Loading...
HomeMy WebLinkAboutWQ0041311_Engineering Certification_20220715PERMITTEE: PERMIT tt: PROJECT: ISSUE DATE: FAST TRACK SEWER ENGINEERING CERTIFICATION Town of Griffon WQ0041311 Pump Station and Sewer Rehabilitation/Replacement November 19, 2019 RECEI vtumuutivrvuvvft JUL 16 2022 Water Quality RegionSection Washington Regional Office This project shall not be considered complete nor allowed to operate In accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portionsyhereof. Printed Name, Title 71�2/2Z Signature Date ENGINEER'S CERTIFICATION I, ERae_ 6. OL.- E'A/ , as a dui registered Professional En meer in the State of North Carolina, having been authorized to observe (periodically, El weekly, [g] full time) the construction of the project name and location as referee ed above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: of approximately 2,460 linear feet of 8-inch gravity sewer; as part of the Pump Station and Sewer Rehabilitation/Replacement project (PROJECT INFO- aligning new gravity sewer main and manholes and rehabilitation of two pump stations), the discharge of existing (no new) flow consisting of domestic and commercial wastewater being discharged into the Contentnea Metropolitan existing sewerage system; such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: L_] Final ( Partial (include description) Wood(auJY1 'Pump OnJr • 7 e j't2- Certification Comments i" ug,tsolill � Comments/Qualifiers (attach if necessary): �rrrrrlr�►►►►` ? tsCS ref (Oa eel tt - Ctk... tr. ct; o ritcrgets...,,. capad;OWMt re - us.v elr3f • 114.4sra>1. Sys 5 CA NC DWR — Water Quality Regional Operations Section 943 Washington Square Mall, Washington, NC 27889 Washington Regional Office Phone: (252)-946-G481 FAX: 252-946-9215 7.