HomeMy WebLinkAbout20140742 Ver 1_Application_20140718
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
PAT L. MCCRORY July 16, 2014 ANTHONY J. TATA
GOVERNOR SECRETARY
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
1598 MAIL SERVICE CENTER
RALEIGH NC 27699-1598
TELEPHONE: 919-707-6100
FAX: 919-212-5785
WEBSITE: WWW.NCDOT.ORG
LOCATION:
1020 BIRCH RIDGE DRIVE
RALEIGH NC 27610-4328
U. S. Army Corps of Engineers
Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, NC 28801‐5006
ATTN: Ms. Lori Beckwith
NCDOT Coordinator
Subject: Application for Section 404 Nationwide Permit 13 & 33 for the proposed
replacement of Bridge No. 108 over Tuckasegee River on SR 1002 (Old Cullowhee
Road) in Jackson County, Federal Aid Project No. BRZ‐1002(13); Division 14; WBS
Element 33507.1.1, TIP No. B‐4159.
Dear Madam:
The North Carolina Department of Transportation (NCDOT) proposes to replace the existing 4‐
span, 280 foot long bridge with a 3‐span, 300 foot long bridge. NCDOT has minimized impacts
on this replacement to temporary impacts resulting from work pads necessary to remove the
existing structure and its bents, as well as the installation of the new bridge. To accommodate
concerns raised by citizens, traffic will be maintained on‐site using phased construction. The
project will be constructed using a series of work pads totaling 0.19 acre. This amount accounts
for overlapping work pads between different phases of staged construction.
Due to the likelihood of the difficulty of removing the work pads around the bank areas, the
work pad rock will be retained at the bank as bank stabilization. This will result in 185 linear
feet of bank stabilization.
Please see enclosed copies of the Pre‐Construction Notification (PCN), Stormwater
management plan, permit drawings, design plans, Rapanos form, and USFWS informal
concurrence response for the above‐referenced project. A Categorical Exclusion (CE) was
completed and distributed in August 2013. Additional copies are available upon request.
Comments from the North Carolina Wildlife Resources Commission (NCWRC) will be required
prior to authorization by the United States Army Corps of Engineers (USACE). By copy of this
letter and attachments, NCDOT hereby requests NCWRC’s review. NCDOT requests that
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1a. Type(s) of approval sought from the
Corps: Section 404 Permit Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: 13 33 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? Yes No
1d. Type(s) of approval sought from the DWQ (check all that apply):
401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit
401 Water Quality Certification – Express Riparian Buffer Authorization
1e. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification:
Yes No
For the record only for Corps Permit:
Yes No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
Yes No
1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h
below.
Yes No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No
2. Project Information
2a. Name of project: Replacement of Bridge No. 108 over Tuckasegee River on SR 1002.
2b. County: Jackson
2c. Nearest municipality / town: Cullowhee
2d. Subdivision name: not applicable
2e. NCDOT only, T.I.P. or state
project no: B-4159
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. not applicable
3c. Responsible Party (for LLC if
applicable): not applicable
3d. Street address: 1598 Mail Service Center
3e. City, state, zip: Raleigh, NC 27699-1598
3f. Telephone no.: (919) 707-6157
3g. Fax no.: (919) 212-5785
3h. Email address: maturchy@ncdot.gov
Office Use Only:
Corps action ID no. _____________
DWQ project no. _______________
Form Version 1.3 Dec 10 2008
1
4. Applicant Information (if different from owner)
4a. Applicant is: Agent Other, specify:
4b. Name: not applicable
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: not applicable
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
2
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): not applicable
1b. Site coordinates (in decimal degrees): Latitude: 35.315776 Longitude: - 83.177870
(DD.DDDDDD) (-DD.DDDDDD)
1c. Property size: 0.5 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project: Tuckasegee River
2b. Water Quality Classification of nearest receiving water: C Tr
2c. River basin: Little Tennessee
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Residential and commercial land use.
3b. List the total estimated acreage of all existing wetlands on the property:
Zero.
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
500
3d. Explain the purpose of the proposed project:
To replace a structurally deficient and functionally obselete bridge.
3e. Describe the overall project in detail, including the type of equipment to be used:
The North Carolina Department of Transportation (NCDOT) proposes to replace the existing 4-span, 280 foot long bridge
with a 3-span, 300 foot long bridge. NCDOT has minimized impacts on this replacement to temporary impacts resulting
from work pads necessary to remove the existing structure and its bents, as well as the installation of the new bridge. To
accommodate concerns raised by citizens, traffic will be maintained on-site using phased construction. The project will
be constructed using a series of work pads totaling 0.19 acre. This amount accounts for overlapping work pads between
different phases of staged construction.
Due to the likelihood of the difficulty of removing the work pads around the bank areas, the work pad rock will be retained
at the bank as bank stabilization. This will result in 185 lnear feet of bank stabilization.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments: Requesting the JD with this permit.
Yes No Unknown
4b. If the Corps made the jurisdictional determination, what type
of determination was made? Preliminary Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company:
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? Yes No Unknown
5b. If yes, explain in detail according to “help file” instructions.
3
6. Future Project Plans
6a. Is this a phased project? Yes No
6b. If yes, explain.
4
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
Wetlands Streams - tributaries Buffers
Open Waters Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number –
Permanent (P) or
Temporary (T)
2b.
Type of impact
2c.
Type of wetland
(if known)
2d.
Forested
2e.
Type of jurisdiction
(Corps - 404, 10
DWQ – non-404, other)
2f.
Area of impact
(acres)
Site 1 P T Yes
No
Corps
DWQ
Site 2 P T Yes
No
Corps
DWQ
Site 3 P T Yes
No
Corps
DWQ
Site 4 P T Yes
No
Corps
DWQ
Site 5 P T Yes
No
Corps
DWQ
Site 6 P T Yes
No
Corps
DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number -
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial
(PER) or
intermittent
(INT)?
3e.
Type of
jurisdiction
(Corps - 404, 10
DWQ – non-404,
other)
3f.
Average
stream
width
(feet)
3g.
Impact length
(linear feet)
Site 1 P T Temporary
Work Bridge Tuckasegee River PER
INT
Corps
DWQ 125 0.19 acre
Site 1 P T Bank
Stabilization Turkasegee River PER
INT
Corps
DWQ 125 185
Site P T PER
INT
Corps
DWQ
Site P T PER
INT
Corps
DWQ
Site P T PER
INT
Corps
DWQ
Site P T PER
INT
Corps
DWQ
3h. Total stream and tributary impacts 185' Perm
0.19 ac Temp
3i. Comments:
5
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
Open water
impact number –
Permanent (P) or
Temporary (T)
4b.
Name of
waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody type
4e.
Area of impact (acres)
O1 P T
O2 P T
O3 P T
O4 P T
4f. Total open water impacts X Permanent
X Temporary
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a.
Pond ID
number
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded Filled Excavat
ed Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
Yes No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer
impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.
Project is in which protected basin?
Neuse Tar-Pamlico Other:
Catawba Randleman
6b.
Buffer impact
number –
Permanent (P) or
Temporary (T)
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1 impact
(square feet)
6g.
Zone 2 impact
(square feet)
B1 P T Yes
No
B2 P T Yes
No
B3 P T Yes
No
6h. Total buffer impacts
6i. Comments:
7
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Due to concerns raised by the community, traffic will be maintained on-site using phased construction.
Temporary workpads will be phased so that no more than 50% of the river channel will be blocked at any time.
Work pads will be further stabilized by "jersey" barriers on their upstream sides to prevent them from washing away
during high flow events.
NCDOT will establish a contact network with Duke Energy to ensure that impending flows are anticipated and that any
equipment on work pads be moved to high ground.
NCDOT will participate in a preconstruction survey during the 2014 field season in order to validate the assumption that
the Appalachian elktoe is not within the area that may be affected by indirect effects.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Design Standards for Sensitive Waters will be used for this project. Deck drains will not discharge into open water. The
Department will observe an in-stream moratorium for trout from October 15-April 15.
Demolition of existing the existing structure will be conducted in a manner that minimizes dropping material into the river.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
Yes No
If no, explain: The NCDOT does not propose mitigation for
stream bank stabilization activities. Stabilizing the bank of a
stream does not require fill in the stream bed and, therefore,
under Section 404 of the Clean Water Act, does not
constitute Loss of Waters of the U.S. and is not subject to
compensatory mitigation. Furthermore, the proposed bank
stabilization activities are necessary to prevent erosion and
sedimentation, i.e. preventing bank destabilization and
minimizing impacts to the environment.
2b. If yes, mitigation is required by (check all that apply): DWQ Corps
2c. If yes, which mitigation option will be used for this
project?
Mitigation bank
Payment to in-lieu fee program
Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: not applicable
3b. Credits Purchased (attach receipt and letter) Type Quantity
8
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: warm cool cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
Yes No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
9
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules?
Yes No
1b. If yes, then is a diffuse flow plan included? If no, explain why.
Comments: Yes No
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? Yes No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
See attached permit drawings.
2e. Who will be responsible for the review of the Stormwater Management Plan?
Certified Local Government
DWQ Stormwater Program
DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government’s jurisdiction is this project? not applicable
3b. Which of the following locally-implemented stormwater management programs
apply (check all that apply):
Phase II
NSW
USMP
Water Supply Watershed
Other:
3c. Has the approved Stormwater Management Plan with proof of approval been
attached?
Yes No
4. DWQ Stormwater Program Review
4a. Which of the following state-implemented stormwater management programs apply
(check all that apply):
Coastal counties
HQW
ORW
Session Law 2006-246
Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? Yes No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No N/A
5b. Have all of the 401 Unit submittal requirements been met? Yes No N/A
10
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1a. Does the project involve an expenditure of public (federal/state/local) funds or the
use of public (federal/state) land? Yes No
1b. If you answered “yes” to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
Yes No
1c. If you answered “yes” to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.)
Comments: CE Approved & Distributed August 1, 2013.
Yes No
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
or Riparian Buffer Rules (15A NCAC 2B .0200)?
Yes No
2b. Is this an after-the-fact permit application? Yes No
2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
additional development, which could impact nearby downstream water quality?
Yes
No
3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered “no,” provide a short narrative description.
Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby
land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
not applicable
11
(Version 1.2; Released July 2012)
B-4159 County(ies):Jackson Page 1 of 1
Project Type:Date:
Phone:Phone:
Email:Email:
County(ies):
CAMA County?
Design/Future:Existing:
Surrounding Land Use: Light urban business .0237 miles
9,800(2032)
1.63Project Built-Upon Area (ac.)
Proposed Project Existing Site
Project Length (lin. Miles or feet):
Buffer Rules in Effect
Project Description
No
NCDWQ Surface Water Classification for Primary Receiving Water
303(d) Impairments:
River Basin(s):
Primary Receiving Water:
Class B
Other Stream Classification:
Carlas Sharpless, PE
City/Town:
919-707-6750
1590 Mail Service Center Address:
Cullowhee
919-707-6739
Jackson
ac.
General Project Narrative:The project involves replacing Bridge 108 on SR 1002 (Old Cullowhee Rd.) over the Tuckasegee River in Jackson County. This project also involves traffic improvements
which includes the realignments of SR 1336 (Montieth Gap Road) and SR 1732 (Edgewater Road). Portions of the new alignments are located on new location and are
meant to improve intersection conditions with SR 1002. The existing structure is a 3-span 280' bridge, and will be replaced with a 300' 3-span structure in the exising location.
The existing roadway consists of 20' of BST with shoulder section. The proposed roadway is a 2-12 foot travel lane facility with a variable width center turn lane, 4-foot bike
lanes, sidewalks, curb and gutter section, and shoulder section. No Deck drains will be present over open waters, and deck drain dissipator pads will be used to prevent
erosion.
Typical Cross Section Description:
References
6,300 (2013)
2.38
Average Daily Traffic (veh/hr/day):
ac.
North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
FOR LINEAR ROADWAY PROJECTS
Stephen Morgan, PE
Existing location
General Project Information
Address:
4/14/2014
1590 Mail Service Center
Raleigh, NC 27699-1590 Raleigh, NC 27699-1590
Project/TIP No.:
NCDOT Contact:
Project No.:B-4159
Contractor / Designer:
smorgan@ncdot.gov
Little Tennessee
2-79-(30)
csharpless@ncdot.gov
2-12 foot travel lanes with variable width center turn lane, 4 foot bike lanes, curb and
gutter, sidewalks, and shoulder sections with variable side slopes to tie-in.
NCDWQ Stream Index No.:
Supplemental: Trout Waters (Tr)
Primary:
Tuckaseegee River
DHVDTV ======%%MPH ADTADT% *
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
FUNC CLASS =000PROFILE (HORIZONTAL)
P
R
O
J
E
C
T
L
E
N
G
T
H
R
I
G
H
T
O
F
W
A
Y
D
A
T
E
:
L
E
T
T
I
N
G
D
A
T
E
:
S
T
A
T
E
S
T
A
T
E
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
S
T
A
T
E
P
R
O
J
.
N
O
.
F.
A
.
P
R
O
J
.
N
O
.
DE
S
C
R
I
P
T
I
O
N
N
O
.
T
O
T
A
L
S
H
E
E
T
S
N
.
C
.
S
H
E
E
T
1
DESIGN DATA
P
r
e
p
a
r
e
d
i
n
t
h
e
O
f
f
i
c
e
o
f
:
S
I
G
N
A
T
U
R
E
:
S
I
G
N
A
T
U
R
E
:
P
.
E
.
P
.
E
.
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
P
R
O
J
E
C
T
E
N
G
I
N
E
E
R
P
R
O
J
E
C
T
D
E
S
I
G
N
E
N
G
I
N
E
E
R
GRAPHIC SCALES C203498 PLANSPROFILE (VERTICAL)
H
Y
D
R
A
U
L
I
C
S
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
O
A
D
W
A
Y
D
E
S
I
G
N
L
O
C
A
T
I
O
N
:
T
Y
P
E
O
F
W
O
R
K
:
09/08/99
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
000 See Sheet 1-A For Index of Sheets$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$
1
0
0
0
B
i
r
c
h
R
i
d
g
e
D
r
.
,
R
a
l
e
i
g
h
N
C
,
2
7
6
1
0
CON TRACT:TIP PROJECT:
DEPARTMENT
O
F
T
R
A
N
S
P
OR
T
A
T
IO N
S
T
ATE
O
F
N
O
R
T
H
C
AROLINA
J
A
C
K
S
O
N
C
O
U
N
T
Y
A
N
D
S
T
R
U
C
T
U
R
E
D
E
C
E
M
B
E
R
1
6
,
2
0
1
4
T
O
N
Y
H
O
U
S
E
R
,
P
.
E
.
L
E
E
A
N
N
M
O
O
R
E
LE
N
G
T
H
O
F
R
O
A
D
W
A
Y
T
I
P
P
R
O
J
E
C
T
B
-
4
1
5
9
=
0
.
2
3
7
M
I
L
E
S
LEN
G
T
H
O
F
S
T
R
U
C
T
U
R
E
T
I
P
P
R
O
J
E
C
T
B
-
4
1
5
9
=
0
.
0
5
7
M
I
L
E
S
T
O
T
A
L
L
E
N
G
T
H
O
F
T
I
P
P
R
O
J
E
C
T
B
-
4
1
5
9
=
0
.
2
9
4
M
I
L
E
S
5025501005025501001051020201220321060540DUAL 3* TTST 2 B-4159
B
-
4
1
5
9
4
FOR BRIDGE PROJECTS THE SUB REGIONAL TIER GUIDELINES THIS PROJECT WAS DESIGNED USING VICINITY MAP SHOWING LOCATION OF PROJECT B-4159 See Sheet 1-B For Conventional Symbols
3
3
5
0
7
.
1
.
1
B
R
Z
-
1
0
0
2
(
1
3
)
P
E
G
R
A
D
I
N
G
,
P
A
V
I
N
G
,
D
R
A
I
N
A
G
E
RURAL COLLECTOR
-
L
-
P
O
T
S
T
A
.
1
4
+
2
5
.
0
0
B
E
G
I
N
T
I
P
P
R
O
J
E
C
T
B
-
4
1
5
9
-
L
-
P
O
T
S
T
A
.
2
9
+
7
5
.
0
0
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
4
1
5
9
-
L
-
P
O
T
S
T
A
.
2
1
+
6
6
.
0
0
E
N
D
B
R
I
D
G
E
CAROLINA UNIVERSITY
TO WESTERN
TO SYLVA
-
L
-
SR 1002
OL
D
C
ULL
O
W
HE
E
R
O
A
D
SR 1732 EDGEWATER ROAD
SR 1336
MO
NTEIT
H
G
AP R
O
A
D
SR
1169
CEN
TR
A
L D
R
IV
E
TUCKASEGEE RIVER
PROJECT BEGIN PROJECT END
-
Y
1
-
-
Y
2-
-DR1-
-
L
-
P
O
T
S
T
A
.
