISCOVERED ON SITE THAT WILL HAVE NO USE MUST BE PLUGGED BY ALICENSED WELL DRILLING CONTRACTOR IN A MANNER APPROVED BY ALL JURISDICTIONAL AGENCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY WELL ABANDONMENT PERMITS REQUIRED.ANV WELL DISCOVERED DURING EARTH MOVING OR EXCAVATION SHALL BE REPORTED TO THE APPROPRIATE JURISDICTIONAL AGENCIES WITHIN 24 HOURS AFTER DISCOVERY IS MADE. 15. TRAFFIC CONTROL ON ALL STATE LOCAL AND COUNTY RIGHTS-OF-WAV SHALL MEET THE REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (U.S. DOTIFHA) AND THE REQUIREMENTS OF THE STATE AND ANY LOCAL AGENCY HAVING JURISDICTION. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN. SANITARY SEWER NOTES 1. CONTRACTOR TO LOCATE LATERAL CONNECTIONS TO BUILDING PER PLUMBING PLANS. 2. PLACE CLEAN -OUTS ON SANITARY SEWER LATERALS AS REQUIRED BY PLUMBING CODE. 3. PIPE LENGTHS SHOWN ARE MEASURED FROM CENTER TO CENTER OF STRUCTURES AND ARE ROUNDED TO THE NEAREST FOOT. 4. AMINIMUM HORIZONTAL SEPARATION OF 10 FEET BETWEEN WATER LINES AND SEWERS SHALL BE MAINTAINED AT ALL TIMES. A MINIMUM VERTICAL SEPARATION OF 18 INCHES BETWEEN WATER LINES AND SEWERS SHALL BE MAINTAINED AT CROSSINGS. IN THE EVENT THAT MINIMUM SEPARATION REQUIREMENTS CANNOT BE MET, THE CONTRACTOR SHALL UTILIZE PRESSURE -TYPE WATER PIPE FOR THE SEWER PER DETAIL. 5. SANITARY SEWER PIPE SHALL BE AS FOLLOWS: 8" PVC SDR35 PER ASTM D 3034, FOR PIPES LESS THAN 12' DEEP 8" PVC SOR26 PER ASTM D 3034 FOR PIPES MORE THAN 12' DEEP 6" PVC SCHEDULE 40 DUCTILE IRON PIPE PER AW WA C150 6. WHENEVER VERTICAL DISTANCE BETWEEN OUTGOING AND INCOMING SEWERS IS MORE THAN2 FEETAOUTSIDE DROP MANHOLE SHALL 8E INSTALLED. ]. PRIVATE SANITARY SEWER STRUCTURES SHALL BE AS FOLLOWS: 48" DIAMETER PRECAST CONCRETE MANHOLE PER ASTM C4]8. 48" DIAMETER PRECAST POLYETHYLENE IN ACCORDANCE WITH ASTM 01248. MANHOLES SHALL HAVE A COMPRESSIVE STRENGTH THAT MEETS ASTM D2412. 8. PUBLIC SANITARY SEWER STRUCTURES SHALL CONFORM TO THE CITY OF LOWELL SPECIFICATIONS FOR SANITARY SEWER. 9. ALL MANHOLES AND CLEANOUTS SHALL BE H2O TRAFFIC GRADE AND RATED WITH HEAVY DUTY COVERS AND FRAMES PER THE SAME. GENERAL ACCESSIBILITY NOTES 1. THE CONTRACTOR SHALL REVIEW ALL APPLICABLE STATE AND LOCAL GUIDELINES AS THEY APPLY TO THE ACCESSIBILITY AND SIGNAGE. 2. ALL CONSTRUCTION SHALL BE VERIFIED BY THE CONTRACTOR TO BE IN COMPLIANCE WITH LOCALLY ADOPTED ACCESSIBILITY REGULATIONS. ANYTHING FOUND NOT IN COMPLIANCE SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. 3. THE PROPOSED IMPROVEMENTS SHALL BE CONSTRUCTED COMPLIANT WITH THE LATEST EDITION OF THE ADA STANDARDS FOR ACCESSIBILE DESIGN AS PUBLISHED BY THE DEPARTMENT OF JUSTICE. UNLESS AND E%CEPT IN AREAS WHERE AN APPROVED STATEMENT FROM A SITE ENGINEER, SURVEYOR, OR ARCHITECT VERIFIES THAT SITE CONDITIONS EXIST WHERE THE TOPOGRAPHY OF THE SITE IS EXTREME AND ONLY ALTERNATE METHODS OF COMPLIANCE ARE POSSIBLE. 4. CURB RAMPS ALONG PUBLIC STREETS AND IN THE PUBLIC RIGHT-0OF-WAV SHALL BE CONSTRUCTED BASED ON THE CITY STANDARD CONSTRUCTION DETAILS AND SPECIFICATIONS. 5. PRIVATE CURB RAMPS ON THE SITE(I.E. OUTSIDE PUBLIC STREET RIGHT-OF-WAV)SHALL CONFORM TO THE ADA STANDARDS FOR ACCESSIBLE DESIGN AND SHALL HAVE A DETECTABLE WARNING SURFACE THAT IS FULL WIDTH OF THE CURB RAMP, NOT INCLUDING FLARES. 8. AL ACCESSIBLE ROUTES, GENERAL SITE AND BUILDING ELEMENTS, RAMPS, CURB RAMPS, STRIPING AND PAVEMENT MARKINGS SHALL CONFORM TO ADA STANDARDS FOR ACCESSIBLE DESIGN, LATEST EDITION. ]. ANYCOMP OF THE PROJECT SERVING MULTIFAMILY DWELLINGS IN BUILDINGS THAT HAVE 4 OR MORE UNITS PER DWELLING SHALL ALSO CONFORM TO THE FAIR HOUSING ACT (FHA), AND COMPLY WITH THE FAIR HOUSING ACT DESIGN MANUAL BY THE US DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT. B. BEFORE PLACING PAVEMENT, CONTRACTOR SHALL VERIFY THAT SUITABLE ACCESSIBLE PEDESTRIAN ROUTES (PER ADA AND FHA) EXIST TO AND FROM EVERY DOOR AND ALONG SIDEWALKS ACCESSIBLE PARKING SPACES ACCESS AISLES AND ACCESSIBLE ROUTES. IN NO LASE SHALL AN ACCESSIBLE RAMP SLOPE EXCEED 1 VERTICAL TO 12 HORIZONTAL. IN NO CASE SHALL SIDEWALK CROSS SLOPE EXCEED 2.0 PERCENT. IN NO CASE SHALL LONGITUDINAL SIDEWALK SLOPE EXCEED 5.0 PERCENT. ACCESSIBLE PARKING SPACES AND ACCESS AISLES SHALL NOT EXCEED 2.0 PERCENT SLOPE IN ANY DIRECTION. S. CONTRACTOR SHALL TAKE FIELD SLOPE MEASUREMENTS ON FINISHED SUBGRADE AND FORM BOARDS PRIOR TO PLACING PAVEMENT TO VERIFY THAT ACCESSIBLE SLOPE REQUIREMENTS ARE PROVIDED. CONTRACTOR SHALL CONTACT ENGINEER PRIOR TO PAVING IF ANY EXCESSIVE SLOPES ARE ENCOUNTERED. NO CONTRACTOR CHANGE ORDERS WILL BE ACCEPTED FOR ADA COMPLIANCE ISSUES. GENERAL EROSION CONTROL NOTES 1. REFER TO MASS GRADING AND INFRASTRUCTURE PLANS PREPARED BY KIMLEV-HORN FOR ALL EROSION CONTROL REQUIREMENTS. 2. PRIOR TO CONSTRUCTION THE CONTRACTOR MUST CLEARLY DELINEATE AND MARK OFF AREAS IDENTIFIED IN THE SWPPP OR IN THE FIELD TO BE PROTECTED SUCH AS STREAMSNJETLANDS ( NATURAL BUFFERS, TREE, HABITATS OF ENDANGERED/]HREATENED SPECIES, HISTORIC PROPERTIES, ETC.) 3. THE CONTRACTOR SHALL PROTECT ALL MONUMENTS, IRON PINS, AND PROPERTY CORNERS DURING CONSTRUCTION. 4. SEDIMENT CONTROL BMPS PROPOSED FOR SITE DEVELOPMENT HAVE BEEN DESIGNED TO ADDRESS CONSTRUCTION STORMWATER RUNOFF. IN THE EVENT THE BMPS BECOME INEFFECTIVE AT PREVENTING SEDIMENT FROM LEAVING THE SITE, IT IS THE CONTRACTORS RESPONSIBILITY TO IMPLEMENT ADDITIONAL BMPS.THE CONTRACTOR SHALL CONTINUOUSLY MAINTAIN BMPS AS DESCRIBED IN THE GENERAL PERMIT .ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BYTHE EROSION CONTROL INSPECTOR. 5. CONTRACTOR SHALL REVIEW THE GENERAL PERMIT PRIOR TO COMMENCING CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL KEEPA COPY OF THE APPROVED PLANS AND GENERAL PERMIT ONSITE AT ALL TIMES. fi. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN ISA VIOLATION AND IS SUBJECT TO A FINE. ]. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE STATE WHICH THE WORK IS PERFORMED. B. THE CONTRACTOR SHALL INSTALL AND MAINTAIN THROUGHOUT THE PROJECT CONSTRUCTION ALL EROSION CONTROL MEASURES SHOWN WITHIN THESE PLANS IN ACCORDANCE WITH APPLICABLE STATE EROSION AND SEDIMENT CONTROL REGULATIONS, 9. ALL CONSTRUCTION WORK SHALL BE IN COMPLIANCE WITH REGULATIONS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) STORM WATER GENERAL PERMIT. f0. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE. 11. CONSTRUCTION ENTRANCE SHALL BE LOCATED SO AS TO PROVIDE THE LEAST AMOUNT OF DISTURBANCE TO THE FLOW OF TRAFFIC IN AND OUT OF THE SITE. ADDITIONALLY CONSTRUCTION ENTRANCE SHALL BE LOCATED TO COINCIDE WITH THE PHASING OF THE PAVEMENT REPLACEMENT. 12. POST CONSTRUCTION STORM WATER POLLUTION CONTROL MEASURES INCLUDE STABILIZATION BV PERMANENT PAVING, DRAINAGE SYSTEM STRUCTURE, OR LANDSCAPING. 13. TEMPORARY AND PERMANENT STABILIZATION PRACTICES AND BMP'S SHALL BE INSTALLED AT THE EARLIEST POSSIBLE TIME DURING THE CONSTRUCTION SEQUENCE. AS AN EXAMPLE, PERIMETER SILT FENCE SHALL BE INSTALLED BEFORE COMMENCEMENT OF ANV GRADING ACTIVITIES. OTHER BMP'S SHALL BE INSTALLED AS SOON AS PRACTICABLE AND SHALL 8E MAINTAINED UNTIL FINAL SITE STABILIZATION IS ATTAINED. CONTRACTOR SHALL ALSO REFERENCE CIVIL AND LANDSCAPE PLANS SINCE PERMANENT STABILIZATION IS PROVIDED BY LANDSCAPING THE BUILDINGS AND SITE PAVING. ib. BMPS HAVE BEEN LOCATED AS INDICATED ON THIS PLAN IN ACCORDANCE WITH GENERALLY ACCEPTED ENGINEERING PRACTICES IN ORDER TO MINIMIZE SEDIMENT TRANSFER. FOR EXAMPLE: SILT FENCES LOCATED AT TOE OF SLOPE AND INLET PROTECTION FOR INLETS RECEIVING SEDIMENT FROM SITE RUN-OFF. 15. ACOPV OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MINIMIZE EROSION. i6. THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE EROSION CONTROL INSPECTOR SO THAT PERIODIC INSPECTIONS CAN BE PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. 1]. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFFSITE GRADING PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. CONTACT PROJECT ENGINEER AND PROJECT EROSION CONTROL INSPECTOR TO ENSURE ADDITIONAL EROSION CONTROL MEASURES ARE INSTALLED PRIOR TO OFFSITE GRADING. 18. ANY SPILLS OF PETROLEUM PRODUCTS OR HAZARDOUS MATERIALS IN EXCESS OF REPORTABLE QUANTITIES AS DEFINED BY EPA OR THE STATE OR LOCAL AGENCY REGULATIONS, SHALL BE IMMEDIATELY REPORTED TO THE EPA NATIONAL RESPONSE CENTER (1-600-420.6802), AND AS REQUIRED BY THE GENERAL PERMIT. 19. THE CONTRACTOR SHALL MAINTAIN JURISDICTIONALLV REQUIRED BUFFERS OF UNDISTURBED NATURAL VEGETATION BETWEEN THE DISTURBED PORTIONS OF THE SITE AND SURFACES WATERS AT ALL TIMES. BUFFERS SHALL BE MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS OF THE JURISDICTION. 20. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TOOFF-SITE BORROW OR WASTE AREAS, STAGING OR STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND TO THE APPROPRIATE GOVERNING ENTITY FOR APPROVAL. CONTRACTOR SHALL PAV ALL FEES REQUIRED AND SHALL INSTALL NECESSARY MEASURES AT NO SEPARATE PAYMENT. THE CONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER A COPY OF THE AMENDED PERMIT. 21. CONTRACTOR SHALL PLACE EROSION CONTROL BLANKET (NORTH AMERICAN GREEN SCi500R APPROVED EQUAL ON ALL SITE AREAS WITH SLOPES GREATER THAN 2: 1, AND IN THE BOTTOM AND SIDE SLOPES OF ALL SWALES. 22. NO PARKING SHALL BE LOCATED OUTSIDE THE LIMITS OF DISTURBANCE. 23. NO CONSTRUCTION LAVDOWN OR STAGING SHALL BE LOCATED OUTSIDE THE LIMITS OF DISTURBANCE. 24. ALL DRAINAGE SWALES MUST BE GRADED AND RIP -RAP MUST BE REPLACED AS REQUIRED TO CONTROL EROSION. RIP -RAP WILL CONSIST OF 50 -125 POUND STONES PLACED AT ALL HEADWALLS, AND WHERE NOTED ON CONSTRUCTION DRAWINGS. SEE DETAIL SHEET FOR OUTFACE PIPE SIZE CHART. 25. ADDITIONAL EROSION CONTROL MEASURES MAYBE REQUIRED FOR ADDITIONAL CONTRACTOR LAVOOWN AREA. CONTRACTOR TO COORDINATE WITH ENGINEER DURING CONSTRUCTION. THE LIMITS OF DISTURBANCE SHOULD CONTAIN ANYADDITIONAL LAVDOWN AREAS. IF ADDITIONAL LAVDOWN AREA IS NEEDED OUT SIDE THE LIMITS OF DISTURBANCE A REVISED EROSION CONTROL PLAN SHOULD BE REVIEWED AND PERMITTED. 26. PUMPING SEDIMENT LADEN WATER INTO ANY STORMWATER FACILITY THAT IS NOT DESIGNATED TO BE A SEDIMENT TRAP, DRAINAGEWAV, OR OFFSITE AREA EITHER DIRECTLY OR INDIRECTLY WITHOUT FILTRATION IS PROHIBITED. DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO RECEIVING OUTLET. WATER REMOVED FROM TRAPS, BASINS, AND OTHER WATER HOLDING DEPRESSIONS OR EXCAVATIONS MUST FIRST PASS THROUGH A SEDIMENT CONTROL AND/OR FILTRATION DEVICE. WHEN DEWATERING DEVICES ARE USED, DISCHARGE LOCATIONS SHALL BE PROTECTED FROM EROSION. 2]. ALL TEMPORARY STORMWATER EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL STABILIZATION IS ACHIEVED.TRAPPED SEDIMENT AND OTHER DISTURBED SOILS RESULTING FROM TEMPORARY MEASURES SHALL BE PROPERLY DISPOSED OF PRIOR TO PERMANENT STABILIZATION. 28. SOIL STOCKPILES SHALL NOT BE LOCATED IN A ORAINAGEWAV, STOCKPILES .FLOOD PLAIN AREA OR A DESIGNATED BUFFER. ALL STOCKPILES SHALL BE IMMEDIATELY STABILIZED AS STORMWATER NOTES 1. REFER TO GENERAL UTILITY NOTES FOR ADDITIONAL REQUIREMENTS PERTAINING TO UNDERGROUND UTILITY AND STORMWATER PIPE INSTALLATION. 2. ALL NECESSARY PERMITS ARE THE RESPONSIBILITY OF THE CONTRACTOR AND MUST OBTAIN ALL PERMITS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 3. PIPE LENGTHS, GRACES, ELEVATIONS AND LOCATIONS SHOWN ARE APPROXIMATE ONLY. AS DIRECTED BY THE ENGINEER, THEY MAY BE ADJUSTED TO ACCOMMODATE UNFORESEEN CONDITIONS. 4. ALL STORM PIPE INSTALLED SHALL BE RCP OR HOPE, UNLESS SPECIFICALLY NOTED OTHERWISE. EXISTING STORMWATER PIPE MATERIALS, MODIFIED, DAMAGED OR DEFORMED, ETC. SHALL NOT BE REUSED UNLESS SPECIFICALLY DIRECTED BY THE ENGINEER. 5. ALL PIPES SHALL BE LAID ON STRAIGHT ALIGNMENT AND EVEN GRADES USING APIPE LASER OR OTHER ACCURATE METHOD. fi. ALL PIPES SHALL BE BEDDED PER MANUFACTURER'S RECOMMENDATIONS. ]. ALL ALL DRAINAGE STRUCTURES SHALL BE CONSTRUCTED WITH 4 SIDED BEARING HEAVY DUTY H-20 RATED TRAFFIC RIMS AND GRATES 8. ALL CLEANOUT COVERS WITHIN THE PAVEMENT SECTIONS SHALL BE RATED FOR HEAVY DUTY TRAFFIC (H-20 RATED). 9. WEEPHOLES ARE TO BE CONSTRUCTED IN ALL DRAINAGE STRUCTURES,AMINIMUM OFI WEEPHOLE PER STRUCTURE. WEEPHOLES ARE TO BE CONSTRUCTED IN THE BOTTOM I/3 OF STRUCTURE AND COVERED ON THE OUTSIDE OF THE STRUCTURE BY A BAG MADE OF FILTER FABRIC AND FILLED WITH p]8 STONE. f0. CONTRACTOR SHALL PROVIDE CATCH BASIN INLET PROTECTION ON ALL EXISTING AND PROPOSED INLETS UNTIL CONTRIBUTING DRAINAGE AREAS ARE STABILIZED. ALL DRAINAGE STRUCTURES SHALL BE CLEANED OF DEBRIS AS REQUIRED DURING AND AT THE END OF CONSTRUCTION TO PROVIDE POSITIVE DRAINAGE FLOWS. 11. THE CONTRACTOR SHALL INSTALL ALL UNDERGROUND STORM WATER PIPING PER MANUFACTURER'S RECOMMENDATIONS. 12. GRADE ALL AREAS TO MAINTAIN POSITIVE SLOPE AWAY FROM BUILDING. 13. CONTRACTOR SHALL PROVIDE SMOOTH TRANSITION BETWEEN PROPOSED PAVEMENT AND EXISTING PAVEMENT AND STORM STRUCTURES ib. DURING CONSTRUCTION AND AFTER FINAL GRADING, NO SURFACE WATER RUNOFF MY BE DIRECTED TO ADJACENT PROPERTIES, AND ALL SURFACE WATER RUNOFF MUST BE ROUTED TO APPROVED DRAINAGE FACILITIES OR BE RETAINED ON SITE. ALL RUNOFF FROM THE SITE, BOTH DURING AND AFTER CONSTRUCTION, MUST BE FREE OF POLLUTANTS, INCLUDING SEDIMENT, PRIOR TO DISCHARGE. GENERAL DEMOLITION NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN ANY PERMITS AND PAY FEES REQUIRED FOR DEMOLITION AND HAUL -OFF FROM THE APPROPRIATE AUTHORITIES. THESE FEES SHALL BE INCLUDED WITH THE BID. THE CONTRACTOR SHALL PREPARE ALL DOCUMENTS AND ACQUIRE APPROPRIATE PERMITS AS REQUIRED PRIOR TO THE COMMENCEMENT OF DEMOLITION. 2. DEMOLITION AS DEPICTED ON THE DEMOLITION PLAN IS INTENDED TO DESCRIBE GENERAL DEMOLITION AND UTILITY WORK. IT IS NOT INTENDED TO IDENTIFY EACH ELEMENT OF DEMOLITION OR RELOCATION. CONTRACTOR SHALL COORDINATE WITH THE OWNER AND APPROPRIATE UTILITY COMPANY PRIOR TO WORK. 3. THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION, REMOVAL, AND LAWFUL DISPOSAL OF ALL STRUCTURES PAVING UTILITIES ETC. SUCH THAT THE IMPROVEMENTS SHOWN ON THE PLANS CAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL MATERIAL AS NECESSARY. 4. ASBESTOS OR ANV OTHER HAZARDOUS MATERIAL, IF FOUND ON SITE, SHALL BE REMOVED BY A LICENSED HAZARDOUS MATERIAL CONTRACTOR ONLY AFTER NOTIFICATION OF THE ENGINEER AND AUTHORIZATION TO PROCEED IS GIVEN BY THE OWNER 5. THE CONTRACTOR SHALL PUMP OUT BUILDING FUEL AND WASTE OIL TANKS (IF ANY ARE ENCOUNTERED) AND REMOVE FUEL TO AN APPROVED DISPOSAL AREA BY AN APPROPRIATELY LICENSED WASTE OIL HANDLING CONTRACTOR IN STRICT ACCORDANCE WITH FEDERAL AND STATE REQUIREMENTS ONLY AFTER NOTIFICATION OF THE ENGINEER AND AUTHORIZATION TO PROCEED IS GIVEN BY THE OWNER. 8. THE CONTRACTOR SHALL MAINTAIN ALL UTILITY SERVICES TO ALL EXISTING FACILITIES AND OUTLOTS AT ALL TIMES. UTILITY SERVICES SHALL NOT BE INTERRUPTED WITHOUT APPROVAL FROM THE SERVICE PROVIDERS AND COORDINATION THROUGH THE PROPERTY OWNER(5). THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL UTILITIES TO REMAIN IN PLACE. ]. THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIEG PRIOR TO THE REMOVAL AND/OR RELOCATION OF UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANY CONCERNING PORTIONS OF WORK WHICH MAYBE PERFORMED BY THE UTILITY COMPANY'S FORCES AND ANV FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR SERVICES. THE CONTRACTOR IS RESPONSIBLE FOR PAVING ALL FEES AND CHARGES. S. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN ON THIS PLAN HAVE BEEN DETERMINED FROM THE BEST INFORMATION AVAILABLE AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THEIR ACCURACY. THE ITEMS SHOWN ARE NOT TO BE INTERPRETED AS THE EXACT LOCATION, OR AS THE ONLY OBSTACLES THAT MAY OCCUR ON THE SITE. VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ANY ANTICIPATED FEATURES. PRIOR TO THE START OFANY DEMOLITION ACTIVITY THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES FOR ONSITE LOCATIONS OF EXISTING UTILITIES. 9. ELECTRICAL TELEPHONE CABLE WATER FIBER OPTIC CABLE AND/OR GAS LINES NEEDING TO BE REMOVED OR RELOCATED SHALL BE COORDINATED WITH THE AFFECTED UTILITY COMPANY. ADEQUATE TIME SHALL BE PROVIDED FOR RELOCATION AND CLOSE COORDINATION WITH THE UTILITY COMPANY IS NECESSARY TO PROVIDE A SMOOTH TRANSITION IN UTILITY SERVICE. CONTRACTOR SHALL PAY CLOSE ATTENTION TO EXISTING UTILITIES WITHIN THE ANY ROAD RIGHT OF WAY DURING CONSTRUCTION 10. SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED EXISTING PIPING OR OTHER UTILITY BE UNCOVERED DURING EXCAVATION CONTRACTOR SHALL CONSULT THE ENGINEER AND OWNER IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING FURTHER WITH WORK IN THIS AREA. 11. CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES, ENCLOSURES, ETC., (AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES) AG APPROVED BV THE OWNER 12. CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING BUSINESSES AND PROPERTIES AT ALL TIMER DURING DEMOLITION OF THE EXISTING IMPROVEMENTS AND CONSTRUCTION OF THE PROPOSED IMPROVEMENTS. CONTRACTOR SHALL COORDINATE WITH THE OWNER(Sy LEASEE(5) PRIOR TO ANV CONSTRUCTION TO ESTABLISH CUSTOMER ACCESS AND TRAFFIC FLOW DURING ALL PHASES. 13. SHOULD CONSTRUCTION ACTIVITIES DAMAGE EXISTING FEATURES, THE CONTRACTOR SHALL REPLACE THE FEATURES WITH NEW MATERIALS. DAMAGE TO ANV EXISTING CONDITIONS TO REMAIN WILL BE REPLACED AT CONTRACTOR'S EXPENSE. ib. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS TO AVOID UNNECESSARY DAMAGE TO EXISTING ROAD SURFACES. FINISHED SURFACES TO BE REMOVED OR DEMOLISHED SHALL BE CUT ALONG LINES OF JOINTS WHICH WILL PERMIT A NEAT SURFACE WHEN RESTORED. SAW CUT AT INTERFACE OF PAVEMENT OR CURB TO REMAIN. SAW CUT EXISTING PAVEMENT AT THE RIGHT-OF-WAV. SAW CUTS SHALL BE MADE FULL DEPTH THROUGH THE EXISTING PAVEMENT. DISCARDED PAVEMENT SHALL BE REMOVED WITHOUT UNDERMINING THE EXISTING PAVEMENT. IFANV DAMAGE IS INCURRED ON ANV OF THE SURROUNDING PAVEMENT, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ITS REMOVAL AND REPAIR. 15. CONTRACTOR SHALL MAINTAIN ALL EXISTING PARKING SIDEWALKS DRIVES ETC. CLEAR AND FREE FROM ANV CONSTRUCTION ACTIVITY ANOIOR MATERIAL TO ENSURE EASY AND SAFE PEDESTRIAN AND VEHICULAR TRAFFIC TO AND FROM THE SITE. CONTRACTOR SHALL COORDINATEIPHASE ALL CONSTRUCTION ACTIVITY WITHIN PROXIMITY OF THE BUILDING AND UTILITY INTERRUPTIONS WITH THE PROPERTY OWNERS AND UTILITY PROVIDERS TO MINIMIZE DISTURBANCE AND INCONVENIENCE. i6. ALL EXISTING ITEMS TO REMAIN WHICH ARE DAMAGED DURING CONSTRUCTION SHALL BE RESTORED TO ITS ORIGINAL CONDITION AT THE SOLE EXPENSE OF THE CONTRACTOR. 1]. SHOULD ANV UNCHARTED OR INCORRECTLY CHARTED EXISTING PIPING OR OTHER UTILITY BE UNCOVERED DURING EXCAVATION CONTRACTOR SHALL CONSULT THE ENGINEER AND OWNER IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING FURTHER WITH WORK IN THIS AREA. 18. ANY WATER WELLS ENCOUNTERED ARE TO BE BROUGHT TO THE PROJECT ENGINEER ATTENTION IMMEDIATELY AND PROPERLY ABANDONED BVALICENSED WELL DRILLER. 19. ANY SEPTIC SYSTEMS ENCOUNTERED SHALL BE BROUGHT TO THE THE PROJECT ENGINEER ATTENTION IMMEDIATELY AND SHALL BE PROPERLY DEMOLISHED. GENERAL PAVING NOTES 1. CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURER SMOOTH FIT AND CONTINUOUS GRADE. CONTRACTOR SHALL PROVIDE SMOOTH TRANSITION BETWEEN PROPOSED PAVEMENT, EXISTING PAVEMENT AND ANY STRUCTURES. 2. THE PROPOSED SPOT ELEVATIONS SHOWN ARE FINISHED ELEVATIONS INCLUDING ASPHALT AND CONCRETE. REFER TO PAVEMENT SECTIONS AND CURB DETAILS TO ESTABLISH CORRECT SUBBASE OR AGGREGATE BASE COURSE ELEVATIONS TO BE COMPLETED UNDER THIS CONTRACT. 3. ALL AREAS INDICATED AS PAVEMENT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TYPICAL PAVEMENT SECTIONS AS INDICATED ON THE DRAWINGS. CONTRACTOR SHALL REVIEW THE RECCOMENDATIONS OF THE GEOTECHNICAL ENGINEER PRIOR TO PAVING. 4. WHERE EXISTING PAVEMENT IS INDICATED TO BE REMOVED AND REPLACED THE CONTRACTOR SHALL SAW CUT A MINIMUM 2' DEEP FOR A SMOOTH AND STRAIGHT JOINT AND REPLACE THE PAVEMENT WITH THE SAME TYPE AND DEPTH OF MATERIAL AS EXISTING OR AS INDICATED. 5. ALL PAVING, CONSTRUCTION, MATERIALS, AND WORKMANSHIP WITHIN JURISDICTIONAL FIGHT -OF -WAY SHALL 8E IN ACCORDANCE WITH LOCAL OR COUNTY SPECIFICATIONS AND STANDARDS (LATEST EDITION) OR STATE DEPT. OF TRANSPORTATION SPECIFICATIONS AND STANDARDS (LATEST EDITION) IF NOT COVERED BY LOCAL OR COUNTY REGULATIONS. 8. ALL ON -SITE STRIPING IS TO BE PAINTED, UNLESS OTHERWISE NOTED. ALL STRIPING IN PUBLIC RIGHT-OF-WAV TO BE THERMOPLASTIC STRIPING. ]. TRANSVERSE EXPANSION JOINTS ARE TO BE PROVIDED IN CONCRETE SIDEWALKS AND COMBINED WALKS/CURBS WHERE SHOWN AND AT INTERVALS NOT TO EXCEED 12 X THE WIDTH OF THE WALK. 8. EXPANSION JOINTS SHALL BE INSTALLED IN CONCRETE PAVEMENTS AND WALKS AT ALL LOCATIONS WHERE PAVEMENTS AND WALKS ABUT A VERTICAL SURFACE SUCH AS A CURB, WALL, CDLUMN, ETC. 9. CONTRACTION JOINTS SHALL BE PROVIDED AT EQUAL INTERVALS BETWEEN EXPANSION JOINTS IN CONCRETE WALKS. INSTALL CONTRACTION JOINTS AS SHOWN BUT IN NO CASE AT INTERVALS GREATER THAN 1.5 X THE WIDTH OF THE WALK 10. CONTRACTOR SHALL COORDINATE PAVING IMPROVEMENTS TO AVOID TIRE MARKS FROM CONSTRUCTION ACTIVITY. FINAL PAVING SHALL BE AS SMOOTH AS POSSIBLE AND FREE FROM ANY CRACKS, SCRAPES, GOUGES, TIRE MARKS, ETC. CAUSED DURING CONSTRUCTION. 11. ALL NEW CONCRETE SHALL BE DOWELED INTO ALL EXISTING CONCRETE (PAVING, SIDEWALKS, CURB, ETC.). TRANSVERSE EXPANSION JOINTS ARE TO BE PROVIDED IN CONCRETE SIDEWALKS AND COMBINED WALKS/CURBS AS SHOWN ON THE DETAILS AND AT INTERVALS NOT TO EXCEED 12 TIMES THE WIDTH OF THE WALK. 12. ALL STRUCTURES SHALL BE ADJUSTED AS NECESSARY TO BE FLUSH WITH FINAL PAVEMENT. CONSTRUCTION TESTING 1. IT IS THE CONTRACTORS RESPONSIBILITY TO OBTAIN ALL TESTS REQUIRED BY THE JURISDICTIONAL AGENCIES HAVING AUTHORITY. 2. IF DETERMINED BY THE OWNER THE CONTRACTOR SHALL PROVIDE ADDITIONAL CONSTRUCTION TESTING. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER FOR REQUIRED CONSTRUCTION TESTING. 3. TESTING OF MATERIALS REQUIRED FOR THE CONSTRUCTION OF THE PAVING IMPROVEMENTS SHALL BE PERFORMED BY AN APPROVED AGENCY FOR TESTING MATERIALS. THE TESTING LABORATORY AND THE PAYMENT OF SUCH TESTING SERVICES SHALL 8E MADE BY THE OWNER. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SHOW BY STANDARD TESTING PROCEDURES THAT THE WORK CONSTRUCTED GOES MEET THE REQUIREMENTS OF THE SPECIFICATIONS. 4. ALL COPIES OF COMPACTION, CONCRETE AND OTHER REQUIRED TEST RESULTS ARE TO BE SENT TO THE OWNER AND DESIGN ENGINEER OF RECORD DIRECTLY FROM THE TESTING AGENCY. S. EACH BACKFLOW PREVENTION ASSEMBLY IS REQUIRED TO BE TESTED BVA JURISDICTIONALLV-APPROVED CERTIFIED TESTER PRIOR TO PLACING THE WATER SYSTEM IN SERVICE. GENERAL UTILITY NOTES 1. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR OBTAINING AN ENCROACHMENT AGREEMENT PERMIT, AS REQUIRED, TO CONSTRUCT UTILITY CONNECTIONS. 2. REFER TO ARCHITECTURAL /MECHANICAL, ELECTRICAL AND PLUMBING PLANS FOR CONTINUATION OF UTILITIES WITHIN 5 FEET OF STRUCTURES. 3. THE CONTRACTOR IS RESPONSIBLE FOR HORIZONTALLY AND VERTICALLY LOCATING AND PROTECTING ALL PUBLIC OR PRIVATE UTILITIES (SHOWN OR NOT SHOWN) WHICH LIE IN OR ADJACENT TO THE CONSTRUCTION SITE. AT LEAST 48 HOURS PRIOR TO ANY DEMOLITION, GRADING, OR CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL CONTACT 611 FOR THE IDENTIFICATION OF EXISTING UTILITIES WITHIN THE SITE. 4. EXISTING UTILITIES SHOWN ARE LOCATED ACCORDING TO THE INFORMATION AVAILABLE TO THE ENGINEER AT THE TIME OF THE TOPOGRAPHIC SURVEY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR THE ENGINEER. GUARANTEE IS NOT MADE THAT ALL EXISTING UNDERGROUND UTILITIES ARE SHOWN OR THAT THE LOCATION OF THOSE SHOWN ARE ENTIRELY ACCURATE. FINDING THE ACTUAL LOCATION OF ANY EXISTING UTILITIES IS THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE DONE BEFORE COMMENCING ANV WORK IN THE VICINITY. FURTHERMORE, THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANV AND ALL DAMAGES DUE TO THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. THE OWNER OR ENGINEER WILL ASSUME NO LIABILITY FOR ANY DAMAGES SUSTAINED OR COST INCURRED BECAUSE OF THE OPERATIONS IN THE VICINITY OF EXISTING UTILITIES OR STRUCTURES, NOR FOR TEMPORARY BRACING AND SHORING OF SAME. IF IT IS NECESSARY TO SHORE, BRACE, SWING OR RELOCATE A UTILITY, THE UTILITY COMPANY OR DEPARTMENT AFFECTED SHALL BE CONTACTED AND THEIR PERMISSION OBTAINED REGARDING THE METHOD TO USE FOR SUCH WORK. 5. SHOULD ANV UNCHARTED OR INCORRECTLY CHARTED UTILITIES BE ENCOUNTERED, THE CONTRACTOR SHALL CONTACT THE OWNER IMMEDIATELY FOR DIRECTIONS. fi. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES DURING CONSTRUCTION. AT LEAST 48 HOURS PRIOR TO ANY DEMOLITION, GRADING, OR CONSTRUCTION ACTIVITY THE CONTRACTOR SHALL NOTIFY THE UTILITY PROVIDER FOR PROPER IDENTIFICATION OF EXISTING UTILITIES WITHIN THE PROJECT SITE. THE CONTRACTOR SHALL COORDINATE ANY INTERRUPTION OF UTILITY SERVICE WITH OWNER(S) AND RESPECTIVE UTILITY COMPANY REPRESENTATIVE. ]. CONTRACTOR SHALL NOTIFY THE UTILITY AUTHORITIES INSPECTORS ]2 HOURS BEFORE CONNECTING TO ANY EXISTING LINE. B. CONTRACTOR SHALL SAW CUT, REMOVE, AND REPLACE ASPHALT PAVEMENT AS NECESSARY TO INSTALL UNDERGROUND ELECTRIC,TELEPHONE, SEWER, WATER, AND COMMUNICATION CONDUITS.PAVEMENTS WALKS CURBS AND OTHER SURFACE IMPROVEMENTS REQUIRING REMOVAL FOR INSTALLATION OF UNDERGROUND UTILITIES SHALL BE RESTORED TO THEIR PRESENT CONDITION UNLESS OTHERWISE SHOWN. 9. ALL ELECTRICAL WORK SHALL BE DONE IN ACCORDANCE WITH LOCAL POWER COMPANY STANDARDS. 10. CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS.LONTRALTOR IS RESPONSIBLE FOR ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED 8V CODES AND/OR UTILITY SERVICE COMPANIES. 11. PRESSURE UTILITY MAINS AND SERVICE LINES MAY NEED TO BE INSTALLED ATA DEPTH GREATER THAN THAT SPECIFIED OR SHOWN ON THE DRAWINGS TO CLEAR EXISTING AND PROPOSED CROSSING UTILITIES. IN SUCH CASES, THE CONTRACTOR SHALL INSTALL VERTICAL BENDS AS REQUIRED TO ACHIEVE APPROPRIATE CLEARANCE BETWEEN THE CROSSING UTILITIES. 12. WHERE GRADE MODIFICATIONS (CUTOR FILL ARE SHOWN ADJACENT TO EXISTING VALVE BOX COVERS AND MANHOLE CASTINGS, THE VALVE BOX COVERS AND MANHOLE CASTINGS SHALL BE ADJUSTED FLUSH WITH THE PROPOSED GRADE. 13. THE CONTRACTOR SHALL MAINTAIN ALL FLOWS AND UTILITY CONNECTIONS TO EXISTING BUILDINGS, ETC. WITHOUT INTERRUPTION UNLESSIUNTIL AUTHORIZED TO DISCONNECT BV THE OWNER, UTILITY COMPANIES, AND GOVERNING AUTHORITIES. THE CONTRACTOR SHALL INSTALL AS NECESSARY, TEMPORARY SITE LIGHTING, GAS, SANITARY, WATER, STORM, ELECTRIC, TELEPHONE, AND CABLE SERVICES TO SERVICE BUILDING(S) TO REMAIN OPEN. 14. ALL PROPOSED STUBS SHALL BE CAPPED AND SHALL BE PROVIDED WITH FIELD MARKERS. 15. CONTRACTOR TO PROVIDE AND INSTALL CONDUIT FOR SITE LIGHTING PER SITE LIGHTING PLAN (BY OTHERS). 16. CONTRACTOR TO PROVIDE AND INSTALL CONDUIT FOR IRRIGATION PER IRRIGATION PLAN (BY OTHERS). 1]. LINES UNDERGROUND SHALL BE INSTALLED, INSPECTED, SURVEYED, AND APPROVED BEFORE BACKFILLING. 18. MINIMUM TRENCH WIDTH SHALL BE 2 FEET. 19. ALL CHANGES IN DIRECTION OF THE CONDUIT SHALL UTILIZE STANDARD SWEEPS WITHA MINIMUM BENDING RADIUS LISTED IN THE NEC. NO MORE THAN (2) 90-DEGREE BENDS WILL BE ALLOWED BETWEEN PULLING POINTS, OR A TOTAL OF 180 DEGREES COMBINED IN SEVERAL BENDS. PULL BOXES SHALL BE LOCATED EVERY 400 FEET UNLESS THE COMBINED TOTAL OF BENDS REQUIRE ADDITIONAL MANHOLES. 20. ALL UTILITIES SHOULD BE KEPT TEN (10'JAPART(PARALLEL)OR WHEN CROSSING IS- VERTICAL CLEARANCE OUTSIDE EDGE OF PIPE TO OUTSIDE EDGE OF PIPE. 21. THE CONTRACTORSHALL CONSTRUCT GRAVITY SEWER LATERALS, MANHOLES GRAVITY SEWER LINES AND DOMESTIC WATER AND FIRE PROTECTION SYSTEM AS SHOWN ON THESE PLANE. THE CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIALS, EQUIPMENT, MACHINERY, TOOLS, MEANS OF TRANSPORTATION AND LABOR NECESSARY TO COMPLETE THE WORK IN FULL AND COMPLETE ACCORDANCE WITH THE SHOWN DESCRIBED AND REASONABLY INTENDED REQUIREMENTS OF THE CONTRACT DOCUMENTS AND JURISDICTIONAL AGENCY REQUIREMENTS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN. 22. DEFLECTION OF PIPE JOINTS AND CURVATURE OF PIPE SHALL NOT EXCEED THE MANUFACTURER'S SPECIFICATIONS. SECURELY CLOSE ALL OPEN ENDS OF PIPE AND FITTINGS WITH A WATERTIGHT PLUG WHEN WORK IS NOT IN PROGRESS. THE INTERIOR OF ALL PIPES SHALL BE CLEAN AND JOINT SURFACES WIPED CLEAN AND DRY AFTER THE PIPE HAS BEEN LOWERED INTO THE TRENCH. VALVES SHALL BE PLUMB AND LOCATED ACCORDING TO THE PLANS. MAXIMUM PIPE JOINT DEFLECTION FOR CITY MAINTAINED LINES IS � OF THE MANUFACTURER'S RECOMMENDATION. 23. ALL PHASES OF INSTALLATION, INCLUDING UNLOADING, TRENCHING, LAVING AND BACK FILLING, SHALL BE DONE INAFIRST CLASS WORKMANLIKE MANNER. ALL PIPE AND FITTINGS SHALL BE CAREFULLY STORED FOLLOWING MANUFACTURER'S RECOMMENDATIONS. CARE SHALL 8E TAKEN TO AVOID DAMAGE TO THE COATING OR LINING IN ANY DUCTILE IRON PIPE FITTINGS. ANY PIPE OR FITTING WHICH IS DAMAGED OR WHICH HAS FLAWS OR IMPERFECTIONS WHICH, IN THE OPINION OF THE ENGINEER OR OWNER, RENDERS IT UNFIT FOR USE, SHALL NOT BE USED. ANY PIPE NOT SATISFACTORY FOR USE SHALL BE CLEARLY MARKED AND IMMEDIATELY REMOVED FROM THE JOB SITE, AND SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. 24. WATER FOR FIRE FIGHTING SHALL BE AVAILABLE FOR USE PRIOR TO COMBUSTIBLES BEING BROUGHT ON SITE. 25. ALL UTILITY AND STORM DRAIN TRENCHES LOCATED UNDER AREAS TO RECEIVE PAVING SHALL BE COMPLETELY BACK FILLED IN ACCORDANCE WITH THE GOVERNING JURISDICTIONAL AGENCY'S SPECIFICATIONS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN. 28. UNDERGROUND WATERAND SANITARY SEWER LINES SHALL BE SURVEYED BY STATE LICENSED PROFESSIONAL LAND SURVEYOR PRIOR TO BACK FILLING. 2]. CONTRACTOR SHALL PERFORM, AT HIS OWN EXPENSE, ANY AND ALL TESTS REQUIRED BY THE SPECIFICATIONS AND/OR ANV AGENCY HAVING JURISDICTION. THESE TESTS MAY INCLUDE, BUT MAY NOT BE LIMITED TO, INFILTRATION AND EXFILTRATION, TELEVISION INSPECTION AND A MANDREL TEST ON GRAVITY SEWER. A COPY OF THE TEST RESULTS SHALL BE PROVIDED TO THE UTILITY PROVIDERS, OWNERAND JURISDICTIONAL AGENCY AS REQUIRED. 28. IF DETERMINED NECESSARY BY THE LOCAL JURISDICTION, THE CONTRACTOR SHALL ABANDON EXISTING WATER METERS. CUT THE CORPS OFF, AND AIR -GAP THE SERVICES. 29. UNDERGROUND UTILITY, INCLUDING STORMWATER PIPES, SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS: A. NO MORE THAN 500 LF OF TRENCH MAY BE OPENED AT ONETIME. B. EXCAVATED MATERIAL SHALL BE LACED ON THE UPHILL SIDE OF TRENCHES. A8-BUILT8/RECORD DRAWINGS 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DOCUMENTING AND MAINTAINING AS -BUILT INFORMATION WHICH SHALL BE RECORDED AS CONSTRUCTION PROGRESSES OR AT THE COMPLETION OF APPROPRIATE CONSTRUCTION INTERVALS AND SHALL BE RESPONSIBLE FOR PROVIDING AS - BUILT DRAWINGS TO THE OWNER FOR THE PURPOSE OF CERTIFICATION TO JURISDICTIONAL AGENCIES AS REQUIRED. ALL AS -BUILT DATA SHALL BE COLLECTED BV ASTATE OF NORTH CAROLINA PROFESSIONAL LAND SURVEYOR WHOSE SERVICES ARE ENGAGED BY THE CONTRACTOR. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING TO THE ENGINEER CERTIFIED RECORD SURVEYS SEALED BY A STATE REGISTERED PROFESSIONAL LAND SURVEYOR DEPICTING THE ACTUAL FIELD LOCATION OF ALL CONSTRUCTED IMPROVEMENTS. THE RECORD DRAWINGS SHALL BE PREPARED TO THE SAME LEVEL OF DETAILS AS PROVIDED ON THE DESIGN DRAWINGS. 3. THE CONTRACTOR SHALL PROVIDE TO THE ENGINEER AND OWNER RECORD DRAWINGS IN BOTH PDF AND AUTOCAD FORMAT FOR ALL PAVING, GRADING, AND STORMWATER BMPS, AND STORMWATER DRAINAGE PIPES AND STRUCTURES. 4. THE CONTRACTOR SHALL PROVIDE ASEPARATE UTILITY RECORD DRAWING IN AUTOCAD AND PDF FORMAT. THE RECORD DRAWINGS SHALL VERIFY ALL DESIGN INFORMATION INCLUDED ON THE DESIGN PLANS. 5. IN ADDITION TO THE OWNER AND ENGINEER REQUIRED SURVEYS, THE CONTRACTOR SHALL PROVIDE ADDITIONAL RECORD DRAWINGS AND AS -BUILT INFORMATION AS REQUIRED BY THE JURISDICTION. GENERAL GRADING NOTES 1. ALL NECESSARY PERMITS ARE THE RESPONSIBILITY OF THE CONTRACTOR AND MUST OBTAIN ALL PERMITS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 2. BEFORE ANY EARTHWORK IS GONE, THE CONTRACTOR SHALL STAKE OUT AND MARK THE LIMITS OF PAVEMENT AND OTHER ITEMS ESTABLISHED IN THE PLANS. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY ENGINEERING AND SURVEYING FOR LINE AND GRADE CONTROL POINTS RELATED TO EARTHWORK. 3. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST ]2 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 4. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS REFLECT FINISHED GRADES. ALL ELEVATIONS ARE IN REFERENCE TO THE BENCHMARK, AND THIS MUST BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO GROUND BREAKING. 5. CONTRACTOR SHALL REVIEW, UNDERSTAND AND IMPLEMENT ALL REQUIRED EROSION AND SEDIMENTATION CONTROL MEASURES PRIOR TO ANY DISTURBANCE. 6. THE CONTRACTOR SHALL GRADE THE SITE TO THE ELEVATIONS INDICATED AND SHALL REGRADE WASHOUTS WHERE THEY OCCUR AFTER EVERY RAINFALL UNTIL A GRASS STAND IS WELL ESTABLISHED OR ADEQUATE STABILIZATION OCCURS. ]. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR BLASTING ROCK IF BLAST ROCK IS ENCOUNTERED. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COMPLYING WITH ALL BLASTING AND SAFETY REQUIREMENTS S. ALL UNPAVED AREAS IN EXISTING RIGHTS -OF -WAY DISTURBED 8V CONSTRUCTION SHALL 8E REGRADED AND SEEDED. 8. THE CONTRACTOR SHALL CLEAR AND GRUB THE SITE AND PLACE, COMPACT, AND MOISTURE CONDITION ALL FILL PER THE GEOTECHNICAL ENGINEERS SPECIFICATIONS. FILL MATERIAL SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT. 10. THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF ALL SHEETING, SHORING, BRACING AND SPECIAL EXCAVATION MEASURER REQUIRED TO MEET OSHA, FEDERAL, STATE AND LOCAL REGULATIONS PURSUANT TO THE INSTALLATION OF THE WORK INDICATED ON THESE DRAWINGS. THE DESIGN ENGINEER ACCEPTS NO RESPONSIBILITY FOR THE DESIGN(S) TO INSTALL SAID ITEMS. 11. FIELD ADJUSTMENTS OF RIM ELEVATIONS OF STRUCTURES MAY BE REQUIRED TO MEET FIELD CONDITIONS. MAXIMUM HEIGHT OF ADJUSTING RINGS SHALL NOT EXCEED 12 INCHES. ADJUSTMENTS OF CASTINGS WHERE THE TOTAL HEIGHT OF ADJUSTING RINGS WOULD EXCEED 12 INCHES SHALL BE MADE BY REPLACING THE CONE AND/OR BARREL SECTION OF THE STRUCTURE. 12. WHERE GRADE MODIFICATIONS ARE SHOWN ADJACENT TO EXISTING VALVE BOX COVERS AND MANHOLE CASTINGS, THE VALVE BOX COVERS AND MANHOLE CASTINGS SHALL BE ADJUSTED FLUSH WITH THE PROPOSED GRADE. 13. ALL OPEN AREAS WITHIN THE PROJECT SITE SHALL BE SEEDED UNLESS INDICATED OTHERWISE ON THE LANDSCAPE PLAN. 14. IF DEWATERING IS REQUIRED THE CONTRACTOR SHALL OBTAIN ANY APPLICABLE REQUIRED PERMITS. THE CONTRACTOR IS TO COORDINATE WITH THE OWNER AND THE DESIGN ENGINEER PRIOR TO ANY EXCAVATION. 15. STRIP TOPSOIL AND ORGANIC MATTER FROM ALL AREAS OF THE SITE AS REQUIRED. IN SOME CASES TOPSOIL MAY STOCKPILED ON SITE FOR PLACEMENT WITHIN LANDSCAPED AREAS BUT ONLY AS DIRECTED BY THE OWNER. 18. FIELD DENSITY TESTS SHALL BE TAKEN AT INTERVALS IN ACCORDANCE WITH THE LOCAL JURISDICTIONAL AGENCY OR TO STATE DEPARTMENT OF TRANSPORTATION STANDARDS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN. 1]. ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED AS PER PLANS. THE AREAS SHALL THEN BE SEEDDED AS SPECIFIED IN THE PLANS, FERTILIZED, MULCHED, WATERED AND MAINTAINED UNTIL HARDY GRASS GROWER IS ESTABLISHED IN ALL AREAS. ANY AREAS DISTURBED FOR ANY REASON PRIOR TO FINAL ACCEPTANCE OF THE JOB SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. ALL EARTHEN AREAS WILL BE SEEDDED AND MULCHED AS SHOWN ON THE LANDSCAPING PLAN. 18. ALL CUT OR FILL SLOPES SHALL BE 3 (HORIZONTAL) :1 (VERTICAL) OR FLATTER UNLESS OTHERWISE SHOWN. THE CONTRACTOR SHALL COORDINATE WITH THE GEOTECHNICAL ENGINEER FOR APPROPRIATE SLOPE STABILIZATION ON ALL SLOPES STEEPER THAN 31. CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE. 19. SEED MUST BE INSTALLED AND MAINTAINED ON EXPOSED SLOPES WITHIN 48 HOURS OF COMPLETING FINAL GRADING, AND AT ANV OTHER TIME AS NECESSARY, TO PREVENT EROSION, SEDIMENTATION OR TURBID DISCHARGES. 20. THE CONTRACTOR SHALL ENSURE THAT ISLAND PLANTING AREAS AND OTHER PLANTING AREAS ARE NOT CDMPACTED AND DO NOT CONTAIN ROAD BASE MATERIALS. THE CONTRACTOR SHALL ALSO EXCAVATE AND REMOVE ALL UNDESIRABLE MATERIAL FROM ALL AREAS ON THE SITE TO BE PLANTED AND PROPERLY DISPOSED OF IN A LEGAL MANNER. 21. UNLESS OTHERWISE RECOMMENDED BY THE GEOTECHNICAL ENGINEER. REFER TO THE GEOTECHNICAL REPORT OF ALL REQUIREMENTS. GENERAL FILL COMPACTION MUST MEET A MINIMUM OF 95% OF THE MATERIAL'S MAXIMUM STANDARD PROCTOR DRY DENSITY (ASTM D898). THE UPPER 12 INCHES OF SUBGRADE IN PAVEMENT AREAS SHOULD BE COMPACTED TO AT LEAST f00%OF THE MATERIALS MAXIMUM STANDARD PROCTOR DRY DENSTIV (ASTM D898) OR AS DIRECTED BVAGEOTECHNICAL ENGINEER. FILL SHALL BE PLACED AND COMPACTED IN MAXIMUM 8' LIFTS. THE WATER CONTENT RANGE SHOULD BE WITHIN 3%OF OPTIMUM MOISTURE CONTENT. 22. GRADEALL AREAS TO MAINTAIN POSITIVE SLOPE AWAY FROM BUILDING. 23. ALL SOIL USED FOR PLANTING SHALL CONSIST OF REGIONALLY APPROPRIATE SOILS. 24. UNSUITABLE FILL BENEATH BUILDING PADS AND PAVED SURFACES MUST BE EXCAVATED AND WATER DISTRIBUTION NOTES 1. CONTRACTOR TO LOCATE TIE-INS TO ALL BUILDINGS BASED ON ARCH/MECHANICAL, ELECTRICAL AND PLUMBING PLANS. 2. AMINIMUM HORIZONTAL SEPARATION OF IO FEET BETWEEN WATER LINES AND SEWERS SHALL BE MAINTAINED AT ALL TIMES. A MINIMUM VERTICAL SEPARATION OF 18 INCHES BETWEEN WATER LINES AND SANITARY/STORM SEWERS SHALL BE MAINTAINED AT CROSSINGS. 3. IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATER LINES, SANITARY LINES, STORM LINES AND GAS LINES (EXISTING AND PROPOSED), THE SANITARY LINE SHALL BE DUCTILE IRON PIPE WITH MECHANICAL JOINTS AT LEAST 10 FEET ON BOTH SIDES OF CROSSING, THE WATER LINE SHALL HAVE MECHANICAL JOINTS WITH APPROPRIATE THRUST BLOCKING AS REQUIRED TO PROVIDE A MINIMUM OF 18' CLEARANCE. MEETING REQUIREMENTS OF ANSI A21.10 OR AN5121.11 (AMA C-151) (CLASS 50). 4. WATER MAIN5101NCHE5 AND SMALLER SHALL BE INSTALLED WITHAMINIMUM OF 381NLHE5 OF COVER AS MEASURED FROM THE TOP OF THE PIPE TO THE FINAL FINISH GRADE ABOVE THE PIPE. WATER MAIN5121NCHE8 AND LARGER SHALL BE INSTALLED WITHAMINIMUM OF 421NCHE5 OF COVER AS MEASURED FROM THE TOP OF THE PIPE TO THE FINAL FINISH GRADE ABOVE THE PIPE. 5. THRUST BLOCKS OR JOINT RESTRAINTS SHALL BE INSTALLED ON ALL WATER LINES AT ALL BENDS, TEES AND HYDRANTS PER THE DETAILS. 6. PIPE LENGTHS SHOWN ARE MEASURED FROM CENTER TO CENTER OF FITTINGS AND APPURTENANCES ROUNDED TO THE NEAREST FOOT. ]. WATER LINES SHALL BE AS FOLLOWS: :'AND LARGER, PVC C-900, OR-14, PER ASTM 02241 6' AND LARGER DUCTILE IRON PIPE PER AW WA C150 SMALLER THAN 6' EITHER COPPER TUBE TYPE (SOFT) PER AN51816.22 OR PVC, 200 P.S.I., PER ASTM 01]84 AND D2241. 6. ALL WATER JOINTS ARE TO BE MECHANICAL JOINTS WITH THRUST BLOCKING. 9. THERE SHALL BE NO TAPS, PIPING BRANCHES, UNAPPROVED BYPASS PIPING, HYDRANTS, FIRE DEPT. CONNECTION POINTS, OR OTHER WATER USING APPURTENANCES CONNECTED TO THE SUPPLY LINE BETWEEN ANV WATER METER AND ITS REQUIRED BACKFLOW PREVENTER. 10. BACKFLOW PREVENTION ASSEMBLIES TO BE INSTALLED ABOVE -GROUND SHALL BE INSTALLED WITHIN INSULATED ENCLOSURE AND PER JURISDICTIONAL REQUIREMENTS. ENCLOSURES SHALL INCLUDE GRAIN PORTS) FOR DISCHARGE WATER. CONTRACTOR SHALL ENSURE THE BACKFLOW PREVENTION ASSEMBLY AND ENCLOSURE IS INSTALLED OUTSIDE OF SIGHT DISTANCE TRIANGLES AT INTERSECTIONS WITH VEHICULAR TRAVEL WAYS. if. ALL BACKFLOW PREVENTERS SHALL BE HEATED. m REFER TO APPROVED TREE SAVE PLAN F 1. THE CONTRACTOR SHALL PROTECT ALL TREES AND SHRUBS OUTSIDE OF CUT/FILL LINES, IN $ c p ADDITION TO THOSE THAT RECEIVE TREEISHRUB PROTECTION BARRIERS. THE CONTRACTOR IS ALSO REQUESTED TO SAVE ALL OTHER EXISTING TREES AND SHRUBS WHERE POSSIBLE. 2. WHENROOT PRUNING IS NECESSARY, CUT ROOTS CLEANLY USING A DISC TRENCHER AND ip IMMEDIATELY COVER ALL ROOT CUT SURFACES LARGER THAN TWO INCHES IN DIAMETER WITH X TREE WOUND DRESSING. USE PLYWOOD FORMS WHEN TREE ROOTS ARE ADJACENT TO PROPOSED CURB & GUTTER OR SIDEWALK. F 3. NO SOIL DISTURBANCE OR COMPACTION, CONSTRUCTION MATERIALS, TRAFFIC, BURIAL PITS, - a TRENCHING OR OTHER LAND DISTURBING ACTIVITY ALLOWED IN THE TREE PROTECTION ZONE. E H TREE BARRICADES MUST BE INSTALLED BEFORE ANY DEMOLITION, GRADING OR CONSTRUCTION BEGINS, AND NOT REMOVED UNTIL FINAL INSPECTION. w O_ 4. NO GRUBBING WITHIN TREE PROTECTION ZONE. LEAVE SOIL AND LEAF LITTER UNDISTURBED. SUPPLEMENT WITH 1- INCHES OF MULCH. RE -SEED WITH GRASS ONLY IN DISTURBEDIGRADEDo K w N W AREAS. rc 5. TREE BARRICADES MUST BE INSTALLED BEFORE ANY DEMOLITION, CLEARING, GRADING OR N O CONSTRUCTION BEGINS AND IS NOT TO BE REMOVED UNTIL AFTER CONSTRUCTION. - f O v DRAINAGE STRUCTURES z W GRADES, ELEVATIONSADJUSTED TO ACATIONCOMMODATE SHOWN ARE FORESEEN CONDE.ITIONS. AS . STATIONS,RECTED THE ENGINEER, THEY MY BE ADJUSTED TO ACCOMMODATE UNFORESEEN CONDITIONS. STATIONS, OFFSETS AND a a a a a a Qe Z ELEVATIONS REFER TO THE CENTER OF DROP INLETS, MANHOLES AND JUNCTION BOXES, AND THE MIDPOINT OF THE LIP FOR CATCH BASINS. ALL PIPES SHALL BE RCP CLASS III, UNLESS OTHERWISE o NOTED. WEEPHOLES ARE TO BE CONSTRUCTED IN ALL DRAINAGE STRUCTURES, A MINIMUM OF 1 j WEEPHOLE PER STRUCTURE. WEEPHOLES ARE TO BE CONSTRUCTED IN THE BOTTOM II3 OF STRUCTURE AND COVERED ON THE OUTSIDE OF THE STRUCTURE BY A BAG MADE OF FILTER FABRIC AND FILLED WITH 478 STONE. THERE WILL BE NO SEPARATE PAYMENT FOR THIS WORK. 1. S RM DRAINAGE WITHIN THE PROJECT SHALL BE REINFORCED CONCRETE PIPE, AS SHOWN ON L z THE DRAINAGE CHART. O N 2. PIPE LENGTHS INDICATED ON THE PLANS ARE APPROXIMATE ONLY AND INCLUDE END SECTIONS. w Q r 3. NECESSARY DRAINAGE FACILITIES MAY BE REQUIRED IN THE STREET RIGHT-OF-WAY IF DEEMED U NECESSARY BY THE INSPECTOR. d 4. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING j STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA tJ n A NO MORE THAN 500 LF OF TRENCH MY BE OPENED AT ONE TIME. �\ 4 B. EXCAVATED MATERIAL SHALL BE LACED ON THE UPHILL SIDE OF TRENCHES. �O _ m - jA C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN �z3U APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED INA MANNER THAT w a3z O DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFFSITEPROPERTY. o D. MATERIAL USED FOR BACK -FILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER i TO MINIMIZE EROSION AND PROMOTE STABILIZATION. 4 E. RE STABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE EROSION AND SEDIMENT CONTROL REGULATIONS. F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. Y lc 5. ALL PIPES SHALL BE LAID ON STRAIGHT ALIGNMENT AND EVEN GRADES USING A PI PE LASER OR OTHER ACCURATE METHOD. /j 6. ALL PIPES SHALL BE BEDDED PER MANUFACTURER'S RECOMMENDATIONS. 3 0 I 4 O 2 a° H N N p G y a U O C w O ON t2il 2 O Q O O rn d N p 7 2 ED w !O y O ED - M pK I S U) n W N O O Z J ul /� W 0 Z Z WW r n (� v O K W z O w Z w 00 C) 0 > O m (n J w U Lu o > w ow Lu a Q 0 w a N G'/� O d Z Z Q_ 0 H Q O Z a 00 SHEET NUMBER R102 a SANITARY SEWER NOTES SANITARY SEWER NOTES SANITARY SEWER NOTES SANITARY SEWER NOTES ALL SANITARY SEWER PIPE SHALL BE POLY -VINYL CHLORIDE OR CEMENT LINED ZINC COATED DUCTILE IRON (PRESSURE CLASS 350 MIN.). THESE STANDARD SPECIFICATIONS FOR SANITARY SEWER PIPE ARE INTENDED FOR SIZES UP TO AND INCLUDING 15" IN DIAMETER. MATERIAL AND CONSTRUCTION SPECIFICATIONS FOR PIPE SIZES IN EXCESS OF 15' IN DIAMETER SHALL REQUIRE APPROVAL BY THE CITY ENGINEER. IT IS THE INTENT OF THIS SPECIFICATION TO PROVIDE PIPE OF THE HIGHEST STANDARD KNOWN TO THE TRADE AND TO PROVIDE PIPE THAT IS FREE FROM DEFECTS IN WORKMANSHIP AND MATERIALS. ALL PIPE AND OTHER MATERIALS SHALL BE FIRST CLASS AND NO USED OR SECOND HAND PIPE OR MATERIALS WILL BE PERMITTED. FOR DEPTHS OF COVER OVER PIPE THREE FEET OR LESS, ONLY DUCTILE IRON SEWER PIPE MAY BE USED. FOR DEPTHS OF COVER OVER PIPE GREATER THAN THREE FEET, BUT LESS THAN TWENTY FEET, PVC OR CEMENT LINED ZINC COATED DUCTILE IRON MAY BE USED. FOR DEPTHS OF COVER OVER PIPE IN EXCESS OF TWENTY FEET, ONLY CEMENT LINED ZINC COATED DUCTILE IRON MAY BE USED. THICKNESS OF DIP SHALL BE AS SPECIFIED BY THE CITY ENGINEER. CLEARING THE CONTRACTOR WILL BE REQUIRED TO CLEAR, REMOVE, OR DISPOSE OF ALL NATURAL, ARTIFICIAL, OR MAN MADE OBSTRUCTIONS TO THE CONSTRUCTION AS INDICATED ON THE PROJECT PLANS, OR AS MAY BE EVIDENT AT THE TIME OF THE BIDDING OF CONSTRUCTION. THE CONTRACTOR WILL BE REQUIRED TO RESTORE THE CONSTRUCTION AREA AS CLOSE AS IS PRACTICAL TO THE CONDITION HE FOUND IT. CONTRACTOR SHALL BE FAMILIAR AND COMPLY WITH ALL RESTRICTIONS IMPOSED BY CLEAN WATER 401/404 OR OTHER PERMITS. ALL TREES, STUMPS, ROOTS AND OTHER DEBRIS SHALL BE REMOVED AND PROPERLY DISPOSED OF BY THE CONTRACTOR. FENCES, MAILBOXES, STREET SIGNS, SMALL SHRUBS, DRIVEWAYS, ROADS, SIDEWALKS, CURB AND GUTTER, WALLS, DRAINAGE SYSTEMS, POLES AND CABLES, ETC., SHALL BE PROTECTED. IF DAMAGED THEY SHALL BE RESTORED BY THE CONTRACTOR TO A CONDITION EQUAL TO THAT EXISTING AT THE DATE OF AWARD OF THE CONTRACT. ANY OPEN CUTS APPROVED BY THE CITY SHALL BE RESTORED WITH ASPHALT/CONCRETE THE SAME DAY AS THE DISTURBANCE BEGAN. ALL DISTURBED AREAS SHALL BE SEEDED, MULCHED, AND TACKED NO LATER THAN SEVEN (T) DAYS AFTER THE LAND DISTURBING ACTIVITY STARTED. FOR SPECIAL CONDITIONS REQUIRING FERROUS MATERIAL PIPE SEE SECTION 2.10. 