Loading...
HomeMy WebLinkAboutNCG500582_Compliance Evaluation Inspection_20220719ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality July 19, 2022 Ms. Rebecca Young Southern Power Company — Plant Rowan County Power Station 575 NC-801 Cleveland, NC 27013 SUBJECT: Compliance Evaluation Inspection Southern Power Company NPDES Permit #NCG0500582 Rowan County, NC Ms. Young: On July 15, 2022, Roberto Scheller of this Office conducted an inspection at the subject facility. This inspection was conducted as a Compliance Evaluation Inspection (CEI) to ensure compliance with permit requirements and conditions. At time of inspection, the subject facility appeared to be well maintained and operated. We wish to thank your operating staff for their assistance regarding this inspection. The enclosed report should be self-explanatory; however, should you have any questions, please do not hesitate to contact Roberto Scheller, of the Mooresville Regional Office, at 704-663-1699 or roberto.scheller@ncdenr.gov. Enclosure: Inspection Report Cc: LaserFiche GDE NORTH C OLI .JA ' omm m�� ep..of o�.i Sincerely, ,---DocuSigned by: `— A14CC681 AF27425... W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611 919.707.9000 United States Environmental Protection Agency EPA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code 1 IN I 2 IL 21IIIIII NPDES yr/mo/day Inspection I 3 I NCG500582 111 121 22/07/14 117 Type 1810I IIIIIIIIIII Inspector Fac Type 19I S I 2011 IIIIIIIIIII IIIIIII I IIIIII P6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 671 I 70I3 I 711 1 72 I N I 73I 1 74 71 I I I I I I I I 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES oermit Number) Plant Rowan County 5755 NC Hwy 801 Salisbury NC 28147 Entry Time/Date 10:OOAM 22/07/14 Permit Effective Date 20/12/31 Exit Time/Date 11:18AM 22/07/14 Permit Expiration Date 25/11/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Richard A Foster,5755 NC Hwy 801 Salisbury NC 28147//704-278-6670/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Records/Reports Self -Monitoring Progran Facility Site Review Compliance Schedules Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signa Roberto Scheller Ppiator(s) EAgency/Office/Phone and Fax Numbers Date (�t,y4-p S.dlu, ,y� 7/18/2022 DWR/MRO WQ/707-235-2204/ 91C2A007838943E... Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date W. Corey Basinger DWR/Division of Water Quality/704-235-2194/ EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. DocuSigned by: 7/19/2022 "-A14CC681AF27425... Page# 1 31 NPDES yr/mo/day NCG500582 111 121 22/07/14 I17 Inspection Type 18 [j (Cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) The General Permit NCG500582 became effective on December 1, 2020, expires November 30, 2025 and is for the discharge of non -contact cooling water, via Outfall #002 and stormwater via Outfall #001, into Second Creek which is Class C waters (Sub -basin #03-07-07) in the Yadkin River Basin. The facility utilizes Pace Labatory (Lab Certification #40) and has a Field Laboratory Certification #5588 to perform on -site sample analysis for Temperature, pH, Total Residual Chlorine. Labatory analysis, chain of custody forms and calibration records were well kept and readily available for review. At time of inspection discharge point for Outfall #002 into Second Creek was reviewed. The outfall was discharging at time of visit and it was noted that there were no discharge of floating solids or visible foam other than trace amounts. Outfall #001 was not discharging due to low water level in stormwater pond. At time of Compliance Evaluation Inspection (CEI) subject facility appeared to be compliant with effluent limits and monitoring requirements. Page# 2 Permit: NCG500582 Inspection Date: 07/14/2022 Owner - Facility: Plant Rowan County Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new El El ❑ application? Is the facility as described in the permit? • El El El # Are there any special conditions for the permit? El El • El Is access to the plant site restricted to the general public? • ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? • El El El Comment: Facility is permitted under General Permit NCG500000. Record Keeping Are records kept and maintained as required by the permit? Is all required information readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? Is the chain -of -custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification? Is a copy of the current NPDES permit available on site? Facility has copy of previous year's Annual Report on file for review? Comment: Flow Measurement - Effluent # Is flow meter used for reporting? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • • ❑ ❑ ❑ • ❑ • ❑ ❑ ❑ • ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE Page# 3 Permit: NCG500582 Inspection Date: 07/14/2022 Owner - Facility: Plant Rowan County Inspection Type: Compliance Evaluation Flow Measurement - Effluent Yes No NA NE Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? ❑ ❑ • ❑ Comment: Effluent flow is estimated via Permit NCG500582, Part I, Section B, Monitoring Requirements. Effluent Pipe Is right of way to the outfall properly maintained? Is there a compliance schedule for this facility? Are the receiving water free of foam other than trace amounts and other debris? Is the facility compliant with the permit and conditions for the review period? Comment: If effluent (diffuser pipes are required) are they operating properly? Comment: Yes No NA NE • ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ Page# 4