Loading...
HomeMy WebLinkAboutNCC190554_NOT Closeout Documents_20220719North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Wake Project: WTCC Classroom Bldg. RT2 Person financially responsible: Wake Technical Community College - Garion Bunn, Project Manager Address: 9101 Fayetteville Road, Raleigh, NC 27603 1. Project Location: Chapel Hill Road, Morrisville Pictures: No 2. Weather and soil conditions: rain, partially workable, wet 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: River basin: Neuse Project #: WAKE-2019-093 Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Bobby Jones Inspection report: Sent Report 9. Corrective action needed: 10. Comments: Title: Rogers Const Date given/sent: July 11, 2022 Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Kimberly Summers Others present: Date of inspection: June 30, 2022 Time arriving on site: 1:50 PM Time leaving site: 2:05 PM cc: Yes