1
8
+
6
6
.
0
0
B
E
G
I
N
B
R
I
D
G
E
B
R
I
D
G
E
N
O
.
1
0
8
O
V
E
R
T
H
E
T
U
C
K
A
S
E
G
E
E
R
I
V
E
R
O
N
S
R
1
0
0
2
(
O
L
D
C
U
L
L
O
W
H
E
E
R
D
.
)
T
O
NC 107
N
O
V
E
M
B
E
R
2
2
,
2
0
1
3
2
0
1
2
S
T
A
N
D
A
R
D
S
P
E
C
I
F
I
C
A
T
I
O
N
S
%%15,400 9,800
B
R
Z
-
1
0
0
2
(
1
3
)
3
3
5
0
7
.
2
.
1
R
O
W
&
U
T
I
L
THERE IS NO CONTROL OF ACCESS ON THIS P
R
O
J
E
C
T
CLEARING ON THIS PROJECT SHALL BE PERFO
R
M
E
D
T
O
T
H
E
L
I
M
I
T
S
E
S
T
A
B
L
I
S
H
E
D
B
Y
M
E
T
H
O
D
I
I
W
E
T
L
A
N
D
A
N
D
S
U
R
F
A
C
E
W
A
T
E
R
I
M
P
A
C
T
S
P
E
R
M
I
T
WC
R
WC
R
WC
R
WC
R
Roger Rd.HollyHillsRd.HollyHillsRd.Rd.River(107 (107CullowheeWesternCarolinaUniversityWayehutta TuckasegeeRiverBranch100217331732100210021732OldCullowheeRd.1336
R
IV
E
R
T
U
C
KA
S
E
G
E
E
LINE
CONTROL
BENT 1
-L-
VERTICAL GRADE DATA -L-
(-)8.2138%(-)0.4017%
VC = 380’
ELEV. = 2,080.04
P.I. = 16+39.50 -L-
R
T
L
D
P.I.
HORIZONTAL CURVE DATA -L-
= 831.00’
= 1,387.09’
= 1,713.59’
= 653’41.3"
= 11808’55.9" (RT)
= 26+65.65 -L-
2,090
2,080
2,070
2,060
2,050
2,040
2,030
2,020
RIP RAP BERM
1’-7" MIN.
FILL FACE @ END BENT 1
BEGIN FRONT SLOPE
DRILLED
3’-6" ~
SECTIONS AT BENT AND END BENTS ARE AT RIGHT ANGLES
SECTION ALONG -L-
BEGIN FRONT SLOPE
GROUND
NATURAL
APPROXIMATE
STRUCTURE EXCAVATION (TYP.)
1’-6" TO UNCLASSIFIED
EXCAVATION
STRUCTURE
UNCLASSIFIED
COLUMN
3’-0" ~
RIP RAP (TYP.)
2’-0" CLASS II
W.P. #1
FILL FACE @ END BENT 1
STA. 18+66.00 -L-
(TYP.)
EXCAVATION
STRUCTURE
UNCLASSIFIED
TOP OF DRILLED PIER
TOTAL LENGTH OF BRIDGE (FROM W.P. #1 TO W.P. #4)
300’-0" (ALONG ARC)
LINE
CONTROL
BENT 2
(TYP.)
RIP RAP
CLASS II
(TYP.)
PIER
(TYP.)
STA. 18+51.13 -L-
BEGIN FRONT SLOPE
GRADE POINT EL. = 2,079.13
STA. 18+66.00 -L-
GRADE POINT EL. = 2,079.19
STA. 18+51.13 -L-
GRADE POINT EL. = 2,077.93
STA. 21+66.00 -L-
GRADE POINT EL. = 2,077.87
STA. 21+78.50 -L-
(ALONG ARC)
50’-0"
TO SR 1336
(TYP.)
STRUCTURE
EXISTING
E
L
.
2
,
0
4
8
|
E
L
.
2
,
0
7
6
|
E
L
.
2
,
0
7
5
|
E
L
.
2
,
0
7
2
|
E
L
.
2
,
0
5
0
|
E
L
.
2
,
0
6
4
|E
L
.
2
,
0
7
6
|
E
L
.
2
,
0
7
6
|
E
L
.
2
,
0
5
3
|
E
L
.
2
,
0
5
8
|
E
L
.
2
,
0
5
9
|
E
L
.
2
,
0
6
1
|
E
L
.
2
,
0
5
4
|
E
L
.
2
,
0
4
9
|
E
A
RT
H
BE
RM
1’-
0"
MI
N.
E
A
RT
H
BE
RM
1’-
0"
MI
N.
E
ART
H
BE
RM
1’-
0
"
MI
N.
E
ART
H
BE
RM
1’-
0"
MI
N.
BEGIN FRONT SLOPE
STA. 21+78.50 -L-
END BENT 1 BENT 1 BENT 2 END BENT 2
BEGIN APPROACH SLAB
STA. 18+42.31 -L-
END APPROACH SLAB
STA. 21+89.94 -L-
SPAN ‘‘C’’
100’-0" (ALONG ARC)
SPAN ‘‘B’’
100’-0" (ALONG ARC)
SPAN ‘‘A’’
100’-0" (ALONG ARC)
SHEET 1 OF 4
RI
P
RA
P
BE
RM
1’-
7"
MI
N.
RI
P
RAP
BE
RM
1’-
7"
MI
N.
RI
P
RA
P
BE
RM
1’-
7"
MI
N.
RI
P
RA
P
BE
RM
1’-
7"
MI
N.
(SR
1002
)
O
LD
CU
LL
OWHEE
ROAD
EXCAVATION
STRUCTURE
UNCLASSIFIED
EXCAVATION
STRUCTURE
UNCLASSIFIED
31
’-3
" |
27
’-9
" |
(TYP.)
NORMAL TO CAP
(
T
Y
P
.
)
1
’
-
0
"
(TYP.)
(NORMAL TO CAP)
SLOPE 1:1
EL. 2,054.50 EL. 2,054.50
SPAN A SPAN B SPAN C
(TYP.)
STRUCTURE
EXISTING
EXP.EXP.
TOP OF DRILLED PIER
(TYP.)
3’-6"
FILL FACE @ END BENT 2
EL. 2,063.5|
GREENWAY SHELFEL. 2,062.5|
GREENWAY SHELF
FIX FIX FIX FIX
EL.
2.
0
7
1.
2
5
EL.
2,
0
6
9.
2
5
EL.
2,
0
6
7.
2
1
EL.
2,
0
6
9.
2
1
33
’-11
" |
39
’-1" |
TO CURVE)
(TANGENT
13020’32"
TO CURVE)
(TANGENT
12326’51"
TO CURVE)
(TANGENT
10939’28"
TO CURVE)
(TANGENT
11633’09"
STA. 20+16.00 -L-
{ BRIDGE
STA. 19+66.00 -L-
W.P. #2
STA. 20+66.00 -L-
W.P. #3
28
’-2
" |
29
’-10
" |
26
’-8
" |
28
’-4
" |
EL.
2,
0
7
0 .
0
6
EL.
2,
0
6
8.
0
6
EL.
2,
0
6
5.
9
2
EL.
2,
0
6
7.
9
2
STA. 21+66.00 -L-
W.P. #4
FILL FACE @ END BENT 2
PLAN
ALL BENTS ARE PARALLEL
PILES NOT SHOWN FOR CLARITY
TO CURVE)
(TANGENT
12000’00"
(TYP.)
STEEL PILES
HP 12 X 53
GRADE TO DRAIN
GRADE TO DRAIN
UTILITY PLANS)
(TO REMAIN, SEE
8" ~ SEWER LINE
UTILITY PLANS)
OR REMOVED, SEE
(TO BE RELOCATED
8" ~ SEWER LINE
(1940)
EL. 2,075
HIGH W.S.
(Q100) 2,072
W.S. EL.
PAD
DISSIPATOR
DECK DRAIN
PAD
DISSIPATOR
DECK DRAIN
N.W.S. EL. 2,053
TO
SR
1732
+50 19+00 +50 20+00 +50 21+00 +5018+00 F.A. PROJECT NO. : BRZ-1002(13)
END BENT 1
FILL FACE @
END BENT 2
FILL FACE @
NORTH
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
DEPARTMENT OF TRANSPORTATION
1
2
3
4
STATION:
COUNTY
PROJECT NO.
I
C
A
E
n
g
i
n
e
e
r
i
n
g
f
/
k
/
a
F
lo
r
e
n
c
e
&
H
u
t
c
h
e
s
o
n
,
I
n
c
.
V
:
\
S
t
r
u
c
t
u
r
e
s
\
S
t
r
u
c
t
u
r
e
_
D
e
s
i
g
n
\
T
I
P
\
B
-
4
1
5
9
_
J
a
c
k
s
o
n
_
1
0
8
\
P
la
n
s
\
P
r
e
l
i
m
i
n
a
r
y
\
s
1
_
B
-
4
1
5
9
_
s
d
_
g
d
.
d
g
n
1
1
/
1
/
2
0
1
3
S-1
20+16.00 -L-
B-4159
DRAWN BY :
CHECKED BY :
DATE :
DATE :
T. E. TALLMAN DATE :DESIGN ENGINEER OF RECORD:
D. H. CARTER S-1NOV 2013
NC License No: F-0258
Engineering
f/k/a Florence & Hutcheson, Inc.
REPLACES BRIDGE NO. 108
4
JACKSON
NOV 2013
NOV 2013
PRELIMINARY
GENERAL DRAWING
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
K. M. MOBLEY
BETWEEN SR 1336 AND SR 1732
TUCKASEGEE RIVER ON SR 1002
FOR BRIDGE OVER
TSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY
P
L
A
N
V
I
E
W
G
R
A
P
H
I
C
S
C
A
L
E
0
’
1
0
0
’
2
0
0
’
3
0
0
’
1
0
0
’
NAD 83/95
NC GRID
S
c
a
l
e
:
1
"
=
5
0
’
shown in pla
n
v
i
e
w
f
o
r
c
l
a
r
i
t
y
.
Excavation s
h
o
w
n
i
n
p
r
o
f
i
l
e
v
i
e
w
i
s
n
o
t
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
P
e
r
m
i
t
D
r
a
w
i
n
g
B
l
o
w
u
p
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
B
-
4
1
5
9
PHASE 1A TEMP. WORK PAD
S
H
E
E
T
_
_
O
F
_
_
P
E
R
M
I
T
D
R
A
W
I
N
G
3
1
1
D
I
15
" RC
P
-III
B
Y
H
Y
D
R
O
1
8
"
C
M
P
L
O
C
A
T
E
D
18" CM
P
RETAIN
24" RCP-III
2
G
I
2
G
I
24" RCP-III
2GI
RC
P-I
V 15"
RCP-III 18"& 24" RCP/
C
M
P
REMOVE DI
’
S
D
E
C
K
D
R
A
I
N
D
I
S
S
I
P
A
T
O
R
P
A
D
S
E
E
D
E
T
A
I
L
D
CFF
F
F
C
C
C
CF
C
F
F
C
CFFF
C
F
LTGR BSTCONC1SBLKBUS
L
T
MT
L
S
DKBSTGR GRDI
D
I
L
T
MTL
CON
C
2
S
B
L
K
A
P
T
3
S
F
A
P
T
GR
B
S
T
2
S
F
A
P
T
DKTWALL108" BLK GAS TANKSCONC W/ UG CONC ISL
S
T
E
P
S
W
D
S
T
E
P
S
WD
BLK WALL48" - 108" 7 ABANDON8911 12
1
3
1
4
15
16
26
2
9
B
LK
WA
LL
CONC LT CANOPYWD W/LT
W
/
C
A
T
V
DK
W/C
A
T
V
B
S
T
W/L
T
24" RCP
2
4
" C
M
P
1SB
K
B
U
S
W
/
C
A
T
V
W/C
AT
V
W
/
C
A
T
V
GR
8"
DIP
S
R
10
02
T
8"
DIP
1"
P
L
A
S
TI
C
12
" D
IP
12
"
D
I
P
4
" S
T
E
E
L
12" DIP12" DIP (RAW)6" DIPCONC. WATER VAULT
2"
P
L
A
S
TI
C
C
A
T
V
W/
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
ELL
M
ONI
T
O
R
2" PLASTIC AZTEC DRIVEELEV.=2076.3
7
’
E
L
E
V
.=
2
0
7
6
.5
8
’
18’
BS
T
SP
IK
E
R
/REIP
EIP
DK
B
A
S
E
M
E
N
T
2
S
B
K
D
W
/
S
3
S
B
K
A
P
T
SR 1335
1
S
F
B
U
S
WD36"(RAW)12" DIP
E
DG
E
W
AT
E
R
R
OAD
S
R
17
3
2
BUS/APT3SBK
PK
N
A
IL
PK NAIL
WCR WCRWCR
5
5
.
0
0
’
3
5
.
0
0
’
+
9
0
.
0
0
-
L
-
+
3
5
.
0
0
-
D
R
1
-
20
5
0
2
0
5
0
2
0
5
0
2050
2055
20
55
20
5
5
2055
2055
2060
20
6
0
2060
2060
2060
2060
2060
206
0
20
6
0
2060
2065
2 065
2065
20
6
5
20
65
2070
2
0
7
0
2
0
7
0
2070
2070
2075
2075
2
0
7
5
2075
2
0
7
5
2
0
7
5
2075
2
0
7
5
2080 2080 2080 2080
2
0
8
0
2
0
8
0
2085 2090 209521002105
T
B
T
B
TB
T
B
TB
TB
T
B
TB
T
U
C
K
ASE
GEE
RI
VE
R
TYPE-
I
I
I
TYPE-I
I
I
TY
P
E
-
I
I
I
TYP
E TL
-
2
TYPE
TL
-
2
TYPE TL-2TYPE-IIITYPE TL-2
TES
TES
GRAU 350 TL-2
R
IV
E
R
T
U
C
KA
S
E
G
E
E
LINE
CONTROL
BENT 1
-L-
VERTICAL GRADE DATA -L-
(-)8.2138%(-)0.4017%
VC = 380’
ELEV. = 2,080.04
P.I. = 16+39.50 -L-
R
T
L
D
P.I.
HORIZONTAL CURVE DATA -L-
= 831.00’
= 1,387.09’
= 1,713.59’
= 653’41.3"
= 11808’55.9" (RT)
= 26+65.65 -L-
2,090
2,080
2,070
2,060
2,050
2,040
2,030
2,020
RIP RAP BERM
1’-7" MIN.
FILL FACE @ END BENT 1
BEGIN FRONT SLOPE
DRILLED
3’-6" ~
SECTIONS AT BENT AND END BENTS ARE AT RIGHT ANGLES
SECTION ALONG -L-
BEGIN FRONT SLOPE
GROUND
NATURAL
APPROXIMATE
STRUCTURE EXCAVATION (TYP.)
1’-6" TO UNCLASSIFIED
EXCAVATION
STRUCTURE
UNCLASSIFIED
COLUMN
3’-0" ~
RIP RAP (TYP.)
2’-0" CLASS II
W.P. #1
FILL FACE @ END BENT 1
STA. 18+66.00 -L-
(TYP.)
EXCAVATION
STRUCTURE
UNCLASSIFIED
TOP OF DRILLED PIER
TOTAL LENGTH OF BRIDGE (FROM W.P. #1 TO W.P. #4)
300’-0" (ALONG ARC)
LINE
CONTROL
BENT 2
(TYP.)
RIP RAP
CLASS II
(TYP.)
PIER
(TYP.)
STA. 18+51.13 -L-
BEGIN FRONT SLOPE
GRADE POINT EL. = 2,079.13
STA. 18+66.00 -L-
GRADE POINT EL. = 2,079.19
STA. 18+51.13 -L-
GRADE POINT EL. = 2,077.93
STA. 21+66.00 -L-
GRADE POINT EL. = 2,077.87
STA. 21+78.50 -L-
(ALONG ARC)
50’-0"
TO SR 1336
(TYP.)
STRUCTURE
EXISTING
E
L
.
2
,
0
4
8
|
E
L
.
2
,
0
7
6
|
E
L
.
2
,
0
7
5
|
E
L
.
2
,
0
7
2
|
E
L
.
2
,
0
5
0
|
E
L
.
2
,
0
6
4
|E
L
.
2
,
0
7
6
|
E
L
.
2
,
0
7
6
|
E
L
.
2
,
0
5
3
|
E
L
.
2
,
0
5
8
|
E
L
.
2
,
0
5
9
|
E
L
.
2
,
0
6
1
|
E
L
.
2
,
0
5
4
|
E
L
.
2
,
0
4
9
|
E
A
RT
H
BE
RM
1’-
0"
MI
N.
E
A
RT
H
BE
RM
1’-
0"
MI
N.
E
ART
H
BE
RM
1’-
0
"
MI
N.
E
ART
H
BE
RM
1’-
0"
MI
N.
BEGIN FRONT SLOPE
STA. 21+78.50 -L-
END BENT 1 BENT 1 BENT 2 END BENT 2
BEGIN APPROACH SLAB
STA. 18+42.31 -L-
END APPROACH SLAB
STA. 21+89.94 -L-
SPAN ‘‘C’’
100’-0" (ALONG ARC)
SPAN ‘‘B’’
100’-0" (ALONG ARC)
SPAN ‘‘A’’
100’-0" (ALONG ARC)
SHEET 1 OF 4
RI
P
RA
P
BE
RM
1’-
7"
MI
N.
RI
P
RAP
BE
RM
1’-
7"
MI
N.
RI
P
RA
P
BE
RM
1’-
7"
MI
N.
RI
P
RA
P
BE
RM
1’-
7"
MI
N.
(SR
1002
)
O
LD
CU
LL
OWHEE
ROAD
EXCAVATION
STRUCTURE
UNCLASSIFIED
EXCAVATION
STRUCTURE
UNCLASSIFIED
31
’-3
" |
27
’-9
" |
(TYP.)
NORMAL TO CAP
(
T
Y
P
.
)
1
’
-
0
"
(TYP.)
(NORMAL TO CAP)
SLOPE 1:1
EL. 2,054.50 EL. 2,054.50
SPAN A SPAN B SPAN C
(TYP.)
STRUCTURE
EXISTING
EXP.EXP.
TOP OF DRILLED PIER
(TYP.)
3’-6"
FILL FACE @ END BENT 2
EL. 2,063.5|
GREENWAY SHELFEL. 2,062.5|
GREENWAY SHELF
FIX FIX FIX FIX
EL.
2.
0
7
1.
2
5
EL.
2,
0
6
9.
2
5
EL.
2,
0
6
7.
2
1
EL.
2,
0
6
9.
2
1
33
’-11
" |
39
’-1" |
TO CURVE)
(TANGENT
13020’32"
TO CURVE)
(TANGENT
12326’51"
TO CURVE)
(TANGENT
10939’28"
TO CURVE)
(TANGENT
11633’09"
STA. 20+16.00 -L-
{ BRIDGE
STA. 19+66.00 -L-
W.P. #2
STA. 20+66.00 -L-
W.P. #3
28
’-2
" |
29
’-10
" |
26
’-8
" |
28
’-4
" |
EL.
2,
0
7
0 .
0
6
EL.
2,
0
6
8.
0
6
EL.
2,
0
6
5.
9
2
EL.
2,
0
6
7.
9
2
STA. 21+66.00 -L-
W.P. #4
FILL FACE @ END BENT 2
PLAN
ALL BENTS ARE PARALLEL
PILES NOT SHOWN FOR CLARITY
TO CURVE)
(TANGENT
12000’00"
(TYP.)
STEEL PILES
HP 12 X 53
GRADE TO DRAIN
GRADE TO DRAIN
UTILITY PLANS)
(TO REMAIN, SEE
8" ~ SEWER LINE
UTILITY PLANS)
OR REMOVED, SEE
(TO BE RELOCATED
8" ~ SEWER LINE
(1940)
EL. 2,075
HIGH W.S.
(Q100) 2,072
W.S. EL.
PAD
DISSIPATOR
DECK DRAIN
PAD
DISSIPATOR
DECK DRAIN
N.W.S. EL. 2,053
TO
SR
1732
+50 19+00 +50 20+00 +50 21+00 +5018+00 F.A. PROJECT NO. : BRZ-1002(13)
END BENT 1
FILL FACE @
END BENT 2
FILL FACE @
NORTH
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
DEPARTMENT OF TRANSPORTATION
1
2
3
4
STATION:
COUNTY
PROJECT NO.
I
C
A
E
n
g
i
n
e
e
r
i
n
g
f
/
k
/
a
F
lo
r
e
n
c
e
&
H
u
t
c
h
e
s
o
n
,
I
n
c
.
V
:
\
S
t
r
u
c
t
u
r
e
s
\
S
t
r
u
c
t
u
r
e
_
D
e
s
i
g
n
\
T
I
P
\
B
-
4
1
5
9
_
J
a
c
k
s
o
n
_
1
0
8
\
P
la
n
s
\
P
r
e
l
i
m
i
n
a
r
y
\
s
1
_
B
-
4
1
5
9
_
s
d
_
g
d
.
d
g
n
1
1
/
1
/
2
0
1
3
S-1
20+16.00 -L-
B-4159
DRAWN BY :
CHECKED BY :
DATE :
DATE :
T. E. TALLMAN DATE :DESIGN ENGINEER OF RECORD:
D. H. CARTER S-1NOV 2013
NC License No: F-0258
Engineering
f/k/a Florence & Hutcheson, Inc.
REPLACES BRIDGE NO. 108
4
JACKSON
NOV 2013
NOV 2013
PRELIMINARY
GENERAL DRAWING
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
K. M. MOBLEY
BETWEEN SR 1336 AND SR 1732
TUCKASEGEE RIVER ON SR 1002
FOR BRIDGE OVER
TSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY
P
L
A
N
V
I
E
W
G
R
A
P
H
I
C
S
C
A
L
E
0
’
1
0
0
’
2
0
0
’
3
0
0
’
1
0
0
’
NAD 83/95
NC GRID
S
c
a
l
e
:
1
"
=
5
0
’
shown in pla
n
v
i
e
w
f
o
r
c
l
a
r
i
t
y
.
Excavation s
h
o
w
n
i
n
p
r
o
f
i
l
e
v
i
e
w
i
s
n
o
t
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
P
e
r
m
i
t
D
r
a
w
i
n
g
B
l
o
w
u
p
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
B
-
4
1
5
9
PHASE 1B TEMP. WORK PADPHASE 1B TEMP. WORK PAD
S
H
E
E
T
_
_
O
F
_
_
P
E
R
M
I
T
D
R
A
W
I
N
G
5
1
1
D
I
15
" RC
P
-III
B
Y
H
Y
D
R
O
1
8
"
C
M
P
L
O
C
A
T
E
D
18" CM
P
RETAIN
24" RCP-III
2
G
I
2
G
I
24" RCP-III
2GI
RC
P-I
V 15"
RCP-III 18"& 24" RCP/
C
M
P
REMOVE DI
’
S
D
E
C
K
D
R
A
I
N
D
I
S
S
I
P
A
T
O
R
P
A
D
S
E
E
D
E
T
A
I
L
D
CFF
F
F
C
C
C
CF
C
F
F
C
CFFF
C
F
LTGR BSTCONC1SBLKBUS
L
T
MT
L
S
DKBSTGR GRDI
D
I
L
T
MTL
CON
C
2
S
B
L
K
A
P
T
3
S
F
A
P
T
GR
B
S
T
2
S
F
A
P
T
DKTWALL108" BLK GAS TANKSCONC W/ UG CONC ISL
S
T
E
P
S
W
D
S
T
E
P
S
WD
BLK WALL48" - 108" 7 ABANDON8911 12
1
3
1
4
15
16
26
2
9
B
LK
WA
LL
CONC LT CANOPYWD W/LT
W
/
C
A
T
V
DK
W/C
A
T
V
B
S
T
W/L
T
24" RCP
2
4
" C
M
P
1SB
K
B
U
S
W
/
C
A
T
V
W/C
AT
V
W
/
C
A
T
V
GR
8"
DIP
S
R
10
02
T
8"
DIP
1"
P
L
A
S
TI
C
12
" D
IP
12
"
D
I
P
4
" S
T
E
E
L
12" DIP12" DIP (RAW)6" DIPCONC. WATER VAULT
2"
P
L
A
S
TI
C
C
A
T
V
W/
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
ELL
M
ONI
T
O
R
2" PLASTIC AZTEC DRIVEELEV.=2076.3
7
’
E
L
E
V
.=
2
0
7
6
.5
8
’
18’
BS
T
SP
IK
E
R
/REIP
EIP
DK
B
A
S
E
M
E
N
T
2
S
B
K
D
W
/
S
3
S
B
K
A
P
T
SR 1335
1
S
F
B
U
S
WD36"(RAW)12" DIP
E
DG
E
W
AT
E
R
R
OAD
S
R
17
3
2
BUS/APT3SBK
PK
N
A
IL
PK NAIL
WCR WCRWCR
5
5
.