8.01 CEMENT LINED ZINC COATED DUCTILE IRON SEWER PIPE DUCTILE IRON PIPE SHALL BE MANUFACTURED AND TESTED IN THE U.S.A. AND SHALL CON, C 151 AND ANSI STANDARD p 151 OR LATEST REVISION. CEMENT LININGS FOR DUCTILE IRON PIPE SHALL CONFORM TO AW WA SPECIFICATION C IN ZINC APPLIED SHALL BE 200 GM OF PIPE SURFACE AREA. AN ASPHALTIC TOPCOAT LAYER SHALL BE APPLIED OVER THE ZINC TO A MINIMUM 2 MIL THICKESS. ZINC COATING SYSTEM SHALL CONFORM TO ISO 81731 'DUCTILE IRON PIPES - EXTERNALZINCBASEDCOATING- PART 1, SECOND EDITION 2004-06-01 OR LATEST REVISION. DUCTILE IRON PIPE SHALL BE MECHANICAL JOINT OR PUSH -ON JOINT TYPE. PUSH -ON JOINTS SHALL BE "BELL-TITE; 'FAB ITE" OR APPROVED EQUAL. ALL JOINTS FOR DUCTILE IRON PIPE SHALL CONFORM TO THE APPLICABLE DIMENSIONS AND WEIGHTS SHOWN IN THE TABLES IN AWWA C151 AND TO ANSI A 21.11 (AW WA C111) OR LATEST REVISION. ALL PIPE SHALL BE CLEAN AND SOUND WITHOUT DEFECTS THAT WILL IMPAIR THEIR SERVICE. REPAIRING OF DEFECTS BY WELDING OR OTHER METHODS SHALL NOT BE ALLOWED. ALL PIPE SHALL HAVE AN OUTSIDE PETROLEUM ASPHALTIC COATING OF APPROXIMATELY 1 MIL THICK. THE COATING SHALL BE APPLIED TO THE OUTSIDE OF ALL PIPE AND THE FINISHED COATING SHALL BE CONTINUOUS, SMOOTH, NEITHER BRITTLE WHEN COLD, NOR STICKY WHEN EXPOSED TO THE SUN. AND SHALL BE STRONGLY ADHERENT TO THE PIPE. THICKNESS FOR ALL DUCTILE IRON PIPE IN SHALL BE AS RECOMMENDED FOR THE PROPOSED DEPTH OF COVER IN THE MAY 2016 "DESIGN OF DUCTILE IRON PIPE" HANDBOOK AS PUBLISHED BY THE DUCTILE IRON PIPE RESEARCH ASSOCIATION, ORAS SHOWN ON THE PROJECT PLANS (WITH THE MINIMUM BEING PRESSURE CLASS 360). POLYETHYLENE ENCASEMENT- SEE SECTION 9.03 SOLID SLEEVES - SEE SECTION 9.W 8.02 PVC SANITARY SEWER PIPE AND FITTINGS PVC SEWER PIPE MAY BE PERMITTED ONLY IN AREAS THAT GENERATE DOMESTIC SEWAGE, ARE ZONED FOR RESIDENTIAL USE, AND WHERE ALL UP STREAM DRAINAGE AREAS HAVE RESIDENTIAL ZONING DESIGNATIONS AND USES. PVC SEWER PIPE MAY BE INSTALLED IN SOME COMMERCIAL DEVELOPMENT; HOWEVER, EACH PROJECT MUST BE EVALUATED AND APPROVED BY THE CITY ENGINEER ON A "CASE BY CASE' BASIS. WHEN S' THRU. 15' DIAMETER POLYVINYL CHLORIDE (PVC) PIPE IS SPECIFIED ON THE APPROVED PROJECT PLANS, UNLESS OTHERWISE SPECIFIED, THE PVC PIPE SHALL BE AS SPECIFIED IN ASTM D-3D34 WITH A STANDARD DIMENSION RATIO (SDR) OF 35, PVC SEWER PIPE SHALL BE FURNISHED WITH AN INTEGRAL BELL AND ELASTOMERIC GASKETED JOINT PERMANENTLY INSTALLED AT THE FACTORY IN ACCORDANCE WITH ASTM D-3212 AND ASTM F4]]. THE PIPE SHALL BE FURNISHED IN NOMINAL LENGTHS OF 13 FEET OR AS APPROVED 20 FEET SHALL BE GREEN IN COLOR AND SHALL BE MANUFACTURED AND TESTED IN THE U.S.A. ALL PVC GRAVITY SEWER PIPE SHALL BE MANUFACTURED FROM MATERIAL MEETING THE MINIMUM REQUIREMENTS OF CELL CLASSIFICATION 12454, OR 12364-13 AS PER ASTM D1784. THE PIPE MANUFACTURER SHALL CERTIFY THAT THIS REQUIREMENT HAS BEEN MET, AND THE PIPE SHALL BE APPROPRIATELY MARKED ACCORDING TO ASTM SPECIFICATIONS. SEWER AND WATER CROSSINGS SHALL BE AS SPECIFIED IN SECTION 2.10 OF THE CITY OF GASTONIA STANDARD CITYS APPROVED MATERIAL LIST OR AS SPECIFICALLY APPROVED ALL FITTINGS USED ON PVC SEWER MAINS INCLUDING TEES FOR TAPS, SHALL MEET THE SAME SPECIFICATIONS AS THOSE OF THE PVC SEWER MAIN. TO COUPLE THE TAPPING TEES TO THE SEWER LATERAL BEND, IT WILL BE NECESSARY TO USE AN SDR 35 TO SCHEDULE 40 PVC SLIP -BY -HUB ADAPTER. SEE SECTION 8.18 OF THE CITY OF GASTONIA STANDARD SPECIFICATIONS FOR TAP REQUIREMENTS. THE CONTRACTOR SHALL PROVIDE ADAPTERS, SEALS, AND TRANSITIONAL PIECES AS REQUIRED FOR CONNECTING TO OTHER PIPE OR STRUCTURES SHOWN ON THE DRAWINGS OR INDICATED IN THE BID DOCUMENTS. FLEXIBLE REPAIR COUPLINGS WILL NOT BE ALLOWED. ANY FIELD CUT ENDS SHALL BE AS PER THE PIPE MANUFACTURER'S AND AW WA'S RECOMMENDATIONS. IN ALL INSTANCES PVC PIPE SHALL BE INSTALLED IN AN ACCEPTABLE MANNER, TRUE TO LINE AND GRADE, WITH THE BELL ENDS FACING UP -GRADE. THE VARIOUS PIPES, REFERRED TO HEREIN, SHALL BE HANDLED, BELLED UP AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND ESTABLISHED ENGINEERING PRACTICES AS DESCRIBED IN THE VARIOUS PUBLICATIONS REFERENCED IN THIS DOCUMENT. SEE SECTION 8.15 ALSO. ALL PVC PIPE SHALL BE SHIPPED, STORED, AND PLACED AT THE PROJECT SITE IN A MANNER SO AS TO BE PROTECTED FROM TOTAL ACCUMULATED EXPOSURE TO SUNLIGHT AND ULTRA VIOLET RADIATION OF NO MORE THAN SIX (6) MONTHS, NO DEFECTS SHALL BE VISIBLE. ANY VISIBLE DEFECTS INCLUDING BUT NOT LIMITED TO CHALKING, DISCOLORATION, BLISTERS, OR LOSS OF SHEEN SHALL BE CAUSE FOR THE PIPE TO BE REJECTED AND REPLACED. ANY TESTING SUGGESTED IN LIEU OF THE ABOVE SHALL BE AT THE MANUFACTURER'S EXPENSE. ALL SUCH TEST SHALL BE PERFORMED PIPE. THESE INSTALLATION REQUIREMENTS SHALL BE AS SPECIFIED IN ASTM D-2321, LATEST REVISION, TYPE IA GRANULAR EMBEDMENT (# 57 WASHED STONE) REGARDLESS OF GROUND WATER OR SOIL CONDITIONS; THE BEDDING SHALL BE INSTALLED TO 95% STANDARD PROCTOR. NATIVE MATERIALS OF CLASSES II AND III MAY BE USED ABOVE THE PIPE SPRINGLINE AND SHALL BE PLACED AND COMPACTED AS SPECIFIED IN THE CITY OF GASTONIA STANDARD SPECIFICATIONS. THE MINIMUM DEPTH OF COVER SHALL BE 3 FEET AND THE MAXIMUM DEPTH OF COVER SHALL BE 30 FEET DEPTHS GREATER THAN TWENTY FEET 20' REQUIRE PRE -APPROVAL BY THE CITY ENGINEER. NO BACKFILL MAY BE PLACED OVER THE PVC PIPE UNTIL THE CITY ENGINEER OR HIS DESIGNATED REPRESENTATIVE HAS VISUALLY INSPECTED THE GRAVEL BED AND PVC PIPE INSTALLATION. IF FOR ANY REASON BACKFILL IS PLACED PRIOR TO THE INSPECTION, THE CONTRACTOR WILL BE REQUIRED TO REMOVE THE BACKFILL TO ALLOW FOR THIS VISUAL INSPECTION. ALL COST FOR SAID REMOVAL AND REPLACEMENT OF BACKFILL, AS WELL AS ANY DEFECTS FOUND, SHALL BE AT THE CONTRACTOR'S AND/OR DEVELOPER SOLE EXPENSE. IN ADDITION TO OTHER TESTS, INCLUDING BUT NOT LIMITED TO SECTION 8.17 OF THE CITY OF GASTONIA STANDARD SPECIFICATIONS, A DEFLECTION TEST WILL BE REQUIRED TO BE PERFORMED NOT LESS THAN 30 DAYS FOLLOWING COMPLETION OF BACKFILL OPERATIONS. THE CONTRACTOR SHALL SUPPLY ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO PULL A MANDREL SIZED FORA MAXIMUM OF 5%DEFLECTION OF THE ACTUAL PIPE INSIDE DIAMETER, AS DEFINED IN ASTM D4W3 THE MANDREL SHALL BE PROVIDED BY THE CONTRACTOR UNLESS THE CITY OF GASTONIA DECIDES TO SUPPLY IT. THE MANDREL SHALL BE PULLED THROUGH EACH SECTION OF PIPE FROM MANHOLE TO MANHOLE. THE MANDREL MUST SLIDE FREELY THROUGH THE PIPE WITH ONLYA NOMINAL HAND FORCE APPLIED. NO MECHANICAL FORCE SHALL BE USED IN PULLING THE MANDREL. ANY PIPE WHICH REFUSES THE MANDREL SHALL BE REMOVED AND REPLACED AND THE BEDDING SHALL BE PROPERLY CONSTRUCTED AS SPECIFIED TO PREVENT EXCESSIVE DEFLECTION. SUCH SECTIONS SHALL BE RE -TESTED AFTER COMPLETION OF BACKFILL. ALL COST FOR SUCH TESTING, REMOVAL, AND REPLACEMENT SHALL BE AT THE CONTRACTORS AND /OR DEVELOPERS SOLE EXPENSE. IF A DEVELOPER DESIRES TO USE PVC SEWER PIPE, PVC SEWER PIPE MUST BE USED THROUGHOUT THE DEVELOPMENT UNLESS DIP IS REQUIRED AND IS SHOWN ON THE PLANS APPROVED THE BY THE CITY ENGINEER. MANHOLES SHALL BE BUILT WHERE SHOWN ON THE PLANS AND SHALL BE IN ACCORDANCE WITH CITY STANDARD NO. 718-1 THRU 71848 AND THESE SPECIFICATIONS. DISTANCE BETWEEN MANHOLES SHALL VARY AS SHOWN ON THE PLANS, BUT THE MAXIMUM DISTANCE BETWEEN MANHOLES SHALL BE FOUR HUNDRED TWENTY FIVE FEET (425') FOR SEWER MAINS AND FIVE HUNDRED FEET (500') FOR OUTFALL LINES. VENTING SHALL BE PROVIDED AT INTERVALS NOT TO EXCEED 1.000'. INVERTS ARE TO HAVE A SMOOTH FINISH AND SHALL CONFORM TO CITY STANDARD NO. 71 134 IN CROSS-SECTION. THERE SHALL BE A MINIMUM DROP OF 0.2 FEET WITHIN THE MANHOLE, BUT IN NO CASE SHALL IT EXCEED TWO AND ONE HALF FEET (2-1/2') , UNLESS AN OUTSIDE DROP IS CONSTRUCTED. MANHOLE WALLS SHALL BE PRE -CAST UNLESS SPECIAL PERMISSION IS GIVEN FOR BLOCK OR BRICK CONSTRUCTION. MANHOLE BOTTOMS SHALL BE CONSTRUCTED OF 3000 PSI CLASS 'A' CONCRETE AND SHALL BE A MINIMUM OF SIX INCHES (6") IN THICKNESS. WHEN REQUIRED BY THE CITY ENGINEER, THE FOUNDATION FOR THE MANHOLE BOTTOMS SHALL BE STABILIZED BY PLACING NO.5] WASHED STONE IN THE EXCAVATION. MANHOLE STEPS SHALL BE PROVIDED AND INSTALLED IN ACCORDANCE WITH CITY STANDARD DETAIL 71B-2. MANHOLE STEPS SHALL BE MADE WITH A NO.3 REINFORCING ROD ENCAPSULATED IN A POLYPROPYLENE PLASTIC, AND SHALL BE AS SHOWN ON THE CITYS APPROVED MATERIALS LIST OR SPECIFICALLY APPROVED BY THE CITY ENGINEER. CAST IRON MANHOLE COVERS AND FRAMES SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH CITY STANDARD NO. 7113-1. MANHOLE COVERS AND FRAMES SHALL BE SET IN MORTAR WITH EVEN BEARING. INSTALLATIONS OUTSIDE THE ROADWAY SHALL BE SET ON BUYYL RUBBER SEALANT AND MECHANICALLY SECURED; BOLTS SHALL BE COVERED IN CONCRETE MORTAR. AS A NORMAL POLICY, ALL MANHOLE RIM ELEVATIONS IN WELL MAINTAINED AREAS SUCH AS STREETS, PARKING LOTS, YARDS, BALL FIELDS, ETC., SHALL BE SET FLUSH WITH THE EXISTING GRADE. MANHOLE RIMS SET IN FIELDS, PASTURES, WOODS, ETC. , SHALL BE SET 6' ABOVE THE NATURAL EXISTING GRADE AND BACKFILLED FLUSH WITH THE RIM WITH A MAXIMUM SLOPE OF 4:1. MANHOLE RIMS IN FLOOD PLAIN AREAS, SHALL BE SET TWO (2) FEET ABOVE THE 100 YEAR FLOOD ELEVATION; OR A SEALED MANHOLE SHALL BE SET FLUSH WITH THE NATURAL EXISTING GROUND AND VENTED ACCORDING TO STANDARD DETAIL 71134A AND AS SHOWN ON THE PROJECT PLANS. THE CITYS INSPECTOR MAY VARY FROM THIS POLICY IF SPECIAL FIELD CONDITIONS WARRANT IT. PLUGS AND SEALED STUBS SHALL BE PLACED AS REQUIRED BY THE PLANS OR AS DIRECTED BY THE CITY ENGINEER CONTRACTOR SHALL FOLLOW MANUFACTURERS RECOMMENDATIONS FOR INTERNAL AND EXTERNAL SEALS OF ALL PRE -CAST JOINT SECTIONS. THE MASONRY HEIGHT FOR ADJUSTMENT OF GRADE ABOVE THE CONE SHALL BE 12 INCHES MAXIMUM. MANHOLES SHALL BE CLEANED, AND IN GOOD ORDER, AND SO KEPT UNTIL FINAL ACCEPTANCE OF THE JOB. BLOCK AND BRICK MANHOLE SPECIFICATIONS ARE INCLUDED HEREIN FOR USE WITH THE REPAIR OF EXISTING STRUCTURES ONLY. ALL NEW (PROPOSED) MANHOLES SHALL BE AS SPECIFIED IN SECTION 8.07 HEREIN. 8N MANHOLE BRICK ALL MANHOLE BRICK USED SHALL BE HARD ROUGH, SOUND CLAY BRICK OF FIRST CLASS QUANTITY, ESPECIALLY SUITABLE FOR THIS CLASS OF WORK AND SHALL CONFORM TO ASTM STANDARD NO. C62 OR LATEST SUBSEQUENT REVISION. OVER -BURNED BRITTLE BRICK OR BRICK FROM BENCHES OF KILNS SHALL NOT BE ACCEPTED. THE BRICK SHALL BE SET AT THE TIME OF LAYING, EXCEPT WHEN LIABLE FOR FREEZING. THE BRICK SHALL BE LAID WITH FULL SHOVE JOINTS, FILLING UP THE JOINTS WITH MORTAR AND THE THICKNESS OF THE JOINTS ON THE INSIDE OF THE WALLS MUST NOT BE MORE 8.05 MANHOLE BLOCK ALL MANHOLE BLOCK USED IN CONSTRUCTION SHALL BE A STANDARD SIX INCH (6') THICK CONCRETE MANHOLE BLOCK AND SHALL CONFORM TO ASTM STANDARD NO. C-139 OR LATEST SUBSEQUENT REVISION AND SHALL AS SHOWN ON THE CITYS APPROVED MATERIALS LISTOR AN APPROVED EQUAL. THE MANHOLE SHALL BE CONSTRUCTED OF TWO (2) TYPES OF BLOCK, THE BARREL BLOCK AND THE BATTERED ENTRANCE BLOCK. THE BARREL BLOCK SHALL FORM THE MAIN BODY OF THE MANHOLE AND SHALL FORM A CYLINDRICAL SECTION. THE STANDARD INSIDE DIAMETER OF THE CYLINDER SHALL BE FOUR FEET (4') FOR MANHOLES UP TO FOURTEEN FEET (14') IN DEPTH AND FIVE FEET (S) FOR MANHOLE SECTIONS GREATER THAN FOURTEEN FEET (14') IN DEPTH. THE TOP BATTERED SECTION SHALL FORM A CONICAL SECTION WHICH SHALL HAVE A FOUR FOOT (4') DIAMETER BASE AND SHALL BE CONSTRUCTED OF FOUR (4) COURSES OF EIGHT INCH (8') HIGH BATTERED BLOCKS. THESE BLOCKS SHALL BE DESIGNED SO AS TO REDUCE THE INSIDE DIAMETER BY SIX INCHES (6') PER COURSE. THE TOP DIAMETER OF THE MANHOLE SHALL BE TWENTY-FOUR INCHES (24"), AND SHALL BE THE STANDARD OPENING NEEDED FOR THE CAST IRON MANHOLE RING. THE BLOCKS SHALL BE EMBEDDED IN A MORTAR BED TO FORM w. HORIZONTAL MORTAR JOINTS AND SHALL BE LAID END TO END WITHOUT MORTAR ON ENDS. AS EACH COURSE IS COMPLETED, THE END OPENINGS SHALL BE FILLED WITH MORTAR AND SHALL BE RODDED THOROUGHLY TO FORM A WATERTIGHT SEAL BETWEEN BLOCKS. 8.O6 PRECAST MANHOLES ALL PRECAST MANHOLE SECTIONS AND COMPONENTS SHALL CONFORM TO ASTM C4]8-]2 OR LATEST SUBSEQUENT REVISION. PRECAST MANHOLES SHALL BE THOSE AS AS SHOWN ON THE CITYS APPROVED MATERIALS LIST OR APPROVED PRECAST MANHOLE SECTIONS SHALL CONSIST OF CIRCULAR SECTIONS WITH NOMINAL INSIDE DIAMETERS OF 48' AND 60 THICKNESS FOR 48" AND 60° DIAMETER SECTIONS SHALL BE MINIMUM OF 5", AND SHALL BE DESIGNED TO SUPPORT ALL DEAD LOAD AND HS-20 TRAFFIC LOADS. REINFORCEMENT FOR PRECAST MANHOLE SECTIONS SHALL CONSIST OF A SINGLE CAGE OF STEEL, PLACED AT THE APPROXIMATE CENTER OF THE WALL SECTION. THE 48" DIAMETER SECTIONS SHALL HAVE NOT LESS THAN 0.12 SQUARE INCHES OF CIRCUMFERENTIAL STEEL PER LINEAR FOOT OF BARREL AND THE 60- DIAMETER SECTION SHALL HAVE NOT LESS THAN 0.17 SQUARE INCHES OF CIRCUMFERENTIAL STEEL PER LINEAR FOOT OF BARREL. THE CAGE STEEL SHALL BE WELDED AT EVERY CIRCUMFERENTIAL WIRE, OR LAPPED 40 WIRE DIAMETERS AND TIED. THE WELDED SPLICE SHALL DEVELOP A TENSILE STRENGTH OF 50.000 PSI OF THE WIRE DIAMETER. JOINTS BETWEEN SECTIONS SHALL BE TONGUE AND GROOVE AND SHALL PROVIDE 0.10' NOMINAL ANNULAR SPACE HEIGHT SHALL BE 4'. JOINT SURFACES AND TOLERANCES SHALL BE AS PER ASTM C-361. ALL JOINTS SHALL BE SEALED WITH EITHER AN 'O" RING SEAL CONFORMING TO ASTM C 443, OR WITH AN APPROVED BUTYL RUBBER SEALANT CONFORMING TO FEDERAL SPECIFICATION SS-S-210A, AASHTO M-198, FOR TYPE B-BUTYL RUBBER AS SHOWN ON THE CITY'S APPROVED MATERIALS LIST OR AS APPROVED BY THE CITY ENGINEER. CARE IS TO BE TAKEN WITH THE BUTYL RUBBER SEALANT TO MAKE SURE MANUFACTURER'S RECOMMENDATIONS AND OVERLAPS ARE PROPERLY FOLLOWED. BUTYL RUBBER SEALANT SHALL BE KEPT IN ORIGINAL CONTAINERS, STORED IN A COOL AREA AND KEPT FREE FROM FOREIGN MATERIALS. EXTERIOR OF ALL JOINTS SHALL BE SEALED PER MANUFACTURERS RECOMMENDATIONS. MANHOLE STEPS SHALL BE CAST, DRILLED, OR FIRMLY GROUTED IN PLACE SO AS TO ENSURE COMPLETELY WATERTIGHTNESS, ANY STEP HOLES SHALL NOT EXTEND THROUGH THE MANHOLE WALL. STEPS SHALL BE SPACED AT 16' CENTERS AND INSTALLED SO AS NOT TO INTERFERE WITH THE REINFORCING STEEL. STEPS SHALL BE NO. 3 REINFORCING ROD ENCAPSULATED IN A POLYPROPYLENE PLASTIC, AS SHOWN ON THE CITY'S APPROVED MATERIALS LIST OR AS APPROVED BY THE CITY ENGINEER NO MORE THAN TWO LIFT HOLES SHALL BE CAST INTO EACH SECTION. HOLES SHALL BE LOCATED SO AS NOT TO DAMAGE REINFORCING STEEL OR EXPOSE IT TO CORROSION. STEEL LOOPS MAY BE PROVIDED FOR HANDLING, IN LIEU OF LIFT HOLES. PRECAST CONICAL ECCENTRIC TRANSITION SECTIONS SHALL BE PROVIDED FOR REDUCTIONS IN DIAMETERS. THE HEIGHT OF THE TRANSITION SECTION SHALL NOT BE LESS THAN 24". TRANSITION AND BARREL SECTIONS SHALL BE FREE FROM FRACTURES, CRACKS AND SURFACE ROUGHNESS. ALL MANHOLE COMPONENTS SHALL BE CAPABLE OF PRODUCING A WATERTIGHT STRUCTURE. SPECIAL ENGINEER'S APPROVAL IS REQUIRED TO USE FLAT TRANSITION SLABS OR FLAT TOPS. MANHOLES SHALL HAVE PRECAST CONCRETE BOTTOMS WITH INTEGRAL WALLS EXTENDING TO A MINIMUM OF SIX INCHES IS) ABOVE THE TOP OF THE HIGHEST PIPE LINE, EXCEPT AS SHOWN ON THE PLANS. PRECAST MANHOLE SECTIONS SHALL BE AFFIXED TO A MONOLITHIC POURED BOTTOM TO PROVIDE A WATERTIGHT SEAL, AND CONSTRUCTED IN ACCORDANCE WITH CITY STANDARD DRAWING NO. 71B-4. PIPE OPENINGS SHALL HAVE A CAST-INPLACE RUBBER SLEEVE OR RUBBER BOOT COMPLYING WITH ASTM C 923 DESIGNED TO PROVIDE A FLEXIBLE WATERTIGHT SEAL AROUND THE PIPE AND BETWEEN THE SLEEVE/RUBBER BOOT AND THE MANHOLE AS SHOWN ON THE CITY'S APPROVED MATERIALS LIST OR APPROVED BY THE CITY ENGINEER. THE CONE SECTION SHALL BE THE ECCENTRIC TYPE, UNLESS APPROVED OTHERWISE FOR A SPECIFIC LOCATION FOR EACH USE. INVERTS OF THE MANHOLE SHALL BE CONSTRUCTED AS SPECIFIED IN SECTION 8.04 OF THESE SPECIFICATIONS. INVERTS SHALL BE POURED -IN -PLACE, USING THE BASE SECTION AS FORM, AND SHAPED AS REQUIRED FOR THE PROPER FLOW. SEPARATE POUR PRECAST INVERTS MAY BE USED APPROVAL REQUIRED. HOLES OR OPENINGS LEFT IN BARREL SECTIONS FOR PIPE CONNECTIONS SHALL BE CONSTRUCTED SO AS TO PROVIDE A MINIMUM CLEARANCE BETWEEN PIPE AND EDGE OF OPENING AS RECOMMENDED BY THE MANUFACTURER OF THE BOOT TO BE INSTALLED. THIS SPACE MAY NEED TO BE MORTARED TO PRODUCE A WATERTIGHT SEAL AND SUPPORT THE PIPE, SEE THE MANUFACTURER'S RECOMMENDATIONS. ALKALINITY OF THE CONCRETE USED FOR THE MANHOLES SHALL BE ADEQUATE TO PROVIDE A LIFE FACTOR, AZ EQUAL TO THE GALLIUM CARBONATE EQUIVALENT TIMES THE LOVER OVER THE REINFORCEMENT OF NO LESS THAN 0.35, FOR BASES, RISERS, CONES, TRANSITION AND ADJUSTMENT PIECES. CHEMICAL ADMIXTURES SHALL BE AS PER ASTM C 494. CALCIUM CHLORIDE OR ADMIXTURES CONTAINING CALCIUM CHLORIDE SHALL NOT BE USED. ANY INTERIOR PATCHING OF WALL PENETRATIONS SHALL BE BY USING A TWO -COMPONENT EPDXY GEL, SOLVENT FREE, MOISTURE INSENSITIVE, HIGH MODULUS, HIGHSTRENGTH, STRUCTURAL EPDXY PASTE ADHESIVE MEETING ASTM C-881, TYPE I AND II, GRADE 3, CLASS BAND C, EPDXY RESIN ADHESIVE. THE MASONRY HEIGHT FOR ADJUSTMENT OF GRADE ABOVE THE CONE SHALL BE 12 INCHES MAXIMUM. BUTYL RUBBER SEALANT SHALL BE PROVIDED BETWEEN THE FRAME, GRADE RINGS, AND ALL MANHOLE SECTIONS. 1. WHERE CORROSIVE CONDITIONS DUE TO SEPTILITY OR OTHER CAUSES ARE ANTICIPATED, CONSIDERATION SHALL BE GIVEN TO PROVIDING CORROSION PROTECTION ON THE INTERIOR OF THE MANHOLES. 2. WHERE HIGH FLOW VELOCITIES ARE ANTICIPATED, THE MANHOLES SHALL BE PROTECTED AGAINST DISPLACEMENT BY EROSION AND IMPACT. TIE-INS AT EXISTING MANHOLES SHALL BE CONSTRUCTED TO THE SAME STANDARDS AS SPECIFIED FOR NEW MANHOLES HEREIN. ANY EXCEPTIONS SHALL BE AS APPROVED BY THE ENGINEER. 8.07 CEMENT CEMENT USED SHALL BE OF A HIGH GRADE PORTLAND CEMENT OF A BRAND APPROVED BY THE CITY ENGINEER. IT SHALL MEET AASHTO M48549 OR LATEST SUBSEQUENT REVISION. CEMENT SHALL BE NEWLY MANUFACTURED, WELL HOUSED AND PRESERVED DRY FOR USE. NO CEMENT WHICH HAS BEEN INJURED BY AGE OR EXPOSURE SHALL BE USED. 8.08 BAND (FINE AGGREGATE) ALL SAND USED SHALL BE CLEAN, SHARP COARSE GRAIN SAND AND SHALL BE FREE FROM CLAY, LOAM OR ORGANIC MATTER AND SHALL BE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 8.10 WATER WATER USED IN PORTLAND CEMENT MORTAR OR CONCRETE SHALL BE FREE FROM OIL, ALKALI, OR OTHER ORGANIC SUBSTANCES. IF WATER IS USED FROM CITY'S SUPPLY, THE CONTRACTOR SHALL MAKE ARRANGEMENTS WITH THE CITY UTILITIES DEPARTMENT, AND SHALL BE REQUIRED TO METER SUCH WATER USED.BACKFLOW PREVENTION AND METERED USE WILL BE REQUIRED, THE CONTRACTOR SHALL SUPPLY ALL NECESSARY EOUIPTMENT, MATERIALS, AND LABOR. SEE SECTION 2.W. 8.11 MORTAR MORTAR FOR BRICK WORK SHALL BE COMPOSED OF ONE (1) PART PORTLAND CEMENT TO THREE (3) PARTS FINE AGGREGATE. DURING COLD WEATHER, MORTAR AND BRICK WORK MAY BE PLACED WHEN THE AIR TEMPERATURE IN THE SHADE IS 35- FAHRENHEIT OR ABOVE AND RISING. IT MAY NOT BE PLACED WHEN THE AIR TEMPERATURE IN THE SHADE IS 420 FAHRENHEIT AND FALLING. 8.12 CONCRETE CONCRETE USED SHALL CONSIST REDI-MIX CONCRETE COMPOSED OF PORTLAND CEMENT, FINE AGGREGATE, COARSE AGGREGATE, WATER AND ADMIXTURES TO A DESIGN MIX APPROVED BY THE CITY ENGINEER. IT SHALL HAVE A TWENTY-EIGHT (28) DAY COMPRESSIVE STRENGTH OF 3000 PSI. NO WATER SHALL BE ADDED TO THE MIX, EXCEPT THAT CALLED FOR IN THE MIX DESIGN. WATER ADDED TO THE CONCRETE ENROUTE TO THE JOB SITE OR ON THE JOB SITE SHALL BE REASON ENOUGH TO REJECT THE BATCH AND HAVE IT REMOVED FROM THE JOB. ALL CASTINGS SHALL BE OF GOOD QUALITY CAST IRON MANUFACTURED ON NUMBER ONE GRADE SCRAP OR EQUIVALENT. NO OTHER CASTING SHALL BE CONSIDERED. CASTINGS MUST BE FREE FROM BLOW HOLES, SAND HOLES AND ANY OTHER DEFECT, AND SHALL CONFORM STRICTLY TO THE DIMENSIONS SHOWN ON THE CITY'S STANDARD DRAWING NO. ]18-1. GRAY IRON CASTINGS MAY BE SUPPLIED WITH "NO PAINT'. WEIGHT OF THE MANHOLE RING AND COVER SHALL BE APPROXIMATELY 310 POUNDS. MACHINING ON CERTAIN PARTS OF THE MANHOLE RING AND COVER SHALL BE REQUIRED. THAT PORTION OF THE CONTACT WITH THE RING. THIS MACHINED SURFACE SHALL BE 1-- 3W IN WIDTH ALONG THE FULL CIRCUMFERENCE OF THE COVER. THAT PORTION OF THE MANHOLE RING OR FRAME WHICH IS TO BE MACHINED SHALL BE THE INSIDE HORIZONTAL SURFACE UPON WHICH THE COVER SITS. THIS MACHINED SURFACE SHALL BE ONE INCH H-) IN WIDTH, ALONG THE FULL CIRCUMFERENCE OF THE RING. THE MACHINING DESCRIBED ABOVE SHALL BE SO ACCOMPLISHED SO AS TO LEAVE THE MACHINED SURFACES IN A TRUE EVEN PLANE, SO THAT WHEN THE COVER IS PLACED ON THE RING IN ANY POSITION, THE MACHINED SURFACES WILL BE I FULL CONTACT AND EVEN BEARING, WITH NO TILTING OR ROCKING MOTION. THE MACHINING TO BE DONE IS IN NO WAY INTENDED TO DECREASE THE THICKNESS OF THE PARTS MACHINED, BUT WILL HAVE THE DIMENSIONS SHOWN ON THE CITYS STANDARD DRAWING. LOCKING WATERTIGHT COVERS FOR OUTFALL CONSTRUCTION LOCKING WATERTIGHT FRAMES AND COVERS SHALL BE USED ON OUTFALL CONSTRUCTION. FRAMES AND COVERS SHALL BE PRODUCED FROM ASTM A 48-]4, CLASS 30 IRON. THE MINIMUM WEIGHT OF THE FRAME AND COVER SHALL BE 310 POUNDS, AS PER DETAIL 7113-1. THE FRAME FLANGE SHALL HAVE FOUR ONEINCHHOLES AT 90 DEGREES FOR ANCHORING THE FLANGE TO THE CONCRETE MANHOLE WITH 4 EACH -5/8' DIA. BOLTS. THE CONTRACTOR SHALL COORDINATE THE BOLT CIRCLE DIAMETER WITH THE MANHOLE AND FRAME SUPPLIERS. THE COVER SHALL HAVE FOUR HOLES FOR BOLTS AT W DEGREES FOR LOCKING THE COVER TO THE FRAME. THE FRAME SHALL BE TAPPED AND THE LOVER ATTACHED USING FOUR HEXHEAD 1M' X 1-3/4' BRASS OR STAINLESS STEEL BOLTS. A NEOPRENE GASKET SHALL BE PROVIDED BETWEEN THE COVER AND THE FRAME SEAT. BUTYL RUBBER SEALANT SHALL BE PROVIDED BETWEEN THE FRAME, GRADE RINGS, AND ALL MANHOLE SECTIONS. ONLY FRAMES AND COVERS MANUFACTURED AND TESTED IN THE U.S.A. WILL BE ALLOWED. MANHOLE COVERS ARE TO BE PROVIDED WITH TWO ONE -INCH DIAMETER HOLES FOR VENTILATION, UNLESS THE PROJECT PLANS INDICATE THAT THE MANHOLE IS TO BE VENTED TO A SPECIFIED ELEVATION OR A SEALED MANHOLE INDICATED. VENTED MANHOLES SHALL BE AS INDICATED. ON THE PROJECT DETAILS AND STD. DETAIL ]iB-0A AS REVISED 1/OS195 OR LATER REVISION. 8.14 CONCRETE ENCASING FOR PIPE ENCASING FOR PIPES SHALL CONSIST OF PLAIN 3000 PSI CLASS 'A" CONCRETE AS A PROTECTIVE COVERAND REINFORCEMENT POURED AND FORMED TO THE CROSS-SECTION AS SHOWN IN CITY STANDARD DETAIL ]i B-15. THIS PROTECTIVE COVER SHALL BE REQUIRED WHEN SHOWN OR INDICATED ON THE PLANS, OR WHEN DIRECTED BY THE CITY ENGINEER. 8.15 LAYING PIPE AND MAKING JOINTS THE PIPE SHALL BE LAID BEGINNING AT THE LOWER OR DOWN -STREAM END OF THE LINE AND SHALL PROGRESS CONTINUOUSLY UPSTREAM. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR LEAVE OUT ANY SECTION OF THE LINE TO WORK ON ANOTHER PORTION FURTHER UPGRADE, WITHOUT FIRST SECURING WRITTEN APPROVAL FROM THE ENGINEER. EACH JOINT OF PIPE SHALL BE LAID ACCORDING TO MANUFACTURES RECOMMENDATIONS AND, IN ACCORDANCE WITH LATEST REVISION OF ASTM A-746 FOR DUCTILE IRON PIPE ASTM FOR PVC. CARE SHALL BE TAKEN IN PLACING PIPE SO THAT PRIOR MADE JOINTS ARE NOT DISTURBED. COMPETENT PIPE LAYERS SHALL BE REQUIRED FOR PIPE INSTALLATION. LINES THAT DO NOT EXHIBIT TRUE LINE AND GRADE OR HAVE STRUCTURAL DEFECTS SHALL BE CORRECTED AT THE CONTRACTOR'S TOTAL EXPENSE. REFER TO SECTION 10.00 ALSO. AT THE END OF EACH DAYS WORK, THE CONTRACTOR SHALL PLUG ALL PIPE ENDS. TRENCH PREPARATION THE CONTRACTOR SHALL PREPARE THE PIPE TRENCH ACCORDING TO THE "PROJECT DETAILS, AND TO THE STANDARD SPECIFICATIONS" INCLUDING BUT NOT LIMITED TO SECTIONS 6.0, 8.0, 9.0, AND 10.13 THEREOF AND PIPE MANUFACTURER'S RECOMMENDATIONS. CLASS B BEDDING CLASS B BEDDING SHALL CONSIST OF BEDDING THE PIPE IN COMPACTED GRANULAR MATERIAL PLACED ON A BED OF GRANULAR MATERIAL % THE PIPE DIAMETER BUT NOT LESS THAN 4"; AFTER JOINTING OF THE PIPE, EXTENDING THE COMPACTED GRANULAR MATERIAL ALONG THE SIDES OF THE PIPE TO THE LEVEL 1/2 THE DIAMETER OF THE PIPE, AND THE PLACEMENT OF COMPACTED SELECT BACKFILL MATERIAL TO A DEPTH OF 6" ABOVE THE TOP OF THE PIPE, ALL AS SPECIFIED HEREIN AND DETAILED ON THE DRAWINGS. THE GRANULAR BEDDING SHALL HAVE A WIDTH EQUAL TO THE WIDTH OF THE PIPE TRENCH AND THE LENGTH AS INDICATED ON THE DRAWINGS OR AS DIRECTED BY THE ENGINEER. GRANULAR MATERIAL USED FOR CLASS B BEDDING SHALL BE WASHED STONE CONFORMING TO THE GRADATION REQUIREMENTS OF THE N.C. DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR NO. 57 STANDARD SIZE AGGREGATE UNLESS OTHERWISE INDICATED ON THE PLANS. GRANULAR MATERIAL SHALL BE PLACED IN LAVERS NOT MORE THAN 6" IN THICKNESS AND EACH LAYER THOROUGHLY TAMPED WITH APPROVED MECHANICAL TAMPERS BEING EXTREMELY CAREFUL TO COMPLETELY FILL ALL SPACES UNDER AND ADJACENT TO THE PIPE. THE GRANULAR MATERIAL SHALL BE PLACED UNDER AND ADJACENT TO THE PIPES HAND IF NECESSARY TO COMPLETELY FILL ALL SPACES UNDER AND ADJACENT TO THE PIPE. ALL OTHER ASPECTS SHALL BE AS PER CLASS D BEDDING AND SECTION 8.15. SEE CITY STANDARD DETAIL 71B-5 CLASS C BEDDING CLASS C BEDDING SHALL CONSIST OF A ROUND BOTTOM TRENCH SITUATED SO THAT THE WIDTH OF THE CURVEATURE IS EQUAL TO''A THE DIAMETER OF THE PIPE. ALL OTHER ASPECTS SHALL BE AS PER CLASS D BEDDING AND SECTION 8.15 SEE CITY STANDARD DETAIL ]f M. CLASS D BEDDING CLASS D BEDDING SHALL CONSIST OF SQUARE CUT TRENCH BOTTOM WITH BELL HOLES. WHEREVER ROCK IS ENCOUNTERED FOR CLASS D BEDDING CONDITIONS THE ROCK SHALL BE REMOVED FOR AT LEAST 6' BELOW PIPE AND REPLACED WITH COMPACTED BACKFILL TO THE REQUIRED PIPE BEDDING GRADE. SEE SECTION 8.16 FOR BACKFILL. CONCRETE ENCASEMENT CONCRETE ENCASEMENT SHALL BE MADE OF 3000 PSI CLASS CONCRETE AND SHALL BE CONSTRUCTED IN ACCORDANCE WITH DETAILS SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL OF THE ENGINEER HIS PROPOSED METHOD OF SUPPORTING THE SEWER TO MAINTAIN LINE AND GRADE WHILE THE CONCRETE ENCASEMENT IS BEING CONSTRUCTED. ALSO, SEE SECTION 8.14. TRENCH STABILIZATION (#5] WASHED STONE) WILL BE REQUIRED WHEN A WET OR POOR SUBGRADE CONDITION IS ENCOUNTERED BY THE CONTRACTOR AND WHEN IN THE CITY ENGINEER'S OPINION OTHER PROPER FOUNDATIONS CANNOT BE PROVIDED. REFER TO STANDARD SPECIFICATIONS SECTION 10.04 FOR ADDITIONAL REQUIREMENTS. ROCK EXCAVATION EXCAVATION OF HARD ROCK, LEDGE ROCK, OR BOULDERS LARGER THAN TWO CUBIC YARDS WHICH CAN NOT BE RIPPED, CLAWED, ETC., AND OR REMOVED BY CONVENTIONAL CONSTRUCTION METHODS WILL BE CONSIDERED AS ROCK EXCAVATION. ALL BLASTING OPERATIONS (USE OF EXPLOSIVES) SHALL BE CONDUCTED. IN STRICT ACCORDANCE WITH EXISTING LAWS, RULES, AND REGULATIONS RELATIVE TO THE STORAGE AND USE OF EXPLOSIVES. BLASTING SHALL BE PERFORMED ONLY BY EXPERIENCED PERSONNEL WORKING ACCORDING TO ACCEPTED PRACTICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS INCLUDING, BUT NOT LIMITED TO THE CITY FIRE DEPARTMENT. THE CONTRACTOR SHALL COMPLY WITH THE CITYS STANDARD SPECIFICATIONS INCLUDING, BUT NOT LIMITED TO SECTION 2.06. EXTREME CARE SHALL BE EXERCISED BY THE CONTRACTOR TO PREVENT INJURY TO ANY EXISTING PIPES, WATER. SEWER. GAS. POLES. WIRES. CABLES. DRAINS. BUILDINGS OR OTHER STRUCTURES OR UTILITIES EITHER BELOW RESULTING FROM THE USE OF EXPLOSIVES. WHERE THERE IS ANY POSSIBILITY OF DAMAGE BEING CAUSED BY BLASTING IT MAY BE NECESSARY TO RESORT TO DRILLING, WEDGING, AND SPLITTING TO REMOVE THE ROCK. ANY ROCK ENCOUNTERED SHALL BE EXCAVATED SIX INCHES (6") BELOW THE SUBGRADE OF THE PIPE BED. 8.16 BACKFILLING PIPE TRENCHES AS THE PIPE LINE IS LAID IT SHALL BE FIRMLY BEDDED WITH SUITABLE MATERIAL ON EACH SIDE AND THOROUGHLY TAMPED ON EACH SIDE OF AND UNDERNEATH THE PIPE. AS SOON AS PRACTICAL AFTER THE PIPE HAS BEEN LAID AND. JOINTED, THE TRENCH SHALL BE BACKFILLED WITH SELECT MATERIAL AND THOROUGHLY TAMPED IN SIX INCH (6") LAVERS TO A DEPTH OF ONE FOOT (1') OVER THE TOP OF THE PIPE. EXTREME CARE SHALL BE EXERCISED IN BACKFILLING AND TAMPING TO PREVENT DAMAGE TO THE NEWLY MADE PIPE JOINTS AND TO THE PIPE ITSELF. THE TRENCH SHALL THEN BE BACKFILLED WITH SELECT MATERIALS, FREE OF LARGE STONES, IN SIX INCH (6') HORIZONTAL LAYERS AND THOROUGHLY COMPACTED. WHEN THE PIPE IS LOCATED IN STREETS, ROADS, AND DRIVEWAYS, THE BACKFILL SHALL BE COMPACTED AS SPECIFIED IN SECTION 5.03, PARAGRAPH (2). i CI rc t9 Z p Q I N N p C Y a U O O 2 O N O dU N Q O ¢ m N p N EE w 0 zz y w 3 w z Lcu ZLo Lu G w U O U o � ~TT:� p w 0 Q Wa O d z G'/ Q p Z I 0 HN LL p Z SHEET NUMBER R103 6 0 C I 51 SANITARY SEWER NOTES 8.17 TESTING THE CONTRACTOR SHALL MAKE THE CONSTRUCTION SITE AND PIPE INSTALLATION AVAILABLE TO THE CITY ENGINEER OR HIS REPRESENTATIVE AT ALL TIMES FOR PERFORMING TESTS ON THE MATERIALS AND CONSTRUCTION. THESE TESTS SHALL INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING: (.)COMPACTION OF DITCH BACKFILL MATERIAL SHALL BE THOROUGHLY TAMPED AS SPECIFIED IN SECTION 5.05 OF THESE SPECIFICATIONS AND SHALL BE TESTED IN ACCORDANCE WITH AASHTO T99-57 TEST PROCEDURES FOR FIELD DENSITY. (b) ALIGNMENT AND GRADE THE LINES SHALL BE LAID STRAIGHT, WITHIN ONE FOURTH (1/4') INCH VARIATION PER JOINT, BUT IN ALL CASES SO THAT A FULL MOON IS VISIBLE FROM MANHOLE TO MANHOLE. LINES WHICH DO NOT EXHIBIT A TRUE LINE AND GRADE OR HAVE STRUCTURAL DEFECTS SHALL BE CORRECTED TO MEET THESE SPECIFICATIONS. THE CONTRACTOR SHALL PROVIDE COLOR VIDEO INSPECTION SERVICES ON NEW SEWER LINES AND/OR EXISTING CITY MAINTAINED SEWER LINES. INSPECTION OF SEWER LINES SHALL BE PERFORMED BY EXPERIENCED PERSONNEL TRAINED IN LOCATING BREAKS, OBSTACLES, AND SERVICE CONNECTIONS BY CLOSED CIRCUIT TELEVISION. THE INTERIOR OF THE LINE SHALL BE CAREFULLY INSPECTED TO DETERMINE THE LOCATION OF ANY CONDITIONS WHICH MAY INDICATE CURRENT OR FUTURE PROBLEMS OR NON-COMPLIANCE TO THE CONTRACT DOCUMENTS. ANV SUCH CONDITIONS SHALL BE NOTED AND CORRECTED AT THE CONTRACTOR EXPENSE. THE TELEVISION CAMERA USED FOR THE INSPECTION SHALL BE ONE SPECIFICALLY DESIGNED AND CONSTRUCTED FOR SUCH INSPECTION. LIGHTING FOR THE CAMERA SHALL BE TO ALLOW A CLEAR, COLOR PICTURE OF THE ENTIRE PERIPHERY OF THE PIPE. THE CAMERA SHALL BE CAPABLE OF A 360- VIEWING AREA. A BACKUP CAMERA SHALL BE AVAILABLE ON THE PROJECT SITE. THE CAMERA SHALL BE OPERABLE IN 100% HUMIDITY CONDITIONS. THE CAMERA, TELEVISION MONITOR, AND OTHER COMPONENTS OF THE VIDEO SYSTEM SHALL BE CAPABLE OF PRODUCING COLOR PICTURE QUALITY TO THE SATISFACTION OF THE ENGINEER AND IF UNSATISFACTORY THE EQUIPMENT SHALL BE REPLACED AND NO PAYMENT WILL BE MADE FOR ANY UNSATISFACTORY INSPECTION. THE PROJECT NAME LOCATION DATE MANHOLE NUMBERS SIZE AND TYPE PIPE AND OTHER INFORMATION SPECIFIC TO THE LINE SEGMENT BEING INSPECTED SHALL BE VISIBLY DISPLAYED ON THE VIDEO VIEWING SM CREEN FORA MINIMU OF 10 SECONDS PRIOR TO CAMERA ENTRY INTO THE MANHOLE. UPON ENTRY INTO THE MANHOLE, THE SURFACES OF THE MANHOLE SHALL BE VIDEOED AND POTENTIAL DEFECTS NOTED. PRIOR TO ENTERING THE SEWER LINE, CONDITIONS OF THE MANHOLE/PIPE CONNECTION SHALL BE VIDEOED AND POTENTIAL DEFECTS NOTED. WHEN EXISTING SEWER FLOW DEPTH, AS MEASURED IN THE FIRST MANHOLE UPSTREAM OF THE SEWER SEGMENT BEING TELEVISED, EXCEEDS 20% OF THE SEWER LINE PIPE DIAMETER, THE CONTRACTOR SHALL IMPLEMENT WASTEWATER FLOW CONTROL METHODS, INCLUDING BUT NOT LIMITED TO BYPASS PUMPING, AT NO ADDITIONAL COST TO THE CITY. THE RATE OF TRAVEL SHALL NOT EXCEED 30 FEET PER MINUTE. AT EACH LINE DEFECT OR SERVICE CONNECTION THE CAMERA SHALL COME TO A COMPLETE STOP AND THE SUBJECT PANNED. THE FOOTAGE METER COUNT SHALL BE CLEARLYVISIBLE. PRINTED TELEVISION INSPECTION LOGS SHALL BE RECORDED BY THE CONTRACTOR CLEARLY SHOWING THE DISTANCE FROM AN ADJACENT MANHOLE TO DISCERNABLE FEATURES SUCH AS BROKEN OR CRACKED PIPE, DEFECTIVE JOINTS, SERVICE LATERALS, AND IN EXISTING LINES PRESENCE OF SCALE CORROSION, GREASE BUILDUP, STORM SEWER CONNECTIONS, AND ANY OTHER UNUSUAL CONDITIONS. A COPY OF THE INSPECTION LOGS SHALL BE PROVIDED TO THE ENGINEER BY THE CONTRACTOR. A STANDARD CITY VIDEO INSPECTION LOG FORM SHALL BE PROVIDED TO THE CONTRACTOR BY THE ENGINEER. THE CONTRACTOR SHALL PROVIDE COLOR VIDEO RECORDINGS OF ALL THE SUBJECT LINES, THE RECORDINGS SHALL PROVIDE A VISUAL AND AUDIO RECORD OF PROBLEM AREAS OF THE LINES BEFORE AND AFTER ANY REHABILITATION. THE VIDEO RECORDING SHALL INCLUDE, AT A MINIMUM, A DISPLAY OF THE FOOTAGE METER AND A DISPLAY OF THE MANHOLE SEGMENT NUMBER BEING TELEVISED. WHERE APPROPRIATE, COMMENTS SHOULD BE INCLUDED BY CONCURRENT AUDIO RECORDING ON THE RECORDING OR ELECTRONIC DISPLAY. VIDEO RECORDING PLAYBACK SHALL BE AT THE SAME SPEED THAT IT WAS RECORDED. SLOW MOTION OR STOPMOTIONPLAYBACK FEATURES MAY BE SUPPLIED AT THE OPTION OF THE CONTRACTOR. THE CONTRACTOR SHALL CARRY OUT HIS OPERATIONS IN STRICT ACCORDANCE WITH ALL OSHA AND MANUFACTURER'S SAFETY REQUIREMENTS. PARTICULAR ATTENTION IS DRAWN TO THOSE SAFETY REQUIREMENTS INVOLVING ENTERING CONFINED SPACES. CLEANING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ANY HANG-UPS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, THE CONTRACTOR SHALL REMOVE THE CAMERA AND REPAIR ANY DAMAGE TO THE SEWER LINE. (c) INFILTRATIOWEXFILTRATION 1 THECONTRACTOR SHALL PROVIDE THE EQUIPMENT MATERIALS AND LABOR NECESSARY TO CHECK THE LINES FOR INFILTRATION OREX TION BEFORE THEY ARE PUT IN SERVICE INFILTRATION OR EXFILTRATION IN EXCESS OF (1 GALLONS ONE HUNDRED (100) GALLONS PER DAY PER INCH -MILE OF SEWER WILL RESULT IN HAVING THE CONTRACTOR GO OVER THE LINES, ASCERTAIN WHERE THE LEAKAGE EXISTS, AND REPAIR THE LINES TO THE EXTENT NECESSARY TO BRING THE INFILTRATION OR EXHURATION DOWN WITHIN ACCEPTABLE LIMITS. THE CONTRACTOR SHALL TEST ONLY PIPE OF THE SAME DIAMETER AND FOR SUCH LENGTHS AS APPROVED BY THE ENGINEER. 2 EXFILTRATION TESTS SHALL BE CONDUCTED ON ALL GRAVITY SEWER LINES UNLESS AUTHORIZED OTHERWISE BY THE CITY ENGINEER. THE LINE UNDER TEST SHALL BE PLUGGED AND FILLED WITH WATER IN SUCH A MANNER THAT THE MAXIMUM LHYDROSTATICLBETESTED. HEAD FI ANY POINT IN THE LINE WOULD NOT EXCEED TEN FEET 0 WATER. ALL MANHOLES SHALL BE TESTED. THE PER MILE OF FROM THE LINE UNDER TEST H SHALL NOT EXCEED OF GALLONS PER INCH OF NOMINAL PIPE DIAMETER PER MILE OF PIPE PER TWENTY- FOUR HOURS. THE AMOUNT OF -FILTRATION SHALL BE MEASURED BY THE INSPECTOR USING METHODS SPECIFIED BY THE CITY ENGINEER FOR THE PARTICULARUI-AR SITUATION. (3) WHERE GROUND WATER IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL FURNISH LABOR, EQUIPMENT, AND MATERIALS INCLUDING PUMPS, AND SHALL ASSIST THE ENGINEER IN MAKING INFILTRATION TESTS OF THE COMPLETED SEWER SECTION BEFORE IT CAN BE PLACED IN SERVICE OR CONNECTED TO ANV OTHER LINES. THE CONTRACTOR WILL FURNISH AND INSTALL THE MEASURING WEIRS OR OTHER MEASURING DEVICES. THE LENGTH OF LINE TO BE TESTED AT ANY TIME SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER. THE TOTAL INFILTRATION SHALL IN NO CASE EXCEED 100 GALLONS PER INCH OF DIAMETER PER MILE OF PIPE PER DAY. THE TEST PERIOD SHALL BE TWENTY-FOUR HOURS, AND IF THE QUANTITY OF INFILTRATION IS IN EXCESS OF THE MAXIMUM ALLOWABLE, THE LEAKING JOINTS SHALL BE RELAID IF NECESSARY OR OTHER REMEDIAL CONSTRUCTION SHALL BE PERFORMED BY AND AT THE EXPENSE OF THE CONTRACTOR. THE SECTION OF SEWER SHALL THEN BE RETESTED AFTER REPAIRS ARE COMPLETED TO DETERMINE COMPLIANCE WITH THE SPECIFICATIONS. (4) THE INFILTRATION IN THE LINE SHALL BE CHECKED THRU A LOW PRESSURE EXFILTRATION AIR TEST. THE SANITARY SEWER PIPE AND LINES SHALL BE CAPABLE OF REACHING A CONSTANT PRESSURE OF 4 PSIG WITHIN THE TIME SPECIFIED IN TABLE 1 AND SHALL BE CAPABLE OF MAINTAINING THE PRESSURE FOR THE TIME LIMIT SPECIFIED IN TABLE 2. (5) ALL TESTS SHALL BE MADE IN THE PRESENCE OF THE CONTRACTOR OR HIS REPRESENTATIVE AND THE ENGINEER. (6) ANY AND ALL WORK NECESSARY TO BRING THE LINE INTO CONFORMANCE WITH THE INFILTRATION/E-1-TRATION SPECIFICATIONS SHALL BE PERFORMED BY THE CONTRACTOR AT NO COST TO THE CITY. ALL APPARENT SOURCES OF INFILTRATION SHALL BE REPAIRED. THE CITY RESERVES THE RIGHT TO REQUIRE THAT THE LINES BE TESTED IN SECTIONS SUCH THAT THE MAXIMUM ALLOWABLE STATIC HEAD IS IMPOSED ON AS MUCH OF THE LINE AS IS PRACTICABLE. (T) WHEREASTREAM IS NOT READILY AVAILABLE ASA SOURCE OF WATER TO USE FOR TESTING, WATER FROM THE CITY SYSTEM MAY BE USED, PROVIDING PROPER NOTIFICATION PROCEDURES FOR OPERATING VALVE HYDRANTS WILL BE REQUIRED. 8 MATERIALS AND CONSTRUCTION METHODS CALLED FOR IN THESE SPECIFICATIONS ARE OF SUCH NATURE AS TO INSURE MAXIMUM PROTECTION FOR THE SEWER FROM INFILTRATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SEWER CONFORMING TO THE ABOVE LIMITS FORA PERIOD OF ONE YEAR FROM GATE OF FINAL ACCEPTANCE. SANITARY SEWER NOTES TABLE 1 TIME REQUIRED TO PRESSURIZE TO 4 PSIG' TIME (IN MINUTES) PIPE REACH OF LINE TESTED SIZE 20' 100' 200' 300' 400' SO 60D 4' 6 SEC .0.5 1.0 1.5 1.9 2.4 3.0 6' 12 SEC. 1.0 2.2 3.2 4.4 SB 6.4 8' 235EC. 1.9 3.8 6.0 7.6 9.6 11.6 10" 11 35 SEC. 50 SEC. 2.9 4.2 5.8 BS 11.6 SA 12.6 16.8 1- 21.2 17.6 21.6 15" 1.3 MIN. 6.6 3.2 19.8 26.4 35.0 39.6 18' 1.9 9.4 18.8 28.2 37.6 47.0 56.4 21' 2.5 12.6 26.2 37.8 50.4 63.0 75.6 24' 3.4 17.0 34.0 51.0 68.0 102.0 INN - THIS TABLE IS CAPACITY. BASED ON THE COMPRESSOR UNIT MOUNTED ON A CHERNE AIR-LOC TESTING UNIT ASSUMING 5 CFM TABLE 2 MINIMUM TEST TIME FOR VARIOUS PIPE SIZES NOMINAL PIPE SIZE IN. MIN/100 FT. T (TIME) NOMINAL PIPE SIZE IN. MIN1100 FT. T (TIME) 3 0.2 21 3.0 4 0.3 24 3.6 6 8 0.7 1.2 27 30 4.2 4.8 10 1.6 33 5.4 12 1.8 36 6.0 15 18 2.1 2.4 39 42 6.6 7.3 THE LOW PRESSURE AIR TEST SHALL BE PERFORMED AS SPECIFIED IN LATEST REVISION OF ASTM C 828 FOR VCP AND ASTM C924 FOR RCP. IF THE LINE PRESSURE DROPS MORE THAN 1 PSI DURING THE REQUIRED TEST TIME THEN THE SECTION OF PIPE HAS FAILED THE TEST. FURTHERMORE, IN TESTING ANY SANITARY SEWER LINE, THE INFILTRATION/E-1-TRATION RATE SHALL BE LESS THAN 100 GALLONS PER INCH DIAMETER OF PIPE PER DAY PER MILE OF SANITARY SEWER. SEE SECTION 8.17(C) (1), (2). AND (3).. SANITARY SEWER NOTES W.-At. ONLY AUTHORIZED PERSONNEL OF THE CITY OF GASTONIA UTILITIES DEPARTMENT SHALL BE PERMITTED TO MAKE SANITARY SEWER TAPS UNLESS THE DEVELOPER HAS RECEIVED PERMISSION IN WRITING FROM THE DIRECTOR OF TRU OR DESIGNATED REPRESENTATIVE, FOR AN APPROVED UTILITIES CONTRACTOR TO MAKE THESE TAPS. ALL TAPS SHALL BE MADE IN STRICT CONFORMANCE TO CITY REQUIREMENTS. NO TAP SHALL BE MADE BEFORE THE TESTS ARE COMPLETE AND APPROVED. SANITARY SEWER SERVICE CONNECTIONS MAY BE INSTALLED BY THE DEVELOPER OF PROPERTY UPON REQUEST. THE APPLICATION (FORM SUPPLIED BY THE CITY) SHOULD BE COMPLETED AND SENT TO THE DIRECTOR OF TRU. MATERIAL FOR THESE SERVICES WILL BE OBTAINED BY THE CONTRACTOR. MATERIALS USED IN MAKING THE SANITARY SEWER SERVICE CONNECTION SHALL CONFORM TO DETAIL Tf B-19. FERNCO DONUT REQUIRED WHEN TYING INTO TEES. (SEE SECTION 8.03 FOR ADAPTERS AND FURTHER REQUIREMENTS FOR TAPS INTO PVC SEWER PIPE.) ALL MATERIAL WILL BE INSPECTED FOR COMPLIANCE BY TRU INSPECTOR PRIOR TO INSTALLATION. ALL SERVICES WILL BE INSPECTED PRIOR TO BACKFILL OPERATION FOR COMPLIANCE. THE BACKFILL AND COMPACTION OPERATION SHALL BE ACCORDING TO STANDARD PROCEDURE, AND THE STANDARD SPECIFICATIONS INCLUDING SECTION NO. 5.05. ALL TAPS SHALL BE MADE IN A METHOD APPROVED BY THE TRU, AND ACCORDING TO STANDARD DETAILS INCLUDING 7113-19. ALL TAPS INSTALLED BY CUTTING INTO THE SEWER MAIN SHALL BE MADE WITH THE USE OF A TAPPING/CORING MACHINE IF SADDLES ARE USED. (THE USE OF A HAMMER AND CHISEL OR OTHER MANUAL IMPACT METHODS WILL NOT BE ALLOWED.) ANY CUSTOMER SERVICE CONNECTION REQUIRED TO BE INSTALLED INTO ANY OUTFALL SANITARY SEWER LINE WILL BE TIED INTO EITHER A PROPOSED MANHOLE SHOWN ON THE PROIECT PLANS OR INTO AN ADDED MANHOLE AS REQUIRED AND APPROVED BY THE CITY ENGINEER. SEE SECTION 8.21 FOR SMOKE TESTING REQUIREMENT ON EXISTING TAPS TO BE RECONNECTED. PAVEMENT CUTS ACROSS PUBLIC STREETS FOR SERVICES SHALL BE AVOIDED. THE CONTRACTOR SHALL INSTALL THESE LINES USING AN AIR PRESSURE DRIVEN, PNEUMATIC 'MOLE' OR AN AUGER TYPE MACHINE. IF AN OPEN CUT IS UNAVOIDABLE, THE CONTRACTOR SHALL SECURE APPROVAL FROM THE CITY ENGINEER PRIOR TO MAKING ANY STREET CUT FOR A SERVICE LINE. ALL TAP LOCATIONS SHALL BE SHOWN ON THE "AS -BUILT' PLANS AND SHALL BE MARKED ON THE TOP OF THE CURB WITH SEE SECTION 2.34 FOR ADDITIONAL AS -BUILT REQUIREMENTS 8.19 FORCE MAINS PIPE MATERIAL FOR FORCE MAINS SHALL BE EITHER CEMENT LINED DUCTILE IRON PIPE AS SPECIFIED IN SECTION 9.03 HEREIN OR PVC AWWA G 900 AS SPECIFIED IN SECTION 9.02 HEREIN. ALL FORCE MAINS SHALL BE TESTED IN ACCORDANCE TO SECTION 9.12 HEREIN WITH THE MINIMUM TEST PRESSURE BEING I00 PSI. ALL BLOCKING/RESTRAINING FOR THE FITTINGS SHALL BE DESIGNED TO WITHSTAND THE TEST PRESSURE. A PROPERLY SIZED AND APPROVED AIR RELEASE VALVE IN A STANDARD MANHOLE SHALL BE PROVIDED AT ALL HIGH POINTS WHERE A NEGATIVE PRESSURE OF 10' MAY BE PRODUCED. A WEEP PIT OF NO. 57 STONE SHALL BE PROVIDED SIMILAR TO STANDARD DETAIL 71B-17. AIR RELEASE VALVES SHALL BE APPROVED BY THE CITY ENGINEER 8.22 ABANDONMENT AND SHUTDOWN OF EXISTINGOPERATIONSOF UTILITIES THE CONTRACTOR SHALL SUPPLY ALL NECESSARY LABOR, EQUIPMENT, AND MATERIALS TO PLUG AND ABANDON IN PLACE THE EXISTING SANITARY SEWER OUTFALL SYSTEM AS INDICATED ON THE PROJECT PLANS. CONTINUOUS OPERATION OF THE CITY'S EXISTING SEWER SYSTEM IS OF CRITICAL IMPORTANCE. CONNECTION TO EXISTING SERVICES OR UTILITIES, OR OTHER WORK THAT REQUIRES THE TEMPORARY SHUTDOWN OF ANY EXISTING OPERATIONS OR UTILITIES SHALL BE PLANNED IN DETAIL WITH APPROPRIATE SCHEDULING OF THE WORK AND COORDINATED WITH THE UTILITY CUSTOMER AND THE ENGINEER. THE APPROVED SCHEDULE FOR SHUTDOWN OR RESTART SHALL BE INDICATED ON THE CONTRACTOR'S PROGRESS SCHEDULE AND ADVANCE NOTICE SHALL BE GIVEN IN ORDER THAT THE CUSTOMER AND THE ENGINEER MAY WITNESS THE SHUTDOWN, TIE-IN, AND START-UP. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION OF EACH PROPERTY OWNER PRIOR TO DISRUPTION OF SERVICE, EXCEPT IN THE EVENT OF AN EMERGENCY SITUATION. THE CONTRACTOR SHALL COORDINATE HIS ACTIVITIES WITH ANY NON -CITY OWNED UTILITY. ONLY CITY PERSONNEL SHALL OPERATE ANY VALVES AND CONTROLS ON THE CITfS EXISTING UTILITY SYSTEMS. THE TESTING, ACCEPTANCE, TAP AND MAINLINE TI E ERS SHALL BE COORDINATED SO AS TO ELIM I NATE ANY DISRUPTIONS IN SERVICE. A SPILL, LEAKAGE, OR BY-PASS OF WASTEWATER SHALL NOT BE ALLOWED, THE CONTRACTOR AND HIS SURETIES SHALL HOLD HARMLESS AND DEFEND THE CITY FROM ANY PENALTIES WHICH MAY RESULT THEREOF. ALL MATERIALS AND EQUIPMENT INCLUDING EMERGENCY EQUIPMENT) NECESSARY TO EXPEDITE THE TIE-IN SHALL BE ON HAND PRIOR TO THE SHUTDOWN OF EXISTING SERVICES OR UTILITIES. ALL EXISTING SEWER TAPS SHALL BE SMOKE TESTED (OR OTHER APPROVED METHOD) PRIOR TO RECONNECTION, TO MAKE SURE THAT NO CONNECTION OF STORM WATER OR OTHER IDENTIFIED ILLEGAL INFLOW IS PRESENT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SUPPLY ALL LABOR, MATERIALS, AND EQUIPMENT TO PERFORM THESE TESTS AND TO NOTIFY THE RESIDENTS OF SUCH PLANNED TESTS. IT WILL BE THE CITYS RESPONSIBILITY TO NOTIFY THE OWNER OF ANY ILLEGAL INFLOWS FOUND, AND TO BE SURE ALL REMEDIES ARE IN PLACE PRIOR TO ALLOWING THE CONTRACTOR TO CONNECT THE TAP TO THE NEW SEWER LINE, AND THAT THE REMEDIES ARE COMPLETED IN A TIMELY MANNER TO ALLOW THE CONTRACTOR TO COMPLETE HIS CONSTRUCTION WITHOUT ANY UNDUE DELAY. 8.23 DEMOLITION OF EXISTING MANHOLES LINES AT EACH MANHOLE ON THE ABANDONED SYSTEM WITH NON -SHRINK GROUT. REMOVE THE ABANDONED MANHOLES TO DEPTH OF 4 FEET BELOW GRADE AND FILL THE VOID WITH WASHED STONE TO 18-INCHES BELOW GRADE. THE WASHED STONE FILL SHALL BE COVERED WITH APPROVED FILTER FABRIC. FILL THE REMAINING WITH TOP SOIL. WHERE THE MANHOLE IS IN A PAVED AREA THE REMAINING SHALL BE FILLED WITH ABC TO THE BOTTOM OF THE UTILITY CUT PATCH. RESTORE ALL AFFECTED AREAS. 