Loading...
HomeMy WebLinkAbout20190159 Ver 1_Mitigation Information_20220718From: Davis, Erin B To: Baker, Caroline D Subject: FW: Notice of As -Built Review/ NCDMS Strawberry Hill Mitigation Site/ SAW-2019-00124/ Johnston County Date: Tuesday, July 19, 2022 11:43:48 AM Attachments: imaae001.ona Strawberry Hill 100094 INS 01 STIR Initial Release.Ddf Laserfiche Upload: Email & Attachment DWR#: 20190159 v.1 Doc Type: Mitigation Information From: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov> Sent: Monday, July 18, 2022 12:44 PM To: Kim Browning <Kimberly.D.Browning@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Haywood, Casey M CIV (USA) <casey.m.haywood@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Merritt, Katie <katie.merritt@ncdenr.gov> Cc: Dow, Jeremiah J <jeremiah.dow@ncdenr.gov>; Jamey McEachran <jmceachran@res.us> Subject: Notice of As -Built Review/ NCDMS Strawberry Hill Mitigation Site/ SAW-2019-00124/ Johnston County The final baseline (as -built) report and record drawings were uploaded to the DMS/IRT SharePoint and DWR Laserfiche for IRT review: Project Information — Name: USACE ID: DWR ID: DMS Project #: RFP: Institution: River Basin: County: Mitigation Plan Assets Provider: DMS PM: Strawberry Hill SAW-2019-00124 20190159 100094 16-007576—Issued 05/17/2018 12/12/2018—Full Delivery Neuse 03020201 Johnston 3,719.000 SMUs (Warm) / 656,593.451 Riparian Buffer Credits (BMUs) Resource Environmental Solutions, LLC, Jamey Mceachran, 919-623-9889 Jeremiah Dow, 919-218-0226 Please note: Stream construction was completed in January 2022 and planting was completed March 7, 2022; 2022 will be Monitoring Year 1 for this project. The as -built stream length is the same as the centerline design length. No change in project stream credits is requested. As -built riparian buffer mitigation credits are 650,162.286 BMUs. The final baseline (as -built) report and record drawings were uploaded to the DMS/IRT SharePoint, and DWR Laserfiche for IRT review. https://ncconnect.sharepoint.com/sites/I RT-DMS/Site Pages/Home.aspxx The credit ledger for the 30% release is attached for review and signature. Lindsay Crocker D E Eastern Regional Supervisor NORTF CAaouNA Division of Mitigation Services Department ai EnAronme�l qualm /'� 217 West Jones St., Raleigh, NC 27603 v Cell: 919/594/3910 Mitigation Project Name DMSID River Basin Cataloging Unit County Strawberry Hill Project 100094 Neuse 03020201 Johnston USACE Action ID DWR Permit Date Project Instituted Date Prepared Stream/Wet. Service Area Signature of Official Approving Credit Release 2019-00124 2019-0159 12/12/2018 7/16/2022 Neuse 03020201 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1,115.700 1,115.700 0.000 1,115.700 2022 7/16/2022 3 - Year 1 Monitoring 10.00% 371.900 2023 4 - Year 2 Monitoring 10.00% 371.900 2024 5 - Year 3 Monitoring 10.00% 371.900 2025 6 - Year 4 Monitoring 5.00% 185.950 2026 7 - Year 5 Monitoring 10.00% 371.900 2027 8 - Year 6 Monitoring 5.00% 185.950 2028 9 - Year 7 Monitoring 10.00% 371.900 2029 Stream Bankfull Standard 10.00% 371.900 2026 Totals 1,115.700 Total Gross Credits 3,719.000 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1,115.700 Total Percentage Released 30.00% Remaining Unreleased Credits 2,603.300 Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 3,719.000 Strawberry Hill Neuse 03020201 1 of 2 Mitigation Project Name Strawberry Hill Project USACE Action ID 2019-00124 DMS ID 100094 DWR Permit 2019-0159 River Basin Neuse Date Project Instituted 12/12/2018 Cataloging Unit 03020201 Date Prepared 7/16/2022 County Johnston Stream/Wet. Service Area Neuse 03020201 Debits Warm Stream Restoration Credits Beginning Balance (mitigation credits) 3,719.000 Released Credits 1,115.700 Unrealized Credits 0.000 Converted Credits 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 1,115.700 Remaining Balance (Unreleased credits) 2,603.300 Total Remaining Balance (Released and Unreleased credits) 3,719.000 Strawberry Hill Neuse 03020201 2 of 2