0
0
’
3
5
.
0
0
’
+
9
0
.
0
0
-
L
-
+
3
5
.
0
0
-
D
R
1
-
20
5
0
2
0
5
0
2
0
5
0
2050
2055
20
55
20
5
5
2055
2055
2060
20
6
0
2060
2060
2060
2060
2060
206
0
20
6
0
2060
2065
2 065
2065
20
6
5
20
65
2070
2
0
7
0
2
0
7
0
2070
2070
2075
2075
2
0
7
5
2075
2
0
7
5
2
0
7
5
2075
2
0
7
5
2080 2080 2080 2080
2
0
8
0
2
0
8
0
2085 2090 209521002105
T
B
T
B
TB
T
B
TB
TB
T
B
TB
T
U
C
K
ASE
GEE
RI
VE
R
TYPE-
I
I
I
TYPE-I
I
I
TY
P
E
-
I
I
I
TYP
E TL
-
2
TYPE
TL
-
2
TYPE TL-2TYPE-IIITYPE TL-2
TES
TES
GRAU 350 TL-2
R
IV
E
R
T
U
C
KA
S
E
G
E
E
LINE
CONTROL
BENT 1
-L-
VERTICAL GRADE DATA -L-
(-)8.2138%(-)0.4017%
VC = 380’
ELEV. = 2,080.04
P.I. = 16+39.50 -L-
R
T
L
D
P.I.
HORIZONTAL CURVE DATA -L-
= 831.00’
= 1,387.09’
= 1,713.59’
= 653’41.3"
= 11808’55.9" (RT)
= 26+65.65 -L-
2,090
2,080
2,070
2,060
2,050
2,040
2,030
2,020
RIP RAP BERM
1’-7" MIN.
FILL FACE @ END BENT 1
BEGIN FRONT SLOPE
DRILLED
3’-6" ~
SECTIONS AT BENT AND END BENTS ARE AT RIGHT ANGLES
SECTION ALONG -L-
BEGIN FRONT SLOPE
GROUND
NATURAL
APPROXIMATE
STRUCTURE EXCAVATION (TYP.)
1’-6" TO UNCLASSIFIED
EXCAVATION
STRUCTURE
UNCLASSIFIED
COLUMN
3’-0" ~
RIP RAP (TYP.)
2’-0" CLASS II
W.P. #1
FILL FACE @ END BENT 1
STA. 18+66.00 -L-
(TYP.)
EXCAVATION
STRUCTURE
UNCLASSIFIED
TOP OF DRILLED PIER
TOTAL LENGTH OF BRIDGE (FROM W.P. #1 TO W.P. #4)
300’-0" (ALONG ARC)
LINE
CONTROL
BENT 2
(TYP.)
RIP RAP
CLASS II
(TYP.)
PIER
(TYP.)
STA. 18+51.13 -L-
BEGIN FRONT SLOPE
GRADE POINT EL. = 2,079.13
STA. 18+66.00 -L-
GRADE POINT EL. = 2,079.19
STA. 18+51.13 -L-
GRADE POINT EL. = 2,077.93
STA. 21+66.00 -L-
GRADE POINT EL. = 2,077.87
STA. 21+78.50 -L-
(ALONG ARC)
50’-0"
TO SR 1336
(TYP.)
STRUCTURE
EXISTING
E
L
.
2
,
0
4
8
|
E
L
.
2
,
0
7
6
|
E
L
.
2
,
0
7
5
|
E
L
.
2
,
0
7
2
|
E
L
.
2
,
0
5
0
|
E
L
.
2
,
0
6
4
|E
L
.
2
,
0
7
6
|
E
L
.
2
,
0
7
6
|
E
L
.
2
,
0
5
3
|
E
L
.
2
,
0
5
8
|
E
L
.
2
,
0
5
9
|
E
L
.
2
,
0
6
1
|
E
L
.
2
,
0
5
4
|
E
L
.
2
,
0
4
9
|
E
A
RT
H
BE
RM
1’-
0"
MI
N.
E
A
RT
H
BE
RM
1’-
0"
MI
N.
E
ART
H
BE
RM
1’-
0
"
MI
N.
E
ART
H
BE
RM
1’-
0"
MI
N.
BEGIN FRONT SLOPE
STA. 21+78.50 -L-
END BENT 1 BENT 1 BENT 2 END BENT 2
BEGIN APPROACH SLAB
STA. 18+42.31 -L-
END APPROACH SLAB
STA. 21+89.94 -L-
SPAN ‘‘C’’
100’-0" (ALONG ARC)
SPAN ‘‘B’’
100’-0" (ALONG ARC)
SPAN ‘‘A’’
100’-0" (ALONG ARC)
SHEET 1 OF 4
RI
P
RA
P
BE
RM
1’-
7"
MI
N.
RI
P
RAP
BE
RM
1’-
7"
MI
N.
RI
P
RA
P
BE
RM
1’-
7"
MI
N.
RI
P
RA
P
BE
RM
1’-
7"
MI
N.
(SR
1002
)
O
LD
CU
LL
OWHEE
ROAD
EXCAVATION
STRUCTURE
UNCLASSIFIED
EXCAVATION
STRUCTURE
UNCLASSIFIED
31
’-3
" |
27
’-9
" |
(TYP.)
NORMAL TO CAP
(
T
Y
P
.
)
1
’
-
0
"
(TYP.)
(NORMAL TO CAP)
SLOPE 1:1
EL. 2,054.50 EL. 2,054.50
SPAN A SPAN B SPAN C
(TYP.)
STRUCTURE
EXISTING
EXP.EXP.
TOP OF DRILLED PIER
(TYP.)
3’-6"
FILL FACE @ END BENT 2
EL. 2,063.5|
GREENWAY SHELFEL. 2,062.5|
GREENWAY SHELF
FIX FIX FIX FIX
EL.
2.
0
7
1.
2
5
EL.
2,
0
6
9.
2
5
EL.
2,
0
6
7.
2
1
EL.
2,
0
6
9.
2
1
33
’-11
" |
39
’-1" |
TO CURVE)
(TANGENT
13020’32"
TO CURVE)
(TANGENT
12326’51"
TO CURVE)
(TANGENT
10939’28"
TO CURVE)
(TANGENT
11633’09"
STA. 20+16.00 -L-
{ BRIDGE
STA. 19+66.00 -L-
W.P. #2
STA. 20+66.00 -L-
W.P. #3
28
’-2
" |
29
’-10
" |
26
’-8
" |
28
’-4
" |
EL.
2,
0
7
0 .
0
6
EL.
2,
0
6
8.
0
6
EL.
2,
0
6
5.
9
2
EL.
2,
0
6
7.
9
2
STA. 21+66.00 -L-
W.P. #4
FILL FACE @ END BENT 2
PLAN
ALL BENTS ARE PARALLEL
PILES NOT SHOWN FOR CLARITY
TO CURVE)
(TANGENT
12000’00"
(TYP.)
STEEL PILES
HP 12 X 53
GRADE TO DRAIN
GRADE TO DRAIN
UTILITY PLANS)
(TO REMAIN, SEE
8" ~ SEWER LINE
UTILITY PLANS)
OR REMOVED, SEE
(TO BE RELOCATED
8" ~ SEWER LINE
(1940)
EL. 2,075
HIGH W.S.
(Q100) 2,072
W.S. EL.
PAD
DISSIPATOR
DECK DRAIN
PAD
DISSIPATOR
DECK DRAIN
N.W.S. EL. 2,053
TO
SR
1732
+50 19+00 +50 20+00 +50 21+00 +5018+00 F.A. PROJECT NO. : BRZ-1002(13)
END BENT 1
FILL FACE @
END BENT 2
FILL FACE @
NORTH
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
DEPARTMENT OF TRANSPORTATION
1
2
3
4
STATION:
COUNTY
PROJECT NO.
I
C
A
E
n
g
i
n
e
e
r
i
n
g
f
/
k
/
a
F
lo
r
e
n
c
e
&
H
u
t
c
h
e
s
o
n
,
I
n
c
.
V
:
\
S
t
r
u
c
t
u
r
e
s
\
S
t
r
u
c
t
u
r
e
_
D
e
s
i
g
n
\
T
I
P
\
B
-
4
1
5
9
_
J
a
c
k
s
o
n
_
1
0
8
\
P
la
n
s
\
P
r
e
l
i
m
i
n
a
r
y
\
s
1
_
B
-
4
1
5
9
_
s
d
_
g
d
.
d
g
n
1
1
/
1
/
2
0
1
3
S-1
20+16.00 -L-
B-4159
DRAWN BY :
CHECKED BY :
DATE :
DATE :
T. E. TALLMAN DATE :DESIGN ENGINEER OF RECORD:
D. H. CARTER S-1NOV 2013
NC License No: F-0258
Engineering
f/k/a Florence & Hutcheson, Inc.
REPLACES BRIDGE NO. 108
4
JACKSON
NOV 2013
NOV 2013
PRELIMINARY
GENERAL DRAWING
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
K. M. MOBLEY
BETWEEN SR 1336 AND SR 1732
TUCKASEGEE RIVER ON SR 1002
FOR BRIDGE OVER
TSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY
P
L
A
N
V
I
E
W
G
R
A
P
H
I
C
S
C
A
L
E
0
’
1
0
0
’
2
0
0
’
3
0
0
’
1
0
0
’
NAD 83/95
NC GRID
S
c
a
l
e
:
1
"
=
5
0
’
shown in pla
n
v
i
e
w
f
o
r
c
l
a
r
i
t
y
.
Excavation s
h
o
w
n
i
n
p
r
o
f
i
l
e
v
i
e
w
i
s
n
o
t
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
P
e
r
m
i
t
D
r
a
w
i
n
g
B
l
o
w
u
p
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
B
-
4
1
5
9
PHASE 2A TEMP. WORK PAD
S
H
E
E
T
_
_
O
F
_
_
P
E
R
M
I
T
D
R
A
W
I
N
G
7
1
1
D
I
15
" RC
P
-III
B
Y
H
Y
D
R
O
1
8
"
C
M
P
L
O
C
A
T
E
D
18" CM
P
RETAIN
24" RCP-III
2
G
I
2
G
I
24" RCP-III
2GI
RC
P-I
V 15"
RCP-III 18"& 24" RCP/
C
M
P
REMOVE DI
’
S
D
E
C
K
D
R
A
I
N
D
I
S
S
I
P
A
T
O
R
P
A
D
S
E
E
D
E
T
A
I
L
D
CFF
F
F
C
C
C
CF
C
F
F
C
CFFF
C
F
LTGR BSTCONC1SBLKBUS
L
T
MT
L
S
DKBSTGR GRDI
D
I
L
T
MTL
CON
C
2
S
B
L
K
A
P
T
3
S
F
A
P
T
GR
B
S
T
2
S
F
A
P
T
DKTWALL108" BLK GAS TANKSCONC W/ UG CONC ISL
S
T
E
P
S
W
D
S
T
E
P
S
WD
BLK WALL48" - 108" 7 ABANDON8911 12
1
3
1
4
15
16
26
2
9
B
LK
WA
LL
CONC LT CANOPYWD W/LT
W
/
C
A
T
V
DK
W/C
A
T
V
B
S
T
W/L
T
24" RCP
2
4
" C
M
P
1SB
K
B
U
S
W
/
C
A
T
V
W/C
AT
V
W
/
C
A
T
V
GR
8"
DIP
S
R
10
02
T
8"
DIP
1"
P
L
A
S
TI
C
12
" D
IP
12
"
D
I
P
4
" S
T
E
E
L
12" DIP12" DIP (RAW)6" DIPCONC. WATER VAULT
2"
P
L
A
S
TI
C
C
A
T
V
W/
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
ELL
M
ONI
T
O
R
2" PLASTIC AZTEC DRIVEELEV.=2076.3
7
’
E
L
E
V
.=
2
0
7
6
.5
8
’
18’
BS
T
SP
IK
E
R
/REIP
EIP
DK
B
A
S
E
M
E
N
T
2
S
B
K
D
W
/
S
3
S
B
K
A
P
T
SR 1335
1
S
F
B
U
S
WD36"(RAW)12" DIP
E
DG
E
W
AT
E
R
R
OAD
S
R
17
3
2
BUS/APT3SBK
PK
N
A
IL
PK NAIL
WCR WCRWCR
5
5
.
0
0
’
3
5
.
0
0
’
+
9
0
.
0
0
-
L
-
+
3
5
.
0
0
-
D
R
1
-
20
5
0
2
0
5
0
2
0
5
0
2050
2055
20
55
20
5
5
2055
2055
2060
20
6
0
2060
2060
2060
2060
2060
206
0
20
6
0
2060
2065
2 065
2065
20
6
5
20
65
2070
2
0
7
0
2
0
7
0
2070
2070
2075
2075
2
0
7
5
2075
2
0
7
5
2
0
7
5
2075
2
0
7
5
2080 2080 2080 2080
2
0
8
0
2
0
8
0
2085 2090 209521002105
T
B
T
B
TB
T
B
TB
TB
T
B
TB
T
U
C
K
ASE
GEE
RI
VE
R
TYPE-
I
I
I
TYPE-I
I
I
TY
P
E
-
I
I
I
TYP
E TL
-
2
TYPE
TL
-
2
TYPE TL-2TYPE-IIITYPE TL-2
TES
TES
GRAU 350 TL-2
R
IV
E
R
T
U
C
KA
S
E
G
E
E
LINE
CONTROL
BENT 1
-L-
VERTICAL GRADE DATA -L-
(-)8.2138%(-)0.4017%
VC = 380’
ELEV. = 2,080.04
P.I. = 16+39.50 -L-
R
T
L
D
P.I.
HORIZONTAL CURVE DATA -L-
= 831.00’
= 1,387.09’
= 1,713.59’
= 653’41.3"
= 11808’55.9" (RT)
= 26+65.65 -L-
2,090
2,080
2,070
2,060
2,050
2,040
2,030
2,020
RIP RAP BERM
1’-7" MIN.
FILL FACE @ END BENT 1
BEGIN FRONT SLOPE
DRILLED
3’-6" ~
SECTIONS AT BENT AND END BENTS ARE AT RIGHT ANGLES
SECTION ALONG -L-
BEGIN FRONT SLOPE
GROUND
NATURAL
APPROXIMATE
STRUCTURE EXCAVATION (TYP.)
1’-6" TO UNCLASSIFIED
EXCAVATION
STRUCTURE
UNCLASSIFIED
COLUMN
3’-0" ~
RIP RAP (TYP.)
2’-0" CLASS II
W.P. #1
FILL FACE @ END BENT 1
STA. 18+66.00 -L-
(TYP.)
EXCAVATION
STRUCTURE
UNCLASSIFIED
TOP OF DRILLED PIER
TOTAL LENGTH OF BRIDGE (FROM W.P. #1 TO W.P. #4)
300’-0" (ALONG ARC)
LINE
CONTROL
BENT 2
(TYP.)
RIP RAP
CLASS II
(TYP.)
PIER
(TYP.)
STA. 18+51.13 -L-
BEGIN FRONT SLOPE
GRADE POINT EL. = 2,079.13
STA. 18+66.00 -L-
GRADE POINT EL. = 2,079.19
STA. 18+51.13 -L-
GRADE POINT EL. = 2,077.93
STA. 21+66.00 -L-
GRADE POINT EL. = 2,077.87
STA. 21+78.50 -L-
(ALONG ARC)
50’-0"
TO SR 1336
(TYP.)
STRUCTURE
EXISTING
E
L
.
2
,
0
4
8
|
E
L
.
2
,
0
7
6
|
E
L
.
2
,
0
7
5
|
E
L
.
2
,
0
7
2
|
E
L
.
2
,
0
5
0
|
E
L
.
2
,
0
6
4
|E
L
.
2
,
0
7
6
|
E
L
.
2
,
0
7
6
|
E
L
.
2
,
0
5
3
|
E
L
.
2
,
0
5
8
|
E
L
.
2
,
0
5
9
|
E
L
.
2
,
0
6
1
|
E
L
.
2
,
0
5
4
|
E
L
.
2
,
0
4
9
|
E
A
RT
H
BE
RM
1’-
0"
MI
N.
E
A
RT
H
BE
RM
1’-
0"
MI
N.
E
ART
H
BE
RM
1’-
0
"
MI
N.
E
ART
H
BE
RM
1’-
0"
MI
N.