821 PROGRESS OF PIPE LINE CONSTRUCTION THE WORK SHALL PROCEED IN A SYSTEMATIC MANNER SO THAT A MINIMUM OF INCONVENIENCE WILL RESULT TO THE PUBLIC IN THE COURSE OF CONSTRUCTION. IT IS THEREFORE NECESSARY TO CONFINE OPERATIONS TO AS SMALL A LENGTH OF WORK AREA PER CREW AS IS PRACTICAL. NORMALLY THE TRENCHING EQUIPMENT SHALL NOT BE FARTHER THAN 200 FEET AHEAD OF EACH PIPE LAYING CREW OR SUCH DISTANCE AS NECESSARY TO PROVIDE MAXIMUM SAFETY. BACKFILL THE TRENCH SO NO SECTION OF PROPERLY LAID PIPE 15 LEFT UNCOVERED LONGER THAN IS ABSOLUTELY COMPLETELY BACKFILL AND CLEAN UP AFTER EACH SECTION OF PIPE HAS BEEN INSPECTED AND APPROVED 8.25 PROTECTION OF EXISTING STRUCTURES CONTRACTOR IS ADVISED THAT HE MUST TAKE EXTREME CARE AND IN SOME CASES MUST IMPLEMENT SPECIAL CONSTRUCTION PROCEDURES WHEN PROCEEDING WITH HIS WORK TO ASSURE THAT THESE STRUCTURES ARE NOT DAMAGED. THE CONTRACTOR SHALL EXERCISE EXTREME CARE AND TAKE ALL PRECAUTIONS DURING EXCAVATION AND CONTRACTOR SHALL BE REPORTED IMMEDIATELY TO THE CITY OF GASTONIA AND SUCH WORK SHALL BE REPAIRED AND/OR REPLACED BY THE CONTRACTOR IN A MANNER APPROVED BY THE CITY OF GASTONIA. ALL COSTS TO REPAIR AND/OR REPLACE ANY DAMAGE TO EXISTING STRUCTURES SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND SUCH REPAIR OR REPLACEMENT SHALL BE PERFORMED EXPEDITIOUSLY WITHOUT COST TO THE CITY OF GASTONIA. WATER DISTRIBUTION NOTES 9.0L WATER DISTRIBUTION PIPE ALL PIPE USED FOR WATER DISTRIBUTION LINES SHALL BE POLYVINYL CHLORIDE, OR CEMENT LINED ZINC COATED DUCTILE IRON PIPE. IT IS THE INTENT OF THIS SPECIFICATION TO PROVIDE PIPE OF THE HIGHEST STANDARD KNOWN TO THE TRADE AND TO PROVIDE PIPE THAT IS FREE FROM DEFECTS IN WORKMANSHIP AND MATERIALS. ALL PIPES AND OTHER MATERIALS SHALL BE FIRST CLASS MATERIALS AND NO USED OR SECOND HAND MATERIALS WILL BE PERMITTED. FOR PIPE SIZES TWO INCHES IN DIAMETER, EITHER COPPER TYPE K SOFT OR PVC PIPE SHALL BE USED.'MUNIPEX' CROSS LINKED POLYETHYLENE PIPE WILL BE CONSIDERED ON A CASE BY CASE BASIS. FOR PIPE SIZES SIX INCHES, EIGHT INCHES, OR TEN INCHES IN DIAMETER, EITHER CEMENT LINED ZINC COATED DUCTILE IRON PIPE (P-13), OR PVC (C-900-T5) SHALL BE USED. FOR PIPE SIZES TWELVE INCHES OR SIXTEEN INCHES IN DIAMETER CEMENT LINED ZINC COATED DUCTILE IRON PIPE SHALL BE USED (MIN. PC350). FOR PIPE SIZES IN EXCESS OF SIXTEEN INCHES IN DIAMETER, THE CITY ENGINEER SHALL SPECIFY TYPE OF PIPE TO BE USED. SEE SECTION 2 D FOR GENERAL INFORMATION INCLUDING BUT NOT LIMITED TO LAYOUT, STAKING, AND RAN REQUIREMENTS. FOR SPECIAL CONDITIONS REQUIRING FERROUS MATERIAL PIPE SEE SECTION 2.10. 9.02POLYVINYL CHLORIDE WATER PIPE T' PVC ALL 2' PVC PIPE SHALL BE MANUFACTURED AND TESTED WITHIN THE UNITED STATES OF AMERICA. IT SHALL BE TWIN GASKETED COUPLING OR INTEGRAL BELL AND PRING RUBBER GASKET TYPE PIPE. ALL 2' PVC PIPE SHALL BE SUITABLE FOR USE AT A MAXIMUM HYDROSTATIC WORKING PRESSURE OF 200 PSI AT 730 FAHRENHEIT (STANDARD DIMENSION RATIO SDR 21) , AND SHALL CONFORM TO THE REQUIREMENTS AS SET FORTH IN COMMERCIAL STANDARD NO. CS-35E063, ASTM 1598- 63T, ASTM D-12A1 OR THE LATEST SUBSEQUENT REVISION. PVC PIPE SHALL COMPLY WITH AND SHALL BEAR THE NATIONAL SANITATION FOUNDATION (NI SEAL OF APPROVAL. ALL 2" PVC PIPE AND FITTINGS SHALL BE MADE FROM CLEAN, VIRGIN NSF APPROVED TYPE I, GRADE I POLYVINYL CHLORINE CONFORMING TO ASTM D 1784 RESIN SPECIFICATION ( EQUIVALENT TO, NEW CELL CLASSIFICATION 1-B ). ALL 2- PVC WATER PIPE SHALL BE FURNISHED IN STANDARD LAVING LENGTHS OF 20 FEET PLUS OR MINUS ONE INCH AND SHALL HAVE ONE OR BOTH ENDS TAPERED FOR USE WITH A TWIN GASKETED COUPLING OR WITH THE INTEGRAL THICKENED -WALL BELL. EACH COUPLING OR BELL SHALL ALLOW FOR THE CONTRACTION AND EXPANSION AT THE JOINTS. JOINTS SHALL BE SEALED WITH A GASKET OR RUBBER O-RING IN ACCORDANCE TO THE MANUFACTURER'S INSTRUCTIONS. COUPLINGS SHALL PERMIT 50 DEFLECTION (2-112 DEGREE EACH SIDE) OF THE PIPE WITHOUT ANY EVIDENCE OF INFILTRATION, EXFLTRATION, CRACKING OR BREAKING. SEE SECTION 9.11 ALSO. LUBRICATION USED ON JOINTS SHALL BE WATER SOLUBLE, NON TOXIC, NONOBJECTIONABLETO TASTE AND ODOR IMPORTED TO THE FLUID, NON- SUPPORTING OF BACTERIA GROWTH AND HAVE NO DETERIORATING EFFECT ON THE PVC PIPE OR RUBBER GASKET, AS RECOMMENDED BY AWWA AND THE PIPE MANUFACTURER. ALL 2- PVC PIPE AND FITTINGS SHALL BE STORED AND PROTECTED FROM DIRECT SUNLIGHT TO PREVENT WARPING OR DEFORMATION UNTIL INSTALLED. MAXIMUM ACCUMULATED EXPOSURE SHALL BE SIX (6) MONTHS, WITH NO VISIBLE DEFECTS. ANY VISIBLE DEFECTS INCLUDING BUT NOT LIMITED TO CHALKING DISCOLORATION BLISTERS OR LOSS OF SHEEN SHALL BE CAUSE FOR THE PIPE TO BE REJECTED AND REPLACED. ANY TESTING SUGG ESTED IN LIEU OF THE ABOVE SHALL BE AT THE MANUFACTURER'S EXPENSE, ALL SUCH TEST SHALL BE PERFORMED BY AN INDEPENDENT LABORATORY. ALL PIPE WHICH HAS WARPED OR OTHERWISE DEFORMED SHALL BE REJECTED AND SHALL BE REMOVED FROM THE PROJECT. 6", 8", 10" PVC PIPE ALL 6', 8', AND 10' PVC PIPE INSTALLED IN THE TRU SYSTEM SHALL BE DR-14 PRESSURE PIPE CONFORMING TO AWWA C-900, LATEST REVISION. DR 18 PVC MAY BE ALLOWED (IN LOW PRESSURE ZONES). ALL OUTSIDE DIAMETERS SHALL BE COMPATIBLE WITH CAST AND DUCTILE IRON FITTINGS. ALL 6', 8", AND 10- PVC PIPE SHALL BE FURNISHED WITH AN ELASTOMERIC-GASKETED COMPRESSION TYPE JOINT, AND THE APPROPRIATE GASKET(5) SHALL BE FURNISHED WITH EACH LENGTH OF PIPE. PIPE BELLS SHALL BE INTEGRAL TO THE PIPE, SLEEVE COUPLINGS ARE NOT PERMITTED. ALL 6", 8', AND 10" PVC PIPES AND MATERIALS ARE TO BE TESTED ACCORDING TO THE REQUIREMENTS OF AWWA STANDARD C-900, LATEST REVISION. CERTIFIED TEST RESULTS SHALL BE PROVIDED TO THE CITY ENGINEER WHEN REQUESTED. THESE TESTS SHALL BE PERFORMED BY AN INDEPENDENT TESTING LABORATORY AT THE EXPENSE OF THE PIPE MANUFACTURER. ALL PVC PIPE SHALL BE MANUFACTURED AND TESTED WITHIN THE UNITED STATES OF AMERICA. ALL 6-, 8%AND 10" PVC WATER PIPE WILL BE SHIPPED, STORED, AND STRUNG AT THE PROJECT IN A MANNER AS TO BE PROTECTED FROM TOTAL ACCUMULATED EXPOSURE TO SUNLIGHT AND POSSIBLE ULTRAVIOLET RADIATION OF NO MORE THAN SIX IS MONTHS WITH NO VISIBLE DEFECTS. ANY VISIBLE DEFECTS INCLUDING BUT NOT LIMITED TO CHALKING, DISCOLORATION, BLISTERS, OR LOSS OF SHEEN SHALL BE CAUSE FOR THE PIPE BE REJECTED AND REPLACED. TESTING SUGGESTED IN LIEU OF THE ABOVE SHALL BEAT THE MANUFACTURER'S'S EXPENSE, ALL SUCH BE LIEU TEST SHALL BE PERFORMED BY AN INDEPENDENT LABORATORY. WHEN THE PLANS AND/OR PROPOSAL CALLS FOR THE USE OF PVC PIPE, A 14 GAUGE SOLID COPPER WIRE SHALL BE ATTACHED ON TOP OF THE P IPE TO AID IN LOCATING THE PIPE. THIS WIRE SHALL BE SECURED TO THE PIPE WITH DUCT TAPE NEAR EACH BELL AND AT THE CENTER OF EACH JOINT OF PIPE. THE WIRE SHALL BE FASTENED SECURELY TO EACH MAIN LINE VALVE AND FIRE HYDRANT. TRACER WIRE SHALL BE TESTED WITH A PIPE LOCATOR BEFORE ACCEPTANCE OF PROJECT. ANY SPLICE CONNECTION SHALL BE AS APPROVED BY THE CITY ENGINEER. 9.03 CEMENT LINED ZINC COATED DUCTILE IRON WATER PIPE DUCTILE IRON PIPE SHALL BE MANUFACTURED AND TESTED IN THE U.S.A. AND SHALL CONFORM TO AWWA SPECIFICATION C-151 AND ANSI STANDARD #A21-51 OR LATEST REVISION. CEMENT LININGS WITH AN ASPHALTIC SEAL COAT FOR DUCTILE IRON PIPE SHALL CONFORM TO AWWA SPECIFICATION C-104. SPECIAL LININGS SHALL BE SPECIFIED IN THE SPECIAL PROVISIONS EXTERIOR OF DUCTILE IRON PIPE SHALL BE COATED WITH A LAVER OF ARG-SPRAYED ZINC PER ISO 81n. THE MASS OF ZINC APPLIED SHALL BE 200 GI OF PIPE SURFACE AREA. AN ASPHALTIC TOPCOAT LAVER SHALL BE APPLIED OVER THE ZINC TO A MINIMUM 2 MIL THICKESS. ZINC COATING SYSTEM SHALL CONFORM TO ISO 8179-1 "DUCTILE IRON PIPES - EXTERNAL ZINC BASED COATING - PART 1 SECOND EDITION 21IN-06-01 OR LATEST REVISION. DUCTILE IRON PIPE SHALL BE MECHANICAL JOINT OR PUSH -ON JOINT TYPE. PUSH -ON TYPE JOINTS SHALL BE "BELL-TITE', T TITE",'MOM, OR APPROVED EQUAL. ALL JOINTS FOR DUCTILE IRON PIPE SHALL CONFORM TO THE APPLICABLE DIMENSIONS AND WEIGHTS SHOWN IN THE TABLES IN AWWA C-151 AND TO ANSI A-21.11 (AWWA C-111) OR LATEST REVISION. ALL PIPE SHALL BE CLEAN AND SOUND WITHOUT DEFECTS THAT WILL IMPAIR THEIR SERVICE. REPAIRING OF DEFECTS BY WELDING OR OTHER M ETHODS SHALL NOT BE ALLOWED. ALL PIPE SHALL HAVE AN OUTSIDE COATING OF A PETROLEUM ASPHALT COATING APPROXIMATELY 1 MIL THICK, AS PER AMA. THE COATING SHALL BE APPLIED TO THE OUTSIDE OF ALL PIPE AND THE FINISHED COATING SHALL BE CONTINUOUS, SMOOTH, NEITHER BRITTLE WHEN COLD NOR STICKY WHEN EXPOSED TO THE SUN, AND SHALL BE STRONGLY ADHERENT TO THE PIPE. THICKNESS FOR ALL DUCTILE IRON PIPE IN THIS CONTRACT SHALL BE AS RECOMMENDED FOR THE PROPOSED DEPTH OF COVER IN THE "DESIGN OF DUCTILE IRON PIPE", AS PUBLISHED BY THE DUCTILE IRON PIPE RESEARCH ASSOCIATION, OR AS SHOWN ON THE PROJECT PLANS (WITH THE MINIMUM BEING PRESSURE CLASS 350). SEE FITTINGS FOR SPECIAL THICKNESS REQUIRED WITH RETAINING GLANDS FLANGED DUCTILE IRON PIPE FLANGED DUCTILE IRON SHALL BE CEMENT -MORTAR LINED AND SHALL CONFORM TO AMA C-115, C-151 AND ANSI A21.15, A21.51 AS TO METAL THICKNESS AND QUALITY AND THE CEMENT LINING TO AWWA/ANSI C-104/A21.4, UNLESS SPECIFIED OTHERWISE. THE THICKNESS CLASS OR CLASSES SHALL BE 53. FLANGES SHALL BE SCREW TYPE, FACED AND DRILLED 121POUND ANSI. FLANGES AND BOLTS SHALL CONFORM TO ANSI B16.1. THE DUCTILE IRON PIPE AND FLANGES SHALL BE RATED FOR 250 P.S.I. WORKING PRESSURE. GASKETS FOR FLANGED PIPE GASKET MATERIAL FOR FLANGED JOINTS IN CAST IRON SHALL BE CLOTH -INSERTED SHEET RUBBER GASKETS CONFORMING TO AMA C207 AND ANSI B16.21, 1/81NCH THICK. THE GASKET SHALL BE FULL CUT, WITH HOLES TO PASS BOLTS. GASKET MATERIAL SHALL BE FREE FROM CORROSIVE ALKALI OR ACID INGREDIENTS. POLYETHYLENE ENCASEMENT POLYETHYLENE MATERIAL, THICKNESS AND WIDTH, SHALL CONFORM TO LATEST REVISION OF AW WA/ANSI C-105IA21, ONLY TUBES SHALL BE USED ON THE MAIN PIPELINE. MINIMUM THICKNESS SHALL BE 8 MIL. THE INSIDE SURFACE OF THE POLYETHYLENE WRAP TO BE IN CONTACT WITH THE PIPE EXTERIOR SHALL BE INFUSED WITH A BLEND OF ANTIMICROBIAL BIOCIDE TO MITIGATE MICROBIOLOGICALLV INFLUENCED CORROSION AND A VOLATILE CORROSION INHIBITOR TO CONTROL GALVANIC CORROSION. POLYETHYLENE ENCASEMENT SHALL BE INSTALLED WHERE SHOWN ON THE DRAWINGS ON DUCTILE IRON PIPE, FITTINGS, AND VALVES IN ACCORDANCE WITH AWWA C105. METHOD C, USING POLYETHYLENE SHEETS, SHALL ONLY BE USED WHEN DIRECTED BY THE ENGINEER. WATER DISTRIBUTION NOTES 9.04GATEVALVES ALL GATE VALVES SHALL HAVE A CAST IRON BODY, FULLY BRONZE MOUNTED, RESILIENT SEATED WEDGE VALVES WITH MECHANICAL JOINT HUBS AND SHALL BE PLACED AT LOCATIONS INDICATED ON CITY APPROVED PLANS IN ACCORDANCE TO CITY STANDARDS. GATE VALVES SHALL, OPEN COUNTERCLOCKWISE (LEFT), SHALL BE A NON -RISING STEM TYPE WITH 2-INCH SQUARE OPERATING NUT AND SHALL BE AWWA C-509 STANDARD DESIGN FOR 200 PSI WORKING PRESSURE FOR 12' AND SMALLER. GATE VALVES FOR 14-INCH OR LARGER DIAMETER PIPES SHALL BE BEVEL GEARED WITH GEAR CASE AND INDICATOR, GREASE PACKED, AND SHALL INCLUDE A 3-INCH BY-PASS AND VALVE (UNLESS AWWA SPECIFIES A LARGER BYPASS FOR THE SIZE VALVE), FOR HORIZONTAL INSTALLATION. AS PER AMA SPEC., ALL SUCH VALVES SHALL INCLUDE ROLLERS, SCRAPERS, AND TRACKS, AND SHALL BE AWWA C 600 STANDARD DESIGN FOR 150 PSI FOR ALL 14' AND LARGER; UNLESS SPECIFIED OTHERWISE IN THE SPECIAL PROVISIONS OR PROPOSAL. GATE VALVES SHALL BE THOSE SHOWN ON THE CITYS APPROVED MATERIALS LIST OR AN APPROVED EQUAL. GATE VALVES SHALL BE PLACED AS SHOWN ON CITY STANDARD DRAWING 71M AND ON THE CITY APPROVED PLANS OR AS DIRECTED BY THE CITY ENGINEER. THE GATE VALVE SHALL BE INSTALLED SO THAT THE OPERATING STEM IS PLUMB, LENGTHWISE IN THE TRENCH. VALVE BOXES SHALL BE CENTERED OVER THE OPERATING NUT AND SHALL STAND PLUMB, WITH THE TOP OF THE VALVE BOX SET FLUSH WITH THE FINISHED SURFACE. BOXES SHALL BE SET IN SUCH A MANNER THAT THE OPERATING WRENCH MAY BE INSERTED ON THE OPERATING NUT AND THE VALVE OP ERATED WITHOUT UNDUE STRESS OR DIFFICULTY. VALVES INSTALLED AT DEAD END MAINS SHALL BE SECURELY RODDED IN ACCORDANCE WITH CITY STANDARD DRAWING 71B-9 FROM THE PLUG TO THE VALVE AND FROM THE VALVE TO THE DEADMAN. THIS WILL ALLOW THE FUTURE REMOVAL OF THE DEAD END PLUG. 9.OSTAPPING SLEEVE AND VALVE ALL TAPPING SLEEVES AND VALVES SHALL BE CAST IRON OR DUCTILE IRON AND BE MANUFACTURED AND TESTED WITHIN THE U.S.A. ACCORDING TO AMA SPECIFICATIONS. ALL TAPPING SLEEVES AND VALVES SHALL BE AS PER THE CITY'$ APPROVED MATERIALS LIST OR AN APPROVED EQUAL. ALL TAPPING SLEEVES SHALL BE FULL SIZE CIP OR DIP, MJ WITH SPLIT/BOLTED GLANDS' OR FULL BODY STAINLESS STEEL. ALL TAPPING SLEEVES SHALL BE THOSE AS APPROVED BY THE CITY ENGINEER. 9.06 WATER PIPE FITTINGS FOR ALL WATER LINES GREATER THAN TWO -INCHES IN DIAMETER, ALL FITTINGS SHALL BE CASTIDUCTILE IRON MECHANICAL JOINT AND SHALL HAVE A MINIMUM WORKING PRESSURE OF 150 PSI, SHALL BE MANUFACTURED AND TESTED WITHIN THE U.S.A. AND SHALL MEET AWWA C-110 STANDARDS AND ANSI 21.11 FOR MECHANICAL JOINT PIPE. FITTINGS FOR TWO -INCHES IN DIAMETER SHALL BE SAME MATERIAL SPECIFICATION AS THE PIPE MATERIAL. COMPACT DUCTILE IRON FITTINGS MAY BE USED IN LIEU OF THE STANDARD CAST IRON OR DUCTILE IRON FITTINGS. ALL COMPACT DUCTILE IRON FITTINGS SHALL BE MECHANICAL JOINT AND SHALL HAVE A MINIMUM WORKING PRESSURE OF 350 PSI, SHALL BE MANUFACTURED AND TESTED WITHIN THE U.S.A. AND SHALL MEET AW WA/ANSI C-153/A2153 AND AWWA/ANSI GLLUA21.11 FOR MECHANICAL JOINT PIPE. ALL FITTINGS LARGER THAN TWO(2) INCHES IN DIAMETER SHALL HAVE A CEMENT -MORTAR LINING AND SEAL COATING IN ACCORDANCE WITH AWWA/MS,C- 04/A21.4. DUCTILE IRON FITTINGS MAY BE ALSO SUPPLIED WITH A 6-8 MIL NOMINAL THICKNESS FUSION BONDED EPDXY COATING INTERNALLY AND EXTERNALLY CORNFORMING TO THE REQUIREMENTS OF AW WAIANSI C550 AND C116/A21.16. ALL TEE, BENDS, PLUGS, ETC. SHALL BE INSTALLED IN ACCORDANCE TO STANDARD DETAILS Ti B-6 THRU 7IB-9B. RETAINER GLANDS MAY BE USED IN LIEU OF TIE RODS AND CONCRETE BLOCKING FOR THE INSTALLATION OF BENDS, AND FIRE HYDRANT LEG VALVES AND FITTINGS. RETAINER GLANDS WILL NOT BE ALLOWED FOR USE WITH PLUGS ON THE END OF A LINE. ALL RETAINER GLANDS SHALL BE USED WITH MECHANICAL JOINT DUCTILE IRON OR CAST IRON PIPE AND FITTINGS; AND SHALL MEET SPECIFICATIONS AWWA C-111 (ANSI A21-11) LATEST REVISION, FOR RUBBER GASKET JOINTS TABLE 11-1 MECHANICAL JOINT DIMENSION. RETAINER GLANDS FURNISHED SHALL BE APPROVED BY FACTORY MUTUAL, UNDERWRITER'S LABORATORIES, AND THE CITY ENGINEER FOR THE CITY OF GASTONIA. FLANGED FITTINGS SHALL CONFORM TO ANSI B16.1 AND SHALL BE FACED AND DRILLED 125-POUND ANSI. THE FITTINGS SHALL BE 250 PSI RATED WORKING PRESSURE AND CEMENT -MORTAR LINED TO SAME THICKNESS SPECIFIED FOR PIPE. RETAINING GLANDS, DIP RETAINING GLANDS FOR USE ON DUCTILE IRON MECHANICAL JOINT PIPE SHALL BE AS SPECIFIED HEREIN. MINIMUM PRESSSURE CLASS 360 DIP MAY BE USED WITH RETAINING GLANDS THAT INCORPORATE THE USE OF BREAKAWAY AT SPECIFIED TORQUE 'AUTO TORK' BOLTS AND CONTOURED WEDGE FACE CONTACTS TO THE PIPE, OR WITH RETAINING GLANDS THAT INCORPORATE MACHINED SERRATIONS FOR EXACT FIT AND 36.0 CONTACT AND SUPPORT OF THE PIPE WALL, SAME AS SPECIFIED IN "RETAINING GLANDS, PVC'. RETAINING GLANDS, PVC JOINT RESTRAINT DEVICES FOR PVC PIPE SHALL CONSIST OF MULTIPLE GRIPPING WEDGES INCORPORATED INTO A FOLLOWER GLAND MEETING THE APPLICABLE REQUIREMENTS OF ANSUAW WA C11WA21.10. RESTRAINT DEVICES SHALL BE MANUFACTURED OF HIGH STRENGTH DUCTILE IRON, ASTM A 536, GRADE 65-45-12, BOLTS/CONNECTING HARDWARE SHALL BE OF HIGH STRENGTH LOW ALLOW MATERIAL IN ACCORDANCE WITH AW WA/ANSI C111/A21.11. ALL JOINT RESTRAINT DEVICES FOR PVC SHALL CARRY A WATER WORKING PRESSURE RATING EQUIVALENT TO THE FULL RATED PRESSURE OF THE PVC PIPE THEY ARE INSTALLED ON, WITH A MINIMUM OF 2:1 SAFETY FACTOR IN ANY NOMINAL PIPE SIZE. IN ADDITION, THEY SHALL MEET OR EXCEED THE REQUIREMENTS ASTM STANDARD F1614, STANDARD TEST METHOD FOR JOINT RESTRAINT FOR PRODUCTS FOR USE WITH POLYVINYL CHLORIDE (PVC) PIPE. NOTARIZED CERTIFICATION FROM THE MANUFACTURER OF THE RESTRAINT DEVICE SHALL BE PROVIDED WITH SUBMITTALS. RESTRAINT DEVICES SHALL BE AS ON THE CITYS APPROVED MATERIAL LIST OR AN APPROVED EQUAL. SOLID SLEEVES - CAST IRON SLEEVE COUPLING WITH MECHANICAL JOINT ENDS AND ALLOY BOLTS AND FOLLOWER. USE PIPE MANUFACTURER'S STANDARD SLEEVE. FLAP VALVES SHALL BE CLOW FLANGED END FLAP VALVE MODEL F-3012, TROY MODEL A-2540-6, OR APPROVED EQUAL. 9.07 VALVE BOXES VALVE BOXES SHALL BE STANDARD CAST IRON EXTENSION VALVE BOXES 5-1/4 INCH SHAFT FOR THE APPROPRIATE COVER OVER THE PIPE, NORMALLY 36" TO 48". ALL VALVE BOXES SHALL BE CAST IRON AND SHALL BE THOSE MANUFACTURED AND TESTED WITHIN THE U.S.A. ALL BOXES SHALL BE TWO SECTIONS WITH BOTH TOP AND BOTTOM SECTIONS EQUIPPED WITH A FLANGE FOOTING. ADJUSTMENTS TO VARYING DEPTHS SHALL BE BY A SLIDI NG JOINT. SCREW TYPE EXTENSIONS ARE NOT ACCEPTABLE. VALVE BOX DEPTH SHALL BE COMPATIBLE FOR ADJUSTMENT FOR THE DEPTH OF WATER LINE BURY, CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE BURY DEPTH NECESSARY. SEE DETAIL 71B-7 FOR PROTECTOR RING DIMENSIONS FOR LOCATIONS OUTSIDE THE PAVEMENT SECTION VALVE BOXES SHALL BE THOSE USTE ON THE CITY'S APPROVED MATERIAL LIST OR AN APPROVED EQUAL. BOB FIRE HYDRANTS FIRE HYDRANTS SHALL BE CAST IRON BODY, FULL BRONZE MOUNTED, SUITABLE FOR A WORKING PRESSURE OF 15. POUNDS PER SQUARE INCH AND SHALL BE IN ACCORDANCE WITH THE LATEST SPECIFICATION OF THE AMA FIRE HYDRANTS SHALL BE CONSTRUCTED IN A MANNER PERMITTING WITHDRAWAL OF INTERNAL WORKING PARTS WITHOUT DISTURBING THE BARREL OR CASTING. HYDRANTS SHALL HAVE A BREAKABLE SAFETY FLANGE IN THE BARREL AND SAFETY COUPLING IN VALVE STEM. FIRE HYDRANT VALVE, WHEN SHUT, SHALL BE REASONABLY TIGHT WHEN UPPER PORTION OF BARREL IS BROKEN OFF. VALVE OPENING SHALL BE AT LEAST 4 -1/2' IN DIAMETER, WITH NET AREA OF WATERWAY AT SMALLEST PART, WITH VALVES WIDE OPEN, NOT LESS THAN 120 PERCENT OF VALVE OPENING. HOSE NIPPLES SHALL BE BRONZE OR NONCORROSIVE METAL. EACH HYDRANT SHALL HAVE TWO 2-112" NIPPLES, NATIONAL STANDARD THREADS AND ONE STEAMER NOZZLE OPENING 4-7/8. O. D. , WITH THREADS OR FITTINGS CONFORMING TO THE CITY OF GASTONIA SPECIFICATIONS AND LOCAL FIRE JURISDICTION STANDARD. HYDRANTS SHALL BE PAINTED WITH ONE COAT OF ZINC CHROMATE PRIMER AND ONE COAT (ACCEPTABLE FOR FINAL COAT) OF PORCELAINIZED ENAMEL, STANDARD COLOR AS USED BY THE LOCAL FIRE DEPARTMENT, OR APPROVED EQUAL. ALL CAST IRON PARTS BELOW GROUND LINES SHALL BE COATED WITH A BLACK ASPHALTUM VARNISH. FIRE HYDRANTS SHALL BE AS LISTED ON THE CITYS APPROVED MATERIAL LIST. HYDRANTS SHALL BE SET ON A BASE OF TWELVE INCHES 12" OF THOROUGHLY COMPACTED WASHED STONE. THE HYDRANT SHALL BE SECURELY ROODEDIRESTRAINED IN ACCORDANCE WITH CITY STANDARD DRAWING NO. 7113-9 TO PREVENT BLOWING -OFF UNDER PRESSURE. ALL HYDRANTS SHALL BE SET PLUMB. CLEAN, COARSE WASHED STONE SHALL BE PLACED AROUND THE BARREL OF THE HYDRANT TO WITHIN TWELVE INCHES (12') OF THE GROUND LEVEL AND SHALL CONFORM TO THE TYPICAL SECTION AS SHOWN ON CITY STANDARD DRAWING NOS. 71 B-T, 71B-8, 71B-9, AS APPLICABLE. CARE SHALL BE EXERCISED TO AVOID EARTH MATERIALS BEING MIXED WITH THE STONE BACKFILL MATERIAL. THE FIRE HYDRANT ASSEMBLY (WHICH WOULD INCLUDE THE HYDRANT, 6- VALVE AND VALVE BOX, 1-6" TEE, 2 SECTIONS OF 6- PIPE, RODDI NG, AND OTHER FITTINGS) SHALL BE CAST IRON WITH MECHANICAL JOINT CONNECTIONS. SLIP JOINT PIPE OR FITTINGS WILL NOT BE PERMITTED FOR FIRE HYDRANT ASSEMBLIES. HYDRANTS SHALL HAVE 6-INCH MECHANICAL JOINT HUB WITH STRAPPING LUGS, PENTAGON OPERATING NUT (1-1/4" MEASURED FROM ONE FLAT S1DE TO AN OPPOSITE POINT). THE HYDRANT VALVE SHALL OPEN IN A CLOCKWISE (RIGHT) DIRECTION AND THE DIRECTION OF OPENING SHALL BE INDICATED ON THE HEAD OF THE HYDRANT. FIRE HYDRANTS SHALL BE INSTALLED, AS SHOWN ON CITY OF GASTONIA STANDARD DRAWING 71B-6 THRU 71B@, AS SHOWN ON THE APPROVED PLANS, OR AS DIRECTED BY THE CITY ENGINEER. ALL NEW FIRE HYDRANTS INSTALLED OR EXISTING FIRE HYDRANTS TAKEN OUT OF SERVICE SHALL BE KEPT "BAGGED' OR "TAGGED", INDICATING THEM AS BEING OUT OF SERVICE. THE CONTRACTOR SHALL MAINTAIN THIS INDICATION UNTIL THE WATER SYSTEM HAS BEEN APPROVED BY THE CITY OF GASTONIA FOR PLACING INTO SERVICE. THE CONTRACTOR SHALL THEN REMOVE THE 'BAGS' OR 'TAGS" AS HE CHECKS ALL VALVES TO MAKE SURE THE SYSTEM IS IN SERVICE. i L9 . L9ZI Z () Q I F N N p 0 Y a E, .0 O 2 = O N UI O O 0 Q O Q m d N p N Z 2 n U) 3 i' O - O a V ) `} Z L O 1 J H -a U `} LL H_ U W U ^^ v/ E w Z Lcu Z G O U Lu 0 O O `} (n J O > O w (l Q W I � z QG_ Z 0- O HN LL a o S Z SHEET NUMBER R104 11 WATER DISTRIBUTION NOTES WATER DISTRIBUTION NOTES WATER DISTRIBUTION NOTES 9.09BLOW-OFF VALVES BLOW -OFF VALVES SHALL BE CONSTRUCTED AT THE END OF ALL DEAD END LINES, EXCEPT WHERE THERE IS A FIRE HYDRANT INSTALLED ON THE LINE WITHIN FIFTY (50) FEET OF THE DEAD END OF THE LINE. SEE SECTION 9.04 FOR ROBBING TO DEADMAN. A TEMPORARY BLOW -OFF VALVE MAY BE PROVIDED FOR CLEANING AND TESTING OF THE LINE DURING CONSTRUCTION. AFTER ALL TESTS HAVE BEEN COMPLETED AND THE LINE APPROVED, THE CONTRACTOR SHALL REMOVE THE TEMPORARY BLOW -OFF VALVE AND REPLACE IT WITH A M PLUG OR A TWO- INCH PLUG. PIPE MATERIALS FOR 3/4" AND 2' BLOW -OFFS SHALL BE ALL BRASS (IPS) PIPE CONFORMING TO ASTM B43-02(2004) OR LATEST REVISION. FITTINGS SHALL BE BRASS, CONFORMING TO ASTM B6252 OR LATEST REVISION, OR FEDERAL SPECIFICATION W W-P-060. WHEN THE INSTALLATION IS BEHIND CURB AND GUTTER OR BEHIND THE SHOULDER OF THE ROAD, A CITY STANDARD WATER METER BOX, AS APPRO VIED BY THE PUBLIC WORKS/UTILITIES DIRECTOR OR THE CITY ENGINEER, MAY BE USED IN LIEU OF THE TWO STANDARD VALVE BOXES, AS SHOWN ON DETAIL 71MB. 9.10TRENCH EXCAVATION WATER LINES SHALL BE LAID AT THE LOCATION AS SHOWN ON CITY STANDARD DRAWING NO. ]1D-15, 11D-i5A AND 11BS THRU 71BS, AND UNLESS OTHERWISE SPECIFIED OR SHOWN ON THE PLANS SHALL HAVE A NOMINAL COVER OF THIRTYSIX (36') INCHES FOR 2-INCH, 6-INCH, AND 8-INCH PIPE AND FORTY-TWO (42") INCHES FOR ALL PIPE TEN (10") INCHES OR MORE IN DIAMETER. UTILITY AND STORM DRAINAGE CROSSINGS MAY REQUIRE DEEPER INSTALLATIONS. THE CONTRACTOR SHALL'POTHOLE" EXCAVATE AT KNOWN UTILITY CROSSING LOCATIONS FOR THE IDENTIFICATION OF CONFLICTS AND ADJUSTMENT OF ALIGNMENT AND GRADE ACCORDINGLY. SEE SECTIONS 8.17 (A) AND 5.05 FOR COMPACTION TEST REQUIREMENTS. TRENCH STABILIZATION (451 WASHED STONE) WILL BE REQUIRED WHEN A WET OR POOR SUB -GRADE CONDITION IS ENCOUNTERED BY THE CONTRACTORAND WHEN IN THE CITY ENGINEER'S OPINION OTHER PROPER FOUNDATIONS CANNOT BE PROVIDED. REFER TO STANDARD SPECIFICATIONS SECTION 10.02 FOR ADDITIONAL REQUIREMENTS. WASHED STONE SCREENING DUST SHALL BE SPREAD PRIOR TO PLACING ANY TRENCH MATERIAL ON ANY PAVEMENT THIS IS TO ALLOW FOR THE THROUGH CLEANING OF THE PAVEMENT (NO DISCOLORATION OR DEBRIS). ROCK EXCAVATION EXCAVATION OF HARD ROCK, LEDGE ROCK, OR BOULDERS LARGER THAN TWO CUBIC YARDS WHICH CAN NOT BE RIPPED, CLAWED, ETC., AND OR RE MOVED BY CONVENTIONAL CONSTRUCTION METHODS WILL BE CONSIDERED AS ROCK EXCAVATION. LAWS, RULES, AND REGULATION S RELATIVE TO THE STORAGE AND USE OF EXPLOSIVES. BLASTING SHALL BE PERFORMED ONLY BY EXPERIENCED PERSONNEL WORKING ACCORDING TO ACCEPTED PRACTICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS INCLUDING, BUT NOT LIMITED TO THE CITY FIRE DEPARTMENT. THE CONTRACTOR SHALL COMPLY WITH THE CITY'S STANDARD SPECIFICATIONS INCLUDING, BUT NOT LIMITED TO SECTION 2.06. EXTREME CARE SHALL BE EXERCISED BY THE CONTRACTOR TO PREVENT INJURY TO ANY EXISTING PIPES, WATER, SEWER, GAS, POLES, WIRES, CABLES, DRAINS, BUILDINGS OR OTHER STRUCTURES OR UTILITIES EITHER BELOW OR ABOVE THE SURFACE OF THE GROUND. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ANY AND ALL DAMAGE RESULTING FROM THE USE OF EXPLOSIVES. WHERE THERE IS ANY TO REMOVE THE ROCK. ANY ROCK ENCOUNTERED SHALL BE EXCAVATED SIX INCHES IS') BELOW THE SUBGRADE OF THE PIPE BED AT THE START OF CONSTRUCTION, ANY EXISTING VALVES TO BE USED AS ISOLATION VALVES TO THE NEW PROJECT LINES SHALL BE VISUALLY INSPECTED BY THE INSPECTOR, CONTRACTOR, AND AS NECESSARY BY TRU REPRESENTATIVE. ANY LEAKS SHALL BE REPAIRED OR ISOLATION CONSTRUCTION METHOD USED, SEE SECTION 9.14. EACH JOINT OF PIPE SHALL BE LAID ACCORDING TO MANUFACTURES RECOMMENDATIONS AND IN ACCORDANCE WITH LATEST REVISION OF AWWA C -600 FOR DUCTILE IRON AND CAST IRON PIPE, AND AWWA G900 FOR PVC. THE NOMINAL ALLOWABLE DEFLECTION FOR ALL THE PIPES LISTED SHALL BE 112 OF THE MANUFACTURER'S RECOMMENDED MAXIMUM DEFLECTION PER JOINT. THE ENGINEER MAY VARY FROM THIS CITY POLICY WHEN PRUDENT. COMPETENT PIPE LAYERS SHALL BE REQUIRED FOR PIPE INSTALLATION. THE CONTRACTOR SHALL PLUG ALL PIPE ENDS, AT THE END OF EACH DAYS WORK. WHERE ROCK IS ENCOUNTERED, THE ROCK SHALL BE EXCAVATED A MINIMUM OF SIX INCHES BELOW THE PIPE GRADE AND THE CUT SHALL BE BACK FILLED TO GRADE WITH AN APPROVED EARTH MATERIAL. 9.12 HYDROSTATIC TESTS THE CONTRACTOR SHALL PROVIDE ALL NECESSARY EQUIPMENT AND TESTS. AFTER THE PIPE HAS BEEN LAID AND PARTIALLY BACKFILLED AND BEFORE ANY SERVICE TAPS HAVE BEEN THE OPERATING PRESSURE GRADIENT AT THE LOWEST POINT OF THE PROPOSED SYSTEM SHALL BE DETERMINED I ONE OF THE FOLLOWING METHODS AS DIRECTED BY THE CITY ENGINEER. (a) THE OPERATING GRADIENT PRESSURE SHALL BE DETERMINED AT A SIMILAR POINT ON THE EXISTING SYSTEM IN THE IMMEDIATE AREA OF THE PROJECT. AFTER THE OPERATING PRESSURE GRADIENT HAS BEEN DETERMINED, THE TEST PRESSURE SHALL BE 50 PERCENT GREATER THAN OPERATING PRESSURE GRADIENT. IN NO CASE SHALL THE TEST PRESSURE BE LESS THAN 126 PSI, THE MAXIMUM TEST PRESSURE SHALL BE 200 PSI. NO TEST SHALL BE MADE FOR AT LEAST 36 HOURS AFTER THE LAST CONCRETE THRUST OR REACTION BLOCK HAS BEEN POURED WITH HIGH EARLY -STRENGTH CEMENT OR AT LEAST SEVEN DAYS AFTER THE LAST CONCRETE THRUST OR REACTION BLOCK HAS BEEN CAST WITH STANDARD CEMENT. THE DURATION OF THE TEST SHALL BE TW O HOURS, UNLESS OTHERWISE DIRECTED BY THE CITY ENGINEER. EACH SECTION OF THE PIPELINE SHALL BE SLOWLY FILLED WITH WATER AND THE SPECIFIED TEST PRESSURE SHALL BE APPLIED BY MEANS OF A PUMP CONNECTED TO THE PIPE IN A MANNER SATISFACTORY TO THE CITY ENGINEER. THE PUMP, PIPE CONNECTIONS, AND ALL NECESSARY APPARATUS SHALL BE FURNISHED BY THE CONTRACTOR. THE CONTRACTOR SHALL ALSO FURNISH THE NECESSARY PERSONNEL TO ADMINISTER THE TEST UNDER THE INSPECTION OF THE CITY ENGINEER OR HIS REPRESENTATIVE. SEE SECTION 2.02 FOR USE OF CRY WATER. DURING THE FILLING OF THE PIPE AND BEFORE THE APPLICATION OF THE SPECIFIED TEST PRESSURE, ALL AIR SHALL BE EXPELLED FROM THE PIPELINE, ADDITIONAL CORPORATION STOPSICURB STOPS MAY BE NECESSARY. DURING THE TEST. ALL PIPE. FITTINGS. VALVES. HYDRANTS. AND COUPLIN GS SHALL BE CAREFULLY EXAMINED FOR LEAKAGE. PRESSURE IN THE NEW WATERLINE SHALL BE MAINTAINED WITHIN 5 PSI OF THE TEST PRESSURE. THE TEST PRESSURE SHALL BE MAINTAINED FOR AT LEAST TWO HOURS, AFTER WHICH THE PRESSURE OF THE LINE SHALL BE MEASURED AND LOGGED BY THE CITY INSPECTOR. ANY WATER ADDED TO MINT AIN THE TEST PRESSURE SHALL BE LOGGED BY THE CITY INSPECTOR. IF THIS PRESSURE IS LESS THAN THE REQUIRED TEST PRESSURE, THE CONTRACTOR SHALL ADD MEASURED AMOUNTS OF WATER UNTIL THE LINE IS BROUGHT BACK TO THE TEST PRESSURE. THE AMOUNT OF WATER ADDED SHALL THEN BE COMPA RED TO THE ALLOWABLE LEAKAGE VALUES FROM THE ANNA FORMULA BELOW. ANY JOINT OR SECTION OF PIPE WHICH IS NOT WITHIN THE ALLOWABLE VALUE SHALL BE REJECTED AND SHALL BE REPLACED OR REPAIRED AND THE TEST SHALL THEN BE REPEATED UNTIL THE RESULTS ARE SATISFACTORY. TABLE 1. AW WAALLOWABLE LEAKAGE FORMULA L= NO (SQUARE ROOT OF P) ]400 L= ALLOWABLE LEAKAGE IN GPH N = NO. COUPLINGS (JOINTS) D=DIAMETER OF PIPE IN INCHES P= AVERAGE TEST PRESSURE IN PSI NOTE: WHEN TESTING AGAINST CLOSED METALSEATEDVALVES, AN ADDITIONAL LEAKAGE PER CLOSED VALVE OF 0.0078 GAL.MR.IIN. OF NOMINAL VALVE SIZE WILL BE ALLOWED. WHERE LINES HAVE BEEN ONLY PARTIALLY BACKFILLED OR WHERE LINES HAVE BEEN UNCOVERED FOR INSPECTION OR CORRECTION, THE CONTRACT OR SHALL BACKFILL AND TAMP THESE AREAS AS PRESCRIBED ELSEWHERE IN THESE SPECIFICATIONS. CARE SHALL BE TAKEN NOT TO DISTURB OR DAMAGE THE PIPE. ONLY AUTHORIZED PERSONNEL OF THE CITY OF GASTONIA UTILITIES DEPARTMENT SHALL BE PERMITTED TO MAKE WATER TAPS UNLESS THE DEVELOPER HAS RECEIVED PERMISSION, IN WRITING, FROM THE CIWS PUBLIC WORKS AND PUBLIC UTILITIES DIRECTOR OR DESIGNATED REPRESENTATIVE, FOR AN APPROVED UTILITIES CONTRACTOR TO MAKE THESE TAPS. ALL TAPS SHALL BE MADE. WITH THE WATER MAIN UNDER NORMAL OPERATING PRESSURE. IN STRICT CONFORMANCE TO CITY REQUIREMENTS. NO TAP SHALL BE MADE BEFORE THE PRESSURE AND STERILIZATION TESTS ARE COMPLETE ANDAPPROVED. WHERE EXISTING WATER LINES ARE TO BE ABANDONED, THE CONTRACTOR WILL BE REQUIRED TO ABANDON AND PLUG THE WATER LINES AND SERVICE TAPS. THE CONTRACTOR SHALL ALSO INSTALL ANEW TAMERVICE CONNECTION FROM THE NEW WATER LINE TO THE EXISTING METER. THE NEW TAPS AND ABANDONING OF THE OLD LINES SHALL BE PERFORMED IN ORDER TO CAUSE THE LEAST DISRUPTION IN SERVICE AS IS POSSIBLE. NO TAPS MAY BE INSTALLED UNTIL ALL TESTS ARE COMPLETED AND APPROVED. WATER SERVICE CONNECTIONS MAY BE INSTALLED BY THE DEVELOPER OF PROPERTY UPON REQUEST. THE APPLICATION (FORM SUPPLIED BY THE CITY) SHOULD BE COMPLETED AND SENT TO THE DIRECTOR OF TRU. MATERIAL FOR THESE SERVICES WILL BE OBTAINED BY THE CONTRACTOR WITH THE EXCEPTION OF WATER METERS. MATERIALS USED IN MAKING THE WATER SERVICE CONNECTION SHALL BE AS AS APPROVED BY TRU TAP APPROVALS ARE SUBJECT TO CHANGE WITHOUT NOTICE, AS SUCH A CURRENT LIST OF APPROVED TAP MATERIALS WILL BE AVAILABLE AT THE TWO RIVERS UTILITIES, 1300 N. BROAD ST. ALL MATERIAL WILL BE INSPECTED FOR COMPLIANCE BY WATER AND SEWER DIVISION INSPECTOR PRIOR TO INSTALLATION. ALL SERVICES WILL BE INSPECTED PRIOR TO BACKFILL OPERATION FOR COMPLIANCE. THE BACKFILL AND COMPACTION OPERATION SHALL BE ACCORDING TO STANDARD PROCEDURE, AND THE STANDARD SPECIFICATIONS INCLUDING SECTION 5.05. ALL TAPS SHALL BE MADE IN A METHOD APPROVED BY THE CITY ENGINEER, AND ACCORDING TO STANDARD DETAILS INCLUDING 71B-20, 71B-21, 71B-22 AND ANY SPECIAL PROJECT DETAILS INCLUDED IN THE PLANS. IN THE EVENT THAT A WATER METER IS COLLOCATED WITH A PROPOSED DRIVEWAY, THE WATER METER SHALL BE RE -LOCATED OUT OF THE PROPOSED DRIVEWAY. NO FITTINGS WILL BE PERMITTED IN THE RELOCATION OF THE WATER METER. IF THE WATER METER CANNOT BE EFFECTIVELY RELOCATED WITHOUT THE USE OF FITTINGS, THE BUILDERIDEVELOPER SHALL INSTALL A NEW SERVICE LINE OF SUFFICIENT LENGTH OF PIPE, FROM THE CORPORATION STOP AT THE MAIN TO THE NEW METER LOCATION. PAVEMENT CUTS ACROSS PUBLIC STREETS FOR SERVICES SHALL BE AVOIDED. THE CONTRACTOR SHALL INSTALL THESE LINES USING AN AIR PRE SSURE DRIVEN, PNEUMATIC'MOLE' OR AN AUGER TYPE MACHINE. IF AN OPEN CUT IS UNAVOIDABLE, THE CONTRACTOR SHALL SECURE APPROVAL FROM THE CITY ENGINEER PRIOR TO MAKING ANY STREET CUT FOR A SERVICE LINE. NO WATER TAP SHALL BE PERMITTED UNTIL THE CURB AND GUTTER HAS BEEN INSTALLED. ALL TAP LOCATIONS SHALL BE PLUSED IN ON THE'ASBUILT' PLANS AND SHALL BE MARKED ON THE TOP OF THE CURB W ITH'ARROW' INDICATING THE WATER AND'X' INDICATING THE SEWER. SEE SECTION 2.34 FOR ADDITIONAL AS -BUILT REQUIREMENTS THE CONTRACTOR, BEFORE ANY NEW PIPE IS PLACED INTO SERVICE, SHALL FILL, DISINFECT, AND TEST THE LINE AS PER AWWA C 51, LATEST REVISION. THE LINES SHALL BE FILLED SLOWLY TO ELIMINATE ANY POSSIBILITIES OF BACKFLOW OR CONTAMINATION OF THE EXISTING LINES WITH THE HIGH CU CONTENT WATER. ISOLATION VALVES ON THE SYSTEM SHALL BE COVERED WITH STONE ( OR TAGGED ) TO INHIBIT ANY ACCIDENTAL OPENING AND CONSEQUENTLY CROSS CONTAMINATION, SEE SECTION 9.11. TO FILL, ONLY ONE VALVE SHALL BE OPEN AT ANY GIVEN TIME. IF PROPER TECHNIQUE IS NOT DEMONSTRATED BY THE CONTRACTOR, THE CITY MAY REQUIRE HIM TO ISOLATE HIS NEW CONSTRUCTION AND FILL AND TEST W ITH A CROSS -CONNECTION CONTROL DEVICE AS APPROVED BY THE CITY ENGINEER, SEE AW WA "51 OPTIONAL SEC. 4.3.9. IF ISOLATION IS REQUIRED , THEN THE SUBSEQUENT FINAL TIE-IN SHALL BE A SANITARY TIE-IN AS DESCRIBED IN AWWA C-01 SECTION 4.6. THE CONTRACTOR SHALL DISINFECT THE LINE BY THE ADDITION AND THOROUGH DISPERSION OF A CHLORINE SOLUTION (DERIVED FROM LIQUID CHLORINE BLEACH) IN CONCENTRATIONS SUFFICIENT TO PRODUCE A CHLORINE RESIDUAL OF AT LEAST'00 PPM IN THE WATER THROUGHOUT THE DISTRIBUTION SYSTEM. THIS SOLUTION MUST REMAI N IN THE LINES FOR AT LEAST 24 HOURS, AFTER WHICH THE CHLORINE RESIDUAL SHALL BE AT LEAST 10 PPM. THEN THE LINES ARE TO BE FLUSHED BY THE CONTRACTOR AND BACTERIOLOGICAL SAMPLES TAKEN BY THE CITY INSPECTOR. NO WATER SHALL BE TURNED ON FOR PUBLIC USE UNTIL STERILI ZATION APPROVAL IS GIVEN BY THE CITY. THE FOLLOWING TEST PROCEDURES SHALL BE INCORPORATED IN CONJUNCTION WITH THE ABOVE 1)A CITY CONSTRUCTION INSPECTOR MUST BE PRESENT TO OPERATE EXISTING VALVES WHEN FLUSHING OR FILLING A NEW LINE. 2) LIQUID BLEACH (INDUSTRIAL STRENGTH, 15%FREE CL2) SHALL BE USED AS THE DISINFECTANT. 3) AFTER FLUSHING THE DISINFECTING SOLUTION FROM NEW LINES, THE INSPECTOR SHALL TAKE SAMPLES (FOR CHEMICAL ANALYSIS) FROM BOTH THE NEW WATER LINES AND THE CITY MAINTAINED LINES BEING USED AS A WATER SOURCE. AFTER SAMPLES ARE COLLECTED FOR A CHEMICAL ANALYSIS THE NEW LINE IS TO BE LEFT IDLE FOR A MINIMUM OF 24 HOURS. AFTER THE 24 HOUR PERIOD, SAMPLES SHALL AGAIN BE COLLECTED FROM THE NEW LINE AND THE CITY MAINTAINED LINES FOR CHEMICAL AND BACTERIOLOGICAL ANALYSIS. THESE SAMPLES WILL BE ANALYZED TO DETERMINE IF THE NEW LINE HAS BEEN ADEQUATELY DISINFECTED. a)ALL CHEMICAL AND BACTERIOLOGICAL SAMPLES MUST BE DELIVERED TO THE CITY LAB (BY THE INSPECTOR) NO LATER THAN 3:00 P.M. MONDAY-FRIDAY. 5)ALL NEW LINES SHALL BE FLUSHED AT A VELOCITY OF 4 FEET PER SECOND FOR SUFFICIENT TIME TO DISCHARGE A MINIMUM OF 2 TIMES THE TOTAL VOLUME OF THE ENTIRE LINE. ADDITIONAL FLUSHING MAY BE REQUIRED AS DEEMED NECESSARY BY THE FIELD ENGINEERS. THE RESPONSIBILITIES OF SAMPLE COLLECTION WILL BE SHARED BETWEEN CONSTRUCTION INSPECTIONS AND THE CITY LAB. CONSTRUCTION INSPECTIONS WILL COORDINATE AND COLLECT THE INITIAL SET OF SAMPLES FOR EACH SEGMENT OF NEW WATER LINES: THE CITY LAB WILL COL LECT THE FOLLOW-UP SAMPLES. THE CITY RESERVES THE RIGHT TO MAKE ANY TESTS ON THE SYSTEM BY CITY EMPLOYEES AS MAYBE DEEMED NECESSARY BY THE CITY ENGINEER. ONLY AUTHORIZED PERSONNEL OF THE CITY SHALL OPERATE VALVES IN THE EXISTING DISTRIBUTION SYSTEM. 9.15 TEMPORARY PLUGS THE CONTRACTOR SHALL SEAL OFF ALL EXPOSED ENDS OF PIPE BEFORE TERMINATING WORK AT ANYTIME. AT THE END OF EACH DAYS WORK OR AT ANY TIME THE PIPE LAYING OPERATION IS STOPPED OR DELAYED, THE CONTRACTOR SHALL PROVIDE A WATER TIGHT SEAL AT ALL EXPOSED ENDS OF PIPE OR FITTINGS. 9.16BAC QV PREVENTION ALL BACK FLOW DEVICES SHALL BE AS PER AW WA C-Xs LATEST REVISION. PROPER TYPE BACKFLOW PREVENTION DEVICES MUST BE INSTALLED ON WATER LINES DESIGNED TO SERVE NON -POTABLE WATER SYSTEMS SUCH AS SPRINKLER FIRE PROTECTION SYSTEMS AND IRRIGATION SYSTEMS. IF ANY CHEMICALS SUCH AS ANTI -FREEZE CHEMICALS ARE TO BE ADDED INTO SPRINKLER FIRE PROTECTION SYSTEMS, REDUCED PRESSURE BACKFLOW PREVENTERS MUST BE INSTALLED. IF NO CHEMICALS ARE TO BE ADDED INTO SPRINKLER FIRE PROTECTION SYSTEMS, DOUBLE DETECTOR CHECK VALVE ASSEMBLIES OR REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTERE MUST BE PROVIDED. ALL BACKFLOW PREVENTION DEVICES MUST HAVE A DETECTOR METER UNLESS METERED SEPARATELY. ALL BACKFLOW PREVENTION DEVICES MUST BE APPROVED BY THE FOUNDATION FOR CROSS -CONNECTION CONTROL & HYDRAULIC RESEARCH, UNIVERSITY OF SOUTHERN CALIFORNIA. PLANS AND SPECIFICATIONS FOR EACH BACKFLOW PREVENTION DEVICE SHALL BE SUBMITTED TO AND APPROVED BY THE N.C. DEPARTMENT OF HUMAN RESOURCES FOR THE SPECIFIED DEGREE OF HAZARD IN ADDITION TO APPROVAL BY THE CITY ENGINEER PRIOR TO CONSTRUCTION. THE UTILITY DEPT. SHALL KEEP AN UP TO DATE LIST OF APPROVED BACKFLOW DEVICES, THE CONTRACTOR SHALL USE SAID MATERIAL CURRENT AT THE TIME OF APPROVAL OF A CUSTOMER SERVICE. SEE SECTION S.14 FOR BACKFLOW PREVENTION DURING TESTINGIFILLING. 9.17 AIR RELEASE VALVE THE CONTRACTOR SHALL SUPPLY ALL MATERIAL, EQUIPMENT, AND LABOR NECESSARY TO INSTALL AND CONSTRUCT AIR RELEASE VALVES IN LOCATIONS SHOWN ON THE PROJECT PLANS OR AS DIRECTED BY THE CITY ENGINEER. THE AIR VALVE SHALL BE INSTALLED IN AN APPROVED PRECAST MANHOLE AC CORDING TO STANDARD DETAIL 71B-17, LATEST REVISION. AL 'AIR RELEASE VALVES" SHALL BE IRON -BODIED, BRONZE MOUNTED WITH V OR 2' AIR VALVE OPENING, AND SHALL BE ABLE TO WITHSTAND A HYDROSTATIC TEST PRESSURE OF 350 P.S.I. ALL "AIR RELEASE VALVES" SHALL BE WITH VACUUM CHECK UNIT AND SHALL BE AS LISTED IN THE CIWS APPROVED MATERIALS LIST. THE CONTRACTOR SHALL SUPPLY ALL NECESSARY LABOR, EQUIPMENT, AND MATERIALS TO PLUG AND ABANDON IN PLACE THE EXISTING WATER DISTRIBUTION SYSTEM AS INDICATED ON THE PROJECT PLANS. CONTINUOUS OPERATION OF THE CIWS EXISTING WATER SYSTEM IS OF CRITICAL IMPORTANCE. CONNECTION TO EXISTING SERVICES OR UTILITIES, OR OTHER WORK THAT REQUIRES THE TEMPORARY SHUTDOWN OF ANY EXISTING OPERATIONS O R UTILITIES SHALL BE PLANNED IN DETAIL WITH APPROPRIATE SCHEDULING OF THE WORK AND COORDINATED WITH THE UTILITY CUSTOMER AND THE ENGINEER . THE APPROVED SCHEDULE FOR SHUTDOWN OR RESTART SHALL BE INDICATED ON THE CONTRACTOR'S PROGRESS SCHEDULE, AND ADVANCE NOTICE SHALL BE GIVEN IN ORDER THAT THE CUSTOMER AND THE ENGINEER MAY WITNESS THE SHUTDOWN, TIE-IN, AND START-UP. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION OF EACH PROPERTY OWNER PRIOR TO DISRUPTION OF SERVICE, EXCEPT IN THE EVE NT OF AN EMERGENCY SITUATION. THE CONTRACTOR SHALL COORDINATE HIS ACTIVITIES WITH ANY NON -CITY OWNED UTILITY. ONLY CITY PERSONNEL SHALL OPERATE ANY VALVES AND CONTROLS ON THE CITY'S EXISTING UTILITY SYSTEMS THE TESTING, ACCEPTANCE, TAP AND MAINLINE TIE-OVERS SHALL BE COORDINATED SO AS TO ELIMI DISRUPTIONS IN SERVICE. SEE SECTION 9.12 AND 9.14 ALSO. ALL MATERIALS AND EQUIPMENT (INCLUDING EMERGENCY EQUIPMENT) NECESSARY TO EXPEDITE" ON HAND PRIOR TO THE SHUTDOWN OF EXISTING SERVICES OR UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY ANY AND ALL RODDINGABLOCKING PRIOR TO THE REMOVAL OF ITEMS INCLUDING BUT NOT LIMITED TO PLUGS, CAPS, AND FIRE HYDRANTS. THE VALVES ISOLATING THESE APPURTENANCES HAS TO BE ROBBED TO THE ASSOCIATED TEE AND/OR DEADMAN, OR TEMPORARY BLOCKING IS REQUIRED PRIOR TO REMOVAL OF THE ITEMS SO MENTIONED. WHEN NECESSARY OR EXPEDIENT THE CONTRACTOR SHALL PROVIDE SUCH TEMPORARY BLOCKING. TEMPORARY BLOCKING IS LIMITING IN SCOPE AND SHOULD BE USED FOR ONLY SHORT PERIODS, NORMALLY LESS THAN ONE (1) DAY. PROGRESS OF PIPE LINE CONSTRUCTION THE WORK SHALL PROCEED IN A SYSTEMATIC MANNER SO THAT A MINIMUM OF INCONVENIENCE WILL RESULT TO THE LENGTH OF WORK AREA PER CREW AS IS PRACTICAL. NORMALLY, THE TRENCHING EQUIPMENT SHALL NOT BE FARTHER THAN 200 FEET AHEAD OF EACH PIPE LAYING CREW OR SUCH DISTANCE AS NECESSARY TO PROVIDE MAXIMUM SAFETY. BACKFILL THE TRENCH SO NO SECTION OF PROPERLY LAID PIPE IS LEFT UNCOVERED LONGER THAN IS ABSOLUTEL Y NECESSARY. THE SAFETY CONDITIONS OF OPEN EXCAVATIONS SHALL BE THE CONTRACTOR'S RESPONSIBILITY. COMPLETELY BACKFILL AND CLEAN UP AFTER EACH SECTION OF PIPE HAS BEEN INSPECTED AND APPROVED. THE CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO INSTALL THE WATER LINE WITHOUT OPEN CUTTING THE PAVEMEN T WHERE INDICATED ON THE PLANS. THE ENCASING PIPE MAY BE JACKED THROUGH DRY BORES SLIGHTLY LARGER THAN THE PIPE, BORED PROGRES SIVELY AHEAD OF THE LEADING EDGE OF THE PIPE. CONTINUOUS CHECK SHALL BE MADE AS TO THE ELEVATION, GRADE, AND ALIGNMENT OF EACH SUCC ESSIVE SECTION OF PIPE AS WELL AS THE TRACKS UPON WHICH THE BORING RIG TRAVELS. THE BORING OPERATION SHALL BE CONTINUOUS TO ITS COMPLETION IN THE EVENT AN OBSTRUCTION IS ENCOUNTERED DURING THE BORING AND JACKING, THE AUGER IS TO BE WITHDRAWN AND THE EXCESS PIPE CU T OFF, CAPPED, AND FILLED WITH 1:3 PORTLAND CEMENT GROUT AS SUFFICIENT PRESSURE TO FILL ALL VOIDS. A NEW SITE WILL T HEN PICKED FORA NEW BORE. IF AN OPEN CUT IS ALLOWED, THEN THE ABORTED LENGTH SHALL BE UTILIZED AND PAID FOR AT 100%OF THE UNIT BID PRICE FOR COMPLETED BORES. THE REMAINING LENGTH ALLOWED TO BE INSTALLED BY OPEN CUT SHALL BE PAID AS PER PIPE INSTALLED BY OPEN CUT AS DESCRIBED IN SECT IONS INCLUDING BUT NOT LIMITED TO 9.01 AND 9.14. THE CARRIER PIPE SHALL BE PROTECTED SO AS TO PREVENT AS MUCH FOREIGN MATERIAL FROM ENTERING AS IS POSSIBLE. THIS INSTALLATION WILL HAVE TO PASS THE TESTS IN THE SECTION 9.13 BEFORE IT CAN BE PLACED INTO SERVICE. SEE SPECIAL PROVISIONS AND PLANS FOR CONTROLLING AGENT NOTIFICATION REQUIREMENTS. THE OPERATION ACROSS THE HIGHWAY RIGHT-OF-WAY MUST CONFORM TO REQUIREMENTS OF THE PERMITTER. EXECUTE ALL NECESSARY AGREEMENTS AND/OR PERMITS BEFORE ENTERING UPON OR COMMENCING ANY WORK IN THE HIGHWAY RIGHT-OF-WAY. COMPLY, ALSO, WITH THE APPLICABLE REQUIREMENTS OF THE GENERAL CONDITIONS AND THE SUPPLEMENTARY CONDITIONS. THE WATER LINE CARRIER PIPE SHALL BE CLASS 52 DUCTILE IRON PIPE, MECHANICAL JOINT WITH RETAINING GLANDS. THE MINIMUM GAUGE OR WALL THICKNESS SHALL CORRESPOND TO THE SIZE OF CASING SELECTED FROM THE FOLLOWING. HOWEVER, THE CONTRACTOR SHALL BE RESPONSIBLE FOR SELECTING THE GAUGE CONSISTENT WITH HIS OPERATION: MINIMUM WALL THICKNESS FOR SMOOTH STEEL CASING PIPE FOR EN LOADING (ASTM Al39 GRADE B; ANNA C-200) NOMINAL DIAMETER (INCHES) WHEN COATED OR CATHODICALLY WHEN NOT COATED NOMINAL THICKNESS INCHES OR CATHODICALLY PROTECTED 12-3/4 AND UNDER 0.188 0.188 14 0.188 0.250 16 0.219 0.281 18 0.250 I) = 20 AND 22 0.281 0.344 28 0.3]5 0.438 30 0.406 0.469 32 0.438 0.600 34 AND W 0.469 0.531 38 1 600 0.562 40 B 1 D594 48 0.625 0.668 50 0.656 0.]19 52 0.688 0.]50 64 0.119 0.181 56 AND 58 0.]50 0.812 80 0.]81 0.844 65 AND 68 0.8]5 0.938 TO 0.90fi 0.969 72 0.938 1.000 THE EXTERIOR COAL -TAR ENAMEL PROTECTIVE COATING TO BE SUPPLIED IN ACCORDANCE WITH AW WA C-203, THE STEEL CASING PIPE MINIMUM THICKNESS MAYBE REDUCED BY 0.063 INCHES, AS PER THE TABLE FOR E80. GAUGE TABLE FOR NCDOT (STREET) CROSSINGS (K-20 LOADINGS) 15-24MTM A139, GRADE B 0.250 AMA C-200 THE CONTRACTOR SHALL PROVIDE A STRAPPED TIMBER CRADLE UNDER BARREL OF PIPE, JOIN PIPE, AND SLIDE INTO CASING. PIPE BARRELS SH ALL BEAR CONTINUOUSLY ON CRADLES. SUPPORTS: CARRIER PIPE SHALL BE SUPPORTED ON EITHER APPROVED 'SPIDER" SUPPORTS AS INDICATED ON THE PLANS (NOT LESS THAN TWO SUPPORTS PER LENGHTH OF PIPE), OR LUMBER SKIDS (PIPE BARREL SHALL BEAR CONTINUOUSLY ON SKIDS). LUMBER SHALL BE CEDAR, OR NO. 2 OR BETTER SOUTHERN YELLOW PINE. LUMBER SHALL BE PRESSURE TREATED WITH APPROVED ROT -RESISTANT TREATMENT FOR GROUND CONTACT. METHOD OF TREATMENT IN ACCORDANCE WITH THE APPLICABLE PORTION OF THE AWPA MANUAL STANDARDS. ALL TIMBERS SHALL BE CUT TO SIZE BEFORE THE MATERIAL IS GIVEN THE PRESERVATIVE TREATMENT. SEE STANDARD DETAIL ]i B-25. STAINLESS STEEL BANDS: ONE-HALF INCH WIDE BY 0.020-INCH THICK, 304 STAINLESS STEEL BANDS, OR EQUAL. PRIOR TO THE START OF THE WORK, SUBMIT SATISFACTORY EVIDENCE TO THE ENGINEER THAT ALL BOND AND INSURANCE COVERAGE REQUIREMENT S CALLED FOR BY THE PERMITTER HAVE BEEN COMPLIED WITH. ALL PROPOSED CONSTRUCTION METHODS AND MATERIALS FOR THE UNDERCROSSING SHALL BE APPROVED BY THE ENGINEER AND PERMITTER PRIOR TO THE CROSSING OPERATION, AND NO CONSTRUCTION SHALL BE STARTED UNTIL WRITTEN AP PROVAL TO PROCEED FROM THE PERMITTER HAS BEEN SUBMITTED TO THE ENGINEER. PLACING SEALS AT ENDS OF CASING: AFTER THE CARRIER PIPE HAS BEEN TESTED AND APPROVED, PLACE W16-INCH BLACK NEOPRENE RUBBER SEALS, OR 8" MASONRY PLUG, AS SHOWN ON THE DRAWINGS. ENCROACHMENT APPROVAL MAY REQUIRE WEEP PITS, CONTRACTOR SHALL BE RESPONSIBLE TO CHECK WITH THE PERMIT REQUIREMENTS AND INCLUDE THEM IN HIS BID. Z p Q I N N p 0 Y a U O O 2 I+ O N to O d N p m Y O U - E w z Lcu Lo Z G 00 U Lu O `} U / 0_ I.I.. O (n OO Lu V Q 0 Wa O Z C'/ Q Z n O HN LL Q p C7 Z SHEET NUMBER R105 PROPOSED BOUNDARY INFORMATION � �srn � RaPomo ,acw�a,r �nE ROW ,roaasm ,row E E aorosm ensemm, 30 SETBACK 100' BUFFER a'°cg° mrmx PROPOSED UTILITY UTE UTE UTE EASEMENT sDE SDE EDE PROPOSED STORM EASEMENT e e e PROPOSED TOE EASEMENT PROPOSED SIDEWALK SE SE EASEMENT PROPOSED SIDEWALK / SUE SUE SUE UTILITY EASEMENT CE PROPOSED CONSERVATION EASEMENT PROPOSED LIMITS OF LOD LOD LOD DISTURBANCE PROPOSED SANITARY SSE SSE SEWER EASEMENT PROPOSED WATER LINE WLE WLE EASEMENT PROPOSED OVERHEAD oUE OUE OUE UTILITY EASEMENT PROPOSED UNDERGROUND uuE uuE DUE UTILITY EASEMENT PROPOSED GREENWAY GE GE EASEMENT PCC PROPOSED CONSTRUCTION CONTROL EASEMENT PROPOSED PAVEMENT INFORMATION 234+00 422'56'12'W 652.23' n,wimnc O � � � ♦ aorosm sminnc swear aaPosmmttaE�—aaocr I� 450--------- -I :PLANTING INFORMATION I-) acTaxw mxv xm una,c • (ro1 w ow our (u) .uanxcse emm po) camrv�nr ancaca� xour (uc) o.. euxcxaao cwmeax uncxwn nu sa.µnnx xc,.r a=o �Ew.xc crPnE== p (an cxwscn P..w.. aw�acwxr e (1) .,.P.HESE 1—T nc) wn. xra„� (xU —.w onrucv --E PROPOSED UTILITY INFORMATION T,---- ]STUB mom—,r 4�-7of OE --- *- — —1. UE xoeacaouxo mecmic Fo----------- 9STUB aP�w �xEx �wc --04- GAS — GAS — GAS ---- 9STUB vaaosm ws —UT— CO N '21412"W.u�iSTUB aPosEo s�,,.�r I FES•� 15d RCS STUB WSTUB 13+50 ,x mrsu oawccnc ..R IR STUB W�,awcA„cn /—S.D. #1 oPo>Eo qG 459' ----------- -TxT PROPOSED STRUCTURAL INFORMATION L� 57.4' PROPOSED TOPO INFORMATION 013-100? 644 Pxm�m waJcx ccxTWx /,100.00 Pam�m sPc. oflnwa C C I—. F F I—. IR— o,ttx > > I—. o,ttn B� PROPOSED EROSION CONTROL INFO > " > " TEMPORARY DIVERSION DITCH DISTURBED AREA 644 PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR SILT FENCE PF TREE PROTECTION FENCE SF—PF SILT FENCE/TREE PROTECTION FENCE BAFFLES SLOPE M TEMPORARY SLOPE CALL OUT TEMPORARY SLOPE DRAIN CONSTRUCTION ENTRANCE RIP RAP APRON STONE FILTER RING SILT FENCE INLET SEDIMENT TRAP EXCAVATED INLET SEDIMENT TRAP BLOCK INLET SEDIMENT FILTER — > —*P-->.. — ROCK CHECK DAM 100.00 TEMPORARY SPOT GRADE �/L, `/ — TEMPORARY SEDIMENT RISER WITH TRASH RACK AND 3.0" FAIRCLOTH SKIMMER TREE PROTECTION PE—TXT 52.8' Z p Q I H N N p CL Y a U O O 2 O ❑6) QO ¢ m dN pr<1 m 0 rLLI vLu J E ~ w z I--Lu Lo z 2E 00 U 0 O U o � Q � p W a 0 Lu a ~ —i a z Q Q z 0- (D O H cl) fy a O c? z SHEET NUMBER R106 11 Jm 11 J S ABERDEEN BOULEVARD EXTENSION DESIGN SPEED = 30 MPH POSTED SPEED LIMIT = 25 MPH EXISTING GROUND EXISTING GROUND EXISTING GROUND EXISTING GROUND -L- ABERDEEN BOULEVARD T 11' 11' 1 T I 0`02 0.02 0.08 E1 D1 C2 I C2 D1 E1 III 2' 6' 6' 2' 4 L- STA 28+25 4 TO STA 32+25 GUARDRAIL TYPICAL SECTION NO. 1 -L- STA 48+20.00 TO STA 75+12.02 *SEE CROSS SECTIONS FOR ACTUAL CROSS SLOPES 2 EXISTING GROUND / EXISTING GROUND / EXISTING C GROUND / EXISTING GROUND FOR ALL SLOPES 2:1 OR STEEPER, CONTRACTOR SHALL PROVIDE PERMANENT SLOPE STABILIZATION AS DESIGNED BY A GEOTECHNICAL ENGINEER. PAVEMENT SCHEDULE (PRELIMINARY PAVEMENT DESIGN) PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, AT AN AVERAGE C1 RATE OF 168 LBS. PER SQ. YARD. PROP. APPROX. 2.0" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, AT AN AVERAGE C2 RATE OF 224 LBS. PER SQ. YARD. PROP. APPROX. 4"ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 119.0B, AT AN D9 AVERAGE RATE OF 448 LBS PER SQ. YARD (ONE LIFT). E1 8" AGGREGATE BASE COURSE Ri V-6" CONCRETE CURB AND GUTTER ® 2'-6" CONCRETE CURB AND GUTTER OCOMPACTED EARTH MATERIAL OEXISTING PAVEMENT MILL APPROX. 1.5" AND REPLACE WITH 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE V1 S9.5C, AT AN AVERAGE RATE OF 168 LBS. PER SQ. YARD. OWEDGING DETAIL FOR RESURFACING NOTES: 1) PAVEMENT EDGE SLOPES ARE 1:1 UNLESS OTHERWISE NOTED. 2) SEE CROSS SECTIONS FOR SUPERELEVATION RATES. 3) USE REINFORCED SOIL SLOPES WHERE SLOPE IS GREATER THAN 2:1. C1 OR C2 D2 D1 E2 C3 1.5"MIN. 21/2"MIN-- - U____ _______ IN. DETAIL DETAIL 1 - METHOD OF WEDGING PROPOSED MILL NOTCH C1 GRADE TO KEY IN 1/2" MILL 25' TO 50' (J AS DIRECTED BY ENGINE R DETAIL 2 - INCIDENTAL MILLING DETAIL MIN. MILLING LIMITS WHERE REQUIRED TO ""UT EXISTING PANEMENTTO INSTALLFULLDEPTH MILLAND OVERLAY ADJACENT 1' PAVEMENT, MILL FROM SAWCUT LOCATIO TIE NEW PAVEMENT LONE WIDTH MIN TO NEXT ADJACENT LANE PRIOR TO TO EXISTING SAWCUTTING EXISTING PAVEMENT AND > INSTALLATION OF NEW PAVEMENT AND / O NEW CURB AND GUTTER. NEW PAVEMENT -FULL DEPTH SAWCUT E%ISTING (SEE CORRESPONDING TYPICAL SECTION U PAVEMENT V1 FOR REQUIRED PAVEMENT STRUCTURE) DETAIL 3 — MILLING AND SAWCUT DIMENSIONS EXISTING 2'-"' CURB &GUTTER NOT TO SCALE DETAIL 4 - CURB AND GUTTER END TREATMENT R=20' C&G FULL DEPTH ASPHALT f2' 2a' TRANSITION TOP OF CURB TO GUTTER ELEVATION DETAIL 5 — CURB TRANSITION 61N. 61N. EXCAVATION LINE 61N, MIN. E1 X DETAIL 6 - CONCRETE CURB & GUTTER, BITUMINOUS CONC. BASE COURSE DETAIL E ~ w z w Lu 000 0_ O U o LU ❑ W Lu a O d Z Q Q z 0_ O H cf) Tf a o 0 Z SHEET NUMBER R200 m o x R.y rc o w > � J � ar k v r 0 i a~ O rc ¢ U i - Wmp, o 9- uSEII LINLr oR �\ _ _ P;PFS 35' oP• L _S 15 M471 FR �o _ o 3 U a3� � Y o a N `o 3 - I "T- IU::7'WIJI-F`�ipNRiA87 ,6,''- A°T HEM<EDtBY�mRMII.TA I:E 1,'A MR ARE r-Nn SE-TION F 7,iC38' IT,YJ ENGIN rRI mow, JP$ NO. z Z p Q I o H N N p K Y a w O N O � u° �rn ao d N p m 2 ZZ Z M e 0 Q aAff i; K 0 K ~ p w z �LU x w OO U 0 mIF a Lu L p W a U, Q L a N Q OZ a 0 x. < O m R201 a z i z "" � 8 C ❑ E F G �m anm •�qq3 wxyr vqeyx� ii pxH ai _ _ ":A[ tF%W .:_N'=.'.:'r Skf tk�:iS iSAG'' __ •':.�k •• • � '1 .. 9i Ilf �:!IdS i:l� :1 "�.'ii � 3AS. ..MYR T yy�� 99gg�F gg�� �_�. .^.�'!;� g., k... ..��!+g 1' `.�'•. Fps 3"' V C:; -".: n `�� .. Y 'TP ... iR • _." i' a`D - r�i 3�?e ask= • . ".:w F• `t� _i@,jj��,.�. o�_„ . �:a=".:'i'A�i'�3ti'?�','' _ ja� �»�-Qi%N'��•. r ��. _ j..--a :: �..... _•� �'. i_w�i •'•='aa�fe�F,a�{�_ .•�-, ao..M.sp�': •e� ; I,M..._ •'-`---ems '.'� -�-,•s_ _ r c �_..L�'__..._ �R.. ...aP: s_ �... ; ii� -1 ; �:�" 1�•..'z'; . -: _. ,�y _,."2` ..s �:a •r"�t' # a s�...'•,� "� },i•' .': g., � ,�'•, r�•'"" 1>`".•� x�. ;.�".. �� :� w Y •'.. ,.lip �'.,� . A:•:`rx'� '�'� -= +� F e. •�'•i�,_"i � �•,...[y � ..�.($!-. ppg � _ •e�d�L4Yr�-A '. q:6� ���ily, .�� - _ re•;-•F _- i?: r�:.:. �i 4114, I:'Ci'-v . fi: `m;�- K1r� ��"� L��J ■��� I�''ly �7'�]r U�4'. 7�. ."i �e'� • 1� '�i'� . y � �''� - •. 7: o�q"• - '7• ��J S� i�i L�'i■ Cl�itF-"D"30=��tILR.i .� J�='�`��' is=a" a=c .�U�� .Ir z ;,�17�'i1j I T" o—�, .S'�ri' 1 I. '1 10^J 411%Y= 44J LI:�•i•-'} ' ?'=:g•,1� Ip'-q; 1.111: 1 QE'• 1 ,a., I: ?-'�,' i3'_�• '2 _S•••:ii"..�; .I -;: -7: ,-� t�'-q': �'-J. 'S' I L°ti, I] 1�2" 4h. Cl 18' �5i¢lfl,12��+.�?�I�.■ rr-'_ I.a r`2"'■ •i ��t S'�•�. •fi, �_. t^C:iil 1•r17+a Le r.'J LtC� 19'- 7'-10110'=107 Gf1'�151 1L' t{"• 12`-Ely �p'�pY ■ 72Y� l�:'-2Y I� �•r�' 'p: lE' • 14" a�� kAWNIEiY:�RaAFa , CHFCKFfDIF:Y:�Nf3M iM Mr HEAGWAL`.L WIN �EAI.1,$ `wc,E 7jl GPI S' C1Tj� ENGiN-ER']FR 77\\\ \ \ \ \ \\\ \ \ \ *� L ` I \ — oxP/) oxv L oHP �0 6— oxP oxPL 6XP oxd t pxv\1Q e� ;o v o, —IFi� �K _ for o 1 i P� � )xv�os o I oxv/ o/ LEGEND LIMITS OF DISTURBANCE - — -XX- — - EXISTING MAJOR CONTOUR - - - - - XX - - - - - EXISTING MINOR CONTOUR XX PROPOSED MAJOR CONTOUR XX PROPOSED MINOR CONTOUR LIMITS OF DRAINAGE AREA Mz SLOPE ARROW IP O INLET PROTECTION CE CONTRUCTION ENTRANCE DD PROPOSED PERMANENT DIVERSION. REFERENCE GRADING AND DRAINAGE PLAN, CO PRO POSED CHECK DAMS. CHECK DAMS MAY BE ROCWCOIR WATTLE JN TEMPORARY JUTE NET BAFFE SK O '^...�.y TEMPORARY RISER AND SKIMMERISEDIMENT ICJ - BASIN TEMPORARY SILT FENCE (DOUBLE ROW) SEE SF SPACING REQUIREMENTS, THIS SHEET JH TEMPORARY SILT FENCE J-HOOK PF EF TEMPORARY PROTECTION FENCE o 12• COIR WATTLEIFILTREX FILTER SOXX OCW O PERMANENT STORM PIPE. REFERENCE SCM DETAIL SHEETS. SD TEMPORARY STORM PIPEISLOPE DRAIN \l 1 \ \ 11 ,-/-e I I'rglll lu vA\V,.1�vv pyl,l I �x� v oxv oxv oxv q bxv ¢xd a 1 7 _ I�Idddl ���d�sxdd—r if PRIOR TO DISTURBANCE OF STREAMS, CONTRACTOR SHALL ENSURE THAT \ \ \ THE APPROPRIATE NATIONWIDE / PD-RZ PERMITS HAVE BEEN RECEIVED y.1■� I I MODIFICATIONSTO THE EXISTING STREAM. \ 1 / I REFER TO THE TYPICAL STREAM SECTIONS I I ANDSTABILIZATIONDETAIL.,\\I`THIS SHEEI 11 I If IIII III\111 `\\)l, I1, IIII \\I�)\rll\\\ \ \\ III I I I I / ---,llp —�—�'/ //,I 1 III — IIIIII I y\� \` LEGEND NOTES TO CONTRACTOR TEMPORARYIPERMANENT STORMWATER TC CULVERT. SIZE AND INVERTS SHOWN ON THIS PLAN FOR CLARITY. SFR STONE FILTER RING SILT FENCE OUTLET. CONTRACTOR TO PLACE SFO ADDITIONAL OUTLETS AS FIELD CONDITIONS REQUIRE. RR RIP -RAP DISSIPATER PAD NAG DSi SO OR EQUAL (UNLESS ERASION CONTROL BLANKET/SLOPE ECB OTHERWISE SPECIFIED) STABILIZATION TEMPORARY SEEDINWTABILIZATION PER EROSION CONTROL DETAILS. TEMPORARY STREAM CROSSING DESIGNED TB BV CONTRACTOR. (BRIDGE) CONSTRUCTION ROADS, CONTRACTORS TO BE CE RESPONSIBLE THAT OFF ROAD TRAFFIC STAYS ON DELINEATED SURFACE DELINEATED JURISDICTIONAL FEATURE, NO DISTURBANCE WITHOUT PROPER PERMITS DELINEATED JURISDICTIONAL FEATURE, FUTURE DISTURBANCE, NO DISTURBANCE WITHOUT PROPER PERMITS OUTFALLS POINT OF ANALYSIS PDA- A IS THE UPSTREAM INVERT OF AN EXISTING SIZE AND MATERIAL UNKNOWN WHICH CONVEYS A WATONG THE SOUTHWESTERN TH UNNAMED STREAM FOUND SITE THE C ACROSS Ir WATERSHED WHICH RUNSALONGTHESOUTHWESTERNPORTION OF THE SITETREAM, -S5. IN THE ITESCROSSES EXISTING CONDITION STORMWATER FLOWSOVERLANDK THE OUTHO TH CROSSES BELOW -SS, AND ULTIMATELY OUTFALLS TO DUHARTS CREEK SOUTH OF THE PROPERTY. POINT OF ANALYSIS POA-B IS THE UPSTREAM INVERT OF AN EXISTING CULVERT (SIZE AND MATERIAL UNKNOWN) LOCATED APPROXIMATELY W00 FT SOUTH AND WEST FORM THE INTERSECTION OF I-S5 AND COX ROAD. THE CULVERT CONVEYS WATER FROM AN UNNAMED STREAM FOUND IN THE CATAWBA WATERSHED, BELOW I-85, AND ULTIMATELY OUTFALLS TO DUHARTS CREEK SOUTH OF THE PROPERTY. POINT OF ANALYSIS POI IS THE UPSTREAM INVERT OF AN EXISTING 48" REINFORCED CONCRETE CULVERT LOCATED APPROXIMATELY 6800 FT SOUTH AND WEST FROM THE INTERSECTION OF I-85 AND COX ROAD. THE CULVERT CONVEYS WATER FROM AN UNNAMED STREAM FOUND IN THE CATAWBA WATERSHED, BELOW I-B5, AND ULTIMATELY OUTFALLS TO DUHARTS CREEK SOUTH OF THE PROPERTY. POINT OF ANALYSIS PDA-D IS THE DOWNSTREAM POINT OF AN EXISTING STREAM TO THE SOUTH AND EAST OF THE DEVELOPMENT. IN THE SITES EXISTING CONDITION, STORMWATER FLOWS OVERLAND TO THE STREAM AND ULTIMATELY OUTFALLS SOUTH EAST OF THE PROPERTY TO DUHARTS CREEK. 1. REFER TO GENERAL NOTES SHEET FOR EROSION CONTROL NOTES. REFER TO MASS GRADING PLAN SET FOR ADDITIONAL EROSION CONTROL MEASURES REQUIRED AND REQUIRED SEQUENCE OF INSTALLATION. SEDIMENT BASINS SHALL BE LEFT IN PLACE UNTIL ALL FUTURE AREAS UP STREAM OF SEDIMENT BASINS ARE FULLY STABILIZED. 2. THE CATAWBA RIVER BASIN IS THE RECEIVING WATER BODY OF STORMWATER DISCHARGE FROM THIS SITE. 3. ANV OFFSITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRAS WDEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE DISPOSED OF AT FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCES RULES AND REGULATIONS. 4. STOCKPILES SHOULD NOT BE LOCATED WITHIN 50 FEET OF ANY STORM DRAIN, BASIN, OR STREAM UNLESS NO ALTERNATIVE IS FEASIBLE. 5. EFFECTIVE OCTOBER 1,2010, PERSONS RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT THE SEDIMENT AND EROSION CONTROL MEASURES ON A PROJECT AFTER FACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. SELF INSPECTION REPORTS ARE REQUIRED. A SAMPLE SELF -INSPECTION REPORT AS WELL AS DETAILS OF THE SELF -INSPECTION PROGRAM, CAN BE FOUND ON THE LAND QUALITY WEB SITE. 6. CONTRACTORSHALL FIELD LOCATE TEMPORARY LAYDOWN B STORAGE AREAS. CONTRACTOR SHALL COORDINATE WITH INSPECTOR PRIOR TO PLACEMENT. ADDITIONAL MEASURES DOWNSTREAMS MAY BE REQUIRED. SOIL TYPE LEGEND A - ALAMANCE VARIANT GRAVELLY LOAM, LtlD2- LLOYD SANDY CLAY LOAM, 8 TO 15 2 TO 8 PERCENT SLOPES PERCENT SLOPES, MODERATELY ERODED A-- ALAMANCE VARIANT GRAVELLY LOAM B-LIGNUM SILT LOAM 1TO6 PERCENT 8 TO 15 PERCENT SLOPES SLOPES CIB -CECIL-URBAN LAND COMPLEX, 2 TO 8 PERCENTSLOPES TBB-TA TUMGRAVELLVLOANZT08PERCENT SLOPES C-CHEWACLA LOAM 0TO2 PERCENT SLOPES FREQUENTLY FLOODED TBD- TATUM GRAVELLY LOAM 8TO 15 PERCENTSLOPES -- LLOYD SANDY CLAY LOAM 2TO8 PERCENTSLOPES, MODERATELY ERODED INSPECTOR DISTURBED AREA JONATHAN C.BOERGER LIMITS OF DISTURBANCE=t 320.0 ACRES GASTON COUNTY NATURAL RESOURCES DEPARTMENT ON) W -2150 JOSEPH ALM CARTON NATURAL RESOURCES DEPARTMENT NORTH (]041922-215] GRAPHIC SCALE IN FEET 0 30 60 120 DRAINAGEAREA=t12.5 AC DISTURBEDAREA=±12.5AC C=0.60 `J/ -_/- DA-B400 -- - \ \ \ /� DRAINAGE AREA =±31.07 AC �_-7�' -� TC-37.4 MINUTES 1 �\\// / DISTURBED AREA =±31.07 AC - - �// Qo=37.4 CPS ' / J]RAINAGE.ARe1C l / C=0.60 .' �+° / j //' \/ // B 1416ARY— / TC = 18.92 MINUTES REFER TO MASSGRADING I , / // \) / QO=$4.1 GF$ V \\\T / PLANSPREPAREDBV / / / / \ KIMLEV-HORN FOR DESIGN // / % / / / /\\ J r INFORMATION y 4\ uNGwV`i�E 9 HIGH POINT loxd \ o�� oxv oxv (1 \,xP ,oxvt- o oxq l'xv LPP— / ox oxAl \ox��Io',v \1v lox oxv oxv d v—I oxv I xxd— oxp� oxv o4v oxv oI \� IRxP �xP oxP -7ox oKa ox oxv d .PD-Rs 11 1 I 1 \, \ \ I PO-R4 \ \ \ \ _ / PD-RS / IE rfo�ARv t¢'sLR�eR�II�rP 6 \-�,% # n / coj / I s I{„ I T D DURING M 1 I I g, \• 10 •t / I L E, D E AV l�N� ->\\ 7 L 10 Q,'R�A� A�WpAC—�a w I\ y��l IIII !\t \ / i/ \ 1 HIJ491N� iTART � DA-13300 \\\ \ \ \\\\\� \ DRAINAGE AREA=±19.02 AC if li//�/i' DISTURBED AREA=±19.02 AC C060 1 QII 48.3CFISUTES It I L•\ 1\ % �\ \ .� LA—CB,CHECK D!•W tVrl /, / / / ( / / , IS>IIB 4TN/�QRK i// \\ \ \d Y 1 'IQALCHANNEL \�` \ \ ) 4 \ \ \ \ \\ \ \ -• -j i\\ „' \4�1�T�VVVDtltltl oe abTTBM- �\ - \ \ 1 \ \ \\z.STiMIN`AX)1 \ \_,\�� 1 \\ \\\\ \ SEDIMENT BASIN B300 ESE SLY 50 �� (--- Q \ \ 1 \ \ \ TOP OF BASIN 708.0 \— / / /\ �� \= \ \_—` \ \ \ 1 \ I / \ BOTTOM OF BASIN 700.0 j STORAGE VOLUME RED.: 34,236 CF /'\PROVIDED STORAGE VOLUME: 121,241 CF \ _ _ \ \ I ) \ 1 \ \ I 1 I - \ SURFACE AREA REQUIRED: 21,018 SF- V DIVERSION DITCHES AND SEDIMENT 1\\ / SURFACE AREA PROVIDED: 27,6415F _ i/� BASINS SHALL BE INSTALLED PRIOR TO \ ! _ \ BEGINNING CONSTRUCTION OF THE a TW1D BDDD / ROADWAY EXTENSION. REFER TO MASS \ \\ \--31'sloy�Fsr6P,EEgyy II%IIII 1 /r GRADING PLANS BY KIMLEY-HORN. / /\\\"�J Jr--_-/-//i05(M5�/fir/�• y `s".21­i,' / \\I I 1 \ RR-B301 \\\\ NCDOT CLASSA RIP RAP \\\ \ \ __-//' �l / /)\\I I APRON WIDTH (START)-12.O FT.�v ( \ 700.00 \ ) J- 11 III APRON WIDTH NGTH- 22.4 FT Vy\\ \ ; LENGTH=22.0 FT \\\ eca rs \ 1 - 700 1 \\\\\I I \\ DEPTH =18.0 IN 1 \\ I\\\l �1\\1 \ \\ \ \ I I \ 1 I \ \ \ I I \\ 1 \\\\\\\\ \\\ \\ \\\ aF\ 1 I I i l I\ \ \\ \l \ \\ \ 1 \ \\ Jill Ill IIII////� II11/`l\1\ \\ I I/lllll`it \\\\\I ONE(1)- 4 INCH FAIRCLOTH SKIMMER \ \\ ORIFICE OIAMETENVERT INCHES' \ I \\\ II INVERT-]01.0' \ C \ \ \1 1 \) i\ EEaSc�E TOti M IPADI G, ST09=N� \\\\ I Ill I %?�O CO APNS FORK TONIA\\\ IIIIII\\\$111,\\ \\\II\, \ IIIII t 1 II II I It P a x N N O ¢ W O O 2 O N I a aN a 0 a 'm _o 'o O < J <�a w O LJ_ .a U Q Z 7I 0- 0_r0r/'� �/) L v J rY 0— W L1 z W coLu U d O J `} 0 LJ J U C'/ O rUr W L�I_I a w � J a Z Q Z d �o N Q LJO O Z 0 Q SHEET NUMBER R301 E REFER TO MASS DA-B400 \ \ I �. \\ I I GRADING PLANS \ / \ ) \I I I I PREPARED BYDRAINAGE AREA - -Mbl A. OR I \ DISTURBED AREA =±31.07 AC 1 / / (/ I \l I \ 1 DESIGN INFORMATIONI TC= 18.92 MINUTES \, J Q-84.1CFS \ DURING EROSION ROL �RUCTURES TO BE UTILI ED AH\ 1 INS TO DIVERT FLI,OW r05 DI T (p f \BA31ry00,(SEE SHEETh23041�O D FOLLOWING FULL 8TA�IHZAY DI�OK THE) AQERUEBN EXTENSIOrJ, CO TRACTOR \ SHALJ.BONVER ITEM%. A. NI-11oAMA)J\OLEfx\_� <\/ PD-R13 I ) �- t-fit\ / / / 1 onv / �/ 1 \ II �� \ \ I j I / 1`� '� fi }'C\ I a �r 1 \ -4 T� \T k DA-B400 _� I ( I I \ DRAINAGE AREA=±31.07 AC </ DISTURBED AREA=±31.07 AC C=0.6o 1 / ��J / / GRAINA)EAREA-- xI\\I I I111I((\ I II I I / l� / ITC=18.92MINUTES Ir _-i-// -/ /'13a�]pAaY-_ / __r D,a=84.i cFs 4 ' k \) I-0PVERTICLE \ \ _ ZRAPEZOIDALLyAMN�L 7. START \t�Z\ �jj �iTTa1t�TIT Cl�(LV`R I G AS'I ACCESS U E \ � �i / 1 III\ / ry N C \ / 1 I I IA\LL5\�r�,yyTB I�IBIAL mbUl21NG �RdSltl1( \ / HIGH PoIN / PO-R9 an I Ip 11--� �HPI I�TIiDBf{HA,s�{iduT�2wIDE OPE[JRu�IN on�� \ \°Xa 8 L /.,yy1 afv j p4 o P Hv�--�.on TI I I I A MTO'ALLOW DITCr TO DRAIN T >IP PIS -I-{ 6P �ir,�rfiae /5"' _� T °H� -Na / r sT sF ea30 /T / I / �/,�///� TErydoR4Yl2"SLgPE IN'TO�E ( DD-B302 s.° DD-aaz C / / \ - WETLAND IMPACTS NO I I START -, .� DISTURBANCE WITHOUT 1 fNST/CLLE[yDR1r .EROAIO I / / START I] / ' / 0��� L RASE D RE P / '1 / I / / PROPER PERMITS F noF�o� wraic/ � /a I �'f I IQ 1 1 \ oo-Bbo2 \ 11 I I 1 11 / / /d \\N\ \ / II I I \ \\ ✓ / \ \ 1 \-- //���■M / / Ip \ 11\ / III �I / \\ \\u/ \ / I\� 11 ■ �ys� / / P CE CHECKp R{' EVE \ BY OF VERRTICAL DROP I I / / / X 1119,T\L OUR GR0910N \ \RR-B401 \ \ +Vy \ ` � _„ - % � �/ / P�NT/ �T�{ F V:OADXI'AV WPRK II / APRON, DTPI{S? jf.0 / AFRO IDTH (END) 4].2/F / / I TEN H-�s2.e FT DA-B300 / / I /J Y IC I / I // sK I f f ( \ \ / /\v / /-- ///'I TRAPEZOIDAL CHANNEL \aEDi=iBBN\, / / \ I REA=±19'r■l/i// /( I,a �(II /{ \� /If ////I/I/— '�\1\\\ \\\\ \ Yn \ /- / - iJ 1 / //�/ a3E:CF1BT D5IBOTTOM .02 AC (IDESOPE N(MAX)/ DISTURBED SET PM C=0.60 TC=21.71 MINUTES a°=a6.aICES _// //......D / /\ \ \ / _-- // PLACE CHECK DAMS EVERY ( \ \ /7 // / 1 II r \ 1.0 FT OF VERTICAL DROP 1 1 \ -.WETLANDIME WITHOUT \ ( \ \ \ \ \ \ \ \ - - / 1 / / 1\ ) I / / \ � \ \\�c� x // = � \b �\ \ \ / / / // DISTURBANCE WITHOUT ' / / / / i DD-Bbo2 /ItI 1 \ 1 \ \ \ \ \ \\ I \ \ \ \ \I RR-B402 '18 NAACPDROOTN WWIDTH 2END \ \ \\ \ \ \\ \\ \\ )NIDTH (SORIPA0T -3 T \\ \ \ \ \ \ I I _ \ \ / // - _ \ I / �_- /L//////// /,,,JJ�����/(%// �% /// / � / �'/// \ = SF \\ �.\ J �^ l .\� f l\ \ __/• _' / / \ \ -\\ \ TOP OF BASIN Z2Z.0 I 1 I I II I \ 7\ /7 ��)•l �/�,� / - - l 1 ///�/\I/( / r - - � \ \\\\ ���y� \ \'\�\ �\ \\ \_ ' �� / // � \ I BOTTOM OF BABIN ]13.0 I I ( � / / I I f / //' i/// SURFACE AREA PROVIDED: \ �\ _�RFzQIBAr G/YAI�YE- /// /�/ // / / /i/ ) 1• l fisrBE se'�` r/ u�/// �/�, =C�?�� _ , �/-. / � � //� �/ � (/ I \ \ \ •\\\\ \� � /, // I 1 ONE(11-SINCHFAIRCLOTHSKIMMER- J_ _�J/// / f' / -`_i// / // / /• // I1 I 1/ / / ORIFICE DIAMETER=4.7 INCHESINVERT -714.0 /I r' CONTRACTOR SHALL —LIGHT A Imo) TEMPORARY PIPE FROM PERMANENT STRUCTURE ORIFICE AS NEEDED TO CONNECT SKIMMER TO /// / / // / ' J)( / � / / _ I / _ ' l s I / l II / / I II \ 1 \ \ \ \ \ \ \ \ � �� \ \� \ \ \ \ \ \ = \ _ \ \ , ( PEP AAC RM R } AN E NT J EISTR I / I _ - - C /DNTAILISHE RR-Baa GRADING PLAN SET FORADDITIONAL EROSION CONTROL MEASURES REQi, \\ / / \4I\ _\ �/�\ I �-(j/\\ //\ //i�'/' �/_�� -/�/\\///%/// \/%/'� _i./�/- ' '\ /�� / • v_ , j- \ / -/_�- i/ � --\/�-� _ �-;\ / � � '_1'\ � -\-- 'I � _' �- U -/ / --/_-/ I / - N\- \ /�\ --' - -�/ l_ -\- _/ � - /'/_/ -/ __i -\ / /_- -\iI % / \/\ //\ /' /� _i \�/' \�� -i�> -�� '�/' ' �/i _ - /�-4/�. /� % —/i / - _��� �\� -_\J� f r . - E / T � =/ 1 / I / J ! / ti <\ `I \_ , 0 NCDOT CA APRON WIDSTSH A(SRTAPRRTPFT 7 AEPNRGOTNHWIDTH(END) =I6OFT / I (7 44 A" GRAPHIC SCALE IN FEET 0 30 60 12 NOTES TO CONTRACTOR 1. REFER TO GENERAL NOTES SHEET FOR EROSIDN CONTROL NOTES. REFE RTOM UIREDAND REQUIRED SEQUENCE OF INSTALLATION. SEDIMENT BASINS SHALL BE LEFT IN PLACE UNTIL ALL FUTURE AREAS UP STREAM OF SEDIMENT WINE ARE FULLY STABILIZED. 2. THECATAWBA RIVER BASIN IS THE RECEIVING WATER BODY OF STORMWATER DISCHARGE FROM THIS SITE. 3. ANV OFFSITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971 OR A LANDFILL REGULATED BYTHE DIVISION OF SOLID WASTE MANAGEMENT. THASHIDEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY MY ACTIVITIES ON SITE MUST BE DISPOSED OF AT FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCES RULES AND REGULATIONS. 4. STOCKPILES SHOULD NOT BE LOCATED WITHIN 50 FEET OF ANY STORM DRAIN, BASIN, OR STREAM UNLESS NO ALTERNATIVE IS FEASIBLE. 5. EFFECTIVE OCTOBERI 2010 PERSONS RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT THE SEDIMENT AND EROSION CONTROL MEASURES ON A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. SELF INSPECTION REPORTS ARE REQUIRED. A SAMPLE SELFINSPECTIONREPORT, AS WELL AS DETAILS OF THE SELF -INSPECTION PROGRAM, CAN BE FOUND ON THE LAND QUALITY WEB SITE. 6. CONTRACTOR SHALL FIELD LOCATE TEMPORARY LAYDOWN B STORAGE AREAS. CONTRACTOR SHALL COORDINATE WITH INSPECTOR PRIOR TO PLACEMENT. ADDITIONAL MEASURES DOWNSTREAMS MAY BE REQUIRED. SOIL TYPE LEGEND --ALAMANCE VARIANT GRAVELLY LOAM, LtlD2- LLOYD SANOV CLAY LOAM, 8 TO 15 2 TO 8 PERCENT SLOPES PERCENT SLOPES, MODERATELY ERODED -- ALAMANCE VARIANT GRAVELLY LOAM, LAB- LIGNUM SILT LOAM, 1 TO 6 PERCENT 8 TO 15 PERCENT SLOPES SLOPES C -CECIL-URBAN LAND COMPLEX, 2 TO 8 T - TATUM GRAVELLY LOAM 2 TO 8 PERCENT PERCENT SLOPES SLOPES ChA- CHEWACLA LOAM, 0 TO 2 PERCENT T - TATUM GRAVELLY LOAM, 8 TO 15 SLOPES FREQUENTLY FLOODED PERCENTSLOPES LdB2 - LLOYD SANDY CLAY LOAM, 2 TO 8 PERCENT SLOPES, MODERATELY ERODED INSPECTOR DISTURBED AREA JONATHAN C. BOERGER LIMITS OF DISTURBANCE=t 320.0 ACRES GASTON COUNTY NATURAL RESOURCES DEPARTMENT (704) 922-21M JOSEPH ALM CAST NATURAL RESOURCES DEPARTMENT (704)922-215] `/ -/ // f I / / / 11 I I II LEGEND / 4LLUD,.D1B)EM\(\(\/\ µlH (H!/EESL J( CQkE/I�{1EO/ V) I /) i R9ATROAD ..qIDRD N' \ /r r4 ' < If <` Vff\ 1111.1 f \ . `/ -/ // f I / / / 11 I I II LEGEND / 4LLUD,.D1B)EM\(\(\/\ µlH (H!/EESL J( CQkE/I�{1EO/ V) I /) i R9ATROAD ..qIDRD N' \ /r r4 ' < If <` Vff\ 1111.1 f \ . - - OVERALLPROPERTYUNE LIMITS OF DISTURBANCE — —XX— — —EXISTING MAJORCONTOUR - - - - - XX - - - - - EXISTING MINOR CONTOUR XX PROPOSED MAJOR CONTOUR XX PROPOSED MINOR CONTOUR LIMITS OF DRAINAGE AREA PROPOSED BUILDING FOOTPRINT 0007 SLOPEARROW IP O INLET PROTECTION CE CONTRUCTION ENTRANCE OD ] • PROPOSED PERMANENT DIVERSION. REFERENCE GRADING AND DRAINAGE PLAN, CD PROPOSED CHECK DAMS. CHECK DAMS MAY BE ROCK/COIR WATTLE JN TEMPORARY JUTE NET BAFFE SK TEMPORARY RISER AND SKIMMERISEDIMENT BASIN TEMPORARY SILT FENCE (DOUBLE ROW) SEE SF SPACING REQUIREMENTS, THIS SHEET JH r `� TEMPORARY SILT FENCE J-HOOK PF PF TEMPORARY PROTECTION FENCE LOIR WATTLEFILTREX FILTER SOXX PERMANENT STORM PIPE. REFERENCE SCM PF DETAIL SHEETS. SD TEMPORARY STORM PIPEISLOPE DRAIN LEGEND TEMPORARY/PERMANENT STORMWATER TC CULVERT. SIZE AND INVERTS SHOWN ON THIS PLAN FOR CLARITY. SFR STDNE FILTER RING SILT FENCE OUTLET. CONTRACTOR TO PLACE SFO ADDITIONAL OUTLETS AS FIELD CONDITIONS REQUIRE. RR RIP -RAP DISSIPATER PAD ECB NAG IS' IAKET/SLOPE 500R EQUAL (UNLESS EROSION CONTROL BN OTHERWISE SPECIFIED) STABILIZATION TEMPORARY SEEDING/STABILIZATION PER i' EROSION CONTROL DETAILS. TB TEMPORARY STREAM CROSSING DESIGNED BV CONTRACTOR. (BRIDGE) CONSTRUCTION ROADS, CONTRACTORS TO BE CE RESPONSIBLE THAT OFF ROAD TRAFFIC STAYS ON DELINEATED SURFACE DELINEATED JURISDICTIONAL FEATURE, NO DISTURBANCE WITHOUT PROPER PERMITS DELINEATED JURISDICTIONAL FEATURE, FUTURE DISTURBANCE, NO DISTURBANCE WITHOUT PROPER PERMITS OUTFALLS POINT OF ANALYSIS PDA- A IS THE UPSTREAM INVERT OF AN EXISTING SIZE AND MATERIAL UNKNOWN) WHICH CONVEYS WATER FROM AN UNNAMED STREAM FOUND IN THE CATAWBA WATERSHED WHICH RUNS ALONG THE SOUTHWESTERN PORTION OF THE SITE ACROSS 1-85. IN THE SITES EXISTING CONDITION, STORMWATER FLOWS OVERLAND TO THE STREAM, CROSSES BELOW 1-85, AND ULTIMATELY OUTFALLS TO DUHARTS CREEK SOUTH OF THE PROPERTY. POINT OF ANALYSIS POA-B IS THE UPSTREAM INVERT OF AN EXISTING CULVERT (SIZE AND MATERIAL UNKNOWN) LOCATED APPROXIMATELY 4000 FT SOUTH AND WEST FORM THE INTERSECTION OF 1-85 AND COX ROAD. THE CULVERT CONVEYS WATER FROM AN UNNAMED STREAM FOUND IN THE CATAWBA WATERSHED, BELOW 1-85, AND ULTIMATELY OUTFALLS TO DUHARTS CREEK SOUTH OF THE PROPERTY. POINT OF ANALYSIS POA-C IS THE UPSTREAM INVERT OF AN EXISTING 48" REINFORCED CONCRETE CULVERT LOCATED APPROXIMATELY 6800 FT SOUTH AND WEST FROM THE INTERSECTION OF 1-85 AND COX ROAD. THE CULVERT CONVEYS WATER FROM AN UNNAMED STREAM FOUND IN THE CATAWBA WATERSHED, BELOW 1-85, AND ULTIMATELY OUTFALLS TO DUHARTS CREEK SOUTH OF THE PROPERTY. POINT OF ANALYSIS P D IS THE DOWNSTREAM POINT OF AN EXISTING STREAM TO THE SOUTH AND EAST OF THE DEVELOPMENT. IN THE SITES EXISTING CONDITION, STORMWATER FLOWS OVERLAND TO THE STREAM AND ULTIMATELY OUTFALLS SOUTH EAST OF THE PROPERTY TO DUHARTS CREEK. Q I N N O D, wo o00 x O N D,- w� d N G O 4 m Y J co o H F- NW LLJ LL G O Q J Z U) 0L r//''�� w U) I L 0- w N L.L.I z LL.I_I Lu 000 D_ O J } U o j Q W w V Q C) H J a Z Q Q Z 0_ I— � a Q O Z LO Q SHEET NUMBER R302 CONSTRUCTION SPECIFICATIONS 2' MIN 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, STEEP CUT OR FILL SLOP - BRUSH, STUMPS, AND OTHER OBJECTIONABLE - T MATERIAL. - - 2. EN SURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 2:1 SLOPE (MAX) 3. ENSURE THATTHE TOP OFTHE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS CROSS SECTION THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. MAINTENANCE AFTER EVERY RAINFALL IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREAAND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. im DE (O.SS MIN) : E1s(MAx) STEEP CUT OR FILL SLOPE PLAN VIEW BMW EOR h1ex.Carculaitetl Pemllaaihle Min. Depth Celculaten Permlawtile Berm Type VC34cRp^ velocity^ DTFIow', Shear 3"4Y hear StMN N. {FPS} [}Pe} IN (ICSIRg) jift0E) PDRi SC250 OF 5.97 15.00 0.60 3.07 10.00 Greeter PPR2 SC250 DF 4.12 15.00 0.50 1.59 10.90 Greeter PD4t3 SC2�0 a 4.25 15.00 0.40 1.75 10.D0 PDR4 SC250 Or 4.23 15.00 0.40 175 10-Do 8C2!50 Or PDBS GfeSter 4.31 15.00 CAD 172 10.00 PDRA 6�aOr 4.57 15.00 0.40 1.72 10-Do Dr PD-R7 gmatar 1.56 15.00 0.50 2.50 10.D0 PPR3 sC2E6 ON 4.50, 15.00 0.40 '2OD 10.00 Br (W Or PDR9 1.p7' 95.00 0.20 OLM 1Q.00 PDJi9D SC250 Dr 1.87 15.00 0.30 0.38 1000 Greeter $0150 or PD.R11 2,58 15A0 0.30 067 10.00 PDR12 SG250 Or 2.50 15.00 0.30 0.07 10.00 25 F Sf`.250 °F PDR13 G ea er 9.C73. 15.00 0.40 3.74 10.00 $Cy50 er PQR14 Greater 4.87 15.00 0.70 263 1.0.00 CRITICAL POINTS ES. A. OYerlap.-Seams Ho 11 ­IXHeetl E Water Ll'. alteretl eif Ge t wa .11 sPi. "P.O.,P C. G5a0GelB WH/Sitle Slope Vertices cnllwl polnM .1O MR cxa 1 A A N B C e C soil contlltions, t,e Use o<-PI IeOgHha greater Nan 6'(16a0) may D. REGPs. awry to p Rly aewre me CHANNEL INSTALLATION NOTES MAT AT THE CHANNEL/CULVERT OUTLET AS SUPPLEMENTAL SCOUR PROTECTION AS NEEDED. ANCHOR THE RECPS WTH A ROW OF STAPLES STAKES APPROXIMATELY 12" 30CM APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT F TRENCH AFTER STAPLING SE APPLY SEED TO THE COMPACTED SOIL AND FOLD THE REMAINING 1 WITH A PORTION T RECPS BACK OVER THE SEED AND COMPACTED SOIL. SECURE RECPS OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 1IN APART ACROSS NTHENE . RE OF THE RECPS. 3. ROLL CENTER RECPS S L SURFACE. OF WATER FLOW IN BOTTOM OF CHANNEL. RECPS O UNROLL ACE APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECPS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONSS SHOWN THE STAPLE PATTERN GUIDE. 4. PLACE CONSECU(S TIVE RECPS END -OVER -END (SHINGLE STYLE) WITH A 4"-6" OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4APART AND 4' ON CENTER TO SECURE RECPS. S. FULL LENGTH S EDGE OF RECPS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY APART IN A 6 (15CM) DEEP X 6"(15CM) CODE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 7.IN HIGH FLOW CHANNEL APPLICATIONS A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9 -12M) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4'(10CM) APART AND 4"(10CM) ON CENTER OVER ENTIRE W OTH OF THE CHANNEL 8. THE TERMINAL END OF THE RECPS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30CM) APART IN A 6'(15CM) DEEP X 6-(15CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. DWI? ppeh Side BDEmm Min. Ditcry Ma K. Ditch Dralpage Opmpp91t8 Tc trtLeneity Feat Flow Max. Depth MI . Depth Ella X. Calculated Check Dam Ph.-SCIf FlomDimerISIDEN $lopes Width ArediNa a.dIRM Am. C.VaI- Imin) (1p1hK) R<D ._ ng'a of FI_- of Flour' vSIGDIEy" 44elght CHNlshuctlon NO. (1LY) (m) (ac} fQ lac) (c14 MI (it) (fps) IFO Required P6R1 2 0ecp 3:1 Ulf]048 1.0.=% 6 1 15 050 1a.00 a50 sae 0.a$ G BO G,60 5.97 1 00 1 V-BOTTO POR2 311 0.0 1.00% 8.50% 0.26 0.00 10.00 013D 1.29 0.03 0.0 0.30 4.12 0.50 1 "-BOTTOM PDR3 1. Deep 3:1 0.0 1.01 7.00% 0.38 0.60 10.00 8.13G 1.96 D.03 1160 0.40 425 1.00 1 v-BOTTOM PDR4 3:1 DA 1.00% 7.00% 0.37 0 10.00 8.60 1.01 0.03 0.5D 0.40 4,23 1.D0 1 v2'Oeep .60 PWR5 8:1 D11 0.$zI% 6.0at5 0.60 10.00 si9a 2.13 0.-0$' 0.743 0.41) 451 1 tl0 1 V BD tP7M .D:41' 2' T)BBp PARS V-BOTTOM 3'1 D.Q 0.30% 8.9039 0.52 0.60 MUD 8.80 2.88 U.09 0:80 DAO 457 1.60 i PDR7 3:1 1.x0 . 8.0034 0.91 O.BO 10.00 8.60 �.70' 0.03 : D.80 0:50 5.56 1.00 1 V-DpT1pM L.D.O. PDRB 3A 0.0 1.A% 0:00% 0.39 0.80 10.00 B.60 2111 DAM Q,SO G.4p 4,50 1-0 1 V•BOTTOM PUR9 1.5 Deep -3.1 0.0 0.9EF5 1.90 0 0 10 D-00 10.00 5.5D 0.52 0.0$ 0.40 0.30 1'.57 0.50 1 V BOTTOM! PDF10 1'$ Deep 39 0.9 0.30% 1.9D% 0.10 O.BO 10.00 9.60 0.52 0.03 0.40 0.30 1. B7' 0.50 1 V-BOTTOM PQR11 µBOTTOM 3:1 0.0' 0.60% 3.6D% 014 D.60 10.00 8.130 0.72 '0.03 0.40 0.30 2.58 0.50. 1 PD-R12 1'$' Pew 2.1 D.0 0.601A. 3.60N, 0.14 D.60 10.00 8.80 0.72 0.03 0.40 0.36 2.50 0.50 1 V-BOTTOM 21 Deep, 1.60% 15.00% 3.72 PDR1$ 3:1 .2D D60 '10.00 5.50 1930 '0.0$ 0.70 0.40 D..03 100 1 TRAPEZIOD / S♦Nt66♦t• tt GV tG ♦♦♦ tt Gt ♦ 4t ♦♦ Vt♦Vtti ,,`t`�`t♦`�"` _ tt C ttt ♦♦ �V ® � CtS��t�♦t♦tGI� itt tt ' it ♦�, .tt♦t�tt♦tom: C It C t• ­TE MI ea of aMple or nerglen9Na g0reate�aNarureN(15rmEmay A SLOPE INSTALLATION NOTES WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12- (30CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO THE COMPACTED SOIL AND FOLD THE REMAINING 12'(30CM) DO TOM OF RECPS BACK OVER THE SEED AND COMPACTED SOIL SECURE RECPS OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12"(3CCM) APART ACROSS THE WIDTH OF THE RECPS. 3. ROLL THE RECPS (A) DOWN OR (B) HORIZONTALLY ACROSS THE SLOPE. RECPS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECPS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. 4.THE EDGES OF PARALLEL RECPS MUST BE STAPLED WITH APPROXIMATELY 2' - 5' 5-12.5CM OVERLAP DEPENDING ON THE RECPS TYPE. ( ) 5.CONSECUTVE RECPS SPLICED DOWN THE SLOPE MUST BE END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3"(7.SCM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12-(30CM) APART ACROSS ENTIRE RECPS WIDTH. MAINTENANCE: 1. INSPECT ROLLED EROSION CONTROL PRODUCTS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAIN FALL EVENT REPAIR IMMEDIATELY. 2. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED AND EROSION MUST NOT OCCUR BENEATH THE FEB. 3. ANY AREAS OF THE ECB THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED PROTECTED. 5. MONITOR AND REPAIR THE BOB AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. OPERMANENT s®NcSEED, SPRIGS & SOD ALL DISTURIBED AREAS IN CDANIZ a11x LAWNS AND GRASSES SPECDCATONS AND LIN (SODDING ANDSPRIGGNG PLAN). O=GN Y SEENNO AGRIQUDDRAL uursroxE Axo taco IeIaar 10-t 10 FEFERnuzeRE rnQUl MULCH N/OCR an1EYa u.1D GauaHis P'BEn saunlic rLBnao.BxETnNGTSUGHL ns Man BWEiM'Lii PKASTC, CoITON. JUTE, K. OR PAPER NETS sTAPLID OVER THE MU-1. AS A p9(µSLUF'T NEARLYSaTRECO14HMENDATg1S OR A MULCH ANq uINwNCE LB/ACRE OF NITROGEN EN MARwo If ETREPAIR AND REFERFUDAMAGEARSIS NECESSARY TO EXTEND TEMPOR ONSTAL mYEa BEvaxl )JORBUS RSEOD NTH KOIiEAN (MOUNTLI s)sMas EN_ IINCRE mA(iEEFEaRUARY� EARLY MARCH O =NI �NY SPRING SEEDING X RYE(GRAIN) EGIES �O0m ANNUAL CZA IDMONAND"A "PPAIM KOREAN IN MOUNANE) ![/4ryEEl1 50 OMIT ANNUAL LESPED MOUNTAINS - DYE 2. FF. DIES.15 -MAY 15 DW 25W 7 FEEL 1 - MAY , PIEDMONT IN OLEC. IMAPPR. 15 SOIL AMENOMENIS MRIGULNRCALCMLIXwHESTONE PN� 7S50B A� 0-10-10 CPECCUBUSEAR. 4TQUND MULCH APPLY 4.000 10 ACRE STRAW. ANCHOR STRAW BY TACKING NW ASPHALT AT A RAM 0.10 GA w SQUARE YARD, METIING SUCH AS UGHTAEIGHT P ASTLF COTTON,I JUTE N,RDING TO THE BE. OR PAPER NETE STAPLED OVER STAPLES OR A MU GH MULCH MNNACCLTENANCES A DISK SET NEARLYSSTRAIGNTEN L ANCHORING REFERTUZE IF GROWPH IS NOT NLLY ADEQUATE. RESEED, REfFRFUZE. AND O SU SEEDED GAT A RAPE OF 50 I5/ACRE 'OUNIA" -MAY 5A AUK 15 COASTAL DMI FSTAALPLMXY 11 AIN APR. 15 PUG. 15 SOIL AMwRw % TONS OF SOIL PEnS OR APPLY 2,� b/ACRE GROUND AGRICULNRAL UMES_E AND 750 IB/ACRE 10-10-10 TU R. NIxOH APPL RAFEYOF 0.10 GAULONS PER SQUARE YARD. NETTNTAT A GSUCH AS UGNTAEIGHT ACODI TO ME MANUFACTURERS RECOMNENDATgIS OR A NULGH NCHgtMO MAINTENANCE WADE. R RTU2E AND MULCH IMMEDIATELY FOLLOWIIF 11 NG EROSION OR OTHER DAMAGE.BEFB SMUT`TURBING-TIEBLLHACME HMPOCBRARILY AORREPERMANENRYNCEASED ACCORDING ALL PERIMETER DINES, STALES. DITCHES, PERMETER SLOPES AND ALL SLOPES RIEEPER SHAIJ_ BE PROVIDED OR PERMANENT ERNBEN ]A CARE DAR Nq 5GRm0UMND )NCO COVER W!� DISNFBBINC ACT�NT.UT IN ANY :N. LL TT::,.OSDURSED AREAS SHALL BE PROYIDm PwPGRARY OR PERMANENT WTHI LIZ4TCAENDARCDAYYSDFROM THESLASCTCMLNID OSTURBING EU „ITMANY EMIT BELOW ARE THE REQUIREMETS FOR EMBANKMENT CONSTRUCTION. THESE REQUIREMENTS SHALL SERVE AS GUIDE FOR CONSTRUCTION OF THE SEDIMENT BASIN'S EMBANKMENT ASSOCIATED WITH THE PROJECT. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW AND CONFIRM THE BELOW REQUIREMENTS MEET OR EXCEED THE GEOTECHNICAL RECOMMENDATIONS FOR THE PROJECT. EMBANKMENTS SHALL BE CONSTRUCTION PER THE DIRECTION OF A GEOTECHNICAL ENGINEER. THE FOLLOWING PARAMETERS APPLY TO MATERIALS USED TO CONSTRUCT EMBANKMENTS: 1. BORROW MATERIAL SHALL BE CLASSIFIED AS ML, MH, SC, SM. CL OR CH SOILS ACCORDING TO THE UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM 02487) OR ANY MIXTURE OF THESE SOILS. 2. BORROW MATERIALS SHALL HAVE A LIQUID LIMIT(LL) BETWEEN 40 AND 60 AND A PLASTICITY INDEX (PI) BETWEEN 15 AND 30 (ASTM D4318). 3. MATERIALS SHALL BE FREE OF TOPSOIL, ORGANIC MATERIAL, ROOTS, STUMPS, BRUSH, ROCKS LARGER THAN 3INCHES, SUBSOIL, DEBRIS, VEGETATION, AND OTHER FOREIGN MATTER. 4. ALL MATERIAL CLODS WILL BE BROKEN DOWN WITH TILLERS AND/OR DISCS TO PROVIDE HOMOGENEOUS SOIL THAT IS FREE OF CLAY CLODS GREATER THAN 31NCHES IN DIAMETER. STEP 1: SUBGRADE PREPARATION: 1. COMPACT SUBGRADE TO DENSITY REQUIREMENTS FOR SUBSEQUENT FILL MATERIALS. 2. CUT OUT SOFT AREAS OF SUBGRADE NOT CAPABLE OF COMPACTION IN PLACE. 3. SCARIFY SUBGRADE SURFACE TO DEPTH OF 6 INCHES. 4. PROOF ROLL SUBGRADE TO IDENTIFY SOFT SPOTS; FILL AND COMPACT TO DENSITY EQUAL TO OR GREATER THAN REQUIREMENTS FOR SUBSEQUENT FILL MATERIAL. STEP 2: SEEPAGE KEY PLACEMENT 1. SEEPAGE KEY TRENCH WILL BE LOCATED BETWEEN EMBANKMENT ABUTMENTS. 2. SEEPAGE KEY SHALL EXTEND TO A MINIMUM DEPTH OF 4 FEET OR AS REQUIRED THROUGH GEOTECHNICAL SEEPAGE ANALYSIS. A MINIMUM BOTTOM TRENCH WIDTH SHALL BE 10 FEET AND THE TRENCH SIDEWALLS SHALL BE SLOPED OR BENCHED TO PROMOTE STABILITYAND BONDING BETWEEN THE SIDEWALL SOILS AND SEEPAGE KEY FILL. STEP 3: EMBANKMENT FILL PLACEMENT 1. EMBANKMENT FILL SHALL BE CONSTRUCTED AT3(HORIZONTAL):1(VERTICAL) OR AS SHOWN ON THE DRAWINGS. DEMONSTRATION OF APPROPRIATE SAFETY FACTORS AGAINST FAILURE THROUGH GEOTECHNICAL ANALYSIS SHALL BE REQUIRED FOR SLOPES STEEPER THAN 3(HORIZONTAL):1(VERTICAL). 2. FILL SOILS SHALL BE PLACED IN LOOSE LIFTS NOT TO EXCEED 81NCHES IN THICKNESS AND BE COMPACTED TO A MINIMUM OF 95 PERCENT OF THE SOILS STANDARD PROCTOR (ASTM D6%) MAXIMUM DRY DENSITY, ORAS SPECIFIED ON THE DRAWINGS. 3. COMPACTED MOISTURE CONTENT SHALL BE BETWEEN 3 PERCENT BELOW AND 3 PERCENT ABOVE THE OPTIMUM MOISTURE CONTENT FOR ALL FILL PLACED, OR AS OTHERWISE APPROVED BY ENGINEER. 4. FILL SOILS SHOULD BE PLACED IN CONTINUOUS, HORIZONTAL LAYERS FROM ABUTMENT TO ABUTMENT. EXISTING SLOPES GREATER THAN 4(HORIZONTAL):1(VERTICAL) SHALL BE BENCHED TO PROMOTE BONDING OF NEWLY PLACED FILL WITH EXISTING SOILS. BENCHING SHALL BE PERFORMED AT MAXIMUN OF 2 FEET VERTICAL INTERVALS AND SHALL EXTEND A MINIMUM OF 4 FEET HORIZONTALLY OR AS SPECIFIED ON DRAWINGS. 5. WITHIN THE UPPER 12 INCHES OF EMBANKMENT, FILL SOILS SHOULD BE COMPACTED TO 100%OF ITS STANDARD PROCTOR (ASTM D698) MAXIMUM DRY DENSITY. 6. FILL AGAINST SUPPORTED STRUCTURES. DO NOT FILL AGAINST UNSUPPORTED STRUCTURES. 7. PLACE FILL SIMULTANEOUSLY ON EACH SIDE OF UNSUPPORTED STRUCTURES UNTIL SUPPORTS ARE IN PLACE. 8. O PLACE A MINIMUM OF SIX INCHES OF TOPSOIL ACROSS DAM EMBANKMENT TO PROMOTE VEGETATIVE GROWTH. STEP 4: OUTLET PIPE FILL PLACEMENT 1. FILLOF THE CULVERTS SHALL BE PLACED AND COMPACTED IN&INCH THICK LOOSE LIFTS AROUND THE DROP INLETS AND UP T02 FEET ABOVE THE CULVERTS. 2. COMPACTION SHALL BE PERFORMED BY HAND TAMPERS OR SMALL HAND OPERATED COMPACTORS. 3. COMPACTION SHALL BE AT A MINIMUM 95 PERCENT OF THE STANDARD PROCTOR (ASTM D698 MAXIMUM DRY DENSITY. COMPACTED MOISTURE CONTENT SHALL BE BETWEEN 3 PERCENT BELOW AND 3 PERCENT ABOVE THE OPTIMUM MOISTURE CONTENT FOR ALL FILL PLACED, OR AS OTHERWISE APPROVED BY ENGINEER. 4. ADDITEMBANONAL KMENT MPACTIONFILL OF LIFTS 2PLACEMENT FEET T GREATER ABOVE CULVERTS SHALL CONFORM TO THE EMBANKMENT FILL PLACEMENT SECTION OF THIS SPECIFICATION. STEP 5: FIELD QUALITY CONTROL AND LABORATORY TESTING 1. PERFORM LABORATORY MATERIAL TESTS IN ACCORDANCE WITH ASTM D422, ASTM D698, ASTM D2216, AND ASTM 04318. 2. TEST AT FREQUENCY OF EVERY 500 CUBIC YARDS OF EMBANKMENT FILL MATERIAL PLACED, WHEN MATERIALS USING FOR EMBANKMENT FILL CHANGE, AND/OR AS DIRECTED BY THE ENGINEER. 3. SAMPLE SIZE SHALL BE 50-LB. 4. IN PLACE COMPACTION AND NATURAL MOISTURE CONTENT TESTS S. PERFORM IN PLACE COMPACTION TESTS IN ACCORDANCE WITH ASTM D1556, ASTM D2922, ORASTM D2937 AND NATURAL MOISTURE CONTENT TEST IN ACCORDANCE WITH ASTM D2216. 6. FREQUENCY OF GOMPACTIONINATURAL MOISTURE CONTENT TESTS: 7. EMBANKMENT FILL: EACH LIFT AT A MINIMUM FREQUENCY OF I PER 2,500 SQ. FT. 8. PIPE INSTALLATION: EACH LIFT AT MINIMUM FREQUENCY OF 1 PER 30 LF OF PIPE. 9. WHEN TESTS INDICATE WORK DOES NOT MEET SPECIFIED REQUIREMENTS, REMOVE WORK, REPLACE AND RETEST. 0 O O w O O] I Q N p r7 0 U) J_ W U W .IQI Y Q LL Eu z I-- cwc Z G 00 U Lu 0 / b K w O > ❑ w K Q `J\ Q V WLL O d Z ~g o Q Z n- �I•t' o = V C0 0-1 Q 0 O i Z SHEET NUMBER R303 TOP OF BERM / SEE PLAN VIEW FOR ELEVATION SIZE AND DEPTH OF ELE. 768.00 - APPLICATION ND OON OUSLEGT GENERAL NOTES'. EN. B P NET AS ECTI NS 1. RIP -RAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END N EF R 110UR 2.1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT secnoras�Ei El RIP RAP OT 1­1 UNDER noN OF sraLLED of THE PIPE OR CULVERT AT THE DISCHARGE OUTLET niAMAXIMUM SLOPE OF ° RIPGRADE _ NEmEO IN sou[IF--xs BF 1. "OLHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE III-_ - OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIP -RAPPED SHALL BE IIII :k -_ AM ("UGF)WI,DERCUT TMEASURFAGE F HE1-1 IF RECEIVNc"cH�NE`THEAPRo SHALL HE E E LENGTH HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. ° 111111=_._`...- IIIIII (sEETABLE)B DTHOFTHE END OFTHE APRON SHALL BEEOUALTOTHE BOTTOM WIDTH =1111 -III==1111-_ A'SuaORADEIsiaucTURETDDIBECOMPACEDT0'95%%%oRGREATER' IN LAYER OF JUTE NETTING 5. THE PLACING OF FILL. EITHER LOOSE OR COMPACTED IN THE RECEIVING I ErvTHEF- /.� (RREEFERTO•JUTEICOIR S% URves N THEHORIGONTAL ALIGNMENT OF THE APRON WILL BE R SPEC) DTH(EN0) OVERLAY RIP-RAPAPRON WASTED BTONE AP(SEE TABLE) 2. CONTRACTOR TO PROVIDE PHOTOS OF NON WOVEN FILTER FABRIC BEING WITH JUTE NETTING (ONLY AFRONNUT ETPRn OR SLOPE PLAN END BECTON 5 USED IN SLOPE DOR RRA NON AGRICO EN FIL G SEE INSTPLLED. CULVERT STORMISTRUCTURES)ION DITCHES, RS UP BOTH SIDES IN SECTION A -A ° 7MU I:D.1 RMW [LASES AND A00N WMfli90X5 w.qM ¢ASS lftm s� 03G ON, pN+c4p 0]6 A Lkw. 14MLmu APltlIIBMTN A4TIRM [a • 1•.0 If ! 7.1 S f0.0 L i 1 ]Y CAUDLUTH'NOMINAL RIP -BAP Bfff SIL (L W NS) PDRI PD•R2 PD-91 POR4 P945 PDRS PD-RT PDR$ PD•R9 PD•R10L3�2211 PDR22 P4hR13 NCMNRL.1-1. •:14 l><.R{f[) D]E OAo`1 'K, 0.i, 033d 0.38" CUM GA2R a D.- 6213 05^B ln.YBl DE51-PIKH xEE f8 k+y's S99 249 1.95 .1.91 Z12 2.68. 4.70 2.01 0.52 0.52 0.72 19.20 [&p545E[ndWLrN,418o•arn) AIf1AE 2.20 0.)o 0-50 0-55 O.SQ 0.60 am 0.40 0.10 0.30 M30 Z10 TA L-1._FTH IR.-I c� l ILA i 0.8Q 0.30. CIAO DAU u.40 0_40 0.50 0.00 0.30 0,30 0.30 0.40 eL l Y1.2 GGLZ V2 32.2 32.2 322 32.2 32]' 312 1Z-2. 32.2 -1 w9w CU85 CLASS' 4 0 xwlnncmxal. LD_ 0 a 0 13 00 0 lD _ 0 _ 0 '0 0 a Q. '.0 2' #RDN WIDI II (Fri ISTAm _W(h 310 If1) _0 0 0 0 0 0 0 0 S I�+a+ll[°7 X'A!f-;' BAB 1.z 2 2 ; 2A 3-2 1-6 1.2 1-Z 1-2 y_Z -11 A. Rats) 2'D301ml 28.00 20.00 18.00 18.00 28.00 18.0D 20.00 20.00 18.00 18.00 19.00 19.00 31.00 APDOMLWIDTN Iwq 3•WHVJ3)'LifG 5.90 0.80 1A0 1.90 L40 1.60 2.20 1.30 0.80 0.80 0.80 0.80 \IJ SILT - SAVER ELEVATION VIEW FILTEROPTIONS FILTER IS AVAILABLE IN TWO OPTIONS: 11 ALL HIGH -FLOW FILTER 2) HIGH -FLOW MATERIAL ON TOP HALF, HIGH -EFFICIENCY MATERIAL ON BOTTOM HALF (THIS FILTER COVER IS RECOMMENDED FOR ALL ROADWAY PROJECTS.) (DOT FILTER) IT IS THE PURCHASERS RESPONSIBILITY TO PURCHASE APPROPRIATE FILTER. PURCHASER SHALL PROVIDE ROCK FOR FILTER POCKETS. FILTER INSTALLATION FILTER SLIDES DIRECTLY OVER FILTER FRAME. TO KEEP FILTER FRAME IN PLACE OVER STORM STRUCTURE, ROCK POCKETS ARE SEWN DIRECTLY INTO FILTER. EVERY FILTER COMES IN ONE PIECE FOR EASY INSTALLATION. MAINTENANCE ALL TEMPORARY EROSION, SEDIMENTATION, & POLLUTION CONTROL PRACTICES SHOULD BE INSPECTED DAILY. CONTRACTORSHALL REMOVE SEDIMENT AND DISPOSE OF IN A PROPER MANNER. INSPECT FRAME AND FILTER DAILY FOR CUTS, ABRASIONS, AND PROPER INSTALLATION. REPLACE OR REPOSITION AS NECESSARY. GREEN HIGH -FLOW �' MATERINL GRAYHIGHEFFICIENCY MATERIAL POCKET FILLEE./ ROCKFORWEIGHT. ROCK PROVIDED BY PURCHASER ISOMETRIC VIEW SHOWN WITH DOT FILTER REPLACEMENT FILTERS: MODEL # R-140HF OR R-340 DOT FRAME MATERIAL: BLACK0 WPE ROUND FRAME & FILTER ASSEMBLY �7 FILTER FABRIC MATERIAL: REFER TO SPEC REFER TOS MOdet # R-IOOA AKA'SS-10OA(Roond)' SCALE: NOT TO SCALE 60" DIAMETER LAST UPDATED: AUGUST 2019 EILTSAVER, INC. - FORRESTER CEMETERY RD, COVINGTON, GA 30014 PHONE:(770) 388H1810 FA%(770)3B8-1M0 TOLL FREE: IL5R382-SILT(7456) www.slMaysmm N A AND B ARE AT EQUAL ELEVATIONS _ A MAXIMUM SPACING _ B =I _III_III�II=II.II - - _I _III_III_I11=III=111_III_ _ - _-III_I_111=III_III_11= GENERAL NOTES: PLAN 1. RIPRAP SIZE TO BE DESIGNED BY ENGINEER. 2. CHECK DAMS MAY BE USED IN SLOPING DITCHES OR CHANNELS TO SLOW VELOCITY OR TO CREATESEDIMENTTRAPS. S. ENSURE THAT MAXIMUM SPACING BETWEEN DAMS PLACES THE TOE OF THE UPSTREAM DAM AT THE SAME ELEVATION AS THE DOWNSTREAM DAM (SEE DIAGRAM ABOVE). TEMPORARY CHECK DAM CD MAY BE U8ED IN PLACE COI. WATTLE CHECK DAM8 " D0t1wvAuw R1 4 QLAMIF CATION N[L•i•1N LtiL SfBC. m.plo6 I1]I 1 A 4 10 2.0 S z.6 • ]q 0 NON -WOVEN FILTER FABRIC SPILLWAY ELEV. 764.00 Not to Scale MIN. WEIR HEIGHT (SEE DATA TABLE) WEIR INVERT ELEV.: 766.00 EMERGENCY SPILLWAY (IF SHOWN ON PLANS) MBANKMENT PON 3' MIN 3' MIN NON WOVEN FILTER ON -WOVEN FABRIC TIE-IN SECTION A -A FILTER FABRIC TIE IN MIN. 1.0' ALL SIDES Horn E t_ rc LN o a z H N N p 0 Y a wO O " O N LD 0 O Q O O d N p 7¢ m W z I- Lu Ln Z 2E Lu 000 0 U o Ld Ld Q P ❑ W a 0 w a ~ _j a Z Q Q Z I O � z z o Z N CD [D SHEET NUMBER R304 EXISTING STREAM BUFFER \ \ \ 30' FROM TOP OF BANK EXISTING STREAM \� \ "RF�ADWALLAl e \ EXISTING 70PRIVATE ACCESS EASEMENT AND PROPOSED GDUE HEADWALL L -______________-� 'I \� -___ PROPOSED SPEED LIMIT SIGN SEE DETAIL SHEET R201 SEE _______i___ PLACE 350' &R GUARC i SPEEDLIMIT DECREASES TO 25 MPH ,\ DITCH `xe A\Vc'Y � I iL�l'onV � A VA V� VA VA:?\ �VAAV MI I \ � i \ 68' DUKE POWER EASEMENT EXISTING 8" SANITARY SEWER mN h \ /y � ' EXISTING STREAM BUFFER \ u \ EXISTING40' / r \ � -� SANITARY SEWER / / -` // // // /,��, 30'FROM TOP OF BANK EXIST' -IT ARY BEWER MANHOLE \ \��\ - -\�- EASEMENT 1 TO BEM DIFIED. SEE SHEETR600 FOR \- \ \ EXISTING STREAM f TAILSGARDING SANITARY SEW ER\\ �- �i / // ' ///i' / \ CONFIGURATION EXISTING 68 DUKE POWER EASEMENT / Sj / I \ PUBLIC WATER LINE J\\ N 710- \ _---_FEMA 100-YR FLOODPLAIN _ >-� `N ��_-- _ I 1 -' \ \ / \ \ \ / 1 _ _ _______ 7� _ - --------- — ---- }— —----1--—µme ------T--- ---- ------ -------��-- —--}—y---�—-- --- -- --1 — UL FUTURE G6UE \ HEADWALL BI i l EXIST GPO RSTRUCTURE I , I \ I / I I POWER STRUCTURE \ 84" HEADWALL / / I I l �' 1 EXISTING 68' DUKE POWER EASEMENT. SEE DETAIL SHEET R201 , r _ °n —I \ ona ona— on - Z-- x `axsr--ari P -� d AMP — onP t onP a o R — oxP oxn t oxP / P nr`\ice X/ GDUE I 1 1 1 1 \I \ \ I I onP�oxr °nP—lone orb — pnv onP Or�q onP — not P� oxP — onP nP t ox �1 RETAINING WALL l 1 0� - - D IGNED AND BU T ° bnP onP L oxPL off �y`m — onP — onP t onP L onn � BY CONTRAC / / \1 \\ / DITCH _ 745 f.fl(r PLACE 350'OF GUARDRAILLL CULVERTAHEADWALL A2WALL SEE DETAIL•SHE D R201 FUTURE GDUE I I I \ \ lr 11HE HD ADWAWALL BO / m 7D7 / m� N1 00 T T T O m N m M60 Am WIT mo mer om m0 zIT art 0 mmX <Z0 O<Drrn m--A0 om CnZ < - T � { _j 00zy O0nm Ate-{ m��z ZZm ^11 00 Co vN z Z Cn m N ^ M a ^ M 48+00 48+50 \ l 1 \ \ \ \ \ �\ \ \ \ •\ \ l 1 r 1 SEE DETAIL SHEET R201 708 708 704 704 700 700 696 696 694 694 rn 0 0+00 TYPICAL STREAM 0+35 STABILIZATION CROSS-SECTION AS H. 8cale.1-o' I V. Scele: l'=40' I // i' / / / / I ; ' I \ �? EXISTING ( STREAM STABILIZE ALL STREAM BANKS PER STABILIZATION DETAILS 1 AND F ON SHEETS 503 AND 504, IRESPECTIVELY. 