Loading...
HomeMy WebLinkAboutNCC222524_ESC Approval Submitted_2022071930 July 2019 LETTER OF APPROVAL WITH MODIFICATIONS MSD of Buncombe County, N.C. ATTN: Mr, Thomas E. Hartye, P.E. 2028 Riverside Drive Asheville, N.C. 28804 RE: Project Name: Christian Creek Interceptor Sewer Rehabilitation Project Acres Approved: 12.5 Project ID: BUNCO-2020-001 County: Buncombe City: Swannanoa Address: 1-40 (Generally Parallels and Crosses). River Basin: French Broad Stream Classification: Christian Creek, `C' Submitted By: Mr. W. Hunter Carson, RE Date Received by LQS: 2 July 2019 Plan Type: Utilities Dear Mr. Hartye, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit, This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq,nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at AAmette.lucas@ncdenr.gov or Paul Clark at Paul.clarli ncderingov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. ® North Carolina department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Reglonal Office 1 2090 U S. Highway 70 1 Swannanoa, North Carolina 28778 M,un.ee :mwmawey 82$.296.4500 Letter of Approval with Modifications Mr. Thomas Hartye, P.E. 30 July 2019 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCG01 permit require thatthe following documentation be kept on file at the job site: 1. The approved USC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Mic ael Smith [Assistant] Regional Engineer Land Quality Section Letter of Approval with Modifications Mr. Thomas Hartye, P.E. 30 July 2019 Page 3 of 3 Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCG01 Fact Sheet ec: Mr. W. Hunter Carson, P.E. hcarson@msdbc.org cc: Regional Office file MODIFICATIONS REQUIRED FOR APPROVAL Proj ect Name: Christian Creek Interceptor Sewer Rehabilitation Project ProjectID: BUNCO-2020-001 County: Buncombe 1. Please provide to this office plan sheet EC-6 showing the two drop inlets with associated inlet protection within the limits of disturbance located west of MH 64 at about STA 117+00 and STA 119+90. {G.S.113A-57 (3)}. 2. Please do not commence construction activities prior to obtaining all necessary permits from the United States Army Corps of Engineers and the North Carolina Department of Environmental Quality, Division of Water Resources. {G.S.113A-57 (11. Ref: G.S.113A-54.1 through G.S.113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities