HomeMy WebLinkAboutSWA000149_Application Form_202207135. Project area and density information:
Total Property Area
443,838 sf
Total Surface Water Area
108,235 sf
Considered to include:
• the normal pool of impounded structures,
• the area between the banks of streams and rivers, and
• the area below the Normal High Water (NHW) line or Mean High Water (MHW) line.
Total Coastal Wetlands Area
N/A sf
Considered to include: coastal wetlands landward from the NHW (or MHW) line.
Total Project Area
335,603 sf
Excludes the surface water area and coastal wetland area identified above.
May or may not be the same as Property Area.
Built -Upon Area (BUA) associated with Existing Development
26,575 sf
"Existing development" means those projects that are built or those projects that have established a
vested right under North Carolina law as of the effective date of the state stormwater program or
applicable local government ordinance to which the project is subject.
Proposed New BUA
73,880 sf
Includes proposed new BUA that is not associated with existing development.
"BUA" is defined in N.C. G. S. 143-214.7(b2). It includes, but is not limited to: buildings, roads, parking
areas, sidewalks, and some gravel areas. The design volume of SCMs must take into account the runoff
from build out from all surfaces draining to the SCM in accordance with 15A NCAC 02H .1050(1).
Project Density
w/ Existing Development: Project Density = [New BUA]/[Total Project Area —Existing BUA] x 100 or
23.9 %
w/o Existing Development: Project Density = [New BUA]/Total Project Area] x 100
6. Anticipated construction start date 08/01/22
7. Is the project located within 5 miles of a public airport? ❑ No ® Yes
If `Yes,'see S.L. 2012-200, Part VI: http://www.ncleg.net/Sessions/2011/Bills/Senate/PDF/S229v6.pdf and
DEQ Stormwater Design Manual Chapter E-4 Airports.
8. For projects in Union County: Contact DEMLR Central Office Stormwater staff at 919-707-9200 to determine
if the project is located within a Threatened & Endangered Species watershed that may be subject to more
stringent stormwater requirements per 15A NCAC 02B .0600.
Stormwater Fast Track ATC Application Form Page 4 of 9 Feb. 10, 2018