Loading...
HomeMy WebLinkAbout820689_NOV-2022-PC-0200 Response_20220616 DFOJDOIR To: Trent Allen and Diane Harrison, DEQ, DWR WQRO-Fayetteville `' VN 2-0li2 From: Frankie Steed, Steeds Farms Inc. Permit#AWS820689 Wf OS FAyET7i iFt r �";_"►F?tlfii1 (1F ICE Your certified letter was signed for on 6/9/22 and I spoke to Diane Harrison by phone on 6/9/22 as well. As stated in your Notice of Violation, I notified DWQ staff of the lagoon level being at 18", and the 30- day Plan was submitted on 3/23/22 also. Knowing that I would exceed the Small Grain PAN if more water was applied and believing that I could not put anymore water out until April when Bermuda PAN period begins under the revised permit,the lagoon level was monitored until it reached 18" and then I notified DWQ,the 30-day POA was put in place, and airway removal of the water began as soon as it was possible. On 4/18/22, I was able to get the lagoon to 21". As weather and field conditions permitted pumping continued, and as of 6/9/22, the lagoon level is at 44". I will continue to follow proposed actions outlined in the POA and take necessary precautions to keep the lagoon level in compliance. Specific Corrective Actions: -Clarify application time period for begin/end of small grain and Bermuda grass -Make sure lagoon level is verified as required I appreciate your understanding that this violation was not committed intentionally, and I believe that I acted as soon as reasonably possible due to weather and field conditions in my attempts to correct the situation. I respectfully request that in your review of this violation that no civil penalty be assessed. Sincerely, J f J. Frank Steed III Steeds Farms Inc. PO BOX 448 Mount Olive, NC 28365