1. \ \ \ SEE TYPICAL \ \ 1 SECTION AS I h, li m PROPOSED TREE (TYP) DUE I U,, B I �\ SEE LANDSCAPE PLANS 4� SHEETS 1100 TO 1102 �I EXISTING SANITARY SEWER MANHOLE TO BE MODIFIED. �rC p SEE SHEET R602 FOR DETAILS REGARDING SANITARY SEWER 1 4 CONFIGURATION ADJUSTING STRUCTURE TO GRADE AND I ( REPLACING PIPE. CONTRACTOR SHALL COORDINATE PHASING OF \ NEW DI PIPE INSTALLATION WITH THE CITY OF GASTONIA. Illlllf Nd\ �v Y II J�U �� j EXISTING 40'SANITARY SEWER EASEMENT --- � %/ ( I IIIIIII II��\'\IVIIIIIIIII!G� �290 LF OFSTREAM / STABILIZATION REFER TO SHEET R503 �, I I FOR STABILIZATION DETAILS 3� ( I EXISTING 12" SANITARY SEWER EXISTING STREAM BUFFER ( 30 FROM TOP OF BANK r FEMA 100-YR FLOODPLAIN FEMA 100-YR FLOODWAY � \ �IF� CULVERT 70' PRIVATE ACCESS EASEMENT TO BE DEDICATED AS CITY OF GASTONIA PUBLIC ROW WITH FUTURE PHASES OF DEVELOPMENT • ` 1 J PROPOSED SPEED LIMIT NORTH GRAPHIC SCALE IN FEET 0 20 40 80 A t� �uaaaaaa _ LEGEND FOR PROPOSED IMPROVEMENTS PROPOSED FULL DEPTH PAVEMENT PROPOSED OVERLAY PROPOSED MILL AND INLAY PROPOSED DITCH moo— PROPOSED GUARD RAIL PROPOSED RIP -RAP PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR HIGH POINT ELEV: 748.87 VC 772 •" ��`�' '" •"•'"I N1 ' P POSED 8" SANIT RY 10' -w 100 YR WATER SURFACE ELEVATION 7 6.35' SE ER. SEE SHEET R 302. SANIT R 25 RWATE SURFA E :ETS R601 T R605 _ --- ELEVA ION (7062') 708 SIG INFORM TION. 100 YR ATERS RFACE --- -- — -- — 0 ELEVATION (06.88') 7— / 7y �p OµpygK E LACE E ISTING 1 " PVC WI H DI BELOW 704 25 YR ATERS RFACE 84" CP. SE SHEET 602 FOR DETAILS 7 EXIST NG 8" SA ITARY E EVATIO REPRE NTS ELE ATION REPRESENTS 700 EWER 1 EXI ING GR UND PRO OSED G ROUND N^ 0! ^ IN Iq O IB NO N M1p ^Hj O Y N O rN� N O r(j� N O y O O O N Q� N N N M r ap N M M < < r()pj M N M << <� V N Oil a M 1D n OD aa0 M ^0] a M a ^ n ^ n ^ ^ ^ ^ ^ ^ ^ n ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ 49+00 49+50 50+00 50+50 51+00 51+50 52+00 52+50 53+00 53+50 54+00 54+50 55+00 55+50 56+00 56+50 57+00 57+50 58+00 58+50 -L- ABERDEEN BOULEVARD H. Scale:1"=40' I V. Scale: V=10' N CD z p ¢ I H N N p K Y Q O N O O Q O Q m x Yo w 0 Q Z Lu J J L.L �0 >Q 0 Q O ry E ~ Lu z I--Lu Lo z 2E Lu 000 0 O �-() o Ld > Q P ❑ W Y¢ 0 _J Lu a ~ J a z Q Q z 0- 0 H C Q O z 11 11 741 CONTRACTOR SHALL COORDINATE WITH \ Q DUKE ENERGY FOR ALL ENCROACHMENTS WITH IN THEIR EASEMENT. \\ --� i ,\ \ RESTRICT ACCESS WITH \ �\a _ 1eo' I \ END OF ROAD BARRIER. V I 1 1 1 PROPOSED STOP BAR AND STOP SIGN _ SEE R410-R412 FOR _ i\ \ MARKING AND SIGNAGE PLANS 746� \ . - _ -- - -- _�- ___ _�___-__ s 68' DUKE POWER EASEMENT j EXISTING POWER STRUCTURE 750 "� HEADWA.ALL Ci` \ \ \ 's / / SEE DETAIL SHEETIR201 0 o d•— oxa�— oxd— oxa oxaJ a� oxa �oxa— ona 1 ona— P 7sa ox — oxa o - oxa— _ \ o \ Ilona onP on�— V a oxa40'X�'SIT SR rAINI IGWALL \ RIAN E oxal— axv/— oxrl— xa ox t oxa- DESIGNED AND BUILT �onP— oxP— - - oxJ S'.Ia uJ aT /oxaJ oxa� P—oa— BV CONTRACTOR ona ona - GDUE _ — — 1 — �a 2 7zo fn 745 ixa o I / / \ 0 < F Si_SF-Ba50 � 1 LULU 780 776 772 768 764 760 756 752 748 744 740 736 732 728 724 720 716 712 708 704 0 ' \\1 •�t�.a REFER TO LINEBERGER ROAD REALIGNMENT PLANS PREPARED BY KIMLEV-HORN , I I REFER TO BUILDING 7 PLANS `\ PREPARED BY KIMLEV-HORN \ — " 30' GENERAL - % AND UTILITY EASEMENT EXISTING 70' PRIVATE - A POWER EASEMENT . - - � ANACCESS EASEMENT D PROPOSED GDUE I ox� \ \ \ EXISTING POWER STRUCTURE / \exams anvT < T pnp A�--' o — ��.� I Pa\, qxao � oxF� T RETAINING WADI a o -lorya^d�v n oxP,76p� DESIGNED AN08UILss\ / �� L BY CONTRACTOR—i yGa/ i dxP IT lox ��nn_x F oxa — ona — �a L L - - SF84a5 STSF Baal 745 sE �sNer R#oz Fa oini P OSED'ROADNJAIY / PROPS _ PROPOSED TREE (TYP) iX CULVERT C l SEE LANDSCAPE PLANS HEADWALL CO T CENTERLINE /; / , 1VHEADWALL I t' GDUE SHEETS L100 TO L102 I _ EXISTING 70' PRIVATE ACCESS ,/ ; I ' SEE DETAIL SHEET R201 + I PLACE 250' OF GUARDRAIL PROPOSED NO EASEMENT ANDPRQPOSED GDUE EXISTING STREAM BUFFER I �! PARKING SIGN DI CH !' 30' FROM TOP OF BANK / e EXISTING STRE ,/ '1 RIP RAP DISSIPATOR PAD \ SEE MASS GRADING CONTROL PLANS \ FOR SIZE AND DIMENSIONS, TYP \ A 1 l q so \ SAND FILTER B400\ / ) / FINAL SAND FILTER SAND ;'',�%��'.,7,7,tt, ,�P :.riq•""'('�„i OBECONVERTED AT SHOWN FOR �; ��{',; kt'f';t1•i'�h "li t�l'"i�•�%i� PARK BUILD OU \ \\ \ REFERENCE, CONTRACTOR ',I"',• '/i• $ 1 4y WI?,,.,i •, •,';N'i;, ,'I, \ , SHALL NOT CONVERT TO • I� +r • '( g,'' REFER TO MASS GRADING, STORMWATER & SAND FILTER PRIOR TO "•I il, �l��+�r•!.'1°'�p•'1't. �'EROSION CONTROL PLANS FOR GASTONIA FINAL STABILIZATION OF ALL •+•,/;h ;�++1�Jv'�r;�l •''k"'� r;,•+;', LOGISTICS CENTER FOR OCS DESIGN \ \ AREAS DRAINING TO THE 11 y + \ SAND FILTERr1 I � v i ,;@C� �1.+ �`'4C `Q A•, r/;'�`°i^{i-,wr'a •y; �!'� ., � ,Y y/ I \ `"�y •„4�� l',.�, y+ a'' a�,�`„x'��.-'./,'ny,'•' ''"ice' \��� NO PARKING SIGN PROPOSED SPEED LIMIT SIGN LEGEND FOR PROPOSED IMPROVEMENTS PROPOSED FULL DEPTH PAVEMENT \\\\\\\\\\\ PROPOSEDOVERLAY PROPOSED MILL AND INLAY PROPOSED DITCH PROPOSED GUARD RAIL PROPOSED RIP RAP PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR GRAPHIC SCALE IN FEET 0 20 40 80 NORTH PVI STA:70+67.44 POP wold—IM M NJ IN WA ---------------®■---—_---------ll�--i�0—����------ ������������������������■a� mr-im 58+50 59+00 59+50 60+00 60+50 61+00 61+50 62+00 62+50 63+00 63+50 64+00 64+50 65+00 65+50 66+00 66+50 67+00 67+50 68+00 68+50 69+00 69+50 70+00 70+50 —L— ABERDEEN BOULEVARD H. Scale:i"=40'IV. Scale: 1"=10' z o ¢ z O O 2 O N � Q O ¢ o 0 w 0 Z Q W J J L.L �O�/ Q L^L LL 0 Q 0�/ LL_ W z I-- W Lu 000 0 O } `m) Ld W Lu a ~ �� z Q o QZ 0- O 1: cf) Tf a o c? z SHEET NUMBER R402 m �►' :- ' 5 EXISTING WATERLINE •�/ EXISTING WETLAND x v" EXISTING 68' DUKE POWER EASEMENT EXISTING POWER STRUCTURE o EXISTING 70' PRIVATE ACCESS EASEMENT AND PROPOSED GDUE / / / 1 -I-t I � � 1 (_ -` p w oy 0 o xv o v ox �xv v — -- onP� oJP— dxv�T 4xv v o� P� v (\oxv\� bx ox�\ oNe— onq—•oHv I� F o — o x v x / ne...., s4 4o0P S� TRIANGLE aE / / v� ory .n \ �oxv ax�� o a onv onf J y W -.Io_ L xv1axvUTURE GD�I EoH X / Liu 6 /°xj/i i e x e g W _ 6 u 760 63. —�-- _ \ \F \��__� aaaaaaa Z LIU 71+00 72+00 +00 74+00 0 PROPOSED STOP SIGN � CULVERTE u \ w z a c/) wl _ \ v Z 'p PROPOSED TREE (TYP) N = 750 day SEE LANDSCAPE PLANS / / / R-26' i („) SHEETS L100 TO L102' I I I / I �� \ \ \ _ - c Q 745 PROPOSED HEADWALL AND WALL / DESIGNED AND BUILT W i PROPOSED NO PARKING SIGN - \ / BY CONTRACTOR I I I C7 I I / \ \ \ \ \ ' w a % ^ CONTRACTOR TO I \ I vl I W \ \ 1 \ \ \ \ r or SUBMIT SHOP DRAWINGS \ \ a Im \ LIU 40' X 40' SITE TRIANGLE EXISTING _ _ Y c WETLAND ]35 �_rT' EXISTING WETLAND / EXISTING STREAM BUFFER - - I I�>• m 30'FROM TOP OF BANK j / /� /oi I / / / // / \ \ \ \ I I 4x A,i° / / EXISTING STREAM ,/' / /✓ I I / I bi ~\IIiII I II II / /� \\ / / i .. //0 ♦/ 1 �/I I( 1 1 �I 1 I �i I �I I I I I I/ ! \ / / / i I I � ( zoQ� i ��� _����/ ✓Y// / ! AV v_Ii�' i� \I 11 \1 A Ate/ // i l i� / 1/ 1 i/ oo `� o oo l �m Qo a m x LEGEND FOR PROPOSED IMPROVEMENTS Y o o a - a 800 H H POINT ELEV: 76 .92 800 ■ PROPOSED FULL DEPTH PAVEMENT Q a 796 796 NORTH PROPOSED OVERLAY Z 0 792 792 PROPOSED MILL AND INLAY Q 788 788 PROPOSED DITCH z GRAPHIC SCALE IN FEET 784 784 0 20 40 80 PROPOSED GUARD RAIL a J J 780 780 PROPOSED RIP -RAP f1 u- 0 776 776 PROPOSED MAJOR CONTOUR O Z PROPOSED MINOR CONTOUR fV a 772 772 L^J_ 768 768 L.L c 764 764 rc 760 760 O o rc 756 756 a 752 752 748 z 748 W W 74.4 744 z W rl > 740 740 00 ci p w �U o w w 70+50 71+00 71+50 72+00 72+50 73+00 73+50 74+00 74+50 75+00 75+50 >> P:_ W -L- ABERDEEN BOULEVARD > U a N O � H. Sple:1"=40' V. Scale: 1"=10' W J a z Q z 0- (� O H - < o Y 00 SHEET NUMBER a R403 -- ---------------- � ■a\����e�� ������!t�Li�h'iinll"��■��11ili�iii I I--------------------------- — I — _�= oxv vv oxv — ov voxv — oxvv_ I N GRAPHIC SCALE IN FEET 0 20 40 80 SPEED PRO POSED! LIMIT SIGN LIMIT oxv— axv— oxv SPEED LIMIT DECREASES TO 25 MPH Cr ona— oxv— oxv—bxv— oxv— @xv� oxv— oxv axv— oxv— oxv— axv— — oxv— oxv— oxv— oxv— — oxv— onv— oxv—[o�xvl— wv— oxv— oxv— oxv— oxv— oxv— oxv— onv— axv— oxv— onv— oxx— oxv— o ona+�Qnal— oxv— oxv— o oxv— oxv— oxv— oxv anq— oxv— axY�/— oxv— oxv, ( oxv— oxv— oxv— onv— oxv — onv— onv— IVV��II oxv— oxv— oxv— oxv— oxv— oxv— oxv— oxv— oxv— onv— oxv— oxv— oxv— o 350' OF GUARDRAIL m,onv oxa \ / v — ten. ��a —bxv— oxv— oxv— axv—/— oNv x \ \ P POSED ROADrV�'Y EDGE LINE. \ / TH RMOPLASTIC WYiITE EDGE LINE 49+00 51+00 53+00 54+00 56+00 8+ 0 N m � O0 m T N m �mm Ammo xo ?aimX o « m +3Z— I -mz- I I O =cm m A Z N=0 c ZO I�c) z A co N I LEGEND FOR PROPOSED STRIPING PROPOSED YELLOW DOUBLE CENTER PROPOSED WHITE STOPBAR PROPOSED WHITE EDGE LINE PROPOSED SIGNAGE NOTES: 1. CONTRACTOR SHALL TIE PROPOSED MARKINGS TO EXISTING MARKINGS AT PROJECT LIMITS. 2. CONTRACTOR SHALL MILL EXISTING MARKINGS SHOWN TO BE REMOVED OR IN CONFLICT WITH PROPOSED. 3. ALL PAVEMENT MARKINGS PER 2018 NCDOT STANDARDS. 4. SEE NCDOT STANDARD DETAIL 1250.01 FOR PERMANENT RAISED PAVEMENT MARKER LOCATIONS. INSTALL PER DETAIL FOR ENTIRE PROJECT STRIPING LIMITS. 350' OF GUARDRAI ARKOIN ANY a, TIMEq a, ARKIN NO FIRE TRUCKS LANE EXIT ONLY ENTRANCE m � ONLY WAY FN Rfl STANDARD ��o,.s PROPOSED ROADWAY CENTERLINE. THERMOPLASTIC YELLOW DOUBLE CENTER (4- YELLOW, 90 MILS) PROPOSED SPEED LIMIT SIGN SPEED LIMIT 25 W W 2 U) W W 6n O LO 00 U) J W Z 2 U Q Z p Q I H N N p 0 Y a O ❑ 6 Q O Q m Yo o Q _ z Y u1 Ca 7s G zrn V z v/ 5W o L z W � Q K ~ W z I-- LJ Lu 000 0 �U o > ❑ W CDQ W a ~ �-J a z Q Z 0- O H cl) Tf a o c? z SHEET NUMBER R410 IN RESTRICT ACCESS WITH END OF WATER FILLED ROAD BARRIER. TO SERVE AS TEMPORARY TRUCK TURNAROUND. CONNECTION TO LINEBERGER TRIGGERS OFFSITE IMPROVEMENTS. EMERGENCY ACCESS ONLY. PROPOSED ROADWAY CENTERLINE. THERMOPLASTIC YELLOW DOUBLE CENTER (4" YELLOW, 90 MILS) PROPOSED STOPBAR. THERMOPLASTIC WHITE STOPBAR (24- WHITE, 90 MILS) O --- PROPOSED STOP SIGN - � PROPOSED ROADWAY EDGE LINE. THERMOPLASTIC WHITE EDGE LINE [[+���//��I��] W oxv— oxv— oxv— oxv—onx— oxP—onv— oxx—oxv (4'oWHITEo90 MILSdnv— —oxv— off t}}ly� oxv— —oxv W 2 oHv— oxv— oxv— oxv— oxv— onx— oxP— onv— wx— oxP— onv— oxx— ox oxv— onv v—oHv- W oxv— oxv— oxv— oxv— oxv— oxv— oxv— oxv— oxv— oxP—oxv— oxx— OnP— III— III — oxv— oxv— oxv— oxv — LU o---------- _----- _ _ ----- _ _ ----- _ _ --- _ _ ----- - -- -- , Lo Lo Lo 61,00 J W Z — — — — — — — — — — — 2 QTEMPORARY. TO SERVE AS TRUCK PROPOSED NO PARKING SIGN TURNAROUND i i LEGEND FOR PROPOSED STRIPING PROPOSED YELLOW DOUBLE CENTER PROPOSED WHITE STOPBAR PROPOSED WHITE EDGE LINE PROPOSED SIGNAGE � NORTH n NOTES: 1. CONTRACTOR SHALL TIE PROPOSED MARKINGS TO EXISTING MARKINGS GRAPHIC SCALE IN FEET AT PROJECT LIMITS. 0 20 40 80 2. CONTRACTOR SHALL MILL EXISTING MARKINGS SHOWN TO BE REMOVED OR IN CONFLICT WITH PROPOSED. F 3. ALL PAVEMENT MARKINGS PER 2018 NCDOT STANDARDS. 4. SEE NCDOT STANDARD DETAIL 1250.01 FOR PERMANENT RAISED PAVEMENT MARKER LOCATIONS. INSTALL PER DETAIL FOR ENTIRE PROJECT STRIPING LIMITS. Ed �Hoa-a,-,� NO E S FIRE ANE EXIT ONLY u ENTRANCE ONLY WAV R STANDARD Eo�Hxaxs I I W20 - 3 AS SHOWN IN DETAIL 71 E-1 SIGN ATTACHED TO TOP OF BARRIER, TVP I I 2 I --------i i i I i ____IIoxv I I — axx — ox onv oxP — oryv — onx — oHP — onv I I — CHv — oxv oxa]III v — onv— oxv — oxv — axv — oxv �P— onv oxv oxv— oxv— oxv— oxv— oxv— — onv axv — — oxx — oxP — oxv — oxx — oxa — oxv — oxv o� ox oxv— v— oxv— onv— oxv— onv— oxx— oHP —onv — xv — nv — oxv — � qV��\jI v— oxx- o— oxv— oxv— ax - oxv— onv oxv—f onv— III— oxv— onx— oxv— oHv— I I I oxv— oHv— oxP—oxv— oxv oxv— — CHI—oxv— oxv— oxv— oxv— I 250, OF GUARDRAIL oxv— exv—onv i I rl —oxx— ox — — o — oxv— PROPOSED SPEED LIMIT SIGN SPEED LIMIT DECREASES TO 25 MPH o — oHP -P— CHI W _____ ____ ____ ______________ -- __---- -------------- -- -- - -- LU l 64 0 65i00 66+00 67+00 69i00 70+00 LO \\\RROPOSED ROADWAY CENTERLINE. I i —� (THERMOPLASTIC MELLOW DOUBLE CENTER (4"+ELLOW, 90 MILS) � 250' OF GUARDRAIL / I I I GDUE I I I I I O J J I� - PROPOSED NO PARKING SIGN I = U Q K ~ W z W z OO U 0 O �-() o > a ;� p Lu / n ¢ 0 W a ~ -J a z Q az 0- (� O (n a O c? z SHEET NUMBER R411 11 0 �/ --------------------------------------------------------------------------- --- ---------------------------------------- v oxv oxv oxv oxv oxv oxv ooxv ooxv ooxv ooxv axv oxv ooxv ooxv oxa o oP ooxv ooxv ooxv ooxv ooxv ooxv ooxv = = = = = = = = = V \I w LU LLI — — — v oxv oxv oxv oxv oxv oxv — — PROPOSED ROADWAY EDGE LINE. r axv oxv — — — o o oxv oxv — off —ooxv — — — — — — —oox THERMOPLASTIC WHITE EDGE LINE I LU___ _ (4_WHITE, 90 MILS) __ _ _ _______ _ _________ _ _ _____________ ___________ ____________ _ LU + 00 73+00 00 � O \ H Z PROPOSED NO PLU ARKING SIGN \ L 7 710WD U I PROPOSED ROADWAYCENTERLINE.THERMOPLASTIC YELLOW DOUBLE < I CENTER (4" YELLOW, 90 MILS) PROPOSED STOP SIGN \ nlEl / ♦., of LU m LU Z J } N� ARKIN ANY TIME NO NO ARKIN TRUCKS FIRE LANE M ENTRANCE ONLY IN © ❑j'' WAY o a STANDARD m«.o�s NORTH GRAPHIC SCALE IN FEET 0 20 40 80 LEGEND FOR PROPOSED STRIPING PROPOSED YELLOW DOUBLE CENTER PROPOSED WHITE STOPBAR PROPOSED WHITE EDGE LINE PROPOSED SIGNAGE NOTES: 1. CONTRACTOR SHALL TIE PROPOSED MARKINGS TO EXISTING MARKINGS AT PROJECT LIMITS. 2. CONTRACTOR SHALL MILL EXISTING MARKINGS SHOWN TO BE REMOVED OR IN CONFLICT WITH PROPOSED. 3. ALL PAVEMENT MARKINGS PER 2018 NCDOT STANDARDS. 4. SEE NCDOT STANDARD DETAIL 1250.01 FOR PERMANENT RAISED PAVEMENT MARKER LOCATIONS. INSTALL PER DETAIL FOR ENTIRE PROJECT STRIPING LIMITS. E ~ w z I-- LEI Lu 000 0 � -U o > >a p w a 0 w ~ -JJ a Z az In �0 cl) fy p c? z SHEET NUMBER R412 'I Ilk jt111'\\ \ �\\�\\\� \\\l'yI�\IIII\\\ 1111\ I //I ! i(I /II /!// '/% I/IIIIIII\I'' \\\y\\ \\\\I\I\l /' ll,ll'\\�\�\\I/' 11 �J\�II I//U/ II/`lllllll .\I I)/I)IIII /\ I(II \\\\ \l'\�\l\\II\II\\IIIII II//'i'x'/Y t\�lt\ 11 I t I I I Ill�lll' l �I \ \ / // / \ \ \ \\ 1 III\ \,IIIII l/jtlY I\\ j � , 1 J\\\\I�j llj l� i- �I JJ/IIIIIrJ\1 I I \ \ll /II 1\1u\/ p \ x \ \ /J%I-���r\\1`11��\\\�\�-_J�-`` //%//lllllll mil\\- "'!' - ;'h;// II' )\1 / 111ll l\\\ ,1 I i /�\ I- I /J , / III \Q�\ I�\2 If Il\\l0\\\ \`\\ \Il \\\\�\`�\��\� N�-.,�� ,;%/ il� lid 1 I �� l\I\ / /\ !1 %1 III i I 11 \/IIII\l\ 1 )\` I/Y( I�\\l\I\\\\\\\ \\\k 1 \ \-��� „JJllllll '\/ 'J,� I i Jl/ i )1I1 4hf //!/I//I//(//!l/ I \`\\ \N 11j1\I 1lX\ IIII \ /\ i�, --- I / I 111 / — V I x �DvVA Vv� vAI I1 1)A) 1) 1� \1�/ v /i `�%w1------ ��/ /� I I// / \ I I / / �'� — / , / I V//I /I�) �I 1�\ I!I IIII — \\\\\�I -//' - \/\ / J/ l// �!I l` /\ 'lllllll//IIII Ir �ll�l h l\\IIII/l\\\/(I,/II�1\\ li 'I` \��'-////��� --�.'` �/ l / / /1 ( )II�J11/I (I/II ICI^-/; w lO)c\\ \ \ /I\ \\\! \\\\p /� ! it /_ I / ``=-- _ r )(f ,I / \\l/I //,I lJ,l ; \ \ 1 I\\ 1� �y�\ r l \ l J/ m I\ IIII\)I\ I�%%`j)yj1IIU Ill jfJl'I�Il�ljlll%1jl1�111111\'/41 I 1\ 'I/ill/\\l\\ %j rri I t I // I/ III J ` //i III I IIIII/I V \ !/I I \\\ //---- --- \ / \ /!� /% // 11/ II , l l I %// \ / I , Ilk I >k - > I / 11 �j1 11, E l I I I I / I / I 11$ 1 \I\\ % l I \\\\ / _ 1 I I I �/l / 1// / // 4J1 \\ I I 1 il/ 1)I�I / 11(6 I II11 j1'I l\ /IIII` III II'1 \\/ I\ \\ / 1 _, lj\11 �- / f - ��\\J i -\ ! J /11 / I Y ltf` i� \\)\ All N. ✓/.\ - r \ /l - l%/,i\P _/ 91 IIII < If //Y�/ /IIII 1 1/ f 1)I/ (IIIIIII/IIIIIYtI\ ( \141I -\-\<i)\\ \ %% II I rlc J// - � \ - i ` I lf Jr�Y'I/ )t)\\\t-ii/il hl /�!/ IIII\ )' IIIIIII II IIII/I \ \ / \\� \\ l \ o 1/ I \1 % 1 fI11 / )) II✓ II r I I1111j111111 \k\\ \ \(\ \ `-\ v /-�_ ✓ \ \ II\\/ \ i �c = i "l /l// /i/i/�'i < 7!' II //l d II Illf % /I'l ll'l I l� l (IIIII/% I1111\ lllllll\ �` y �\ \I\ \\\\--` \ \i I�) lam\ \\ \\\}\\1)/ I Ill l B I I\ //I \\. l \Iltl�\\ll I\�\\ III l ! _- i 1\\� \ t _ `\\ \i �1t \\ /P N \ \\\ / / I111/ l0F // II l\ \j \\ \\ \yt\ l \IIII\ \\ i \ -\ /r'/ I f 1 l Y� k'% \ I ,I 1 11)I- \`IIII �\�\ �- _,\ ,- r III 111 ^���\1 II\il ill h\ \yYIIIh/ (J 1J,it ` �I%/)/ >%/\7 j/�\Jjj11%/)%1/IIS(\ I(( / �� '✓I'll / / / / Y \ NN 1, / I/ / / / l I l ! \ (IIIII / ` ! /j > I�✓jll////(�Iflllllt \ f \ I t \ ss\� 1111y //// I \ \»�)1\ \\IIII `III\\ \(,JI y Allll I\I\k��\\\\I IIIII 1 \\\ \ II . / r;rJ��\11Il11111 _/ �lll�llgl%%'%'i!%%l'l'(i/I%/'// I j Jll�ll-\ // JlJr \\1,11�11\1 I111�11\111I1j11 I\\ i /i�lf -L-\ \` - III,>) 11 l l Z'/i//it // /- I) I J ,1 I I r/\ f \\ \/� �� / , Y \I\� `/// \ \/ // SEE LINEBERGER , l IIII/// I\I\ IFjll / // I /J ♦ \\I I t/ �\ sO\ \�--/ \ \ REALIGNMENT ROADWAY ,( I1111j1\\-\ \\(�11111 �,Il t l \ l ``./-_' := =-- \\ ' _\\\\ \\-\ \ PLANS PREPARED BY21� 11�IIIII�III'L \ \ _ /^ �- -\ \ i \\ \\ \-\\ KIMLEY HORN FOR \\Ihlyi8 LF OF STREAM IMPACTS'% \/-/ - /\ J \j bf�\' \ \_ \ 1^ �_"^\II J ll a/!\ MODIFlCAl10NS TO NW14 \JIII\Il�ll\�\I I(l)l lLFOF\\'\\\\\U' ?2 LF OF STREAM IMPACTS11\U\� I\` \/ /< < I I LWLI ��LP��Pr�oo_ m ; x\\\\\\\\\IoV\ I/ x1; tl�l\<q I! 3°\�\ I \I\\ \1\ VL Y IIII \)/i�)/III\ /If Ijlfl(�AA\Vv\,j�v�/�S� till` III I��I If III I /lllllll//I IIII III 'Ialll /1lwl�l\ �i 1 111111 LEV. If f I I GRAPHIC SCALE IN FEET 0 40 80 160 I f,lr If � wo 0 o N in o < \ N rc �\ aoo a m o � - M E F- w z w LU 00 C) d O J U o w >aL w W O a 0 LLJ i a z az (D O Q < O z SHEET NUMBER R500 / Jr / GRAPHIC /-8--20/ 40 EXISTING OVERHEAD 1 _---- / HEA1WAL111� \ 1 / FUTURE GDUE I- ------ - t('y-jI � l..TING STREAM BUFF \ 0' FROM TOP OF BAERNK / ✓ \ o F \.zm.. \"ep 11 -PROPC ED GRAD FORAEERDEENRIIAD 720 720 715 715 710 710 E FL 3'>• ABOV LINE EX. GRAD HEAD- L WINGW LS 705 TOP OF SILL / F 705 -- - ELLEV:] 3.- / I LFO CULVERT HEADW LLWINGW LS T POF SILL E EV700.85 700 - 700 EX STING ` - GF ADE 695 695 690 690 REFER TO SHEET C503 STREAM STABILIZATION DETAILS 12+uu 13+UU 14+00 14+5 /. u9 CULVERT —A H. Scale:l"=40' I V. Scale: 1'=4' 705 705 700 700 C NTRACT TO MAIN AIN TRIBU ARV T EN GRADI STREAM NK AT 3:1 LOPE S E NO -RISE PERMITTI G DOCUMENTS 695 695 12 0+00 1+00 TRIBUTRARY A -A H. Scale:1"=40' I V. Scale: V=4' x GRAPHIC SCALE IN FEET \ 0 20 40 80— O Z --==-m \ �4 EXISTING STREAM BUFFER 71 HEADWALL BI o� -4a` 30\ROM TOP O\BANK�^'O``,Syy.�y FUTURE GDUE-- `\SPATS. ----q� n. EXISTING 10- PVC TO BE 1 \ \ \ \ \ \ \\\ \ \ \ \\ JO REPLACEDAND \ \ \ \\ \ \ \ \ \\ \ \ \ \ \ RECONSTRUCTED., CONTRACTORWITH 10' DIP , \\ \ \ I EXISTING SANITARY SEWER 30' eROM TOP OF BANK, REFER TO SHEET C503 FOR CULVERT A AND CULVERT B DETAILS 0+00 1+00 TRIBUTARY B-B H. Sca1e:1"=40' 1 V. Scale: 1"=4' Pmfl,- �� ja ram,. ,'i al�r �I,�7CePi1 • �R T 1111 Eile���he ; - - rl 1` i�`= �y nnr, 111111111W ,I=�Fkl FUTURE GDUE7:1— TABILIZATION — 240LFBANKGRADINGAND NATNE RIPARIAN PLANTING ` STREAM STABILIZATION / \ REFER TO SHEET R503 _ FOR STABILIZATION DETAILS FUTURE GDUE/ / j\ Tyv ,EXISTING STREAM BUF EF R — \;�\` 30'FR�TOP OF BANK / \� /` FEMA500-YR FLOODPIAN' — O—GRF::RT �/ / FEh_ 100-VR FLOODPLAIN / FEMA FLOODWAV' 7— ______________ MMr SEX Mw�= iMMMMM _mm�wkll M�llm- gm� __ ___�mm �I�m 1ff"r—Wm___ 11+00 12+00 13+00 14+00 CULVERT-B H. Scalel "=40'1 V. Scale: 1'=4' 0+00 1+00 TRIBUTARY A_B I+ O N V1 O � dN pN3 m 2 2 - O Q L�L/I LJ^^_ V vJ Z Z c/) W U) LIJ 0 00� O� U Lu W 0_' ~ W z I— W Lu O U 0 O 0 (nPJ Q> (� w W d ~ _j a z Q <z o 1: fy Q O z R501 725---//// 720 OFF 3].�'LT ° FUTURE GDUE / ISTING STREAMBUFFER \\�4����--_ y� 30�FROM TOP OF BANG\ MFADW—CI ° \ PROPOSED 30'GENERAL���'—`� DRAINAGE AND UTILITY EASEMENT -1 \== 725— IQ GRAPHIC SCALE IN FEET F 0 20 40 80 O Z 77n 77n —1+00 0+00 1+00 2+00 CULVERT-C H. Scale:l"=40' 1 V. Scale: 1'=4' A' UPSTREAM DETAIL REFER TO CITY STANDARD DETAIL W SHEET R201 FOR HEADWALL DIMENSIONS K)NTRACTOR TO FOR SIGNED AND SEALED SHOP DRAWINGS BEFORE CONSTRUCTION 7r RCP CIRCULAR CULVERT FINISHED GRADE TO MATCH EXISTING GRADE AT PIPE WTLET.— CONCRETE SILL TO W INSTALLED TO VABOVE PIPE INVERT INTERT=1' BELOW FINISHED GRADE TYPICAL HEADWALL INSTALLATION NOT TO SCALE DOWNSTREAM DETAIL REFER TO CITY STANDARD DETAIL GI SHEET R201 FOR HEADWALL DIMENSIONS bMTRACTOR TO SUBMIT SIGNED AND SEALED SHOP MANNGS BEFORE CONSTRUCTION /CIRC11' RIP ULAR CULVERT' GRADE I I I FINISHED GRADE TO MATCH EMSTING GRADE AT PIPE WTLET.— CONCRETE SILL TO BE INSTALLED TO V ABOVE PIPE INVERTINVERT=1' BELOW FINISHED MADE TYPICAL HEADWALL INSTALLATION NOT TO SCALE FINISHED GRADE EL c� E ~ Lu z I— Lcu Lo Z G 000 Lu 0_ O >- (m) o > / V Lu Wa �- z Q Q Z D O HN LL a O Z C SHEET NUMBER R502 I n �row�a sms:r I�r• CYeam rtaWlmrwn Yu4llb•fmF Deacrl a 'Pme it•oe Prone Ya d3r- cwolec J�chra =xl sS Les 'I dryr Ynr • 16i�l�wliay Wxn[HQk•1 1ry.r N.mr 1. It rw�wr lu•Q • Anf `enRr Ivan ke�h weK Ihun Sal nrtsPaeperlFclb.rdIbww. la do arc . • SoPe^l:l cv ti3aYs Tfli. ra dapec ��Y®SO Tm NgMr LLwuguk • A11 PKfrToms N_ SC Wrm wirL.irpr3 fl�ner 14 diYa prri°`�`Pa Ihnn i-i H '2encrl �Jo..e,u,..s.us.ee��.®acti.�iB.i�m.•._�.•Pie�. i rrxr.ileen� ['bos'n rl.ih'1%nN el r— • 3+ ".1ar �sa+N.rew�rcm.,Lm s.rne ,.;. ynu� a n;m a1k. ns rein «mr non InKnr wn isp rM.Nx 6a awibLr mdm d•mre Wixrhnw uviaaer-rpcciF cvw�ea• EpprD.Gr • �+•+fi.ww ti<Yepl RrT yeera a•I •vII•hk'4°" �aa • Elrcbnl',Jlyaeailnnlc ruAarde•Pkv bt rub ' _a 51 ImPlunwlebeaef Mew PecpU1 C•aflftwn • i7ranupu b9— ,x,krrR:rn wocrrNr ue maw • Conpl@aaylk. I[drr�mdpMmAigci 3, ]EI11 .en YWkw San&hipoa M.pprx.xd eeWirrripn .Ar4gf iemr ,N Oer A Lkvm S, MI f mii -pep wit upm pcmiCar>Ibh— ��a,w�, re lnepxn.sr Ibe �rdp��rirm�abrlrr S•o TlP e+®aern3ia:, aod.¢..rlT•rl.vt,nm.. Jam. ras W. U•srlv.. rcluwe.mltR.tRCMwi,.n<r ywa. is d ywcraprvi rI.46wri••.,�Nn _t � @ Rd v Jr: nr• n V•m•,•rxarie e-erruk'xme xinuaprmn.aJ.Iayn 6wy CWI eei L, •dtru lope. pmnii.rrw enrew �w.�r�D.a d....Ui Jwraarc pLm lJ­. A e�div['llatn fTa.#•p rb wax �ru�Twxn 1. .r��� • Vunµqud olemfr d5o'BN onpprud.w Dn6�*Rr males mma he kenedYl'Gaa vmm an:B md.Grtmrc .1—,. rsesewsNc dumalvxv e.ai1•Gs. • Exmb .lcni 0lgpika+uN In I—d§Vl Dsawal drams o:.d mr<ne. �� aor�adbr.clrm.�i.r. adbhkw '.xr>tmcrvts noL¢Lcr�anoukkd rw a'd:cmolri n'iili rmFue •Rana, uell.nQc va euEen. of D4cI m 6ederiYl'-IfrkA prmrr• Fn an pmnT • 1mpmrp[Illlnwarwlrvipn fRR•d: '-O.eernnlnrpirp if ,& Lx,.�,�snr Botip s,<Tm�r. dr.e nuw. eMPa rynnLL 'wae•L ma STREAM STABILIZATION DETAIL Not to Scale UPSTREAM DETAIL REFER TO CITY STANDARD DETAIL ON SHEET R201 FOR HEADWALL DIMENSIONS CONTRACTOR TO SUBMIT SIGNED AND SEALED SHOP DRAWINGS BEFORE CONSTRUCTION q Cr�lnrx La Smd•n S'Se�nawlim C•urml Pkrr•' F.Mi— dI& NPDFSpcmir nc 7 a.pul•e ways k4w61pny • Vnp•Ye iv FhliN ­h wem­ i—— • Udioxcd xea: FarATvo'¢fra. ran xcen mri dbss s1a bw U so' Pw1 Soon dx Dnf s1I 11w unks �Ic alxmedves oR.sw>awe • P•Rn•nIe•x.I.l wcy:irs s.alwl rI• mom m1m Jeansxllep Ta rzssaoLlc wIr:Nlprvnrasvi6Ale. I-—auYry fly xedlrNlyd r.. dr Wl rt �.nsw..e ®e1n umr rm.L. m, nnu: rxr n hm I ti,rW rrrrree uIn: Is iln m:u=ilea !rs Jlen •rrs. �.c :r BNt?�ao�oreJ 1!ravvlana 72' RCP CIRCULAR CULVERT ,703.26 PERMANENT SEEDING (ROADWAY) OVERALL SITE SEEDING, SPRIGGING, AND SODDING SEED ALL DISTURBED AREAS IN ACCORDANCE WITH LAWNS AND GRASSES SPECIFICATIONS AND L104 (SODDING AND SPRIGGING PLAN). PERMANENT SEEDING IN AREAS RECEIVING EROSION CONTROL MATTING PREPARE SEEDBED BY RIPPING, CHISELING, HARROWING, OR PLOWING TO DEPTH OF SIX INCHES SO AS TO PRODUCE A LOOSE, FRIABLE SURFACE. REMOVE ALL STONES, BOULDERS, STUMPS, OR DEBRIS FROM THE SURFACE WHICH WOULD PROHIBIT GERMINATION OR PLANT GROWTH. INCORPORATE INTO THE SOIL 800 TO 1,000 POUNDS OF 10-10-10 FERTILIZER PLUS 500 POUNDS OF 20-PERCENT SUPERPHOSPHATE PER ACRE AND TWO TONS OF DOLOMITIC LIME PER ACRE UNLESS SOIL TESTS INDICATE THAT A LOWER RATE OF LIME CAN BE USED. SEED AREA AND INSTALL EROSION CONTROL MATTING PER MANUFACTURER'S DETAIL. MULCH AFTER SEEDING WITH 1.5 TONS OF GRAIN STRAW PER ACRE AND EITHER CRIMP STRAW INTO SOIL OR TACK WITH LIQUID ASPHALT AT 400 GALLONS PER ACRE OR EMULSIFIED ASPHALT AT 300 GALLONS PER ACRE. PERMANENT SEEDING (NON -RIPARIAN) SEEDING MIXTURE "COOL SEASON" SEPTMEBER 1 - FEBRUARY 28 SPECIES RATE (lb/ACRE) SOFT RED WINTER WHEAT 50 RIVIERA BERMUDA (HULLED) 25 RIVIERA BERMUDA (UNHULLED) 25 "WARM SEASON" MARCH 1 - AUGUST 31 SPECIES RATE (lb/ACRE) GERMAN, BROWN TOP, 50 OR FOX TAIL MULLET RIVIERA BERMUDA (HULLED) 50 *SEE SHEET 13 FOR RIPARIAN SEED MIX REFER TO CITY STANDARD DETAIL ON SHEET R201 FOR HEADWALL DIMENSIONS CONTRACTOR TO SUBMIT SIGNED AND SEALED SHOP DRAWINGS BEFORE CONSTRUCTION TEMPORARY SEEDING LATE WINTER/EARLY SPRING SEEDING MIXTURE SPECIES RATE (lb/ACRE) RYE (GRAIN) 120 ANNUAL LESPEDEZA (KOBE IN KOREAN IN MOUNTAINS) 50 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. SEEDING DATES MOUNTAINS - ABOVE 2500 FT: FEB. 15 - MAY 15 BELOW 2500 FT: FEB. 1 - MAY 1 PIEDMONT - JAN. 1 - MAY 1 COASTAL PLAIN -DEC. 1 - APR. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 lb/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 Ib/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 lb/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT AT A RATE OF 0.10 GALLONS PER SQUARE YARD, NETTING SUCH AS LIGHTWEIGHT PLASTIC, COTTON, JUTE, WIRE, OR PAPER NETS STAPLED OVER THE MULCH ACCORDING TO THE MANUFACTURERS RECOMMENDATIONS, OR A MULCH ANCHORING TOOL SUCH AS A DISK SET NEARLY STRAIGHT. MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. DOWNSTREAM DETAIL 72" RCP CIRCULAR CULVERT FINISHED GRADE 7oD.Bs L. FINISHED GRADE TO MATCH EXISTING GRADE AT PIPE OUTLET. LINVERT=l' BELOW FINISHED GRADE LFOOTER PER FINISHED GRADE TO MATCH EXISTING GRADE AT PIPE OUTLET. LINVERT=1' BELOW FINISHED GRADE FOOT PER CONCRETE SILL TO BE INSTALLED TO 1' ABOVE PIPE INVERT CITY DETAIL CONCRETE SILL TO BE INSTALLED TO 1' ABOVE PIPE INVERT CIN DETAIL TYPICAL HEADWALL INSTALLATION TYPICAL HEADWALL INSTALLATION NOT TO SCALE NOT TO SCALE UPSTREAM DETAIL REFER TO CITY STANDARD DETAIL ON SHEET R201 FOR HEADWALL DIMENSIONS CONTRACT F R TO SUBMIT SIGNED AND SEALED SHOP DRAWINGS BEFORE CONSTRUCTION TEMPORARY SEEDING FALL SEEDING MIXTURE SPECIES RATE (lb/ACRE) RYE (GRAIN) 120 PIEDMONT AND COASTAL PLAIN, SEEDING DATES MOUNTAINS-AUG. 15 - DEC. 15 COASTAL PLAIN AND PIEDMONT-AUG. 15 - DEC. 30 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 Ib/ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 lb/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 lb/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT AT A RATE OF 0.10 GALLONS PER SQUARE YARD, NETTING SUCH AS LIGHTWEIGHT PLASTIC, COTTON, JUTE, WIRE, OR PAPER NETS STAPLED OVER THE MULCH ACCORDING TO THE MANUFACTURERS RECOMMENDATIONS, OR A MULCH ANCHORING TOOL SUCH AS A DISK SET NEARLY STRAIGHT. MAINTENANCE REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50LB/ACRE KOBE (PIEDMONT AND COASTAL PLAIN) OR KOREAN (MOUNTAINS) LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. TEMPORARY SEEDING SUMMER SEEDING MIXTURE SPECIES RATE Ib ACRE) GERMAN MILLET 40 IN THE PIEDMONT AND MOUNTAINS, A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 b/ACRE. SEEDING DATES MOUNTAINS -MAY 15 - AUG. 15 PIEDMONT -MAY 1 - AUG. 15 COASTAL PLAIN -APR. 15 - AUG. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 Ib/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 Ib/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 Ib/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT AT A RATE OF 0.10 GALLONS PER SQUARE YARD, NETTING SUCH AS LIGHTWEIGHT PLASTIC, COTTON, JUTE, WIRE, OR PAPER NETS STAPLED OVER THE MULCH ACCORDING TO THE MANUFACTURERS RECOMMENDATIONS, OR A MULCH ANCHORING TOOL SUCH AS A DISK SET NEARLY STRAIGHT. MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF A SITE WHERE LAND -DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE: ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. REFER TO CITY STANDARD DETAIL ON SHEET R201 FOR HEADWALL DIMENSIONS CONTRACTOR TO SUBMIT SIGNED AND SEALED SHOP DRAWNGS BEFORE CONSTRUCTION DOWNSTREAM DETAIL FINISHED GRADE TO MATCH EXISTING GRADE AT PIPE OUTLET. LINVERT=2' BELOW FINISHED GRADE LFOOTER PER FINISHED GRADE TO MATCH EXISTING GRADE AT PIPE OUTLET. LINVERT=2' BELOW FINISHED GRADE LFOOTER PER CONCRETE SILL TO BE INSTALLED TO 2' ABOVE PIPE INVERT CITY DETAIL CONCRETE SILL TO BE INSTALLED TO 2' ABOVE PIPE INVERT CITY DETAIL TYPICAL HEADWALL INSTALLATION TYPICAL HEADWALL INSTALLATION 119 NOT TO SCALE NOT TO SCALE FT x N N OED C= Q CJ O O EC w O N 1n 0ID w\ K m Q O Q r7 \ _ 0 Y O O a - V Z (Y I— w n F_ L LLI _I w 0- 00 C) p U 0 w Q w W (� a 0 w J m Z Q p-� Z 0- V O U O q Z SHEET NUMBER R503 Y m N SEQUENCE OF CONSTRUCTION FOR CULVERT GEOTEXTILE DEWATER DIRT BAG GENERAL NOTES a 1. CONTRACTOR SHALL DETERMINE A PROPOSED SIZE AND LOCATION OF GEOTEXTILE DEWATERING DIRT w GEOTEXTILE DEWATERING rAn BAG FOR APPROVAL BYY THE THE ENGINEER PRIOR TO INSTALLATION. OD DIRT BAG WITH I D m 2. INSTALL GEOTEXTILE DEWATERING DIRT BAG, AS APPROVED. 1. CEOTEXTILE DEWATERING DIRT BAG DIMENSIONS ARE VARIABLE AND DEPENDENT ON SPECIFIC SITE STABILIZED OUTLET. CONSTRAINTS AND PROPOSED CONSTRUCTION OPERATIONS F 3. INSTALL BYPASS PUMP AND DEWATERING PUMP AND NECESSARY TEMPORARY FLEXIBLE HOSE. -� CONNECT DEWATERING PUMP TO GEOTEXTILE DEWATERING BAG. � O O O O O 2. THE CONTRACTOR SHALL INSURE THAT THE DIRT BAG IS OF A SUFFICIENT SIZE AND STRENGTH TO m w w SEWN N SPOUT PROPERLY DEWATER THE PUMP HOSE INFLUENT, u BY-PASS PUMP OUTLET 4. PLACE UPSTREAM IMPERVIOUS DIKE AND/OR COFFER DAMS TO ISOLATE THE WORK AREA. BEGIN 3. D IRT BAG SHALL BE REPLACED WHEN FULL OF SEDIMENT OR WHEN FLOW THROUGH BAG IS LIMITED p O WITH ENERGY BYPASS PUMPING FOR STREAM PUMP AROUND OPERATION. x P BY SEDIMENT ACCUMULATION. © DISSIP ATOR, TYP. -- -- 5. PLACE DOWNSTREAM IMPERVIOUS DIKE FOR STREAM PUMP AROUND OPERATION. BEGIN DEWATERING "=- GDB PUMP DISCHARGE o z GEOTEXTILE Q- WEXISTING HOSE 3 0 4. IF DEWATERING DIRT BAG IS PLACED IN VEGETATED AREA ADJACENT TI AN p w o F N THE ISOLATED WORK AREA. AREA TO BE DEWATERED SHALL BE EQUAL TO ONE DAY'S WORK. DEWATEBANGG FILTER � "_ � UNDISTURBED UNDISTURBED STREAM NO OUTLET IS REQUIRED (PREFERRED). IF GEOTEXTILE DEWATERING DIRT (PREFERRED). rc w ur 6. CONSTRUCT CULVERT IN ACCORDANCE WITH THE PLANS. - BAG IS PLACED ON DISTURBED SOIL THEN A STABILIZED OUTLET/CHANNEL NEEDS TO BE PROVIDED. rc K 7. REMOVE DIRT BAG AND PROPERLY DISPOSE OF CAPTURED SEDIMENT AND DIRT BAG. STABILIZE FLOW 5. THE STABILIZED OUTLET WILL BE A MINIMUM OF 1' THICK AND CONSIST OF A WELL GRADED MIX OF w DISTURBED AREA WITH SEED AND MULCH. - 1' 6" RIP RAP PER THE DIMENSIONS BELOW. PLACE FILTER FABRIC BETWEEN THE RIP RAP AND SOIL FOUNDATION. THE STABILIZED OUTLET WILL EXTEND FROM THE SPECIAL STILLING BASIN TO - J HIGH STRENGTH STRAPPING THE BANK OF THE CHANNEL BELOW THE WORK AREA. o m FOR SECURING SPOUT TO OIMPERVIOUS DIKE, TYP. PUMP HOSE LENGTH RANGE 6.0-1 GEOTEXTILE DEWATERING STABILIZE OUTLET aaaaQaa z 0.5' LAYER OF NCDOT PLAN VIEW HIGH STRENGTH DOUBLE DIRT BAG AS NEEDED NO. 57 STONE STITCHED "J" TYPE SEAMS �m 0 O 0.5' LAYER OF o 2"-3" RIP RAP _ _ o EXISTINGIII y� III III III III L z N _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - GROUND EXISTING GROUND LENGTH RANGE - O w 6.0'-15.0' r 3:1 3:1 DIRT BAG TO BE PLACED ON NON -WOVEN LAYER OF NCDOT NO. 57 STONE � 0.5' STREAM BANK. PROVIDE STABILIZED OUTLET TO STREAM CHANNEL a = l o o < - `' N DEWATERING PUMP FOR SEDIMENT LADEN _ FILTER FABRIC 3.0 FEET SIDE VIEW ^ o o n p /^ n 2 WATER WITHIN WORK AREA STABILIZED OUTLET < z PROPOSED CULVERTS r o = B EOTEXTILE DEWATERING DIRT BAG o SCALE:NOT TO SCALE o IMPERVIOUS O DIKE, TYP. ® GY- w TEMPORARY FLEXIBLE PUMP HOSE, TYP. EXISTING STREAM CHANNEL 4 " D A ~ ID DRY WORK AREA - A WELL A PUMP H SE GRADED MI BYPASS PUMP FOR CLEAN UPSTREAM CHANNEL BASE FLOW I A A FLOW PONDED DRY WORK WATER AREA 8"-R2'p RIP 1� 2 2 PLAN a x o TOP OF :E IMPERVIOUS DIKE PUMP HOSE N 3 m o 0 0 PLAN VIEW w ID m 0 0 EXAMPLE OF PUMP -AROUND OPERATION PLATE UPSTREAM RIDE OF GRADE o z o\ a Z 3 S IMPERVIOUS DIKE WITH SANDBAGS, RIP RAP OR FILTER FABRIC OTHER TOP WIDTH SECTION A -A 'NC MATERIAL, 1 FOOT THICK PLATE WITH IMPERVIOUS z 3.0' MIN. POLYETHYLENE MEMBRANE, o 20 MIL THICK Tv WSE 2 MAX. �1 J APUMP -AROUND OPERATION `-' w �• DRY WORK SCDLeNOT To SCALE m 3 AREA ENERGY DISSIPATOR PUMP OUTLET SCALE NOT TO SCALE `^ vr^l a o =III=11 I— — =11 11= 1=III=III=III=11 =III=III=11 v ) \ EXISTING STREAM BED V ! J TRENCH IN FABRIC CLASS RIP RAP OR OTHER N MIN. 1 FOOT APPROVED NON -ERODIBLE MATERIAL LL_ FILTER FABRIC PER SECTION A -A SPECIFICATIONS U 1 /2" - 2" w </1 FLAT TOP END ESTABLISHED PLANT SHOWN Q p}FOR INFORMAL ONLY ui LATERAL BUD � GROUND pp1\ SURFACE 9 7 INSTALL SPLIT DEAD STOUT IMPERVIOUS DIKE II II STAKES PER SPECIFICATIONS SCALE:NOT TO SCALE o v BARK RIDGE ANCHOR TRENCH PLANTNG TO TOP 18" (TYP.) FLOODPLAIN EXISTING ON 1' CENTERS RIDE BRANCH REMOVED J of RIP RAP (ttP) BACKFILL MATTING IN GROUND z u ° CONMAT FIBER TRENCH ANCHOR OVERLAP LU a MATTING ON 1' CENTERS W Z II LL.I 30' LIVE CUTTING (DORMANT) EXISTING GROUND NOTES: Z c G 1. IF USING WOVEN COIR FIBER -- LLJ - LOW SEASONAL ANCHORS ON Np MAT, INSTALL LONG STRAW 3' CENTERS TF MULCH BENEATH MAT. 2 2. 2. 0' ON CENTERS. I- MIN ANCHORS ON 3' CENTERS (� 0 (n J () WATER TABLE DIRECTION is 0 ; �' ANCHORS ON 1' OF FLOW w BUTTAPE CENTERS IN TRENCH _,.,,,_� ANCHORS (TYP) Q LIVE STAKE DETAIL LIVE STAKE IN EARTH = MATTING SHALL BE PLACED IN p W NOT TO SCALE NOT TO SCALE TRENCH AND BACKFILLED J a z Q 0 STREAM BED EXTEND MATTING BELOW TOE 6" OVERLAY (MIN.) Q Z 0- OF SLOPE AND KEY INTO +I ( O STREAMBED MIN. 1.0' ANCHORS INTO STREAM BED ON 1.0' CENTERS �-/ � U) � TYPICAL CROSS SECTION PLAN VIEW Q 0 Z ELIVE STAKES F OIR MATTING FOR STREAM BANKS SHEET NUMBER SCALE:NOT TO SCALE -ALE:NOT TO SCALE R504 I— tocament. '.gamer won the concept. Ana aeaigns pre.entet o—o. a. an instrument or service. is intent.. only for to sP..- purpose Ana client for wo n was prepares. Kause of Ana improper reliance on to document .,tnott written autnonzat Ana aaaptanon oy Kimsey -Morn ant .....1—., inc..naii 01 —oout iiaoiiity 11 Kimsey -Morn 110 wseocwtee. inc. Qm1m In 11 I Xp / I 1/, /,/ �— / O� i�I — — �����. ������\— sszzao \ • PROPOSEDB PVC SEWER CD \ �------- `\52260 � sszz6a _y___Payoaos�o e•'°_ -ER PLAN VIEW - LINEBERGER EXTENSION (10+00.00 - 21+00.00) 2 2 SCALE: I" = — 710 \ \ 705 c m rc EXISTIN GRADE 7 E cxti MANHOL IN S GREATE 1FFTH Mil. \ . j O BE 5' N DIAMETE Y / \ _ 700 — — 7 00 ='m SEAL ND VENT MANHOLE P R oso°.c STAN VENT IARDDETAL71B— LEV.=6960' / 695 100VRFL ODELEV. _— / 1st LF pT6 O48 PUkSLI 695 PANEL:3 5 / -- --- -- — — LIC ELEV. =6 .0' / a Te•w / PUBLI NOTES: 1. CONSTRUCTION SHALL NOT BEGIN UNTIL A PRE -CONSTRUCTION MEETING HAS BEEN HELD WITH THE 690 OF GASTONIA STAFF. 2. CONSTRUCTION SHALL NOT BEGIN UNTIL A PRELIMINARY CONSTRUCTION INSPECTION OF THE SITE IS T (70 THE -6015A LEAST ON (1)WO KINENGINERI RI TO BEGINNING ADMINISTRATOR ADMINISTRATOR AT (T04) 6fi6-6015 AT LEAST ONE (1) WORKING DAY PRIOR TO BEGINNING CONSTRUCTION FOR INSPECTION. 3. THE CITY OF GASTONIA WILL REQUIRE AS -BUILT DRAWINGS, ENGINEER'S CERTIFICATION, AND ALL EASEMENTS RECORDED BEFORE A CERTIFICATE OF OCCUPANCY CAN BE ISSUED. 4. CONTRACTOR TO PROVIDE VIDEO OF COMPLETED SANITARY SEWER AS REQUIRED BY THE CITY OF GAS DNA. 5. CONTRACTOR IS TO PROVIDE COMPACTION TESTING FOR THE INSTALLATION OF ALL SANITARY 685 SEWER LINES IN FILL AREAS. 6. CONTRACTOR TO PROVIDE 'COMPETENT' CARD CARRYING INDIVIDUALS FOR OSHA REGULATIONS. 690 �.i SEALA STANDARD DVENTM DETAI HOLE PE T1B— ICITY I 1 VENTE EV.-696.' LF OF ' pv ®1' PUB 685 ROPOSED OGHOUSE ANHOLE To O EXISTIN CONNEC 12•'EWE,R 680 68 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 SS2230 TO SS2260 H. Scale:i"=40'IV. Scale: 1'=4' _ U Q CD O) Of I W — W U W W O O I O N U1 O Q O Q N p m C) w — O Z J a- Lu III 0� J W LL 3:0 wrr^ v J U � LL W z LLI Lu OO U 0 (n J Q U > (n LLI V Q 0 W a ~ —i a z G'/ Q z 0- O H fn Tf a O c? z SHEET NUMBER R603 0000000 • O 1 • ■� E �•• • 1 i / / I ------- I --- • • • 1 • 1 Lu of of ,at o I,1 I x cP STORM \��E— \\ \ / TILITV EASEMENT \ \ "%/�6 _ \�` \�\\\^II--`--_ 4 // I � \, � _✓� J _ \ \ � \�aa \ \ _ \\ _ �\ \ \ � � \ --—— \�_�_\ \\ \ PLAN VIEW - LINEBERGER EXTENSI N (27+00.00 - 33+00.00 ) NOTES: 1. CONSTRUCTION SHALL NOT BEGIN UNTILAPRE-CONSTRUCTION MEETING HAS BEEN HELD WITH THE CITY OF GASTONIA STAFF. 2. CONSTRUCTION SHALL NOT BEGIN UNTIL PRELIMINARY CONSTRUCTION INSPECTION OF THE SITE IS COMPLETED. CONTACT THE OFFICE OF THE CONSTRUCTION ENGINEER(RIGHT-OF-WAY ADMINISTRATOR AT (]04) 866F018 AT LEAST ONE (1) WORKING DAY PRIOR TO BEGINNING CONSTRUCTION FOR INSPECTION, 3. THE CITY OF GASTONIA WILL REQUIRE AS -BUILT DRAWINGS, ENGINEER'S CERTIFICATION, AND ALL EASEMENTS RECORDED BEFORE ACERTIFICATE OF OCCUPANCY CAN Be ISSUED. 4. CONTRACTOR TO PROVIDE VIDEO OF COMPLETED SANITARY SEWER AS REQUIRED BY THE CITY OF GASTONIA. 5. CONTRACTOR IS TO PROVIDE COMPACTION TESTING FOR THE INSTALLATION OF ALL SANITARY SEWER LINES IN FILL AREAS. 6. CONTRACTOR TO PROVIDE 'COMPETENT'LARD CARRYING INDIVIDUALS FOR OSHA REGULATIONS. 7$0 A PROXIMAT LOCATIO OF PROP SED ] PRIVATE CCESS EA EMENT 745 740 735 7 Z AN TH14 IN DEPTH UST POSEDG PR WE f �n �aeF MANH LE REA ER SZ D26+61.]8 INV:]21.3] THAN 4' IN DEPTH MUST - MANHOL SS2270 TO BE O ADJUS D TO FIN L AGENCY CORRESPONDENCE North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Bartos, Administrator Governor Roy Cooper Secretary Susi H. Hamilton June 5, 2020 Addie Lasitter Kimley-Horn 200 South Tryon Street, Suite 200 Charlotte, NC 282020 Addie.Lasitterkkimley-horn. com Office of Archives and History Deputy Secretary Kevin Cherry Re: Develop industrial space and associated infrastructure, between Lowell Road and Interstate 85, Gastonia, Gaston County, ER 20-0882 Dear Ms. Lasitter: Thank you for your email of April 3, 2020, regarding the above -referenced undertaking. We have reviewed your submittal and offer the following comments. We apologize for the delay in our response and any inconvenience it may have caused. This project will adversely affect the National Register -eligible Caleb John Lineberger House (GS0327). We advise that project management determine if federal permitting, funding, or approval will be required, as Section 106 of the National Historic Preservation Act requires the resolution of adverse effects to historic properties. As always, we encourage the applicant to avoid the adverse effect and if that cannot be accomplished then to minimize or mitigate. We would be happy to facilitate contact between the applicant and historic preservation groups that may be interested in the relocation of the house. There is one previously recorded archaeological site (31GS376) within the project area. It consists of the remains of an early twentieth-century domestic structure. When the site was documented in 2016, further archaeological investigations were recommended to assess whether the site is eligible for listing in the National Register of Historic Places (NRHP). One architectural resource, the Caleb John Lineberger House (GS0327), is also located within the project area. This house was determined eligible for listing in the NRHP under Criterion B for its association with Gaston County textile industry pioneer, Caleb John Lineberger, and under Criterion C for Architecture. Archaeological investigations were not conducted round the house. We recommend that prior to the initiation of any ground disturbing activities within the project area that archaeological site 31GS376 be relocated and assessed for listing in the NRHP. We also recommend that the area surrounding the Caleb John Lineberger House by investigated for archaeological remains that may contribute to the resource's NRHP eligibility. Please note that our office requests consultation with the Office of State Archaeology Review Archaeologist to discuss appropriate field methodologies prior to archaeological field investigations. Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 27699-4617 Telephone/Fax: (919) 807-6570/807-6599 This work should be conducted by an experienced archaeologist that meets the Secretary of the Interior professional qualification standards. A list of archaeological consultants who have conducted or expressed an interest in contract work in North Carolina is available at https://archaeoloa.ncdcr.gov/archaeological- consultant-list. The archaeologists listed, or any other experienced archaeologist, may be contacted to conduct the recommended survey. One paper copy and one digital copy (PDF) of all resulting archaeological reports, as well as a digital copy (PDF) of the North Carolina Site Form for each site recorded, should be forwarded to the Office of State Archaeology (OSA) through this office, for review and comment as soon as they are available and in advance of any construction or ground disturbance activities. OSA's Archaeological Standards and Guidelines for Background Research, FieldMethodologies, Technical Reports, and Curation can be found online at: https://files.nc.gov/dncr- arch/OSA Guidelines Dec2017.pdf. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comments, please contact Renee Gledhill -Earley, environmental review coordinator, at 919-814-6579 or environmental.reviewnncdcr.gov. In all future communication concerning this project, please cite the above - referenced tracking number. Sincerely, amona Bartos, Deputy State Historic Preservation Officer United States Department of the Interior V, SE�`'E FISH AND WILDLIFE SERVICE Asheville Field Office 160 Zillicoa Street' Asheville, North Carolina 28801 September 18, 2020 Taylor Kiker Kimley Horn 200 South Tryon Street, Suite 299 Charlotte, North Carolina 28202 Taylor.kiker@kimley-hom.com Dear Taylor Kiker Subject: NorthPoint; Gaston County, North Carolina Log No. 4-2-20-486 The U.S. Fish and Wildlife Service (Service) has reviewed the information provided in your correspondence dated September 14, 2020 (received September 15, 2020), wherein you solicit our comments regarding project -mediated impacts to federally protected species. We submit the following comments in accordance with the provisions of the Fish and Wildlife Coordination Act, as amended (16 U.S.C. 661-667e); the National Environmental Policy Act (42 U.S.C. §4321 et seq.); and section 7 of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531-1543) (Act). Project Description According to the information provided, the proposed project would entail the construction of an undisclosed development on approximately 380 undeveloped, forested acres in Gastonia, North Carolina. Onsite habitats appear to consist of mixed successional forest, cleared open space, maintained rights of way, riparian habitats, perennial stream, forested wetlands, and transitional edge habitats. Your correspondence does not identify a federal nexus with the proposed project. Your correspondence indicates that jurisdictional Waters of the U.S. are present onsite, but proposed impacts, and impact avoidance measures were not described. We request that you provide our office with this information to complete our evaluation of the proposed actions. Federally Listed Endangered and Threatened Species Suitable summer roosting habitat may be present in the project area for the federally threatened northern long-eared bat (Myotis septentrionalis). However, the final 4(d) rule (effective as of 1 Pursuant to 50 CFR §402.02, the Action Area includes all areas to be affected directly or indirectly by the Federal action and not merely the immediate area involved in the action. Moreover, the Effects of the Action are all consequences to listed species or critical habitat that are caused by the proposed action, including the consequences of other activities that are caused by the proposed action. A consequence is caused by the proposed action if it would not occur but for the proposed action and it is reasonably certain to occur. Effects of the action may occur later in time and may include consequences occurring outside the immediate area involved in the action (see also 50 CFR §402.17) February 16, 2016), exempts incidental take of northern long-eared bat associated with activities that occur greater than 0.25 miles from a known hibernation site, and greater than 150 feet from a known, occupied maternity roost during the pup season (June I — July 31). Based on the information provided, the project (which may or may not require tree clearing) would occur at a location where any incidental take that may result from associated activities is exempt under the 4(d) rule. Although not required, we encourage you to avoid any associated tree clearing activities during this animal's maternity roosting season from May 15 — August 15. According to the information provided, suitable habitats also occur onsite for the federally threatened dwarf -flowered heartleaf (Hexastylis nan flora), and the federally endangered Schweinitz's sunflower (Helianthus schweinitzii). However, targeted surveys for these species conducted during their respective optimal survey windows detected no evidence for these species. In accordance with the Act, it is the responsibility of the appropriate federal agency or its designated representative to review its activities or programs and to identify any such activities or programs that may affect endangered or threatened species or their habitats. If it is determined that the proposed activity may adversely affect any species federally listed as endangered or threatened, formal consultation with this office must be initiated. The Service appreciates the opportunity to provide these comments. Please contact W. Byron Hamstead of our staff at Byron Hamstead@fws.gov, if you have any questions. In any future correspondence concerning this project, please reference our Log Number 4-2-20-486. Sincerely, - - original signed - - Janet Mizzi Field Supervisor 2 COMPENSATORY MITIGATION ROY COOPER Governor ELIZABETH S. BISER Secretary MARC RECKTENWALD Director Rusty Bost City of Gastonia 150 S. York Street Gastonia, NC 28052 Project: Gateway 85 (additional/mod) NORTH CAROLINA Environmental Quality June 16, 2022 Expiration of Acceptance: 12/15/2022 County: Gaston The purpose of this letter is to notify you that the NCDEQ Division of Mitigation Services (DMS) is willing to accept payment for compensatory mitigation for impacts associated with the above referenced project as indicated in the table below. Please note that this decision does not assure that participation in the DMS in - lieu fee mitigation program will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact permitting agencies to determine if payment to the DMS will be approved. You must also comply with all other state, federal or local government permits, regulations or authorizations associated with the proposed activity including G.S. § 143-214.11. This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 Permit/401 Certification within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to DMS. Once DMS receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the in -lieu fee to be paid by an applicant is calculated based upon the Fee Schedule and policies listed on the DMS website. Based on the information supplied by you in your request to use the DMS, the impacts for which you are requesting compensatory mitigation credit are summarized in the following table. The amount of mitigation required and assigned to DMS for this impact is determined by permitting agencies and may exceed the impact amounts shown below. River Basin Impact Location 8-di it HUC Impact Type Impact Quantity Catawba 03050102 Riparian Wetland 0.276 Catawba 03050102 Warm Stream 762 Upon receipt of payment, DMS will take responsibility for providing the compensatory mitigation. The mitigation will be performed in accordance with the In -Lieu Fee Program instrument dated July 28,. Thank you for your interest in the DMS in -lieu fee mitigation program. If you have any questions or need additional information, please contact Kelly.Williams@ncdenr.gov. Sincerely, FOR James. B Stanfill Asset Management Supervisor cc: Chris Tinklenberg, agent North Carolina Department of Environmental Quality I Division of Mitigation Services 217 West Janes Street l 1652 Mail Service Center I Raleigh, North Carolina 2 7699 -1652 E Q �� oue919.767.$976 DMS ILF Mitigation Request Statement of Compliance with §143-214.11 & 143-214.20 (link to G.S. 143-214.11) Prior to accessing the Division of Mitigation Services (DMS), state law requires applicants to demonstrate compliance with G.S. § 143-214.11 and 143-214.20. All requests MUST include this form signed and dated by the permit applicant or an authorized agent. Compliance Statement: I have read and understand G.S. § 143-214.11 and 214.20 and have, to the best of my knowledge, complied with the requirements. I understand that participation in the DMS is voluntary and subject to approval by permitting agencies. Please check all that apply: ❑ Applicant is a Federal or State Government Entity or a unit of local government meeting the requirements set forth in G.S. 143-214.11 and is not required to purchase credits from a mitigation bank. ❑� There are no listed mitigation banks with the credit type I need located in the hydrologic unit where this impact will take place Mink to QwR list) ❑ Mitigation bank(s) in the hydrologic unit where the impacts will occur have been contacted and credits are not currently available. ❑ The DWR or the Corps of Engineers did not approve of the use of a mitigation bank for the required compensatory mitigation for this project. ❑ This is a renewal request and the permit application is under review. Bank credits were not available at the time the application was submitted. Enter date permit application was submitted for review: Note: It is the applicant's responsibility to document any inquiries made to private mitigation banks regarding credit availability. CMT I have read and understand the DMS refund aolicies (attached) initial here Signature of Applicant or Agent 06/16/2022 Date Gateway 85 Project Name Chris Tinklenberg Printed Name Gaston County, NC Location DIVISION OF MITIGATION SERVICES (DMS) IN -LIEU FEE REQUEST FORM Revised 6/30/2019 Complete requested information, sign and date, email to kelly.williams(ancdenr.gov. . Attachments are acceptable for clarification purposes (location map, address or lat long is required). Information submitted is subject to NC Public Records Law and may be requested by third parties. ..................... ........................................................................................................................................................................... CONTACT INFORMATION APPLICANT'S AGENT APPLICANT ....................................................................................................................:.....................................................................................................................:....................................................................................................................i 1. Business/Company Name ............................................................................................. 2. Contact Person ............................................................................................. 3. Mailing address ............................................................................................. 4. City, State, Zip ............................................................................................. 5. Telephone Number Kimley-Horn ................................................................................................ Chris Tinklenberg ................................................................................................ 200 South Tryon Street, STE 200 ................................................................................................ Charlotte, NC 28202 ................................................................................................ 704-409-1802 City of Gastonia ......................................................................... Rusty Bost ......................................................................... 150 South York Street Gastonia, NC 28052 .................................................................... 704-854-6635 6. E-Mail Address Chris.Tinklenberg@kimley-horn.com : RUStyb@CityofgaStonia.00171 PROJECT INFORMATION .......................................................................................................................................................................................................................................... 7. Project Name .......................................................................................................................................................:........................................................................................................................................................................................................... Gateway 85 8. Project Location (nearest town, city) Gastonia € ................................................................................................................................................................................................................................................................................................................................................................ 9. Lat-Long coordinates or attach a map ................................................................................................................................................................................................................................................................................................................................................................: Latitude: 35.269412 , Longitude:-81.119264 10. county ........................................................................................................................................................:......................................................................................................................................................................................................... Gaston County 11. River Basin & 8-digit HUC (link to Map) Catawba (H UC 03050102) :.......................................................................................................................................................:....................................................1...................................................................................................................................................: 12. Project Type ✓ Government ❑Private Project Type: local government :.......................................................................................................................................................:......................................................................................................................................................................................................... 13. Riparian Wetland Impact (ac.) (e.g., 0.13) 0.27G V........................................................................................... 14. Non -Riparian Wetland Impact (ac.) :.......................................................................................................................................................:........................................................................................................................................................................................................: NA 15. Coastal Marsh Impact (ac.) NA 16. Stream Impact (ft.) (e.g. 1,234) .......................Warm.................................................Cool...................................................Cold...................... 762 NA NA ....................................................... 17. Riparian Buffer Impact (sq. ft.) ......... ....................................................................................................................................................; Zone 1: Zone 2: n/a basin/huc above in #11 NA NA 18. Regulatory Agency Staff Contacts NCDWR: Alan Johnson USACE: Bryan Roden -Reynolds other: ...................................................................................................................................................:........................................................................................................................................................................................................ (_�) below if this request is for a: By signing below, the applicant is confirming they have ❑Check revision to a current acceptance read and understand the DMS refund policy posted at nceep.net and attached to this form. renewal of an expired acceptance Sictnature of Applicant or Authorized Aaent: ❑ extension of unexpired acceptance 06/16/2022 Date: Direct questions to Kelly Williams at 919-707-8915 or kelly.williams(cD_ncdenr.gov or to the front desk at 919-707-8976 Refund Policy for Fees Paid to DMS In -Lieu Fee Programs (9/21/2009) Purpose: The purpose of this policy is to make clear the circumstances and process under which a permittee can obtain a refund while simultaneously balancing customer service and responsible business practices. This policy applies to all refund requests made on or after the publication date of this policy. Policy Statement: The policy of DMS is to allow for refunds under certain conditions. 1. All refund requests must be made in writing to the DMS In -Lieu Fee Program Coordinator at kelly.williamsP_ncdenr.gov. 2. All refund requests are subject to fund availability. DMS does not guarantee fund availability for any request. 3. The request must either come from the entity that made the payment or from an authorized agent. Third parties requesting refunds must provide written authorization from the entity that made the payment specifying the name and address of the authorized refund recipient. 4. Refund requests related to unintended overpayments, typographical errors or incorrect invoices should be brought the attention of the In -Lieu Fee Program Coordinator as soon as possible. Such requests are typically approved without delay. 5. Payments made under an incremental payment arrangement are not eligible for refunds. 6. Refund requests made within nine months of payment to DMS will only be considered for requests associated with projects that have been terminated or modified where the permittee's mitigation requirements have been reduced. Such requests must be accompanied by written verification from the permitting agency that the project has been canceled, the permits have been rescinded or have been modified, or the mitigation requirements have been reduced. 7. Refund requests made more than nine months from the payment date will only be considered for permits that were terminated or modified to not require any mitigation. Such requests must be accompanied by written verification from the permitting agency that the project has been canceled, the permits have been rescinded and/or mitigation is no longer required. 8. Refund requests not meeting the criteria specified above are not eligible for a refund. 9. Refund requests that meet the criteria above will be elevated to DMS Senior Management for review. The following considerations apply to all refund requests: a. availability of funds after consideration of all existing project and regulatory obligations b. the date the payment was made c. the likelihood DMS can use the mitigation procured using the payment to meet other mitigation requirements 10. Once a refund has been approved, the refund recipient must provide a completed W-9 form to the DMS In -Lieu fee Program Coordinator within two weeks in order to process the refund though the State Controller's Office. 11. All decisions shall be final. � E spencer Ave �° J 0711 N Bwk Srd Ave �,�� _a Wnln„r Ave S4 Wi µlury Dr 4111 AV e Re; Ave N py 5}h Avc ° LP ,pr n rlr:han+ Rd yhc� �Maply AVe f Ran)* �I s oy o ire �n ..311� i r z �r R.W. Aye C1 W q f e Rama hq;• p irb•rvr']1r Q Rhyne 9r %evnl A+ ° ° call, fl Rd �Vr r o ti.'l Lowell�1•l�41e r w Rr c Gastarlla Z N AnY er w4V� ` b tl °rn °� t �cvr9evn i o Wlzk,ne @ Garnaue 81"! E Lunp Av# a z a a oI'L lebc 411 ✓Y 0 Cramalton ry ] N cr{ rre h L.• FJr � b va c Geer SI, qv 51� 4 Or :yr rya a J �fye c s emyra a�ky ll, � v Rhpnv aaxland.� 6gt `y�`r 3 6 E 'bplalove sf aQ"`an s-. Mile l+r yr - 4 •'+9rL4X KiS pvr q 14a0 C - 2 x S � N � � giVA �2. N 2 G F A4 91 0 4 0,• 'i , R6g0y+n N P.+oFw b N ll II f-`arA � Ehany Ave •ry g o r+ �rR Aherdam ANd r Re s 4 ��! C s Q'a �.TIIIIJ AVC puh art q�e Or v Ave C,rolr y ,� a PelnBr °ke Rd Av y P� O � c' 54"m°"t AyR w Easier � c �vwul 4''� fiat y �S Adc Y de❑r Rl.ii h. 3 X B r+,' 4b aAr �'Ilre °�'°!! 'nr �- •11 rr alvtl �rti� E Erarrkl+n v y Lynn SS �t 5D Avg ' a Mapt�v+oad Dr MilSha$/A �+nn _ G`�5s�cd crrOr9. nr Fr+�4pn 1 St 2 - C,�,yn t,. Vtib *n 7e` alvd� r'aurp 4 A. — ¢°hMSd� Legend a J a �,ve � rran�r+ 'Afvp x` Feet Limits of Disturbance a sc°ti�vnod Lire 4a 0 2,000 4,000 x„,. Kironp pwk �yo��� Gardntr Figure 1 Vicinity Map Gateway 85 ASTONAA City of Gastonia Nc GrearPlace. Great People. Great Promise. June 2022 Legend top Limits of DisturbanceT: N Qc kc. kIwW b _ fa kZ+ 9 aim _ Q- p r ti• r RCHAN Feet STONIAGreat Mace. Great People. Great Promise. Figure 2 USGS Topographic Map (Gaston N and Mount Holly) Gateway 85 City of Gastonia June 2022 F 'Legend f . d�� �y �> �. F g '" ..'' '• " N Limits of Disturbance ~,' +, Vez i .r It kh f•�� - , -srrx i, r. , i,Y .. y,rry' �' [. !L . � 1.2� ;"� + .. ,• - ' � = ,�, •„.•., t�r..��� � 4�s��' ;:r++ p"'+s. _ w$= A. • � ,i � Wig ' � - i�v - _ '`_ ';�,. " ��. ,,�� , �. •'R;, : �;�,i a 'g�-.,.,t. a ,•. - ' ! .. _ i . �.`� `� ,�`'' ' ,; •,';.� . '+� � e `• �" , :W y *^r '� t�,; +' ;di[4.• .i ,'' * ""'•^i:'' t 1:; _ ! -..� ' T,.�A'i- 7 LSD .f tA., Mi 1 • .lr. , IF Y Jti�uy}{�ie4i'" G ., r, r' A,Y.. r ..+ ~.. ''.i.7 ?'ar - r ; � r r_ � �C'•Fti 'fw• �'t- }'''�J r• i •�� li yy � �- irr Y ' i " . � l.i ' ..�. !' f ,,�'". a.'rliF'��''' �p.' f' A.: K'I ,'}' � i § Mari ' �•'� •� _ �c. �i i� PI IF �''j'-'. rF:pr—�;='- -s } s�J•~. yr. �, � - �.�• 1� # 'ti,d ,.f',,� � � �c: ,� .i . A 3� i-, •� i r' -fir ��.r •,7 ! ,f;�1. �,y��",�.,,� . �. ,•;- I .� �.. '-.. 1i. •�: • fir. .4r *If �` - e -�4-. i••:' •!'fir _�. � ,��' i ,1f ail J �! T - ��• �.� •i 1• .7r .:� �'s�','s ,T E ',.. J », ••�F^ •� �'i. *�'", r � . �ICr, _ } ` ,Y y#� ' ��'�rti S' :r ��, � ' :y, a� p , �,�r} i �s � � . ��yy..: l.. a " rr• h .y ` i1 i ' e ;�: l � 1' 1-` rAL� ' C'_71 1. :''T ��, .F `_ - ', .�- � � r7� ,•�E' �� •,;arc �'t � ,m; +^ �!�'_ .� ^sue, .,���„4 ,� I �A�� ��•, Feet -, .��1 �.i Rai bF:7:pr.'u...� '':�\ . a•ti � : w'1f =. .1� --. '^fir, . ��-.. -� ` .. ,rt .. � i .. R i►: :..F�: STONT-A ,,4c Great Mace. Great People. Great Promise. Figure 3 Aerial Map Gateway 85 City of Gastonia June 2022 user manual version z.i INSTRUCTIONS: Attach a sketch of the assessment area and photographs. Attach a copy of the USGS 7.5-minute topographic quadrangle, and circle the location of the stream reach under evaluation. If multiple stream reaches will be evaluated on the same property, identify and number all reaches on the attached map, and include a separate form for each reach. See the NC SAM User Manual for detailed descriptions and explanations of requested information. Record in the "Notes/Sketch" section if any supplementary measurements were performed. See the NC SAM User Manual for examples of additional measurements that may be relevant. NOTE EVIDENCE OF STRESSORS AFFECTING THE ASSESSMENT AREA (do not need to be within the assessment area). PROJECT / SITE INFORMATION: 1. Project name (if any): Gateway 85 2. Date of evaluation: 4/14/2020 3. Applicant/owner name: City of Gastonia 4. Assessor name/organization: Chris Tinklenberg / Kimley Horn 5. County: Gaston 6. Nearest named water body 7. River Basin: Catawba on USGS 7.5-minute quad: Duharts Creek 8. Site coordinates (decimal degrees, at lower end of assessment reach): 35.266594,-81.122176 STREAM INFORMATION: (depth and width can be approximations) 9. Site number (show on attached map): S1 10. Length of assessment reach evaluated (feet): -100 If 11. Channel depth from bed (in riffle, if present) to top of bank (feet): 2 F Unable to assess channel depth. 12. Channel width at top of bank (feet): 8 13. Is assessment reach a swamp stream? f Yes l' No 14. Feature type: (_- Perennial flow (' Intermittent flow Tidal Marsh Stream STREAM RATING INFORMATION: 15. NC SAM Zone: f Mountains (M) Piedmont (P) f Inner Coastal Plain (1) (' Outer Coastal Plain (0) 16. Estimated geomorphic L l valley shape (skip for C a Tidal Marsh Stream): (more sinuous stream, flatter valley slope) (less sinuous stream, steeper valley slope) 17. Watershed size: (skip C Size 1 (< 0.1 miZ) G Size 2 (0.1 to < 0.5 miZ) ( Size 3 (0.5 to < 5 miz) ( Size 4 (>_ 5 mil) for Tidal Marsh Stream) ADDITIONAL INFORMATION: 18. Were regulatory considerations evaluated? G Yes f No If Yes, check all that appy to the assessment area. F Section 10 water F Classified Trout Waters Water Supply Watershed ( l' I (' II (' III (' IV r. V) F Essential Fish Habitat F Primary Nursery Area I High Quality Waters/Outstanding Resource Waters F Publicly owned property F NCDWR riparian buffer rule in effect F Nutrient Sensitive Waters F Anadromous fish F 303(d) List F CAMA Area of Environmental Concern (AEC) F Documented presence of a federal and/or state listed protected species within the assessment area. List species: F Designated Critical Habitat (list species): 19. Are additional stream information/supplementary measurements included in "Notes/Sketch" section or attached? l Yes G No 1. Channel Water - assessment reach metric (skip for Size 1 streams and Tidal Marsh Streams) A Water throughout assessment reach. B No flow, water in pools only. f C No water in assessment reach. 2. Evidence of Flow Restriction - assessment reach metric A At least 10% of assessment reach in -stream habitat or riffle -pool sequence is adversely affected by a flow restriction or fill to the point of obstructing flow or a channel choked with aquatic macrophytes or ponded water or impounded on flood or ebb within the assessment reach (examples: undersized or perched culverts, causeways that constrict the channel, tidal gates). B Not A 3. Feature Pattern - assessment reach metric A A majority of the assessment reach has altered pattern (examples: straightening, modification above or below culvert). B Not A. 4. Feature Longitudinal Profile - assessment reach metric G A Majority of assessment reach has a substantially altered stream profile (examples: channel down -cutting, existing damming, over widening, active aggradation, dredging, and excavation where appropriate channel profile has not reformed from any of these disturbances). B Not A 5. Signs of Active Instability - assessment reach metric Consider only current instability, not past events from which the stream has currently recovered. Examples of instability include active bank failure, active channel down -cutting (head -cut), active widening, and artificial hardening (such as concrete, gabion, rip -rap). G A < 10% of channel unstable B 10 to 25% of channel unstable f C > 25% of channel unstable 6. Streamside Area Interaction - streamside area metric Consider for the Left Bank (LB) and the Right Bank (RB). LB RB A �' A Little or no evidence of conditions that adversely affect reference interaction B B Moderate evidence of conditions (examples: berms, levees, down -cutting, aggradation, dredging) that adversely affect reference interaction (examples: limited streamside area access, disruption of flood flows through streamside area, leaky or intermittent bulkheads, causeways with floodplain constriction, minor ditching [including mosquito ditching]) f C �' C Extensive evidence of conditions that adversely affect reference interaction (little to no floodplain/intertidal zone access [examples: causeways with floodplain and channel constriction, bulkheads, retaining walls, fill, stream incision, disruption of flood flows through streamside area] or too much floodplain/intertidal zone access [examples: impoundments, intensive mosquito ditching]) or floodplain/intertidal zone unnaturally absent or assessment reach is a man-made feature on an interstream divide 7. Water Quality Stressors - assessment reach/intertidal zone metric Check all that apply. F A Discolored water in stream or intertidal zone (milky white, blue, unnatural water discoloration, oil sheen, stream foam) F B Excessive sedimentation (burying of stream features or intertidal zone) F C Noticeable evidence of pollutant discharges entering the assessment reach and causing a water quality problem F D Odor (not including natural sulfide odors) F E Current published or collected data indicating degraded water quality in the assessment reach. Cite source in the "Notes/Sketch" section. F F Livestock with access to stream or intertidal zone F G Excessive algae in stream or intertidal zone F H Degraded marsh vegetation in the intertidal zone (removal, burning, regular mowing, destruction, etc.) F I Other: (explain in "Notes/Sketch" section) 71 J Little to no stressors 8. Recent Weather -watershed metric For Size 1 or 2 streams, D1 drought or higher is considered a drought; for Size 3 or 4 streams, D2 drought or higher is considered a drought. C' A Drought conditions and no rainfall or rainfall not exceeding 1 inch within the last 48 hours C' B Drought conditions and rainfall exceeding 1 inch within the last 48 hours R C No drought conditions 9 Large or Dangerous Stream - assessment reach metric f Yes G No Is stream is too large or dangerous to assess? If Yes, skip to Metric 13 (Streamside Area Ground Surface Condition). 10. Natural In -stream Habitat Types - assessment reach metric 10a. .4 Yes f No Degraded in -stream habitat over majority of the assessment reach (examples of stressors include excessive sedimentation, mining, excavation, in -stream hardening [for example, rip -rap], recent dredging, and snagging) (evaluate for size 4 Coastal Plain streams only, then skip to Metric 12) 10b. Check all that occur (occurs if > 5% coverage of assessment reach) (skip for Size 4 Coastal Plain streams) F A Multiple aquatic macrophytes and aquatic mosses m N F F 5% oysters or other natural hard bottoms (include liverworts, lichens, and algal mats) H d F G Submerged aquatic vegetation B Multiple sticks and/or leaf packs and/or emergent w in F H Low -tide refugia (pools) vegetation N o F I Sand bottom C Multiple snags and logs (including lap trees) r m F J 5% vertical bank along the marsh F D 5% undercut banks and/or root mats and/or roots 02 F K Little or no habitat in banks extend to the normal wetted perimeter F E Little or no habitat ***'"****************************REMAINING QUESTIONS ARE NOT APPLICABLE FOR TIDAL MARSH STREAMS******** 11. Bedform and Substrate -assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 11 a. r Yes G No Is assessment reach in a natural sand -bed stream? (skip for Coastal Plain streams) 11 b. Bedform evaluated. Check the appropriate box(es). F A Riffle -run section (evaluate 11c) F B Pool -glide section (evaluate 11d) F C Natural bedform absent (skip to Metric 12, Aquatic Life) 11c. In riffles sections, check all that occur below the normal wetted perimeter of the assessment reach - whether or not submerged. Check at least one box in each row (skip for Size 4 Coastal Plain Streams and Tidal Marsh Streams). Not Present (NP) _ absent, Rare (R) = present but <- 10%, Common (C) _ > 10-40%, Abundant (A) _ > 40-70%, Predominant (P) _ > 70%. Cumulative percentages should not exceed 100% for each assessment reach. NP R C A P r r r r f Bedrock/saprolite r r r r f Boulder (256 - 4096 mm) r r r r f Cobble (64 - 256 mm) r r r r f Gravel (2 - 64 mm) r r r r f Sand (.062-2 mm) r r r r f Silt/clay (< 0.062 mm) r r r r f Detritus r r r r f Artificial (rip -rap, concrete, etc.) 11 d. f Yes f No Are pools filled with sediment? (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12. Aquatic Life -assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12a. T Yes f No Was an in -stream aquatic life assessment performed as described in the User Manual? If No, select one of the following reasons and skip to Metric 13. f No Water f Other: 12b. t: Yes f No Are aquatic organisms present in the assessment reach (look in riffles, pools, then snags)? If Yes, check all that apply. If No, skip to Metric 13. 1 >1 Numbers over columns refer to "individuals" for size 1 and 2 streams and "taxa" for size 3 and 4 streams. F F Adult frogs F F Aquatic reptiles F F Aquatic macrophytes and aquatic mosses (include liverworts, lichens, and algal mats) F F Beetles (including water pennies) F F Caddisfly larvae (Trichoptera [T]) F F Asian clam (Corbicula ) F F Crustacean (isopod/amphipod/crayfish/shrimp) F F Damselfly and dragonfly larvae F F Dipterans (true flies) F F Mayfly larvae (Ephemeroptera [E]) F F Megaloptera (alderfly, fishily, dobsonfly larvae) F F Midges/mosquito larvae F F Mosquito fish (Gambusia) or mud minnows (Umbra pygmaea) F F Mussels/Clams (not Corbicula ) F F Other fish F F Salamanders/tadpoles F F Snails F F Stonefly larvae (Plecoptera [P]) F F Tipulid larvae F F Worms/leeches 13. Streamside Area Ground Surface Condition — streamside area metric (skip for Tidal Marsh Streams and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB). Consider storage capacity with regard to both overbank flow and upland runoff. LB RB A �' A Little or no alteration to water storage capacity over a majority of the streamside area C B �' B Moderate alteration to water storage capacity over a majority of the streamside area b C �' C Severe alteration to water storage capacity over a majority of the streamside area (examples include: ditches, fill, soil, compaction, livestock disturbance, buildings, man-made levees, drainage pipes) 14. Streamside Area Water Storage — streamside area metric (skip for Size 1 streams, Tidal Marsh Streams, and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB) of the streamside area. LB RB A �' A Majority of streamside area with depressions able to pond water t 6 inches deep C B �' B Majority of streamside area with depressions able to pond water 3 to 6 inches deep C �' C Majority of streamside area with depressions able to pond water < 3 inches deep 15. Wetland Presence — streamside area metric (skip for Tidal Marsh Streams) Consider for the Left Bank (LB) and the Right Bank (RB). Do not consider wetlands outside of the streamside area or within the normal wetted perimeter of assessment reach. LB RB Y �' Y Are wetlands present in the streamside area? G N r N 16. Baseflow, Contributors — assessment reach metric (skip for size 4 streams and Tidal Marsh Streams) Check all contributors within the assessment reach or within view of and draining to the assessment reach. F A Streams and/or springs (jurisdictional discharges) F B Ponds (include wet detention basins; do not include sediment basins or dry detention basins) F C Obstruction that passes some flow during low -flow periods within assessment area (beaver dam, bottom -release dam) F D Evidence of bank seepage or sweating (iron oxidizing bacteria in water indicates seepage) fr E Stream bed or bank soil reduced (dig through deposited sediment if present) F F None of the above 17. Baseflow Detractors — assessment area metric (skip for Tidal Marsh Streams) Check all that apply. F A Evidence of substantial water withdrawals from the assessment reach (includes areas excavated for pump installation) F B Obstruction not passing flow during low flow periods affecting the assessment reach (ex: watertight dam, sediment deposit) F C Urban stream (>_ 24% impervious surface for watershed) F D Evidence that the stream -side area has been modified resulting in accelerated drainage into the assessment reach F E Assessment reach relocated to valley edge F F None of the above 18. Shading — assessment reach metric (skip for Tidal Marsh Streams) Consider aspect. Consider "leaf -on" condition. A Stream shading is appropriate for stream category (may include gaps associated with natural processes) B Degraded (example: scattered trees) C Stream shading is gone or largely absent 19. Buffer Width — streamside area metric (skip for Tidal Marsh Streams) Consider `vegetated buffer" and "wooded buffer" separately for left bank (LB) and right bank (RB) starting at the top of bank out to the first break. Vegetated Wooded LB RB LB RB A C A A �' A >_ 100-feet wide or extends to the edge of the watershed B �' B B �' B From 50 to < 100-feet wide C �' C C r C From 30 to < 50-feet wide D �' D D �' D From 10 to < 30-feet wide E r E E �' E < 10-feet wide or no trees 20. Buffer Structure — streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Vegetated" Buffer Width). LB RB A A Mature forest B B Non -mature woody vegetation or modified vegetation structure f C G C Herbaceous vegetation with or without a strip of trees < 10 feet wide D D Maintained shrubs E E Little or no vegetation 21. Buffer Stressors — streamside area metric (skip for Tidal Marsh Streams) Check all appropriate boxes for left bank (LB) and right bank (RB). Indicate if listed stressor abuts stream (Abuts), does not abut but is within 30 feet of stream (< 30 feet), or is between 30 to 50 feet of stream (30-50 feet). If none of the following stressors occurs on either bank, check here and skip to Metric 22: IV Abuts < 30 feet 30-50 feet LB RB LB RB LB RB r A �' A r A �' A r A �' A Row crops r B �' B r B �' B r B �' B Maintained turf C �' C C �' C C �' C Pasture (no livestock)/commercial horticulture r D �' D r D �' D r D �' D Pasture (active livestock use) 22. Stem Density — streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Wooded" Buffer Width). LB RB A A Medium to high stem density B B Low stem density C C No wooded riparian buffer or predominantly herbaceous species or bare ground 23. Continuity of Vegetated Buffer— streamside area metric (skip for Tidal Marsh Streams) Consider whether vegetated buffer is continuous along stream (parallel). Breaks are areas lacking vegetation > 10-feet wide. LB RB A A The total length of buffer breaks is < 25 percent. B B The total length of buffer breaks is between 25 and 50 percent. C C The total length of buffer breaks is > 50 percent. 24. Vegetative Composition — First 100 feet of streamside area metric (skip for Tidal Marsh Streams) Evaluate the dominant vegetation within 100 feet of each bank or to the edge of the watershed (whichever comes first) as it contributes to assessment reach habitat. LB RB A A Vegetation is close to undisturbed in species present and their proportions. Lower strata composed of native species, with non-native invasive species absent or sparse. B B Vegetation indicates disturbance in terms of species diversity or proportions, but is still largely composed of native species. This may include communities of weedy native species that develop after clear -cutting or clearing or communities with non-native invasive species present, but not dominant, over a large portion of the expected strata or communities missing understory but retaining canopy trees. r C r C Vegetation is severely disturbed in terms of species diversity or proportions. Mature canopy is absent or communities with non-native invasive species dominant over a large portion of expected strata or communities composed of planted stands of non -characteristic species or communities inappropriately composed of a single species or no vegetation. 25. Conductivity — assessment reach metric (skip for all Coastal Plain streams) 25a. (' Yes (-- No Was a conductivity measurement recorded? If No, select one of the following reasons. ( No Water ( Other: 25b. Check the box corresponding to the conductivity measurement (units of microsiemens per centimeter). ( A <46 ( B 46 to < 67 ( C 67 to < 79 f D 79 to < 230 (' E >_ 230 Notes/Sketch: NC SAM Stream Rating Sheet Accompanies User Manual Version 2.1 Stream Site Name Gateway 85 Stream Category Pb2 Notes of Field Assessment Form (Y/N) Presence of regulatory considerations (Y/N) Additional stream information/supplementary measurements included (Y/N) NC SAM feature type (perennial, intermittent, Tidal Marsh Stream) Function Class Rating Summary Date of Evaluation 4/14/2020 Assessor Name/Organization iris Tinklenberg / Kimley He NO YES NO Perennial USACE/ NCDWR All Streams Intermittent (1) Hydrology LOW (2) Baseflow HIGH (2) Flood Flow LOW (3) Streamside Area Attenuation MEDIUM (4) Floodplain Access MEDIUM (4) Wooded Riparian Buffer MEDIUM (4) Microtopography NA (3) Stream Stability LOW (4) Channel Stability HIGH (4) Sediment Transport LOW (4) Stream Geomorphology LOW (2) Stream/Intertidal Zone Interaction NA (2) Longitudinal Tidal Flow NA (2) Tidal Marsh Stream Stability NA (3) Tidal Marsh Channel Stability NA (3) Tidal Marsh Stream Geomorphology NA (1) Water Quality HIGH (2) Baseflow HIGH (2) Streamside Area Vegetation LOW (3) Upland Pollutant Filtration LOW (3) Thermoregulation LOW (2) Indicators of Stressors NO (2) Aquatic Life Tolerance HIGH (2) Intertidal Zone Filtration NA (1) Habitat LOW (2) In -stream Habitat LOW (3) Baseflow HIGH (3) Substrate LOW (3) Stream Stability MEDIUM (3) In -stream Habitat MEDIUM (2) Stream -side Habitat LOW (3) Stream -side Habitat LOW (3) Thermoregulation LOW (2) Tidal Marsh In -stream Habitat NA (3) Flow Restriction NA (3) Tidal Marsh Stream Stability NA (4) Tidal Marsh Channel Stability NA (4) Tidal Marsh Stream Geomorphology NA (3) Tidal Marsh In -stream Habitat NA (2) Intertidal Zone Habitat NA Overall LOW user manual version c.-i USACE AID #: NCDWR #: INSTRUCTIONS: Attach a sketch of the assessment area and photographs. Attach a copy of the USGS 7.5-minute topographic quadrangle, and circle the location of the stream reach under evaluation. If multiple stream reaches will be evaluated on the same property, identify and number all reaches on the attached map, and include a separate form for each reach. See the NC SAM User Manual for detailed descriptions and explanations of requested information. Record in the "Notes/Sketch" section if any supplementary measurements were performed. See the NC SAM User Manual for examples of additional measurements that may be relevant. NOTE EVIDENCE OF STRESSORS AFFECTING THE ASSESSMENT AREA (do not need to be within the assessment area). PROJECT / SITE INFORMATION: 1. Project name (if any): Gateway 85 2. Date of evaluation: 4/14/2020 3. Applicant/owner name: City of Gastonia 4. Assessor name/organization: Chris Tinklenberg / Kimley Horn 5. County: Gaston 6. Nearest named water body 7. River Basin: Catawba on USGS 7.5-minute quad: Duharts Creek 8. Site coordinates (decimal degrees, at lower end of assessment reach): 35.269063,-81.122176 STREAM INFORMATION: (depth and width can be approximations) 9. Site number (show on attached map): S3 10. Length of assessment reach evaluated (feet): -100 If 11. Channel depth from bed (in riffle, if present) to top of bank (feet): 2 f Unable to assess channel depth. 12. Channel width at top of bank (feet): 5 13. Is assessment reach a swamp stream? f Yes r~ No 14. Feature type: t* Perennial flow r~ Intermittent flow C Tidal Marsh Stream STREAM RATING INFORMATION: 15. NC SAM Zone: f Mountains (M) [« Piedmont (P) r~ Inner Coastal Plain (1) C Outer Coastal Plain (0) 16. Estimated geomorphic L J valley shape (skip for ( a it b Tidal Marsh Stream): (more sinuous stream, flatter valley slope) (less sinuous stream, steeper valley slope) 17. Watershed size: (skip (« Size 1 (< 0.1 mi`) (' Size 2 (0.1 to < 0.5 mi`) (' Size 3 (0.5 to < 5 mi`) I!- Size 4 (>_ 5 miZ) for Tidal Marsh Stream) ADDITIONAL INFORMATION: 18. Were regulatory considerations evaluated? it Yes r~ No If Yes, check all that appy to the assessment area. r Section 10 water r Classified Trout Waters r Water Supply Watershed ( r I r~ II III r Iv r« v) r Essential Fish Habitat r Primary Nursery Area r High Quality Waters/Outstanding Resource Waters F Publicly owned property r NCDWR riparian buffer rule in effect F Nutrient Sensitive Waters r Anadromous fish r 303(d) List F CAMA Area of Environmental Concern (AEC) r Documented presence of a federal and/or state listed protected species within the assessment area. List species: F Designated Critical Habitat (list species): 19. Are additional stream information/supplementary measurements included in "Notes/Sketch" section or attached? Yes Ct No 1. Channel Water- assessment reach metric (skip for Size 1 streams and Tidal Marsh Streams) I: A Water throughout assessment reach. r' B No flow, water in pools only. r' C No water in assessment reach. 2. Evidence of Flow Restriction - assessment reach metric f« A At least 10% of assessment reach in -stream habitat or riffle -pool sequence is adversely affected by a flow restriction or fill to the point of obstructing flow or a channel choked with aquatic macrophytes or ponded water or impounded on flood or ebb within the assessment reach (examples: undersized or perched culverts, causeways that constrict the channel, tidal gates). f B Not A 3. Feature Pattern - assessment reach metric I: A A majority of the assessment reach has altered pattern (examples: straightening, modification above or below culvert). r' B Not A. 4. Feature Longitudinal Profile - assessment reach metric f A Majority of assessment reach has a substantially altered stream profile (examples: channel down -cutting, existing damming, over widening, active aggradation, dredging, and excavation where appropriate channel profile has not reformed from any of these disturbances). f« B Not A 5. Signs of Active Instability - assessment reach metric Consider only current instability, not past events from which the stream has currently recovered. Examples of instability include active bank failure, active channel down -cutting (head -cut), active widening, and artificial hardening (such as concrete, gabion, rip -rap). I: A < 10% of channel unstable r' B 10 to 25% of channel unstable r' C > 25% of channel unstable 6. Streamside Area Interaction - streamside area metric Consider for the Left Bank (LB) and the Right Bank (RB). LB RB f« A f+ A Little or no evidence of conditions that adversely affect reference interaction r~ B r~ B Moderate evidence of conditions (examples: berms, levees, down -cutting, aggradation, dredging) that adversely affect reference interaction (examples: limited streamside area access, disruption of flood flows through streamside area, leaky or intermittent bulkheads, causeways with floodplain constriction, minor ditching [including mosquito ditching]) i` C [' C Extensive evidence of conditions that adversely affect reference interaction (little to no floodplain/intertidal zone access [examples: causeways with floodplain and channel constriction, bulkheads, retaining walls, fill, stream incision, disruption of flood flows through streamside area] or too much floodplain/intertidal zone access [examples: impoundments, intensive mosquito ditching]) or floodplain/intertidal zone unnaturally absent or assessment reach is a man-made feature on an interstream divide 7. Water Quality Stressors - assessment reach/intertidal zone metric Check all that apply. F A Discolored water in stream or intertidal zone (milky white, blue, unnatural water discoloration, oil sheen, stream foam) r B Excessive sedimentation (burying of stream features or intertidal zone) • C Noticeable evidence of pollutant discharges entering the assessment reach and causing a water quality problem r D Odor (not including natural sulfide odors) F E Current published or collected data indicating degraded water quality in the assessment reach. Cite source in the "Notes/Sketch" section. r F Livestock with access to stream or intertidal zone r G Excessive algae in stream or intertidal zone F H Degraded marsh vegetation in the intertidal zone (removal, burning, regular mowing, destruction, etc.) r I Other: (explain in "Notes/Sketch" section) 17 J Little to no stressors 8. Recent Weather - watershed metric For Size 1 or 2 streams, D1 drought or higher is considered a drought; for Size 3 or 4 streams, D2 drought or higher is considered a drought. i` A Drought conditions and no rainfall or rainfall not exceeding 1 inch within the last 48 hours i` B Drought conditions and rainfall exceeding 1 inch within the last 48 hours Ct C No drought conditions 9 Large or Dangerous Stream - assessment reach metric f Yes I: No Is stream is too large or dangerous to assess? If Yes, skip to Metric 13 (Streamside Area Ground Surface Condition). 