Loading...
HomeMy WebLinkAboutNCC212559_NOT Closeout Documents_20220719North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Mecklenburg Project: CLT Airport Belmont 1OOkV UG Relocation Person financially responsible: Duke Energy Carolinas, LLC - Randy N Veltri, Manager, Siting & Permitting Address: 526 South Church Street, EC09Q, Charlotte, NC 28202 1. Project Location: Sears Road, Charlotte Pictures: No 2. Weather and soil conditions: Sunny, Workable Soils River basin: Catawba Project #: IvIECKL-2021-059 Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No One Onsite Title: Inspection report: Sent Report Date given/sent: July 08, 2022 9. Corrective action needed: 10. Comments: Overall, the site has sufficient permanent ground cover to restrain erosion, however there are some bare areas that need to be stabilized. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Remove all remaining installed erosion control devices onsite. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the-permittee via a Notice of Termination (NOT) unless permit approval date was prior to April 2019. The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Jeffrey Chandler Date of inspection: July 07, 2022 cc: Yes Others present: Time arriving on site: 11:00 AM Time leaving site: 11:30 AM North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Mecklenburg Project: 1-85 North Bridge Charlotte 100kV Relocations River basin: Yadkin-PeeDee Person financially responsible: Duke Energy Carolinas, LLC - Randy Veltri Project #: MECKL-2020-006 Address: PO Box 1006/Mail Code EC09Q, 526 South Church Street, Charlotte, NC 28201 1. Project Location: Louis Rose Place, Charlotte Pictures: No 2. Weather and soil conditions: Sunny, Workable Soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No One Onsite Title: Inspection report: Sent Report Date given/sent: July 08, 2022 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Remove all remaining installed erosion control devices onsite. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT) unless permit approval date was prior to April 2019. The NOT is available at: https:Iledocs.deq.nc.gov/FormsNCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Jeffrey Chandler Others present: Date of inspection: July 06, 2022 Time arriving on site: 10:30 AM Time leaving site: 10:45 AM cc: