HomeMy WebLinkAboutWQ0041311_Engineering Certification_20220715PERMITTEE:
PERMIT tt:
PROJECT:
ISSUE DATE:
FAST TRACK SEWER ENGINEERING CERTIFICATION
Town of Griffon
WQ0041311
Pump Station and Sewer Rehabilitation/Replacement
November 19, 2019
RECEI vtumuutivrvuvvft
JUL 16 2022
Water Quality
RegionSection
Washington Regional Office
This project shall not be considered complete nor allowed to operate In accordance with Condition 7 of
this permit until the Division has received this Certification and all required supporting documentation. It
should be submitted in a manner that documents the Division's receipt. Send the required documentation
the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom.
Any wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Certification shall be considered a violation of the permit and shall subject the Permittee to
appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up
until a final certification is received. A Final Certification shall be a complete set of record drawings and
design calculations regardless of whether partials have been submitted.
PERMITTEE'S CERTIFICATION
I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant
to the applicable standards & requirements, the Professional Engineer below has provided applicable
design/construction information to the Permittee, and the Permittee is prepared to operate & maintain
the wastewater collection system permitted herein or portionsyhereof.
Printed Name, Title 71�2/2Z
Signature Date
ENGINEER'S CERTIFICATION
I, ERae_ 6. OL.- E'A/ , as a dui registered Professional En meer in the State of North Carolina,
having been authorized to observe (periodically, El weekly, [g] full time) the construction of the
project name and location as referee ed above for the above Permittee hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the following construction:
of approximately 2,460 linear feet of 8-inch gravity sewer; as part of the Pump Station and Sewer
Rehabilitation/Replacement project (PROJECT INFO- aligning new gravity sewer main and manholes and
rehabilitation of two pump stations), the discharge of existing (no new) flow consisting of domestic and
commercial wastewater being discharged into the Contentnea Metropolitan existing sewerage system;
such that the construction was observed to be built within substantial compliance of this permit; 15A
NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted
February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of
Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials.
North Carolina Professional Engineer's Seal w/signature & date:
L_] Final ( Partial (include description)
Wood(auJY1 'Pump OnJr
• 7 e j't2-
Certification Comments i" ug,tsolill � Comments/Qualifiers (attach if necessary): �rrrrrlr�►►►►`
? tsCS ref (Oa eel tt - Ctk... tr. ct; o
ritcrgets...,,. capad;OWMt re - us.v elr3f • 114.4sra>1. Sys 5 CA
NC DWR — Water Quality Regional Operations Section 943 Washington Square Mall, Washington, NC 27889
Washington Regional Office Phone: (252)-946-G481 FAX: 252-946-9215
7.