Loading...
HomeMy WebLinkAbout20190159 Ver 1_Mitigation Information_20220719From: Davis. Erin B To: Baker. Caroline D Subject: FW: [External] Notice of As -Built Review/ NCDMS Strawberry Hill Mitigation Site/ SAW-2019-00124/ Johnston County Date: Tuesday, July 19, 2022 1:06:56 PM Attachments: Strawberry Hill 100094 NS 01 STR Initial Release.odf Laserfiche Upload: Email & Attachment DWR#: 20190159 v.1 Doc Type: Mitigation Information From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Tuesday, July 19, 2022 12:53 PM To: Davis, Erin B <erin.davis@ncdenr.gov>; Merritt, Katie <katie.merritt@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Garrison, Gabriela <gabriela.garrison@ncwildlife.org>; kathryn_matthews@fws.gov; Bowers, Todd <bowers.todd@epa.gov> Cc: Crocker, Lindsay < Lindsay. Crocker@ncdenr.gov>; Dow, Jeremiah J <jeremiah.dow@ncdenr.gov>; Jamey Mceachran <jmceachran@res.us>; Bradley Breslow <bbreslow@res.us>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil>; Fennel, Tommy E CIV USARMY CESAW (USA) <Tommy.E.Fennel@usace.army.mil> Subject: [External] Notice of As -Built Review/ NCDMS Strawberry Hill Mitigation Site/ SAW-2019- 00124/Johnston County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Greetings IRT, The below referenced FINAL As -Built Report review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. Please note, if a site visit is requested by the IRT, comments will be due 15-days following the visit. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: July 21, 2022 15-Day Comment Deadline: August 5, 2022 45-Day Credit Release Approval Deadline: September 4, 2022 Project information and location of the FINAL As -Built Baseline Monitoring Report (MYO): Name: Strawberry Hill USACE ID: SAW-2019-00124 DWR ID: 20190159 DIMS Project #: 100094 RFP: 16-007576—Issued 05/17/2018 Institution: 12/12/2018—Full Delivery River Basin: Neuse 03020201 County: Johnston Mitigation Plan Assets: 3,719.000 SMUs (Warm) / 656,593.451 Riparian Buffer Credits (BMUs) Provider: Resource Environmental Solutions, LLC, Jamey Mceachran, 919-623-9889 DIMS PM: Jeremiah Dow, 919-218-0226 Please note: Stream construction was completed in January 2022 and planting was completed March 7, 2022; 2022 will be Monitoring Year 1 for this project. The as -built stream length is the same as the centerline design length. No change in project stream credits is requested. As -built riparian buffer mitigation credits are 650,162.286 BMUs. NCDMS Sharepoint: https://ncconnect.sharepoint.com/sites/I RT-DMS/SitePages/Home.asrx RIBITS: https://ribits.ops.usace.army.mil/ords/f?p=107:278:4106712700824::::P278_BANK_ID:5331 As always, thank you for your participation, Kim Kim (Browning) Isenhour Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 1 919.946.5107 Mitigation Project Name DMSID River Basin Cataloging Unit County Strawberry Hill Project 100094 Neuse 03020201 Johnston USACE Action ID DWR Permit Date Project Instituted Date Prepared Stream/Wet. Service Area Signature of Official Approving Credit Release 2019-00124 2019-0159 12/12/2018 7/16/2022 Neuse 03020201 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1,115.700 1,115.700 0.000 1,115.700 2022 7/16/2022 3 - Year 1 Monitoring 10.00% 371.900 2023 4 - Year 2 Monitoring 10.00% 371.900 2024 5 - Year 3 Monitoring 10.00% 371.900 2025 6 - Year 4 Monitoring 5.00% 185.950 2026 7 - Year 5 Monitoring 10.00% 371.900 2027 8 - Year 6 Monitoring 5.00% 185.950 2028 9 - Year 7 Monitoring 10.00% 371.900 2029 Stream Bankfull Standard 10.00% 371.900 2026 Totals 1,115.700 Total Gross Credits 3,719.000 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1,115.700 Total Percentage Released 30.00% Remaining Unreleased Credits 2,603.300 Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 3,719.000 Strawberry Hill Neuse 03020201 1 of 2 Mitigation Project Name Strawberry Hill Project USACE Action ID 2019-00124 DMS ID 100094 DWR Permit 2019-0159 River Basin Neuse Date Project Instituted 12/12/2018 Cataloging Unit 03020201 Date Prepared 7/16/2022 County Johnston Stream/Wet. Service Area Neuse 03020201 Debits Warm Stream Restoration Credits Beginning Balance (mitigation credits) 3,719.000 Released Credits 1,115.700 Unrealized Credits 0.000 Converted Credits 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 1,115.700 Remaining Balance (Unreleased credits) 2,603.300 Total Remaining Balance (Released and Unreleased credits) 3,719.000 Strawberry Hill Neuse 03020201 2 of 2