10. Natural In -stream Habitat Types -assessment reach metric 10a. it Yes (- No Degraded in -stream habitat over majority of the assessment reach (examples of stressors include excessive sedimentation, mining, excavation, in -stream hardening [for example, rip -rap], recent dredging, and snagging) (evaluate for size 4 Coastal Plain streams only, then skip to Metric 12) 10b. Check all that occur (occurs if > 5% coverage of assessment reach) (skip for Size 4 Coastal Plain streams) F- A Multiple aquatic macrophytes and aquatic mosses N F F 5% oysters or other natural hard bottoms (include liverworts, lichens, and algal mats) H m r G Submerged aquatic vegetation F✓ B Multiple sticks and/or leaf packs and/or emergent $ r_, r H Low -tide refugia (pools) vegetation t o I Sand bottom r C Multiple snags and logs (including lap trees) t Co F J 5% vertical bank along the marsh r D 5% undercut banks and/or root mats and/or roots U F K Little or no habitat in banks extend to the normal wetted perimeter F E Little or no habitat *********************************REMAINING QUESTIONS ARE NOT APPLICABLE FOR TIDAL MARSH STREAMS**************************** 11. Bedform and Substrate -assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 11 a. f Yes I: No Is assessment reach in a natural sand -bed stream? (skip for Coastal Plain streams) 11 b. Bedform evaluated. Check the appropriate box(es). r A Riffle -run section (evaluate 11c) r B Pool -glide section (evaluate 11d) Fv C Natural bedform absent (skip to Metric 12, Aquatic Life) 11 c. In riffles sections, check all that occur below the normal wetted perimeter of the assessment reach - whether or not submerged. Check at least one box in each row (skip for Size 4 Coastal Plain Streams and Tidal Marsh Streams). Not Present (NP) _ absent, Rare (R) = present but <- 10%, Common (C) _ > 10-40%, Abundant (A) _ > 40-70%, Predominant (P) _ > 70%. Cumulative percentages should not exceed 100% for each assessment reach. NP R C A P f f f f f Bedrock/saprolite f f f f f Boulder (256 - 4096 mm) f f f f f Cobble (64 - 256 mm) f f f f f Gravel (2 - 64 mm) f f f f f Sand (.062 - 2 mm) f f f f f Silt/clay (< 0.062 mm) f f f f f Detritus f f f f f Artificial (rip -rap, concrete, etc.) 11 d. C` Yes C` No Are pools filled with sediment? (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12. Aquatic Life - assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12a. I: Yes f No Was an in -stream aquatic life assessment performed as described in the User Manual? If No, select one of the following reasons and skip to Metric 13. f No Water f Other: 12b. (- Yes it No Are aquatic organisms present in the assessment reach (look in riffles, pools, then snags)? If Yes, check all that apply. If No, skip to Metric 13. 1 >1 Numbers over columns refer to "individuals" for size 1 and 2 streams and "taxa" for size 3 and 4 streams. r r Adult frogs f r Aquatic reptiles F f Aquatic macrophytes and aquatic mosses (include liverworts, lichens, and algal mats) r r Beetles (including water pennies) F r Caddisfly larvae (Trichoptera [T]) r r' Asian clam (Corbicula ) f r Crustacean (isopod/amphipod/crayfish/shrimp) F r Damselfly and dragonfly larvae F r Dipterans (true flies) r i Mayfly larvae (Ephemeroptera [E]) f r Megaloptera (alderfly, fishily, dobsonfly larvae) r f Midges/mosquito larvae r r Mosquito fish (Gambusia) or mud minnows (Umbra pygmaea) r r Mussels/Clams (not Corbicula ) r r Other fish r r Salamanders/tadpoles F r Snails r r Stonefly larvae (Plecoptera [P]) r r Tipulid larvae F f— Worms/leeches 13. Streamside Area Ground Surface Condition — streamside area metric (skip for Tidal Marsh Streams and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB). Consider storage capacity with regard to both overbank flow and upland runoff. LB RB f A C' A Little or no alteration to water storage capacity over a majority of the streamside area f B C' B Moderate alteration to water storage capacity over a majority of the streamside area f C [' C Severe alteration to water storage capacity over a majority of the streamside area (examples include: ditches, fill, soil, compaction, livestock disturbance, buildings, man-made levees, drainage pipes) 14. Streamside Area Water Storage — streamside area metric (skip for Size 1 streams, Tidal Marsh Streams, and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB) of the streamside area. LB RB C A [' A Majority of streamside area with depressions able to pond water > 6 inches deep C B [' B Majority of streamside area with depressions able to pond water 3 to 6 inches deep C C [' C Majority of streamside area with depressions able to pond water < 3 inches deep 15. Wetland Presence — streamside area metric (skip for Tidal Marsh Streams) Consider for the Left Bank (LB) and the Right Bank (RB). Do not consider wetlands outside of the streamside area or within the normal wetted perimeter of assessment reach. LB RB [ Y Y Are wetlands present in the streamside area? [« N [: N 16. Baseflow Contributors — assessment reach metric (skip for size 4 streams and Tidal Marsh Streams) Check all contributors within the assessment reach or within view of and draining to the assessment reach. r A Streams and/or springs (jurisdictional discharges) r B Ponds (include wet detention basins; do not include sediment basins or dry detention basins) F C Obstruction that passes some flow during low -flow periods within assessment area (beaver dam, bottom -release dam) r D Evidence of bank seepage or sweating (iron oxidizing bacteria in water indicates seepage) R E Stream bed or bank soil reduced (dig through deposited sediment if present) F F None of the above 17. Baseflow Detractors — assessment area metric (skip for Tidal Marsh Streams) Check all that apply. F A Evidence of substantial water withdrawals from the assessment reach (includes areas excavated for pump installation) F B Obstruction not passing flow during low flow periods affecting the assessment reach (ex: watertight dam, sediment deposit) R C Urban stream (>_ 24% impervious surface for watershed) F D Evidence that the stream -side area has been modified resulting in accelerated drainage into the assessment reach F E Assessment reach relocated to valley edge F F None of the above 18. Shading —assessment reach metric (skip for Tidal Marsh Streams) Consider aspect. Consider "leaf -on" condition. i A Stream shading is appropriate for stream category (may include gaps associated with natural processes) 6— B Degraded (example: scattered trees) C' C Stream shading is gone or largely absent 19. Buffer Width — streamside area metric (skip for Tidal Marsh Streams) Consider "vegetated buffer" and "wooded buffer" separately for left bank (LB) and right bank (RB) starting at the top of bank out to the first break. Vegetated Wooded LB RB LB RB (- A r- A (- A r- A >- 100-feet wide or extends to the edge of the watershed i` B C' B B f+ B From 50 to < 100-feet wide i` C [' C [ C [' C From 30 to < 50-feet wide f« D f+ D C D C' D From 10 to < 30-feet wide E C' E C E C' E < 10-feet wide or no trees 20. Buffer Structure - streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Vegetated" Buffer Width). LB RB l- A C` A Mature forest I: B 6- B Non -mature woody vegetation or modified vegetation structure IA C IF C Herbaceous vegetation with or without a strip of trees < 10 feet wide IA D IF D Maintained shrubs IA E IF E Little or no vegetation 21. Buffer Stressors - streamside area metric (skip for Tidal Marsh Streams) Check all appropriate boxes for left bank (LB) and right bank (RB). Indicate if listed stressor abuts stream (Abuts), does not abut but is within 30 feet of stream (< 30 feet), or is between 30 to 50 feet of stream (30-50 feet). If none of the following stressors occurs on either bank, check here and skip to Metric 22: F, Abuts < 30 feet 30-50 feet LB RB LB RB LB RB C` A C' A C` A C' A C` A C' A Row crops C` B C' B C` B C' B C` B C' B Maintained turf i` C [' C i` C [' C i` C [' C Pasture (no livestock)/commercial horticulture r D r n r n r D r D r D Pasture (active livestock use) 22. Stem Density - streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Wooded" Buffer Width). LB RB A C" A Medium to high stem density I: B I: B Low stem density IA C IA C No wooded riparian buffer or predominantly herbaceous species or bare ground 23. Continuity of Vegetated Buffer - streamside area metric (skip for Tidal Marsh Streams) Consider whether vegetated buffer is continuous along stream (parallel). Breaks are areas lacking vegetation > 10-feet wide. LB RB f« A i« A The total length of buffer breaks is < 25 percent. i` B i` B The total length of buffer breaks is between 25 and 50 percent. i` C i` C The total length of buffer breaks is > 50 percent. 24. Vegetative Composition - First 100 feet of streamside area metric (skip for Tidal Marsh Streams) Evaluate the dominant vegetation within 100 feet of each bank or to the edge of the watershed (whichever comes first) as it contributes to assessment reach habitat. LB RB IA A IA A Vegetation is close to undisturbed in species present and their proportions. Lower strata composed of native species, with non-native invasive species absent or sparse. I: B I: B Vegetation indicates disturbance in terms of species diversity or proportions, but is still largely composed of native species. This may include communities of weedy native species that develop after clear -cutting or clearing or communities with non-native invasive species present, but not dominant, over a large portion of the expected strata or communities missing understory but retaining canopy trees. IA C IA C Vegetation is severely disturbed in terms of species diversity or proportions. Mature canopy is absent or communities with non-native invasive species dominant over a large portion of expected strata or communities composed of planted stands of non -characteristic species or communities inappropriately composed of a single species or no vegetation. 25. Conductivity- assessment reach metric (skip for all Coastal Plain streams) 25a. (- Yes ft No Was a conductivity measurement recorded? If No, select one of the following reasons. (- No Water (- Other: 25b. Check the box corresponding to the conductivity measurement (units of microsiemens per centimeter). r A <46 f B 46 to < 67 f C 67 to < 79 i D 79 to < 230 f E ? 230 Notes/Sketch: NC SAM Stream Rating Sheet Accompanies User Manual Version 2.1 Stream Site Name Gateway 85 Date of Evaluation Stream Category Pb1 Assessor Name/Organization iris Tink Notes of Field Assessment Form (Y/N) Presence of regulatory considerations (Y/N) Additional stream information/supplementary measurements included (Y/N) NC SAM feature type (perennial, intermittent, Tidal Marsh Stream) Function Class Rating Summary USACE/ NC All Streams Inter (1) Hydrology HIGH (2) Baseflow MEDIUM (2) Flood Flow HIGH (3) Streamside Area Attenuation HIGH (4) Floodplain Access HIGH (4) Wooded Riparian Buffer MEDIUM (4) Microtopography NA (3) Stream Stability MEDIUM (4) Channel Stability HIGH (4) Sediment Transport LOW (4) Stream Geomorphology MEDIUM (2) Stream/Intertidal Zone Interaction NA (2) Longitudinal Tidal Flow NA (2) Tidal Marsh Stream Stability NA (3) Tidal Marsh Channel Stability NA (3) Tidal Marsh Stream Geomorphology NA (1) Water Quality LOW (2) Baseflow MEDIUM (2) Streamside Area Vegetation MEDIUM (3) Upland Pollutant Filtration MEDIUM (3) Thermoregulation MEDIUM (2) Indicators of Stressors NO (2) Aquatic Life Tolerance LOW (2) Intertidal Zone Filtration NA (1) Habitat MEDIUM (2) In -stream Habitat LOW (3) Baseflow MEDIUM (3) Substrate LOW (3) Stream Stability HIGH (3) In -stream Habitat MEDIUM (2) Stream -side Habitat HIGH (3) Stream -side Habitat HIGH (3) Thermoregulation MEDIUM (2) Tidal Marsh In -stream Habitat NA (3) Flow Restriction NA (3) Tidal Marsh Stream Stability NA (4) Tidal Marsh Channel Stability NA (4) Tidal Marsh Stream Geomorphology NA (3) Tidal Marsh In -stream Habitat NA (2) Intertidal Zone Habitat NA Overall MEDIUM 4/14/2020 lenberg / Kimley He NO YES NO Perennial DWR mittent user manual version z.i INSTRUCTIONS: Attach a sketch of the assessment area and photographs. Attach a copy of the USGS 7.5-minute topographic quadrangle, and circle the location of the stream reach under evaluation. If multiple stream reaches will be evaluated on the same property, identify and number all reaches on the attached map, and include a separate form for each reach. See the NC SAM User Manual for detailed descriptions and explanations of requested information. Record in the "Notes/Sketch" section if any supplementary measurements were performed. See the NC SAM User Manual for examples of additional measurements that may be relevant. NOTE EVIDENCE OF STRESSORS AFFECTING THE ASSESSMENT AREA (do not need to be within the assessment area). PROJECT / SITE INFORMATION: 1. Project name (if any): Gateway 85 2. Date of evaluation: 4/14/2020 3. Applicant/owner name: City of Gastonia 4. Assessor name/organization: Chris Tinklenberg / Kimley Horn 5. County: Gaston 6. Nearest named water body 7. River Basin: Catawba on USGS 7.5-minute quad: Duharts Creek 8. Site coordinates (decimal degrees, at lower end of assessment reach): 35.263409,-81.116850 STREAM INFORMATION: (depth and width can be approximations) 9. Site number (show on attached map): S5 10. Length of assessment reach evaluated (feet): -100 If 11. Channel depth from bed (in riffle, if present) to top of bank (feet): 3 F Unable to assess channel depth. 12. Channel width at top of bank (feet): 8 4 13. Is assessment reach a swamp stream? f Yes f' No 14. Feature type: (_- Perennial flow (' Intermittent flow l Tidal Marsh Stream STREAM RATING INFORMATION: 15. NC SAM Zone: C Mountains (M) G Piedmont (P) l Inner Coastal Plain (1) (' Outer Coastal Plain (0) 16. Estimated geomorphic 11 valley shape (skip for C a G b Tidal Marsh Stream): (more sinuous stream, flatter valley slope) (less sinuous stream, steeper valley slope) 17. Watershed size: (skip C Size 1 (< 0.1 miZ) G Size 2 (0.1 to < 0.5 miZ) ( Size 3 (0.5 to < 5 miz) ( Size 4 (>_ 5 mil) for Tidal Marsh Stream) ADDITIONAL INFORMATION: 18. Were regulatory considerations evaluated? G Yes l' No If Yes, check all that appy to the assessment area. F Section 10 water F Classified Trout Waters Water Supply Watershed ( l' I (' II (' III (-- IV (' V) F Essential Fish Habitat F Primary Nursery Area I High Quality Waters/Outstanding Resource Waters F Publicly owned property F NCDWR riparian buffer rule in effect F Nutrient Sensitive Waters F Anadromous fish F 303(d) List F CAMA Area of Environmental Concern (AEC) F Documented presence of a federal and/or state listed protected species within the assessment area. List species: F Designated Critical Habitat (list species): 19. Are additional stream information/supplementary measurements included in "Notes/Sketch" section or attached? Yes - No 1. Channel Water - assessment reach metric (skip for Size 1 streams and Tidal Marsh Streams) G A Water throughout assessment reach. C B No flow, water in pools only. C C No water in assessment reach. 2. Evidence of Flow Restriction - assessment reach metric C A At least 10% of assessment reach in -stream habitat or riffle -pool sequence is adversely affected by a flow restriction or fill to the point of obstructing flow or a channel choked with aquatic macrophytes or ponded water or impounded on flood or ebb within the assessment reach (examples: undersized or perched culverts, causeways that constrict the channel, tidal gates). B Not A 3. Feature Pattern - assessment reach metric C A A majority of the assessment reach has altered pattern (examples: straightening, modification above or below culvert). G B Not A. 4. Feature Longitudinal Profile - assessment reach metric G A Majority of assessment reach has a substantially altered stream profile (examples: channel down -cutting, existing damming, over widening, active aggradation, dredging, and excavation where appropriate channel profile has not reformed from any of these disturbances). C B Not A 5. Signs of Active Instability - assessment reach metric Consider only current instability, not past events from which the stream has currently recovered. Examples of instability include active bank failure, active channel down -cutting (head -cut), active widening, and artificial hardening (such as concrete, gabion, rip -rap). G A < 10% of channel unstable C B 10 to 25% of channel unstable C C > 25% of channel unstable 6. Streamside Area Interaction - streamside area metric Consider for the Left Bank (LB) and the Right Bank (RB). LB RB C A �' A Little or no evidence of conditions that adversely affect reference interaction G B B Moderate evidence of conditions (examples: berms, levees, down -cutting, aggradation, dredging) that adversely affect reference interaction (examples: limited streamside area access, disruption of flood flows through streamside area, leaky or intermittent bulkheads, causeways with floodplain constriction, minor ditching [including mosquito ditching]) C C �' C Extensive evidence of conditions that adversely affect reference interaction (little to no floodplain/intertidal zone access [examples: causeways with floodplain and channel constriction, bulkheads, retaining walls, fill, stream incision, disruption of flood flows through streamside area] or too much floodplain/intertidal zone access [examples: impoundments, intensive mosquito ditching]) or floodplain/intertidal zone unnaturally absent or assessment reach is a man-made feature on an interstream divide 7. Water Quality Stressors - assessment reach/intertidal zone metric Check all that apply. F A Discolored water in stream or intertidal zone (milky white, blue, unnatural water discoloration, oil sheen, stream foam) F B Excessive sedimentation (burying of stream features or intertidal zone) F C Noticeable evidence of pollutant discharges entering the assessment reach and causing a water quality problem F D Odor (not including natural sulfide odors) F E Current published or collected data indicating degraded water quality in the assessment reach. Cite source in the "Notes/Sketch" section. F F Livestock with access to stream or intertidal zone F G Excessive algae in stream or intertidal zone F H Degraded marsh vegetation in the intertidal zone (removal, burning, regular mowing, destruction, etc.) F I Other: (explain in "Notes/Sketch" section) F1 J Little to no stressors 8. Recent Weather -watershed metric For Size 1 or 2 streams, D1 drought or higher is considered a drought; for Size 3 or 4 streams, D2 drought or higher is considered a drought. C' A Drought conditions and no rainfall or rainfall not exceeding 1 inch within the last 48 hours C' B Drought conditions and rainfall exceeding 1 inch within the last 48 hours R C No drought conditions 9 Large or Dangerous Stream - assessment reach metric f Yes G No Is stream is too large or dangerous to assess? If Yes, skip to Metric 13 (Streamside Area Ground Surface Condition). 10. Natural In -stream Habitat Types - assessment reach metric 10a. z Yes G No Degraded in -stream habitat over majority of the assessment reach (examples of stressors include excessive sedimentation, mining, excavation, in -stream hardening [for example, rip -rap], recent dredging, and snagging) (evaluate for size 4 Coastal Plain streams only, then skip to Metric 12) 10b. Check all that occur (occurs if > 5% coverage of assessment reach) (skip for Size 4 Coastal Plain streams) F A Multiple aquatic macrophytes and aquatic mosses m N F F 5% oysters or other natural hard bottoms (include liverworts, lichens, and algal mats) H d F G Submerged aquatic vegetation r B Multiple sticks and/or leaf packs and/or emergent w rn F H Low -tide refugia (pools) vegetation N o F I Sand bottom C Multiple snags and logs (including lap trees) r m F J 5% vertical bank along the marsh D 5% undercut banks and/or root mats and/or roots 02 F K Little or no habitat in banks extend to the normal wetted perimeter E Little or no habitat ***'"*********************---*REMAINING QUESTIONS ARE NOT APPLICABLE FOR TIDAL MARSH STREAMS**************************** 11. Bedform and Substrate -assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 11 a. C` Yes G No Is assessment reach in a natural sand -bed stream? (skip for Coastal Plain streams) 11 b. Bedform evaluated. Check the appropriate box(es). F A Riffle -run section (evaluate 11c) F B Pool -glide section (evaluate 11d) F C Natural bedform absent (skip to Metric 12, Aquatic Life) 11c. In riffles sections, check all that occur below the normal wetted perimeter of the assessment reach - whether or not submerged. Check at least one box in each row (skip for Size 4 Coastal Plain Streams and Tidal Marsh Streams). Not Present (NP) _ absent, Rare (R) = present but <- 10%, Common (C) _ > 10-40%, Abundant (A) _ > 40-70%, Predominant (P) _ > 70%. Cumulative percentages should not exceed 100% for each assessment reach. NP R C A P r r r r C Bedrock/saprolite r r r r C Boulder (256 - 4096 mm) r r r r C Cobble (64 - 256 mm) r r r r C Gravel (2 - 64 mm) r r r r f Sand (.062-2 mm) r r r r f Silt/clay (< 0.062 mm) r r r r f Detritus r r r r C Artificial (rip -rap, concrete, etc.) 11 d. C Yes C No Are pools filled with sediment? (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12. Aquatic Life -assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12a. 6- Yes C No Was an in -stream aquatic life assessment performed as described in the User Manual? If No, select one of the following reasons and skip to Metric 13. r No Water C' Other: 12b. r Yes G No Are aquatic organisms present in the assessment reach (look in riffles, pools, then snags)? If Yes, check all that apply. If No, skip to Metric 13. 1 >1 Numbers over columns refer to "individuals" for size 1 and 2 streams and "taxa" for size 3 and 4 streams. F F Adult frogs F F Aquatic reptiles F F Aquatic macrophytes and aquatic mosses (include liverworts, lichens, and algal mats) F F Beetles (including water pennies) F F Caddisfly larvae (Trichoptera [T]) F F Asian clam (Corbicula ) F F Crustacean (isopod/amphipod/crayfish/shrimp) F F Damselfly and dragonfly larvae F F Dipterans (true flies) F F Mayfly larvae (Ephemeroptera [E]) F F Megaloptera (alderfly, fishily, dobsonfly larvae) F F Midges/mosquito larvae F F Mosquito fish (Gambusia) or mud minnows (Umbra pygmaea) F F Mussels/Clams (not Corbicula ) F F Other fish F F Salamanders/tadpoles F F Snails F F Stonefly larvae (Plecoptera [P]) F F Tipulid larvae F F Worms/leeches 13. Streamside Area Ground Surface Condition — streamside area metric (skip for Tidal Marsh Streams and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB). Consider storage capacity with regard to both overbank flow and upland runoff. LB RB A �' A Little or no alteration to water storage capacity over a majority of the streamside area C B �' B Moderate alteration to water storage capacity over a majority of the streamside area b C �' C Severe alteration to water storage capacity over a majority of the streamside area (examples include: ditches, fill, soil, compaction, livestock disturbance, buildings, man-made levees, drainage pipes) 14. Streamside Area Water Storage — streamside area metric (skip for Size 1 streams, Tidal Marsh Streams, and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB) of the streamside area. LB RB A �' A Majority of streamside area with depressions able to pond water z 6 inches deep C B �' B Majority of streamside area with depressions able to pond water 3 to 6 inches deep C �' C Majority of streamside area with depressions able to pond water < 3 inches deep 15. Wetland Presence — streamside area metric (skip for Tidal Marsh Streams) Consider for the Left Bank (LB) and the Right Bank (RB). Do not consider wetlands outside of the streamside area or within the normal wetted perimeter of assessment reach. LB RB Y �' Y Are wetlands present in the streamside area? G N r N 16. Baseflow Contributors — assessment reach metric (skip for size 4 streams and Tidal Marsh Streams) Check all contributors within the assessment reach or within view of and draining to the assessment reach. F A Streams and/or springs (jurisdictional discharges) F B Ponds (include wet detention basins; do not include sediment basins or dry detention basins) F C Obstruction that passes some flow during low -flow periods within assessment area (beaver dam, bottom -release dam) F D Evidence of bank seepage or sweating (iron oxidizing bacteria in water indicates seepage) I+ E Stream bed or bank soil reduced (dig through deposited sediment if present) F F None of the above 17. Baseflow Detractors — assessment area metric (skip for Tidal Marsh Streams) Check all that apply. F A Evidence of substantial water withdrawals from the assessment reach (includes areas excavated for pump installation) F B Obstruction not passing flow during low flow periods affecting the assessment reach (ex: watertight dam, sediment deposit) F C Urban stream (>_ 24% impervious surface for watershed) F D Evidence that the stream -side area has been modified resulting in accelerated drainage into the assessment reach F E Assessment reach relocated to valley edge F F None of the above 18. Shading — assessment reach metric (skip for Tidal Marsh Streams) Consider aspect. Consider "leaf -on" condition. A Stream shading is appropriate for stream category (may include gaps associated with natural processes) B Degraded (example: scattered trees) C Stream shading is gone or largely absent 19. Buffer Width — streamside area metric (skip for Tidal Marsh Streams) Consider "vegetated buffer" and "wooded buffer" separately for left bank (LB) and right bank (RB) starting at the top of bank out to the first break. Vegetated Wooded LB RB LB RB A C A C A �' A >_ 100-feet wide or extends to the edge of the watershed B r B C B r B From 50 to < 100-feet wide C �' C C C �' C From 30 to < 50-feet wide D �' D C D �' D From 10 to < 30-feet wide E �' E C E �' E < 10-feet wide or no trees 20. Buffer Structure — streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Vegetated" Buffer Width). LB RB A A Mature forest • B B Non -mature woody vegetation or modified vegetation structure f C r C Herbaceous vegetation with or without a strip of trees < 10 feet wide D D Maintained shrubs E E Little or no vegetation 21. Buffer Stressors — streamside area metric (skip for Tidal Marsh Streams) Check all appropriate boxes for left bank (LB) and right bank (RB). Indicate if listed stressor abuts stream (Abuts), does not abut but is within 30 feet of stream (< 30 feet), or is between 30 to 50 feet of stream (30-50 feet). If none of the following stressors occurs on either bank, check here and skip to Metric 22: Abuts < 30 feet 30-50 feet LB RB LB RB LB RB r A �' A r A �' A r A �' A Row crops r B �' B r B �' B r B �' B Maintained turf C �' C C �' C C �' C Pasture (no livestock)/commercial horticulture r D �' D r D �' D r D �' D Pasture (active livestock use) 22. Stem Density — streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Wooded" Buffer Width). LB RB • A A Medium to high stem density B B Low stem density C C No wooded riparian buffer or predominantly herbaceous species or bare ground 23. Continuity of Vegetated Buffer— streamside area metric (skip for Tidal Marsh Streams) Consider whether vegetated buffer is continuous along stream (parallel). Breaks are areas lacking vegetation > 10-feet wide. LB RB A A The total length of buffer breaks is < 25 percent. B B The total length of buffer breaks is between 25 and 50 percent. C C The total length of buffer breaks is > 50 percent. 24. Vegetative Composition — First 100 feet of streamside area metric (skip for Tidal Marsh Streams) Evaluate the dominant vegetation within 100 feet of each bank or to the edge of the watershed (whichever comes first) as it contributes to assessment reach habitat. LB RB A A Vegetation is close to undisturbed in species present and their proportions. Lower strata composed of native species, with non-native invasive species absent or sparse. B B Vegetation indicates disturbance in terms of species diversity or proportions, but is still largely composed of native species. This may include communities of weedy native species that develop after clear -cutting or clearing or communities with non-native invasive species present, but not dominant, over a large portion of the expected strata or communities missing understory but retaining canopy trees. r C r C Vegetation is severely disturbed in terms of species diversity or proportions. Mature canopy is absent or communities with non-native invasive species dominant over a large portion of expected strata or communities composed of planted stands of non -characteristic species or communities inappropriately composed of a single species or no vegetation. 25. Conductivity — assessment reach metric (skip for all Coastal Plain streams) 25a. (' Yes (-- No Was a conductivity measurement recorded? If No, select one of the following reasons. ( No Water ( Other: 25b. Check the box corresponding to the conductivity measurement (units of microsiemens per centimeter). ( A <46 ( B 46 to < 67 ( C 67 to < 79 f D 79 to < 230 (' E >_ 230 Notes/Sketch: NC SAM Stream Rating Sheet Accompanies User Manual Version 2.1 Stream Site Name NorthPoint Gastonia Logistics Center Stream Category Pb2 Notes of Field Assessment Form (Y/N) Presence of regulatory considerations (Y/N) Additional stream information/supplementary measurements included (Y/N) NC SAM feature type (perennial, intermittent, Tidal Marsh Stream) Function Class Rating Summary Date of Evaluation 4/14/2020 Assessor Name/Organization iris Tinklenberg / Kimley He NO YES NO Perennial USACE/ NCDWR All Streams Intermittent (1) Hydrology MEDIUM (2) Baseflow MEDIUM (2) Flood Flow MEDIUM (3) Streamside Area Attenuation MEDIUM (4) Floodplain Access MEDIUM (4) Wooded Riparian Buffer HIGH (4) Microtopography NA (3) Stream Stability MEDIUM (4) Channel Stability HIGH (4) Sediment Transport LOW (4) Stream Geomorphology MEDIUM (2) Stream/Intertidal Zone Interaction NA (2) Longitudinal Tidal Flow NA (2) Tidal Marsh Stream Stability NA (3) Tidal Marsh Channel Stability NA (3) Tidal Marsh Stream Geomorphology NA (1) Water Quality MEDIUM (2) Baseflow MEDIUM (2) Streamside Area Vegetation HIGH (3) Upland Pollutant Filtration HIGH (3) Thermoregulation HIGH (2) Indicators of Stressors NO (2) Aquatic Life Tolerance LOW (2) Intertidal Zone Filtration NA (1) Habitat LOW (2) In -stream Habitat LOW (3) Baseflow MEDIUM (3) Substrate LOW (3) Stream Stability MEDIUM (3) In -stream Habitat MEDIUM (2) Stream -side Habitat HIGH (3) Stream -side Habitat HIGH (3) Thermoregulation HIGH (2) Tidal Marsh In -stream Habitat NA (3) Flow Restriction NA (3) Tidal Marsh Stream Stability NA (4) Tidal Marsh Channel Stability NA (4) Tidal Marsh Stream Geomorphology NA (3) Tidal Marsh In -stream Habitat NA (2) Intertidal Zone Habitat NA Overall MEDIUM user manual version c.-i USACE AID #: NCDWR #: INSTRUCTIONS: Attach a sketch of the assessment area and photographs. Attach a copy of the USGS 7.5-minute topographic quadrangle, and circle the location of the stream reach under evaluation. If multiple stream reaches will be evaluated on the same property, identify and number all reaches on the attached map, and include a separate form for each reach. See the NC SAM User Manual for detailed descriptions and explanations of requested information. Record in the "Notes/Sketch" section if any supplementary measurements were performed. See the NC SAM User Manual for examples of additional measurements that may be relevant. NOTE EVIDENCE OF STRESSORS AFFECTING THE ASSESSMENT AREA (do not need to be within the assessment area). PROJECT / SITE INFORMATION: 1. Project name (if any): Gateway 85 Lineberger Project 2. Date of evaluation: 05/03/2022 3. Applicant/owner name: City of Gastonia 4. Assessor name/organization: Kimley-Horn 5. County: Gaston 6. Nearest named water body 7. River Basin: Catawba on USGS 7.5-minute quad: Duharts Creek 8. Site coordinates (decimal degrees, at lower end of assessment reach): 35.272439,-81.117097 STREAM INFORMATION: (depth and width can be approximations) 9. Site number (show on attached map): S6 10. Length of assessment reach evaluated (feet): 100 11. Channel depth from bed (in riffle, if present) to top of bank (feet): 1 r Unable to assess channel depth. 12. Channel width at top of bank (feet): 3 13. Is assessment reach a swamp stream? [ Yes [- No 14. Feature type: ( Perennial flow Intermittent flow [ Tidal Marsh Stream STREAM RATING INFORMATION: 15. NC SAM Zone: [' Mountains (M) Piedmont (P) [ Inner Coastal Plain (1) C Outer Coastal Plain (0) 16. Estimated geomorphic L J valley shape (skip for [ a [ b Tidal Marsh Stream): (more sinuous stream, flatter valley slope) (less sinuous stream, steeper valley slope) 17. Watershed size: (skip (* Size 1 (< 0.1 mi`) f Size 2 (0.1 to < 0.5 mi`) (' Size 3 (0.5 to < 5 mi`) f Size 4 (>_ 5 miZ) for Tidal Marsh Stream) ADDITIONAL INFORMATION: 18. Were regulatory considerations evaluated? [- Yes (- No If Yes, check all that appy to the assessment area. F Section 10 water r Classified Trout Waters r Water Supply Watershed ( [- I (' II III r IV r V) F Essential Fish Habitat r Primary Nursery Area F High Quality Waters/Outstanding Resource Waters F Publicly owned property r NCDWR riparian buffer rule in effect F Nutrient Sensitive Waters F Anadromous fish r 303(d) List F CAMA Area of Environmental Concern (AEC) F Documented presence of a federal and/or state listed protected species within the assessment area. List species: F Designated Critical Habitat (list species): 19. Are additional stream information/supplementary measurements included in "Notes/Sketch" section or attached? Yes f* No 1. Channel Water- assessment reach metric (skip for Size 1 streams and Tidal Marsh Streams) f A Water throughout assessment reach. f B No flow, water in pools only. f*' C No water in assessment reach. 2. Evidence of Flow Restriction - assessment reach metric [- A At least 10% of assessment reach in -stream habitat or riffle -pool sequence is adversely affected by a flow restriction or fill to the point of obstructing flow or a channel choked with aquatic macrophytes or ponded water or impounded on flood or ebb within the assessment reach (examples: undersized or perched culverts, causeways that constrict the channel, tidal gates). B Not A 3. Feature Pattern - assessment reach metric f A A majority of the assessment reach has altered pattern (examples: straightening, modification above or below culvert). f*' B Not A. 4. Feature Longitudinal Profile - assessment reach metric [- A Majority of assessment reach has a substantially altered stream profile (examples: channel down -cutting, existing damming, over widening, active aggradation, dredging, and excavation where appropriate channel profile has not reformed from any of these disturbances). B Not A 5. Signs of Active Instability - assessment reach metric Consider only current instability, not past events from which the stream has currently recovered. Examples of instability include active bank failure, active channel down -cutting (head -cut), active widening, and artificial hardening (such as concrete, gabion, rip -rap). f*' A < 10% of channel unstable f B 10 to 25% of channel unstable f C > 25% of channel unstable 6. Streamside Area Interaction - streamside area metric Consider for the Left Bank (LB) and the Right Bank (RB). LB RB f+ A ft A Little or no evidence of conditions that adversely affect reference interaction [- B i' B Moderate evidence of conditions (examples: berms, levees, down -cutting, aggradation, dredging) that adversely affect reference interaction (examples: limited streamside area access, disruption of flood flows through streamside area, leaky or intermittent bulkheads, causeways with floodplain constriction, minor ditching [including mosquito ditching]) [- C (- C Extensive evidence of conditions that adversely affect reference interaction (little to no floodplain/intertidal zone access [examples: causeways with floodplain and channel constriction, bulkheads, retaining walls, fill, stream incision, disruption of flood flows through streamside area] or too much floodplain/intertidal zone access [examples: impoundments, intensive mosquito ditching]) or floodplain/intertidal zone unnaturally absent or assessment reach is a man-made feature on an interstream divide 7. Water Quality Stressors - assessment reach/intertidal zone metric Check all that apply. f A Discolored water in stream or intertidal zone (milky white, blue, unnatural water discoloration, oil sheen, stream foam) r B Excessive sedimentation (burying of stream features or intertidal zone) F C Noticeable evidence of pollutant discharges entering the assessment reach and causing a water quality problem r D Odor (not including natural sulfide odors) r E Current published or collected data indicating degraded water quality in the assessment reach. Cite source in the "Notes/Sketch" section. r F Livestock with access to stream or intertidal zone F G Excessive algae in stream or intertidal zone I— H Degraded marsh vegetation in the intertidal zone (removal, burning, regular mowing, destruction, etc.) F I Other: (explain in "Notes/Sketch" section) F, J Little to no stressors 8. Recent Weather - watershed metric For Size 1 or 2 streams, D1 drought or higher is considered a drought; for Size 3 or 4 streams, D2 drought or higher is considered a drought. [- A Drought conditions and no rainfall or rainfall not exceeding 1 inch within the last 48 hours [- B Drought conditions and rainfall exceeding 1 inch within the last 48 hours [ C No drought conditions 9 Large or Dangerous Stream - assessment reach metric f Yes f*' No Is stream is too large or dangerous to assess? If Yes, skip to Metric 13 (Streamside Area Ground Surface Condition). 10. Natural In -stream Habitat Types -assessment reach metric 10a. [- Yes [-- No Degraded in -stream habitat over majority of the assessment reach (examples of stressors include excessive sedimentation, mining, excavation, in -stream hardening [for example, rip -rap], recent dredging, and snagging) (evaluate for size 4 Coastal Plain streams only, then skip to Metric 12) 10b. Check all that occur (occurs if > 5% coverage of assessment reach) (skip for Size 4 Coastal Plain streams) r A Multiple aquatic macrophytes and aquatic mosses m u) F F 5% oysters or other natural hard bottoms (include liverworts, lichens, and algal mats) H m r G Submerged aquatic vegetation r B Multiple sticks and/or leaf packs and/or emergent $ c r H Low -tide refugia (pools) vegetation L o F I Sand bottom r C Multiple snags and logs (including lap trees) t Co F J 5% vertical bank along the marsh F D 5% undercut banks and/or root mats and/or roots U F K Little or no habitat in banks extend to the normal wetted perimeter R, E Little or no habitat *********************************REMAINING QUESTIONS ARE NOT APPLICABLE FOR TIDAL MARSH STREAMS**************************** 11. Bedform and Substrate -assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 1 la. f Yes f*' No Is assessment reach in a natural sand -bed stream? (skip for Coastal Plain streams) 11 b. Bedform evaluated. Check the appropriate box(es). r A Riffle -run section (evaluate 11c) B Pool -glide section (evaluate 11d) I✓ C Natural bedform absent (skip to Metric 12, Aquatic Life) 11 c. In riffles sections, check all that occur below the normal wetted perimeter of the assessment reach - whether or not submerged. Check at least one box in each row (skip for Size 4 Coastal Plain Streams and Tidal Marsh Streams). Not Present (NP) _ absent, Rare (R) = present but <- 10%, Common (C) _ > 10-40%, Abundant (A) _ > 40-70%, Predominant (P) _ > 70%. Cumulative percentages should not exceed 100% for each assessment reach. NP R C A P f f f f f Bedrock/saprolite f f f f f Boulder (256 - 4096 mm) f f f f f Cobble (64 - 256 mm) f f f f f Gravel (2 - 64 mm) f f f r f Sand (.062 - 2 mm) f f f f Silt/clay (< 0.062 mm) f f f f f Detritus f f f f f Artificial (rip -rap, concrete, etc.) 11 d. [' Yes [' No Are pools filled with sediment? (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12. Aquatic Life - assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12a. f*' Yes f No Was an in -stream aquatic life assessment performed as described in the User Manual? If No, select one of the following reasons and skip to Metric 13. f No Water f Other: 12b. [- Yes [-- No Are aquatic organisms present in the assessment reach (look in riffles, pools, then snags)? If Yes, check all that apply. If No, skip to Metric 13. 1 >1 Numbers over columns refer to "individuals" for size 1 and 2 streams and "taxa" for size 3 and 4 streams. F r Adult frogs F F Aquatic reptiles F r Aquatic macrophytes and aquatic mosses (include liverworts, lichens, and algal mats) r I— Beetles (including water pennies) r Caddisfly larvae (Trichoptera [T]) r r Asian clam (Corbicula ) F r Crustacean (isopod/amphipod/crayfish/shrimp) F r Damselfly and dragonfly larvae F F Dipterans (true flies) f r Mayfly larvae (Ephemeroptera [E]) r r Megaloptera (alderfly, fishily, dobsonfly larvae) f r Midges/mosquito larvae r r Mosquito fish (Gambusia) or mud minnows (Umbra pygmaea) r r Mussels/Clams (not Corbicula ) F r Other fish r r Salamanders/tadpoles F f Snails F r Stonefly larvae (Plecoptera [P]) r r Tipulid larvae F f Worms/leeches 13. Streamside Area Ground Surface Condition — streamside area metric (skip for Tidal Marsh Streams and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB). Consider storage capacity with regard to both overbank flow and upland runoff. LB RB C A C' A Little or no alteration to water storage capacity over a majority of the streamside area C B C' B Moderate alteration to water storage capacity over a majority of the streamside area C C f C Severe alteration to water storage capacity over a majority of the streamside area (examples include: ditches, fill, soil, compaction, livestock disturbance, buildings, man-made levees, drainage pipes) 14. Streamside Area Water Storage — streamside area metric (skip for Size 1 streams, Tidal Marsh Streams, and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB) of the streamside area. LB RB r A [ A Majority of streamside area with depressions able to pond water > 6 inches deep r B [ B Majority of streamside area with depressions able to pond water 3 to 6 inches deep r C [ C Majority of streamside area with depressions able to pond water < 3 inches deep 15. Wetland Presence — streamside area metric (skip for Tidal Marsh Streams) Consider for the Left Bank (LB) and the Right Bank (RB). Do not consider wetlands outside of the streamside area or within the normal wetted perimeter of assessment reach. LB RB C Y Y Are wetlands present in the streamside area? +N [t N 16. Baseflow Contributors — assessment reach metric (skip for size 4 streams and Tidal Marsh Streams) Check all contributors within the assessment reach or within view of and draining to the assessment reach. F A Streams and/or springs (jurisdictional discharges) r B Ponds (include wet detention basins; do not include sediment basins or dry detention basins) F C Obstruction that passes some flow during low -flow periods within assessment area (beaver dam, bottom -release dam) F D Evidence of bank seepage or sweating (iron oxidizing bacteria in water indicates seepage) Fv- E Stream bed or bank soil reduced (dig through deposited sediment if present) F_ F None of the above 17. Baseflow Detractors — assessment area metric (skip for Tidal Marsh Streams) Check all that apply. F A Evidence of substantial water withdrawals from the assessment reach (includes areas excavated for pump installation) F B Obstruction not passing flow during low flow periods affecting the assessment reach (ex: watertight dam, sediment deposit) F C Urban stream (>_ 24% impervious surface for watershed) r✓ D Evidence that the stream -side area has been modified resulting in accelerated drainage into the assessment reach F E Assessment reach relocated to valley edge F F None of the above 18. Shading — assessment reach metric (skip for Tidal Marsh Streams) Consider aspect. Consider "leaf -on" condition. r A Stream shading is appropriate for stream category (may include gaps associated with natural processes) r B Degraded (example: scattered trees) r+ C Stream shading is gone or largely absent 19. Buffer Width — streamside area metric (skip for Tidal Marsh Streams) Consider "vegetated buffer" and "wooded buffer" separately for left bank (LB) and right bank (RB) starting at the top of bank out to the first break. Vegetated Wooded LB RB LB RB C` A c A (- A (- A >- 100-feet wide or extends to the edge of the watershed f B i' B B i' B From 50 to < 100-feet wide [ C ft C C ft C From 30 to < 50-feet wide [` D i' D C D i' D From 10 to < 30-feet wide [` E C' E C E C' E < 10-feet wide or no trees 20. Buffer Structure - streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Vegetated" Buffer Width). LB RB C` A C A Mature forest f* B f* B Non -mature woody vegetation or modified vegetation structure I� C C Herbaceous vegetation with or without a strip of trees < 10 feet wide I� D f D Maintained shrubs f ' E f E Little or no vegetation 21. Buffer Stressors - streamside area metric (skip for Tidal Marsh Streams) Check all appropriate boxes for left bank (LB) and right bank (RB). Indicate if listed stressor abuts stream (Abuts), does not abut but is within 30 feet of stream (< 30 feet), or is between 30 to 50 feet of stream (30-50 feet). If none of the following stressors occurs on either bank, check here and skip to Metric 22: r Abuts < 30 feet 30-50 feet LB RB LB RB LB RB [ A C' A [ A C' A [ A C' A Row crops [ B C' B [ B C' B [ B C' B Maintained turf C` C f- C C` C f- C C` C f- C Pasture (no livestock)/commercial horticulture f D f- P C D f- D C` D f- D Pasture (active livestock use) 22. Stem Density - streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Wooded" Buffer Width). LB RB A C A Medium to high stem density f*' B f*' B Low stem density f ' C f C No wooded riparian buffer or predominantly herbaceous species or bare ground 23. Continuity of Vegetated Buffer - streamside area metric (skip for Tidal Marsh Streams) Consider whether vegetated buffer is continuous along stream (parallel). Breaks are areas lacking vegetation > 10-feet wide. LB RB [- A [- A The total length of buffer breaks is < 25 percent. f+ B f+ B The total length of buffer breaks is between 25 and 50 percent. [- C [- C The total length of buffer breaks is > 50 percent. 