Loading...
HomeMy WebLinkAbout20220972 Ver 1_220715_Supplemental Information - ENG Form 4345 (Finalized) Ammons rev1_20220718Ammons Property Residential Development Project SAW-2022-00367 U.S. Army Corps of Engineers Application for Department of the Army Permit ENG Form 4345 — Supplemental Information 18. Nature of Activily Description of project, include all features) An analysis of the Wake County real estate data prepared by the Triangle Multiple Listing Service shows that from November 2020 to November 2021, the inventory of homes for sale dropped from 2,069 units to 1,005 units —a reduction of inventory by 51.4% (Triangle Multiple Listing Service, 2021). The months' supply of inventory fell from 1.1 months to 0.5 months in the same timeframe. On average, homes in Wake County sold after 10 days on the market by November 2021. The proven market demand within Wake County supported the need for residential and commercial development in the county. An additional consideration for determining the most reasonable and practicable development market for the applicant was utilizing an area of proven market performance. The selected location is approximately 3.5 miles northeast of the master -planned community Wendell Falls; a Community Development Update reports that the Wendell Falls community saw over 100 homes sold and 50 closings in the first quarter of 2022 (Wendell Falls, LLC, 2022). As of April 4, 2022, the total number of occupied homes in the community was 1,316. Additional factors considered in determining the ideal location for the proposed project included (but were not limited to): • Contiguous acreage availability: Size of a parcel assemblage must be such that development costs (e.g. on -site and off -site improvements, development constraints, materials, design, etc.) can be defrayed by a minimum density allowance. • Zoning: Zoning to achieve the minimum density allowance must be available for the selected parcel assemblage. • Utilities: Access to utilities, including (but not limited to) power, gas, electric, water, and sanitary sewer must be available to serve the site. Collectively, these factors led the applicant to determine the Town of Wendell submarket as the most optimal location for the proposed project. The proposed project is a planned unit development consisting of, amenity, residential, and open space/recreation zones. The residential portion of the development consists of various detached and attached product offerings at a wide range of price points. 19. Project Purpose The applicant has stated the basic purpose of the proposed project is to develop residential housing for the Town of Wendell submarket. The overall purpose of the project is to develop single-family residential housing to meet current and future demand in the Town of Wendell submarket. Ammons Property Residential Development Project SAW-2022-00367 20. Reason(s) for Discharge Construction of the proposed project will require permanent and temporary impacts to Waters of the U.S. and Waters of the State to establish access to high -ground developable area, to grade and balance the site so that practicable development can occur, to construct residential units, and to establish sanitary sewer infrastructure. Proposed impacts associated with the development are itemized below. ROADWAY IMPACTS IMPACT# ZONE ZONE2 WETLAND STREAM RIP RAP S.F.7 AC. S.F. AC. S.F. AC. L.F. S.F. L.F. S.F. R1 7537 0,17 12497 0,29 2399 0.06 191 764 60 1080 R2 0 0,00 0 0.00 9746 0.22 0 0 45 540 R3 8976 0,21 13744 0,32 8896 0.20 237 9461 120 4320 TOTAL 16512 0.381 26242 0.60 210401 0.481 4281 1711 225 5940 SEWER IMPACTS ZONE 1 ZONE2 WETLAND STREAM RIP RAP IMPACT# S.F. AC. S.F. AC. S.F. AC. L.F. S.F. L.F. S.F. 51 0 0.00 0 0.00 1037 0,02 0 0 0 0 S2 1320 0.03 2106 0,05 2177 0.05 35 142 0 0 S3 0 0.00 0 0,00 489 0.01 0 0 0 0 S4 1201 0.D3 1802 0.04 4580 0.11 301 180 0 0 S5 0 0.00 0 0.00 5794 0,13 0 0 0 0 S6 1304 0,03 1953 0.04 5927 0,13 32 192 0 0 57 0 0.00 0 0.00 3497 0.08 0 0 0 0 58 0 0.00 0 0,00 8549 0.20 0 0 0 0 59 0 0.00 0 0.00 6254 0.14 0 0 0 0 510 1363 0.03 2C44 US 0 0,00 34 204 0 0 S 11 0 0,00 0 0,00 7557 0,17 0 0 0 0 S 12 0 0.00 0 0.00 212 0.00 0 0 0 0 S13 1220 0.03 2050 0,05 4 0.00 31 185 0 0 TOTAL 6408 0.15 99551 0.231 459621 1.06 162 9031 01 0 G EN ERAL I MPACTS ZONE 1 ZONE2 WETLAND STREAM RIP RAP IMPACT# S.F. AC. S.F. AC. S,F. AC. L.F. S.F. L.F. S.F. Gl 0 0100 0 0,00 34788 0180 0 0 0 0 G2 0 0,00 0 0.00 14533 0.33 0 0 0 0 TOTAL 0 0,00 0 0.00 49320 1.13 0 0 0 0 G RAN U TOTAL 22920 0.531 361971 0.831 1163231 2.671 5901 2614 225 5940 23. Description of Avoidance. Minimization, and Compensation The applicant's preferred alternative is the result of multiple site redesigns that incorporate avoidance and minimization efforts into site design and construction techniques. Avoidance and minimization efforts are detailed below. On -site Alternative I On -site alternative 1 proposed an equivalent amount of road and sewer impacts, but eliminated wetland impacts for residential unit construction. The applicant determined that this alternative was not economically practicable and would result in a non -viable project, therefore this alternative was eliminated from consideration. Ammons Property Residential Development Project SAW-2022-00367 On -site Alternative 2 On -site alternative 2 routed the major thoroughfare road through the project area but implemented a terminus east of Little River, requiring that a road crossing be constructed across the Little River aquatic habitat. This route was approved under the 2019 Town of Wendell Arterial and Collector Street map. The crossing of Little River would have resulted in a substantial increase in impacts to wetlands, streams, riparian buffers, and important aquatic habitat for sensitive State and Federal threatened and endangered species known to occur in the Little River. This site alternative was eliminated based on the significant increase in impacts it would have required. On -site Alternative 3 (Applicant's Preferred) The applicant's preferred alternative is the least impactful practicable site design that still achieves the project purpose. Proposed wetland impacts are the minimum necessary to achieve the project purpose and are unavoidable due to the location of the resources. The number of road crossings and sanitary sewer impacts are the minimum necessary to serve the project. Roads are designed to the minimum necessary width and incorporate wingwalls mitered for 3:1 side slopes, minimizing the length of streambed loss to the maximum extent practicable. The subdivision is designed to incorporate perpendicular road crossings and perpendicular sewer crossings where practicable. Road and sewer infrastructure are co -located to minimize impacts to aquatic resources where practicable. Riparian buffers are observed throughout the project area outside of proposed impacts. Buffers adjacent to Little River are greater than the minimum required to avoid impacts to the archaeological site identified adjacent to Little River. The additional buffer area also enhances water quality protections by minimizing disturbance and the potential for surface water impacts proximate to the Little River. Sanitary sewer incorporates a minimum of three feet of coverage where the proposed permanent easement intersects zones 1 and 2 of the riparian buffer. Road Alignment Impacts R1, R2, and R3 are necessary to construct a 3-lane undivided minor thoroughfare. This road impact is necessary to serve the internal development but also serves a greater area, as the road provides connectivity to adjacent properties and is shown on the Town of Wendell Arterial and Collector Street plan Adopted 08-12-2019. Initially, the routing of this road was southeastward through the site with a connection east of Little River, but the alignment was adjusted after consideration of the aquatic impacts that would have been required. Impact RI Road crossing consisting of 150 linear feet of 72" RCP at 1.16% slope. This crossing is necessary to construct a 3-lane undivided minor thoroughfare that serves as a thoroughfare and as an internal development circulation road. Impacts to the stream and wetland are unavoidable due to the location of the resource in relation to the road alignment and overall development. The impact has been minimized to the maximum extent practicable with the use of 3:1 side slopes and the use of wingwalls. Ammons Property Residential Development Project SAW-2022-00367 Impact R2 Road crossing consisting of 146.3 linear feet of 54" RCP at 1.57% slope. This crossing is necessary to construct a 3-lane undivided minor thoroughfare that serves as a thoroughfare and as an internal development circulation road. Impacts to the wetland are unavoidable due to the location of the resource in relation to the road alignment and overall development. The impact has been minimized to the maximum extent practicable with the use of 3:1 side slopes and the use of wingwalls. Impact R3 Road crossing consisting of 208 linear feet of 12' by 6' box culvert at 0.60% slope. This crossing is necessary to construct a 3-lane undivided minor thoroughfare that serves as a thoroughfare and as an internal development circulation road. Impacts to the stream and wetland are unavoidable due to the location of the resource in relation to the road alignment and overall development. The impact has been minimized to the maximum extent practicable with the use of 3:1 side slopes and the use of wingwalls. Subdivision Design G1 Impact G1 is necessary to balance the grade of this area of the development and to construct residential units. Because of the location of the aquatic resource in relation to the overall development, the impact is unavoidable. G2 Impact G2 is necessary to balance the grade of this area of the development and to construct residential units. Because of the location of the aquatic resource in relation to the overall development, the impact is unavoidable. Compensatory Mitigation The applicant offered the following compensatory mitigation plan to offset unavoidable functional loss to the aquatic environment: The applicant has attempted to avoid and minimize impacts where possible and will compensate to the extent practicable for the remaining mitigatable unavoidable losses with compensatory mitigation. The applicant proposes to compensate for 428 linear feet of permanent streambed loss due to fill for road construction at a 2:1 mitigation ratio; 1.61 acres of permanent riparian wetland loss at a 2:1 ratio; 1.06 acres of permanent conversion of forested wetlands at a 1:1 mitigation ratio; and 42,754 square feet of Zone I and Zone 2 riparian buffer impacts. To offset unavoidable impacts to the riparian buffer, the applicant proposes to purchase Riparian Buffer credits from the Sassarixa Swamp II Nutrient Offset & Buffer Mitigation Banking Instrument private commercial mitigation bank, sponsored by Wildlands Holdings; to offset unavoidable impacts to streams and riparian wetlands, the applicant proposes to purchase stream 4 Ammons Property Residential Development Project SAW-2022-00367 and wetland credits from Falling Creek Umbrella Mitigation Banking Instrument, sponsored by Wildland Holdings. The project proponent proposes an 8-year permit authorization to allow for flexibility in response to market conditions over a build -out period of 8 years. The project proponent proposes phased mitigation.