Loading...
HomeMy WebLinkAboutDuplin Bridge 12 (BR-0017) LossFrom:Farrell, Sean C To:Shaver, Brad E CIV USARMY CESAW (US); Sprinkle, Hannah H Cc:Westphal, Anneliese; Bullard, Jason M Subject:Duplin Bridge 12 (BR-0017) Loss Date:Wednesday, July 20, 2022 12:59:55 PM Attachments:image001.png Loss1.jpg Cleanup.jpg Brad and Hannah, We had a loss at Duplin Bridge 12 (BR-0017) due to rainfall at the site last night. Rob Mariano reported approximately 1/3 of a cubic yard of material overtopped our SDO and deposited on the creek bank/in the creek but it did not get beyond the turbidity curtain. The contractor has already retrieved the majority of the material but may need to get a little more. The washing as a result of runoff from the recently completed bridge deck coming at a new angle to the slopes. This will be resolved when the shoulder berm and gutter and the drop inlet box are installed. They are going to install additional wattles in the flow pattern for the washed area in the meantime as well as replace the wattle at the SDO. Please let me know if you have any questions. Thanks, Sean Farrell Division Environmental Officer Division 3 NCDOT- Division of Highways 910-341-2033 office 910-599-1184 mobile scfarrell@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.