24. Vegetative Composition - First 100 feet of streamside area metric (skip for Tidal Marsh Streams) Evaluate the dominant vegetation within 100 feet of each bank or to the edge of the watershed (whichever comes first) as it contributes to assessment reach habitat. LB RB f ' A f A Vegetation is close to undisturbed in species present and their proportions. Lower strata composed of native species, with non-native invasive species absent or sparse. f*' B f*' B Vegetation indicates disturbance in terms of species diversity or proportions, but is still largely composed of native species. This may include communities of weedy native species that develop after clear -cutting or clearing or communities with non-native invasive species present, but not dominant, over a large portion of the expected strata or communities missing understory but retaining canopy trees. f ' C f C Vegetation is severely disturbed in terms of species diversity or proportions. Mature canopy is absent or communities with non-native invasive species dominant over a large portion of expected strata or communities composed of planted stands of non -characteristic species or communities inappropriately composed of a single species or no vegetation. 25. Conductivity- assessment reach metric (skip for all Coastal Plain streams) 25a. [- Yes [-- No Was a conductivity measurement recorded? If No, select one of the following reasons. [- No Water [- Other: 25b. Check the box corresponding to the conductivity measurement (units of microsiemens per centimeter). i" A <46 f- B 46 to < 67 IA C 67 to < 79 f D 79 to < 230 IA E ? 230 Notes/Sketch: NC SAM Stream Rating Sheet Accompanies User Manual Version 2.1 Stream Site Name Gateway 85 Lineberger Project Stream Category Pb1 Notes of Field Assessment Form (Y/N) Presence of regulatory considerations (Y/N) Additional stream information/supplementary measurements included (Y/N) NC SAM feature type (perennial, intermittent, Tidal Marsh Stream) Function Class Rating Summary Date of Evaluation 05/03/2022 Assessor Name/Organization Kimley-Horn NO NO NO Intermittent USACE/ NCDWR All Streams Intermittent (1) Hydrology (2) Baseflow (2) Flood Flow (3) Streamside Area Attenuation (4) Floodplain Access (4) Wooded Riparian Buffer (4) Microtopography (3) Stream Stability (4) Channel Stability (4) Sediment Transport (4) Stream Geomorphology (2) Stream/Intertidal Zone Interaction (2) Longitudinal Tidal Flow (2) Tidal Marsh Stream Stability (3) Tidal Marsh Channel Stability (3) Tidal Marsh Stream Geomorphology HIGH MEDIUM HIGH HIGH HIGH MEDIUM NA HIGH HIGH LOW HIGH NA NA NA NA NA HIGH MEDIUM HIGH HIGH HIGH MEDIUM NA HIGH HIGH LOW HIGH NA NA NA NA NA (1) Water Quality (2) Baseflow (2) Streamside Area Vegetation (3) Upland Pollutant Filtration (3) Thermoregulation (2) Indicators of Stressors (2) Aquatic Life Tolerance (2) Intertidal Zone Filtration LOW MEDIUM LOW MEDIUM LOW NO OMITTED NA LOW MEDIUM LOW MEDIUM LOW NO NA NA (1) Habitat (2) In -stream Habitat (3) Baseflow (3) Substrate (3) Stream Stability (3) In -stream Habitat (2) Stream -side Habitat (3) Stream -side Habitat (3) Thermoregulation (2) Tidal Marsh In -stream Habitat (3) Flow Restriction (3) Tidal Marsh Stream Stability (4) Tidal Marsh Channel Stability (4) Tidal Marsh Stream Geomorphology (3) Tidal Marsh In -stream Habitat (2) Intertidal Zone Habitat LOW LOW MEDIUM LOW HIGH LOW MEDIUM HIGH LOW NA NA NA NA NA NA NA LOW LOW MEDIUM LOW HIGH LOW MEDIUM HIGH LOW NA NA NA NA NA NA NA Overall LOW LOW NC WAM WETLAND ASSESSMENT FORM Accompanies User Manual Version 5 USACE AID#: NCDWR #: Project Name Gateway 85 Lineberger Realignment Date of Evaluation 05/03/2022 ApplicanUOwner Name City of Gastonia Wetland Site Name W8 Wetland Type Headwater Forest Assessor Name/Organization Kimley-Horn Level III Ecoregion Piedmont Nearest Named Water Body Duharts Creek River Basin Catawba USGS 8-Digit Catalogue Unit 03050102 County Gaston NCDWR Region Mooresville (+ Yes ( No Precipitation within 48 hrs? Latitude/Longitude (deci-degrees) 35.272689,-81.115745 Evidence of stressors affecting the assessment area (may not be within the assessment area) Please circle and/or make note on last page if evidence of stressors is apparent. Consider departure from reference, if appropriate, in recent past (for instance, approximately within 10 years). Noteworthy stressors include, but are not limited to the following. • Hydrological modifications (examples: ditches, dams, beaver dams, dikes, berms, ponds, etc.) • Surface and sub -surface discharges into the wetland (examples: discharges containing obvious pollutants, presence of nearby septic tanks, underground storage tanks (USTs), hog lagoons, etc.) • Signs of vegetation stress (examples: vegetation mortality, insect damage, disease, storm damage, salt intrusion, etc.) • Habitat/plant community alteration (examples: mowing, clear -cutting, exotics, etc.) Is the assessment area intensively managed? (- Yes 6— No Regulatory Considerations - Were regulatory considerations evaluated? [' Yes No If Yes, check all that apply to the assessment area. F Anadromous fish r Federally protected species or State endangered or threatened species F NCDWR riparian buffer rule in effect r Abuts a Primary Nursery Area (PNA) r Publicly owned property r N.C. Division of Coastal Management Area of Environmental Concern (AEC) (including buffer) T" Abuts a stream with a NCDWQ classification of SA or supplemental classifications of HQW, ORW, or Trout r Designated NCNHP reference community F Abuts a 303(d)-listed stream or a tributary to a 303(d)-listed stream What type of natural stream is associated with the wetland, if any? (check all that apply) f Blackwater R Brownwater T- Tidal (if tidal, check one of the following boxes) ( Lunar (- Wind Both Is the assessment area on a coastal island? ( Yes (- No Is the assessment area's surface water storage capacity or duration substantially altered by beaver? ( Yes No Does the assessment area experience overbank flooding during normal rainfall conditions? ( Yes No 1. Ground Surface Condition/Vegetation Condition - assessment area condition metric Check a box in each column. Consider alteration to the ground surface (GS) in the assessment area and vegetation structure (VS) in the assessment area. Compare to reference wetland if applicable (see User Manual). If a reference is not applicable, then rate the assessment area based on evidence of an effect. GS VS C' A C` A Not severely altered 6- B 6- B Severely altered over a majority of the assessment area (ground surface alteration examples: vehicle tracks, excessive sedimentation, fire -plow lanes, skidder tracks, bedding, fill, soil compaction, obvious pollutants) (vegetation structure alteration examples: mechanical disturbance, herbicides, salt intrusion [where appropriate], exotic species, grazing, less diversity [if appropriate], hydrologic alteration) 2. Surface and Sub -Surface Storage Capacity and Duration - assessment area condition metric Check a box in each column. Consider surface storage capacity and duration (Surf) and sub -surface storage capacity and duration (Sub). Consider both increase and decrease in hydrology. A ditch 5 1 foot deep is considered to affect surface water only, while a ditch > 1 foot deep is expected to affect both surface and sub -surface water. Consider tidal flooding regime, if applicable. Surf Sub ' A ( A Water storage capacity and duration are not altered. [•` B C•` B Water storage capacity or duration are altered, but not substantially (typically, not sufficient to change vegetation). ( C ( C Water storage capacity or duration are substantially altered (typically, alteration sufficient to result in vegetation change) (examples: draining, flooding, soil compaction, filling, excessive sedimentation, underground utility lines). 3. Water Storage/Surface Relief- assessment area/wetland type condition metric (skip for all marshes) Check a box in each column for each group below. Select the appropriate storage for the assessment area (AA) and the wetland type (WT). AA WT 3a. (-A (- A Majority of wetland with depressions able to pond water > 1 foot deep ( B ( B Majority of wetland with depressions able to pond water 6 inches to 1 foot deep (- C (- C Majority of wetland with depressions able to pond water 3 to 6 inches deep D D Depressions able to pond water < 3 inches deep 3b. (-A Evidence that maximum depth of inundation is greater than 2 feet ( B Evidence that maximum depth of inundation is between 1 and 2 feet C•` C Evidence that maximum depth of inundation is less than 1 foot 4. Soil Texture/Structure — assessment area condition metric (skip for all marshes) Check a box from each of the three soil property groups below. Dig soil profile in the dominant assessment area landscape feature. Make soil observations within the 12 inches. Use most recent National Technical Committee for Hydric Soils guidance for regional indicators. 4a. i A Sandy soil B Loamy or clayey soils exhibiting redoximorphic features (concentrations, depletions, or rhizospheres) i C Loamy or clayey soils not exhibiting redoximorphic features f D Loamy or clayey gleyed soil i E Histosol or histic epipedon 4b. A Soil ribbon < 1 inch i B Soil ribbon > 1 inch 4c. A No peat or muck presence i B A peat or muck presence 5. Discharge into Wetland — opportunity metric Check a box in each column. Consider surface pollutants or discharges (Surf) and sub -surface pollutants or discharges (Sub). Examples of sub -surface discharges include presence of nearby septic tank, underground storage tank (UST), etc. Surf Sub A A Little or no evidence of pollutants or discharges entering the assessment area C` B C` B Noticeable evidence of pollutants or discharges entering the wetland and stressing, but not overwhelming the treatment capacity of the assessment area r C C` C Noticeable evidence of pollutants or discharges (pathogen, particulate, or soluble) entering the assessment area and potentially overwhelming the treatment capacity of the wetland (water discoloration, dead vegetation, excessive sedimentation, odor) 6. Land Use — opportunity metric (skip for non -riparian wetlands) Check all that apply (at least one box in each column). Evaluation involves a GIS effort with field adjustment. Consider sources draining to assessment area within entire upstream watershed (WS), within 5 miles and within the watershed draining to the assessment area (5M), and within 2 miles and within the watershed draining to the assessment area (2M). Effective riparian buffers are considered to be 50 feet wide in the Coastal Plain and Piedmont ecoregions and 30 feet wide in the Blue Ridge Mountains ecoregion. WS 5M 2M r A F1 A 1171 A z 10% impervious surfaces F B r B r B Confined animal operations (or other local, concentrated source of pollutants) F C f C r' C z 20% coverage of pasture r D r D r D >_ 20% coverage of agricultural land (regularly plowed land) F E I E F_ E z 20% coverage of maintained grass/herb r F r F r F >_ 20% coverage of clear-cut land F_ G f-- G r G Little or no opportunity to improve water quality. Lack of opportunity may result from little or no disturbance in the watershed or hydrologic alterations that prevent dainage and/or overbank flow from affectio the assessment area. Wetland Acting as Vegetated Buffer — assessment area/wetland complex condition metric (skip for non -riparian wetlands) 7a. Is assessment area within 50 feet of a tributary or other open water? 0— Yes r' No If Yes, continue to 7b. If No, skip to Metric 8. 7b. How much of the first 50 feet from the bank is weltand? (Wetland buffer need only be present on one side of the water body. Make buffer judgment based on the average width of wetland. Record a note if a portion of the buffer has been removed or disturbed.) t* A >_ 50 feet [- B From 30 to < 50 feet f C From 15 to < 30 feet r' D From 5 to < 15 feet f— E < 5 feet or buffer bypassed by ditches 7c. Tributary width. If the tributary is anastomosed, combine widths of channels/braids for a total width. t* <_ 15-feet wide f > 15-feet wide f Other open water (no tributary present) 7d. Do roots of assessment area vegetation extend into the bank of the tributary/open water? f Yes f- No 7e. Is tributary or other open water sheltered or exposed? (. Sheltered — adjacent open water with width < 2500 feet and no regular boat traffic. r' Exposed — adjacent open water with width > 2500 feet or regular boat traffic. 8. Wetland Width at the Assessment Area —wetland type/wetland complex condition metric (evaluate WT for all marshes and Estuarine Woody Wetland only; evaluate WC for Bottomland Hardwood Forest, Headwater Forest, and Riverine Swamp Forest only) Check a box in each column. Select the average width for the wetland type at the assessment area (WT) and the wetland complex at the assessment area (WC). See User Manual for WT and WC boundaries. WT WC (` A (•` A z 100 feet (' B (' B From 80 to < 100 feet (` C (` C From 50 to < 80 feet (' D (' D From 40 to < 50 feet (` E (` E From 30 to < 40 feet (' F (' F From 15 to < 30 feet (` G (` G From 5 to < 15 feet (' H (' H < 5 feet 9. Inundation Duration — assessment area condition metric (skip for non -riparian wetlands) Answer for assessment area dominant landform. (' A Evidence of short -duration inundation (< 7 consecutive days) C•` B Evidence of saturation, without evidence of inundation C Evidence of long -duration inundation or very long -duration inundation (7 to 30 consecutive days or more) 10. Indicators of Deposition —assessment area condition metric (skip for non -riparian wetlands and all marshes) Consider recent deposition only (no plant growth since deposition). (' A Sediment deposition is not excessive, but at approximately natural levels. (•` B Sediment deposition is excessive, but not overwhelming the wetland. (' C Sediment deposition is excessive and is overwhelming the wetland. 11. Wetland Size — wetland type/wetland complex condition metric Check a box in each column. Involves a GIS effort with field adjustment. This metric evaluates three aspects of the wetland area: the size of the wetland type (WT), the size of the wetland complex (WC), and the size of the forested wetland (FW) (if applicable, see User Manual). See the User Manual for boundaries of these evaluation areas. If assessment area is clear-cut, select "K" for the FW column. WT WC FW (if applicable) (- A (- A (- A >_ 500 acres (' B (' B (' B From 100 to < 500 acres (- C (- C (- C From 50 to < 100 acres ( D ( D ( D From 25 to < 50 acres (- E (- E (- E From 10 to < 25 acres (' F (' F (' F From 5 to < 10 acres (- G (- G (- G From 1 to < 5 acres (' H (' H (' H From 0.5 to < 1 acre I I I From 0.1 to < 0.5 acre f J f' J f' J From 0.01 to < 0.1 acre (- K r K (- K < 0.01 acre or assessment area is clear-cut 12. Wetland Intactness — wetland type condition metric (evaluate for Pocosins only) f A Pocosin is the full extent (z 90%) of its natural landscape size. (- B Pocosin is < 90% of the full extent of its natural landscape size. 13. Connectivity to Other Natural Areas — landscape condition metric 13a. Check appropriate box(es) (a box may be checked in each column). Involves a GIS effort with field adjustment. This evaluates whether the wetland is well connected (Well) and/or loosely connected (Loosely) to the landscape patch, the contiguous metric naturally vegetated area and open water (if appropriate). Boundaries are formed by four -lane roads, regularly maintained utility line corridors the width of a four -lane road or wider, urban landscapes, fields (pasture open and agriculture), or water > 300 feet wide. Well Loosely (- A i A >_ 500 acres f B l+ B From 100 to < 500 acres (- C (- C From 50 to < 100 acres ( D ( D From 10 to < 50 acres (- E (- E < 10 acres (' F (' F Wetland type has a poor or no connection to other natural habitats 13b. Evaluate for marshes only. ( Yes ( No Wetland type has a surface hydrology connection to open waters/stream or tidal wetlands. 14. Edge Effect — wetland type condition metric (skip for all marshes and Estuarine Woody Wetland) May involve a GIS effort with field adjustment. Estimate distance from wetland type boundary to artificial edges. Artificial edges include non -forested areas z 40 feet wide such as fields, development, roads, regularly maintained utility line corridors and clear -cuts. Consider the eight main points of the compass. Artificial edge occurs within 150 feet in how many directiions? If the assessment area is clear-cut, select option "C." (- A 0 I+ B 1 to 4 (- C 5 to 8 15. Vegetative Composition — assessment area condition metric (skip for all marshes and Pine Flat) (' A Vegetation is close to reference condition in species present and their proportions. Lower strata composed of appropriate species, with exotic plants absent or sparse within the assessment area. f B Vegetation is different from reference condition in species diversity or proportions, but still largely composed of native species characteristic of the wetland type. This may include communities of weedy native species that develop after clearcutting or clearing. It also includes communities with exotics present, but not dominant, over a large portion of the expected strata. (. C Vegetation severely altered from reference in composition, or expected species are unnaturally absent (planted stands of non - characteristic species or at least one stratum inappropriately composed of a single species), or exotic species are dominant in at least one stratum. 16. Vegetative Diversity — assessment area condition metric (evaluate for Non -tidal Freshwater Marsh only) (' A Vegetation diversity is high and is composed primarily of native species (<10% cover of exotics). (- B Vegetation diversity is low or has > 10% to 50% cover of exotics. f C Vegetation is dominated by exotic species (>50% cover of exotics). 17. Vegetative Structure — assessment area/wetland type condition metric 17a. Is vegetation present? R Yes f— No If Yes, continue to 17b. If No, skip to Metric 18. 17b. Evaluate percent coverage of assessment area vegetation for all marshes only. Skip to 17c for non -marsh wetlands. (- A >_ 25% coverage of vegetation f B < 25% coverage of vegetation 17c. Check a box in each column for each stratum. Evaluate this portion of the metric for non -marsh wetlands. Consider structure in airspace above the assessment area (AA) and the wetland type (WT) separately. AA WT (' A (A Canopy closed, or nearly closed, with natural gaps associated with natural processes o C cc (- B (- B Canopy present, but opened more than natural gaps U C (' C Canopy sparse or absent o (- A (- A Dense mid-story/sapling layer (' B B Moderate density mid-story/sapling layer (- C (- C Mid-story/sapling layer sparse or absent a (' A (' A Dense shrub layer E L i B B Moderate density shrub layer c C (' C Shrub layer sparse or absent A A Dense herb layer a� (' B (' B Moderate density herb layer C (- C Herb layer sparse or absent 18. Snags — wetland type condition metric (skip for all marshes) (— A Large snags (more than one) are visible (> 12-inches DBH, or large relative to species present and landscape stability). B Not 19. Diameter Class Distribution — wetland type condition metric (skip for all marshes) ( A Majority of canopy trees have stems > 6 inches in diameter at breast height (DBH); many large trees (> 12 inches DBH) are present. [+ B Majority of canopy trees have stems between 6 and 12 inches DBH, few are > 12-inch DBH. [ C Majority of canopy trees are < 6 inches DBH or no trees. 20. Large Woody Debris — wetland type condition metric (skip for all marshes) Include both natural debris and man -placed natural debris. [ A Large logs (more than one) are visible (> 12 inches in diameter, or large relative to species present and landscape stability). [+ B Not A 21. Vegetation/Open Water Dispersion — wetland type/open water condition metric (evaluate for Non -Tidal Freshwater Marsh only) Select the figure that best describes the amount of interspersion between vegetation and open water in the growing season. Patterned areas indicate vegetated areas, while solid white areas indicate open water. [ A [ B [ C [' D 22. Hydrologic Connectivity — assessment area condition metric (evaluate for riparian wetlands and Salt/Brackish Marsh only) Examples of activities that may severely alter hydrologic connectivity include intensive ditching, fill, sedimentation, channelization, diversion, man-made berms, beaver dams, and stream incision. Documentation required if evaluated as B, C, or D. A Overbank and overland flow are not severely altered in the assessment area. [ B Overbank flow is severely altered in the assessment area. [ C Overland flow is severely altered in the assessment area. [ D Both overbank and overland flow are severely altered in the assessment area. Notes 7b. The wetland is crossed by a cleared vehicle path running from northwest to southeast approximately 140 ft northeast of the streambank NC WAM Wetland Rating Sheet Accompanies User Manual Version 5.0 Wetland Site Name W8 Date 05/03/2022 Wetland Type Headwater Forest Assessor Name/Organization Kimley-Horn Notes on Field Assessment Form (Y/N) YES Presence of regulatory considerations (Y/N) NO Wetland is intensively managed (Y/N) NO Assessment area is located within 50 feet of a natural tributary or other open water (Y/N) YES Assessment area is substantially altered by beaver (Y/N) NO Assessment area experiences overbank flooding during normal rainfall conditions (Y/N) NO Assessment area is on a coastal island (Y/N) NO Sub -function Rating Summary Function Sub -function Metrics Rating Hydrology Surface Storage and Retention Condition LOW Sub -Surface Storage and Retention Condition HIGH Water Quality Pathogen Change Condition HIGH Condition/Opportunity HIGH Opportunity Presence? (Y/N) YES Particulate Change Condition LOW Condition/Opportunity NA Opportunity Presence? (Y/N) NA Soluble Change Condition MEDIUM Condition/Opportunity HIGH Opportunity Presence? (Y/N) YES Physical Change Condition HIGH Condition/Opportunity HIGH Opportunity Presence? (Y/N) YES Pollution Change Condition NA Condition/Opportunity NA Opportunity Presence? (Y/N) NA Habitat Physical Structure Condition LOW Landscape Patch Structure Condition LOW Vegetation Composition Condition LOW Function Rating Summary Function Metrics/Notes Rating Hydrology Condition MEDIUM Water Quality Condition HIGH Condition/Opportunity HIGH Opportunity Presence? (Y/N) YES Habitat Condition LOW Overall Wetland Rating MEDIUM NC WAM WETLAND ASSESSMENT FORM Accompanies User Manual Version 5 USACE AID#: NCDWR #: Project Name Gateway 85 Date of Evaluation 4/14/2020 Applicant/Owner Name City of Gastonia Wetland Site Name Wetland W11 Wetland Type Headwater Forest Assessor Name/Organization Chris Tinklenberg, PWS (Kimley-Horn) Level III Ecoregion Piedmont Nearest Named Water Body Durharts Creek River Basin Catawba USGS 8-Digit Catalogue Unit 03050102 County Gaston NCDWR Region Mooresville C Yes !: No Precipitation within 48 hrs? Latitude/Longitude (deci-degrees) 35.269071,-81.115844 Evidence of stressors affecting the assessment area (may not be within the assessment area) Please circle and/or make note on last page if evidence of stressors is apparent. Consider departure from reference, if appropriate, in recent past (for instance, approximately within 10 years). Noteworthy stressors include, but are not limited to the following. • Hydrological modifications (examples: ditches, dams, beaver dams, dikes, berms, ponds, etc.) • Surface and sub -surface discharges into the wetland (examples: discharges containing obvious pollutants, presence of nearby septic tanks, underground storage tanks (USTs), hog lagoons, etc.) • Signs of vegetation stress (examples: vegetation mortality, insect damage, disease, storm damage, salt intrusion, etc.) • Habitat/plant community alteration (examples: mowing, clear -cutting, exotics, etc.) Is the assessment area intensively managed? !: Yes C No Regulatory Considerations - Were regulatory considerations evaluated? G Yes r' No If Yes, check all that apply to the assessment area. F Anadromous fish F Federally protected species or State endangered or threatened species F NCDWR riparian buffer rule in effect F Abuts a Primary Nursery Area (PNA) F Publicly owned property F N.C. Division of Coastal Management Area of Environmental Concern (AEC) (including buffer) F Abuts a stream with a NCDWQ classification of SA or supplemental classifications of HQW, ORW, or Trout F Designated NCNHP reference community F Abuts a 303(d)-listed stream or a tributary to a 303(d)-listed stream What type of natural stream is associated with the wetland, if any? (check all that apply) C' Blackwater C� Brownwater F Tidal (if tidal, check one of the following boxes) C Lunar C Wind Both Is the assessment area on a coastal island? C Yes G No Is the assessment area's surface water storage capacity or duration substantially altered by beaver? C Yes !: No Does the assessment area experience overbank flooding during normal rainfall conditions? G Yes C' No 1. Ground Surface Condition/Vegetation Condition — assessment area condition metric Check a box in each column. Consider alteration to the ground surface (GS) in the assessment area and vegetation structure (VS) in the assessment area. Compare to reference wetland if applicable (see User Manual). If a reference is not applicable, then rate the assessment area based on evidence of an effect. GS VS C' A C' A Not severely altered !: B !: B Severely altered over a majority of the assessment area (ground surface alteration examples: vehicle tracks, excessive sedimentation, fire -plow lanes, skidder tracks, bedding, fill, soil compaction, obvious pollutants) (vegetation structure alteration examples: mechanical disturbance, herbicides, salt intrusion [where appropriate], exotic species, grazing, less diversity [if appropriate], hydrologic alteration) 2. Surface and Sub -Surface Storage Capacity and Duration — assessment area condition metric Check a box in each column. Consider surface storage capacity and duration (Surf) and sub -surface storage capacity and duration (Sub). Consider both increase and decrease in hydrology. A ditch <_ 1 foot deep is considered to affect surface water only, while a ditch > 1 foot deep is expected to affect both surface and sub -surface water. Consider tidal flooding regime, if applicable. Surf Sub C A O A Water storage capacity and duration are not altered. C B O B Water storage capacity or duration are altered, but not substantially (typically, not sufficient to change vegetation). G C C C Water storage capacity or duration are substantially altered (typically, alteration sufficient to result in vegetation change) (examples: draining, flooding, soil compaction, filling, excessive sedimentation, underground utility lines). 3. Water Storage/Surface Relief — assessment area/wetland type condition metric (skip for all marshes) Check a box in each column for each group below. Select the appropriate storage for the assessment area (AA) and the wetland type (WT). AA WT 3a. C' A C' A Majority of wetland with depressions able to pond water > 1 foot deep C B C B Majority of wetland with depressions able to pond water 6 inches to 1 foot deep C' C C' C Majority of wetland with depressions able to pond water 3 to 6 inches deep !: D !: D Depressions able to pond water < 3 inches deep 3b. C A Evidence that maximum depth of inundation is greater than 2 feet C' B Evidence that maximum depth of inundation is between 1 and 2 feet !: C Evidence that maximum depth of inundation is less than 1 foot 4. Soil Texture/Structure — assessment area condition metric (skip for all marshes) Check a box from each of the three soil property groups below. Dig soil profile in the dominant assessment area landscape feature. Make soil observations within the 12 inches. Use most recent National Technical Committee for Hydric Soils guidance for regional indicators. 4a. (' A Sandy soil G B Loamy or clayey soils exhibiting redoximorphic features (concentrations, depletions, or rhizospheres) C Loamy or clayey soils not exhibiting redoximorphic features D Loamy or clayey gleyed soil E Histosol or histic epipedon 4b. G A Soil ribbon < 1 inch (' B Soil ribbon >_ 1 inch 4c. G A No peat or muck presence r' B A peat or muck presence 5. Discharge into Wetland — opportunity metric Check a box in each column. Consider surface pollutants or discharges (Surf) and sub -surface pollutants or discharges (Sub). Examples of sub -surface discharges include presence of nearby septic tank, underground storage tank (UST), etc. Surf Sub G A f- A Little or no evidence of pollutants or discharges entering the assessment area f' B f B Noticeable evidence of pollutants or discharges entering the wetland and stressing, but not overwhelming the treatment capacity of the assessment area f' C f' C Noticeable evidence of pollutants or discharges (pathogen, particulate, or soluble) entering the assessment area and potentially overwhelming the treatment capacity of the wetland (water discoloration, dead vegetation, excessive sedimentation, odor) 6. Land Use — opportunity metric (skip for non -riparian wetlands) Check all that apply (at least one box in each column). Evaluation involves a GIS effort with field adjustment. Consider sources draining to assessment area within entire upstream watershed (WS), within 5 miles and within the watershed draining to the assessment area (5M), and within 2 miles and within the watershed draining to the assessment area (2M). Effective riparian buffers are considered to be 50 feet wide in the Coastal Plain and Piedmont ecoregions and 30 feet wide in the Blue Ridge Mountains ecoregion. WS 5M 2M r A fl A FI A >_ 10% impervious surfaces F B F B F B Confined animal operations (or other local, concentrated source of pollutants) F-1 C F-1 C F-1 C >_ 20% coverage of pasture r D F D F D >_ 20% coverage of agricultural land (regularly plowed land) i E F E F E >_ 20% coverage of maintained grass/herb F F F F F F >_ 20% coverage of clear-cut land r G F G F G Little or no opportunity to improve water quality. Lack of opportunity may result from little or no disturbance in the watershed or hydrologic alterations that prevent dainage and/or overbank flow from affectio the assessment area. 7. Wetland Acting as Vegetated Buffer— assessment area/wetland complex condition metric (skip for non -riparian wetlands) 7a. Is assessment area within 50 feet of a tributary or other open water? !: Yes f' No If Yes, continue to 7b. If No, skip to Metric 8. 7b. How much of the first 50 feet from the bank is weltand? (Wetland buffer need only be present on one side of the water body. Make buffer judgment based on the average width of wetland. Record a note if a portion of the buffer has been removed or disturbed.) r' A >_ 50 feet r: B From 30 to < 50 feet C' C From 15 to < 30 feet r' D From 5 to < 15 feet C' E < 5 feet or buffer bypassed by ditches 7c. Tributary width. If the tributary is anastomosed, combine widths of channels/braids for a total width. G <_ 15-feet wide r' > 15-feet wide r' Other open water (no tributary present) 7d. Do roots of assessment area vegetation extend into the bank of the tributary/open water? r' Yes G No 7e. Is tributary or other open water sheltered or exposed? G Sheltered — adjacent open water with width < 2500 feet and no regular boat traffic. r' Exposed — adjacent open water with width >_ 2500 feet or regular boat traffic. 8. Wetland Width at the Assessment Area — wetland type/wetland complex condition metric (evaluate WT for all marshes and Estuarine Woody Wetland only; evaluate WC for Bottomland Hardwood Forest, Headwater Forest, and Riverine Swamp Forest only) Check a box in each column. Select the average width for the wetland type at the assessment area (WT) and the wetland complex at the assessment area (WC). See User Manual for WT and WC boundaries. WT WC f A f A >_ 100 feet f' B f' B From 80 to < 100 feet f C f C From 50 to < 80 feet f' D f: D From 40 to < 50 feet f E f E From 30 to < 40 feet f' F f' F From 15 to < 30 feet f G f G From 5 to < 15 feet f' H f' H < 5 feet 9. Inundation Duration — assessment area condition metric (skip for non -riparian wetlands) Answer for assessment area dominant landform. f A Evidence of short -duration inundation (< 7 consecutive days) f' B Evidence of saturation, without evidence of inundation G C Evidence of long -duration inundation or very long -duration inundation (7 to 30 consecutive days or more) 10. Indicators of Deposition — assessment area condition metric (skip for non -riparian wetlands and all marshes) Consider recent deposition only (no plant growth since deposition). t: A Sediment deposition is not excessive, but at approximately natural levels. C' B Sediment deposition is excessive, but not overwhelming the wetland. C C Sediment deposition is excessive and is overwhelming the wetland. 11. Wetland Size — wetland type/wetland complex condition metric Check a box in each column. Involves a GIS effort with field adjustment. This metric evaluates three aspects of the wetland area: the size of the wetland type (WT), the size of the wetland complex (WC), and the size of the forested wetland (FW) (if applicable, see User Manual). See the User Manual for boundaries of these evaluation areas. If assessment area is clear-cut, select "K" for the FW column. WT WC FW (if applicable) C A C A C A >_ 500 acres C' B C' B C' B From 100 to < 500 acres C C C C C C From 50 to < 100 acres C' D C' D C' D From 25 to < 50 acres C E C E C E From 10 to < 25 acres C' F C' F C' F From 5 to < 10 acres C G C G C G From 1 to < 5 acres C' H C' H C' H From 0.5 to < 1 acre t: I t: I t: I From 0.1 to < 0.5 acre C' J C' J C' J From 0.01 to < 0.1 acre C K C K C K < 0.01 acre or assessment area is clear-cut 12. Wetland Intactness — wetland type condition metric (evaluate for Pocosins only) C A Pocosin is the full extent (>_ 90%) of its natural landscape size. C' B Pocosin is < 90% of the full extent of its natural landscape size. 13. Connectivity to Other Natural Areas — landscape condition metric 13a. Check appropriate box(es) (a box may be checked in each column). Involves a GIS effort with field adjustment. This evaluates whether the wetland is well connected (Well) and/or loosely connected (Loosely) to the landscape patch, the contiguous metric naturally vegetated area and open water (if appropriate). Boundaries are formed by four -lane roads, regularly maintained utility line corridors the width of a four -lane road or wider, urban landscapes, fields (pasture open and agriculture), or water > 300 feet wide. Well Loosely C A C' A >_ 500 acres C' B C B From 100 to < 500 acres C C C C From 50 to < 100 acres t: D fi D From 10 to < 50 acres C' E C E < 10 acres C F C' F Wetland type has a poor or no connection to other natural habitats 13b. Evaluate for marshes only. C Yes C No Wetland type has a surface hydrology connection to open waters/stream or tidal wetlands. 14. Edge Effect — wetland type condition metric (skip for all marshes and Estuarine Woody Wetland) May involve a GIS effort with field adjustment. Estimate distance from wetland type boundary to artificial edges. Artificial edges include non -forested areas >_ 40 feet wide such as fields, development, roads, regularly maintained utility line corridors and clear -cuts. Consider the eight main points of the compass. Artificial edge occurs within 150 feet in how many directions? If the assessment area is clear-cut, select option "C." C A 0 t: B 1 to 4 C C 5to8 15. Vegetative Composition — assessment area condition metric (skip for all marshes and Pine Flat) C A Vegetation is close to reference condition in species present and their proportions. Lower strata composed of appropriate species, with exotic plants absent or sparse within the assessment area. C B Vegetation is different from reference condition in species diversity or proportions, but still largely composed of native species characteristic of the wetland type. This may include communities of weedy native species that develop after clearcutting or clearing. It also includes communities with exotics present, but not dominant, over a large portion of the expected strata. t: C Vegetation severely altered from reference in composition, or expected species are unnaturally absent (planted stands of non - characteristic species or at least one stratum inappropriately composed of a single species), or exotic species are dominant in at least one stratum. 16. Vegetative Diversity — assessment area condition metric (evaluate for Non -tidal Freshwater Marsh only) C' A Vegetation diversity is high and is composed primarily of native species (<10% cover of exotics). t: B Vegetation diversity is low or has > 10% to 50% cover of exotics. C' C Vegetation is dominated by exotic species (>50% cover of exotics). 17. Vegetative Structure — assessment area/wetland type condition metric 17a. Is vegetation present? C: Yes C' No If Yes, continue to 17b. If No, skip to Metric 18. 17b. Evaluate percent coverage of assessment area vegetation for all marshes only. Skip to 17c for non -marsh wetlands. C A >_ 25% coverage of vegetation C' B < 25% coverage of vegetation 17c. Check a box in each column for each stratum. Evaluate this portion of the metric for non -marsh wetlands. Consider structure in airspace above the assessment area (AA) and the wetland type (WT) separately. AA WT a C' A ( A Canopy closed, or nearly closed, with natural gaps associated with natural processes mC B t: B Canopy present, but opened more than natural gaps U t: C ( C Canopy sparse or absent o C-' A C-' A Dense mid-story/sapling layer C B C: B Moderate density mid-story/sapling layer ° C: C C C Mid-story/sapling layer sparse or absent C A C A Dense shrub layer C B C: B Moderate density shrub layer C: C C C Shrub layer sparse or absent C: A C A Dense herb layer C B C: B Moderate density herb layer C C C C Herb layer sparse or absent 18. Snags — wetland type condition metric (skip for all marshes) C A Large snags (more than one) are visible (> 12-inches DBH, or large relative to species present and landscape stability). C: B Not A 19. Diameter Class Distribution — wetland type condition metric (skip for all marshes) C A Majority of canopy trees have stems > 6 inches in diameter at breast height (DBH); many large trees (> 12 inches DBH) are present. C B Majority of canopy trees have stems between 6 and 12 inches DBH, few are > 12-inch DBH. C: C Majority of canopy trees are < 6 inches DBH or no trees. 20. Large Woody Debris — wetland type condition metric (skip for all marshes) Include both natural debris and man -placed natural debris. C' A Large logs (more than one) are visible (> 12 inches in diameter, or large relative to species present and landscape stability). C: B Not A 21. Vegetation/Open Water Dispersion — wetland type/open water condition metric (evaluate for Non -Tidal Freshwater Marsh only) Select the figure that best describes the amount of interspersion between vegetation and open water in the growing season. Patterned areas indicate vegetated areas, while solid white areas indicate open water. C A C B C C C D ..� /--�._ ..�1 �-,� ••� f�� •� ems, 22. Hydrologic Connectivity — assessment area condition metric (evaluate for riparian wetlands and Salt/Brackish Marsh only) Examples of activities that may severely alter hydrologic connectivity include intensive ditching, fill, sedimentation, channelization, diversion, man-made berms, beaver dams, and stream incision. Documentation required if evaluated as B, C, or D. C A Overbank and overland flow are not severely altered in the assessment area. C: B Overbank flow is severely altered in the assessment area. C C Overland flow is severely altered in the assessment area. C D Both overbank and overland flow are severely altered in the assessment area. Notes NC WAM Wetland Rating Sheet Accompanies User Manual Version 5.0 Wetland Site Name Wetland W11 Date 4/14/2020 Wetland Type Headwater Forest Assessor Name/Organization Tinklenberg, PWS (Kimley. Notes on Field Assessment Form (Y/N) NO Presence of regulatory considerations (Y/N) NO Wetland is intensively managed (Y/N) YES Assessment area is located within 50 feet of a natural tributary or other open water (Y/N) YES Assessment area is substantially altered by beaver (Y/N) NO Assessment area experiences overbank flooding during normal rainfall conditions (Y/N) YES Assessment area is on a coastal island (Y/N) NO Sub -function Rating Summary Function Sub -function Metrics Rating Hydrology Surface Storage and Retention Condition LOW Sub -Surface Storage and Retention Condition HIGH Water Quality Pathogen Change Condition LOW Condition/Opportunity LOW Opportunity Presence? (Y/N) NO Particulate Change Condition LOW Condition/Opportunity NA Opportunity Presence? (Y/N) NA Soluble Change Condition LOW Condition/Opportunity LOW Opportunity Presence? (Y/N) NO Physical Change Condition LOW Condition/Opportunity LOW Opportunity Presence? (Y/N) NO Pollution Change Condition NA Condition/Opportunity NA Opportunity Presence? (Y/N) NA Habitat Physical Structure Condition LOW Landscape Patch Structure Condition LOW Vegetation Composition Condition LOW Function Rating Summary Function Metrics/Notes Rating Hydrology Condition MEDIUM Water Quality Condition LOW Condition/Opportunity LOW Opportunity Presence? (Y/N) NO Habitat Condition LOW Overall Wetland Rating LOW