BEGIN FRONT SLOPE
STA. 21+78.50 -L-
END BENT 1 BENT 1 BENT 2 END BENT 2
BEGIN APPROACH SLAB
STA. 18+42.31 -L-
END APPROACH SLAB
STA. 21+89.94 -L-
SPAN ‘‘C’’
100’-0" (ALONG ARC)
SPAN ‘‘B’’
100’-0" (ALONG ARC)
SPAN ‘‘A’’
100’-0" (ALONG ARC)
SHEET 1 OF 4
RI
P
RA
P
BE
RM
1’-
7"
MI
N.
RI
P
RAP
BE
RM
1’-
7"
MI
N.
RI
P
RA
P
BE
RM
1’-
7"
MI
N.
RI
P
RA
P
BE
RM
1’-
7"
MI
N.
(SR
1002
)
O
LD
CU
LL
OWHEE
ROAD
EXCAVATION
STRUCTURE
UNCLASSIFIED
EXCAVATION
STRUCTURE
UNCLASSIFIED
31
’-3
" |
27
’-9
" |
(TYP.)
NORMAL TO CAP
(
T
Y
P
.
)
1
’
-
0
"
(TYP.)
(NORMAL TO CAP)
SLOPE 1:1
EL. 2,054.50 EL. 2,054.50
SPAN A SPAN B SPAN C
(TYP.)
STRUCTURE
EXISTING
EXP.EXP.
TOP OF DRILLED PIER
(TYP.)
3’-6"
FILL FACE @ END BENT 2
EL. 2,063.5|
GREENWAY SHELFEL. 2,062.5|
GREENWAY SHELF
FIX FIX FIX FIX
EL.
2.
0
7
1.
2
5
EL.
2,
0
6
9.
2
5
EL.
2,
0
6
7.
2
1
EL.
2,
0
6
9.
2
1
33
’-11
" |
39
’-1" |
TO CURVE)
(TANGENT
13020’32"
TO CURVE)
(TANGENT
12326’51"
TO CURVE)
(TANGENT
10939’28"
TO CURVE)
(TANGENT
11633’09"
STA. 20+16.00 -L-
{ BRIDGE
STA. 19+66.00 -L-
W.P. #2
STA. 20+66.00 -L-
W.P. #3
28
’-2
" |
29
’-10
" |
26
’-8
" |
28
’-4
" |
EL.
2,
0
7
0 .
0
6
EL.
2,
0
6
8.
0
6
EL.
2,
0
6
5.
9
2
EL.
2,
0
6
7.
9
2
STA. 21+66.00 -L-
W.P. #4
FILL FACE @ END BENT 2
PLAN
ALL BENTS ARE PARALLEL
PILES NOT SHOWN FOR CLARITY
TO CURVE)
(TANGENT
12000’00"
(TYP.)
STEEL PILES
HP 12 X 53
GRADE TO DRAIN
GRADE TO DRAIN
UTILITY PLANS)
(TO REMAIN, SEE
8" ~ SEWER LINE
UTILITY PLANS)
OR REMOVED, SEE
(TO BE RELOCATED
8" ~ SEWER LINE
(1940)
EL. 2,075
HIGH W.S.
(Q100) 2,072
W.S. EL.
PAD
DISSIPATOR
DECK DRAIN
PAD
DISSIPATOR
DECK DRAIN
N.W.S. EL. 2,053
TO
SR
1732
+50 19+00 +50 20+00 +50 21+00 +5018+00 F.A. PROJECT NO. : BRZ-1002(13)
END BENT 1
FILL FACE @
END BENT 2
FILL FACE @
NORTH
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
DEPARTMENT OF TRANSPORTATION
1
2
3
4
STATION:
COUNTY
PROJECT NO.
I
C
A
E
n
g
i
n
e
e
r
i
n
g
f
/
k
/
a
F
lo
r
e
n
c
e
&
H
u
t
c
h
e
s
o
n
,
I
n
c
.
V
:
\
S
t
r
u
c
t
u
r
e
s
\
S
t
r
u
c
t
u
r
e
_
D
e
s
i
g
n
\
T
I
P
\
B
-
4
1
5
9
_
J
a
c
k
s
o
n
_
1
0
8
\
P
la
n
s
\
P
r
e
l
i
m
i
n
a
r
y
\
s
1
_
B
-
4
1
5
9
_
s
d
_
g
d
.
d
g
n
1
1
/
1
/
2
0
1
3
S-1
20+16.00 -L-
B-4159
DRAWN BY :
CHECKED BY :
DATE :
DATE :
T. E. TALLMAN DATE :DESIGN ENGINEER OF RECORD:
D. H. CARTER S-1NOV 2013
NC License No: F-0258
Engineering
f/k/a Florence & Hutcheson, Inc.
REPLACES BRIDGE NO. 108
4
JACKSON
NOV 2013
NOV 2013
PRELIMINARY
GENERAL DRAWING
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
K. M. MOBLEY
BETWEEN SR 1336 AND SR 1732
TUCKASEGEE RIVER ON SR 1002
FOR BRIDGE OVER
TSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY
P
L
A
N
V
I
E
W
G
R
A
P
H
I
C
S
C
A
L
E
0
’
1
0
0
’
2
0
0
’
3
0
0
’
1
0
0
’
NAD 83/95
NC GRID
S
c
a
l
e
:
1
"
=
5
0
’
shown in pla
n
v
i
e
w
f
o
r
c
l
a
r
i
t
y
.
Excavation s
h
o
w
n
i
n
p
r
o
f
i
l
e
v
i
e
w
i
s
n
o
t
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
P
e
r
m
i
t
D
r
a
w
i
n
g
B
l
o
w
u
p
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
B
-
4
1
5
9
PHASE 2B TEMP. WORK PADPHASE 2B TEMP. WORK PAD
S
H
E
E
T
_
_
O
F
_
_
P
E
R
M
I
T
D
R
A
W
I
N
G
9
1
1
D
I
15
" RC
P
-III
B
Y
H
Y
D
R
O
1
8
"
C
M
P
L
O
C
A
T
E
D
18" CM
P
RETAIN
24" RCP-III
2
G
I
2
G
I
24" RCP-III
2GI
RC
P-I
V 15"
RCP-III 18"& 24" RCP/
C
M
P
REMOVE DI
’
S
D
E
C
K
D
R
A
I
N
D
I
S
S
I
P
A
T
O
R
P
A
D
S
E
E
D
E
T
A
I
L
D
CFF
F
F
C
C
C
CF
C
F
F
C
CFFF
C
F
LTGR BSTCONC1SBLKBUS
L
T
MT
L
S
DKBSTGR GRDI
D
I
L
T
MTL
CON
C
2
S
B
L
K
A
P
T
3
S
F
A
P
T
GR
B
S
T
2
S
F
A
P
T
DKTWALL108" BLK GAS TANKSCONC W/ UG CONC ISL
S
T
E
P
S
W
D
S
T
E
P
S
WD
BLK WALL48" - 108" 7 ABANDON8911 12
1
3
1
4
15
16
26
2
9
B
LK
WA
LL
CONC LT CANOPYWD W/LT
W
/
C
A
T
V
DK
W/C
A
T
V
B
S
T
W/L
T
24" RCP
2
4
" C
M
P
1SB
K
B
U
S
W
/
C
A
T
V
W/C
AT
V
W
/
C
A
T
V
GR
8"
DIP
S
R
10
02
T
8"
DIP
1"
P
L
A
S
TI
C
12
" D
IP
12
"
D
I
P
4
" S
T
E
E
L
12" DIP12" DIP (RAW)6" DIPCONC. WATER VAULT
2"
P
L
A
S
TI
C
C
A
T
V
W/
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
ELL
M
ONI
T
O
R
2" PLASTIC AZTEC DRIVEELEV.=2076.3
7
’
E
L
E
V
.=
2
0
7
6
.5
8
’
18’
BS
T
SP
IK
E
R
/REIP
EIP
DK
B
A
S
E
M
E
N
T
2
S
B
K
D
W
/
S
3
S
B
K
A
P
T
SR 1335
1
S
F
B
U
S
WD36"(RAW)12" DIP
E
DG
E
W
AT
E
R
R
OAD
S
R
17
3
2
BUS/APT3SBK
PK
N
A
IL
PK NAIL
WCR WCRWCR
5
5
.
0
0
’
3
5
.
0
0
’
+
9
0
.
0
0
-
L
-
+
3
5
.
0
0
-
D
R
1
-
20
5
0
2
0
5
0
2
0
5
0
2050
2055
20
55
20
5
5
2055
2055
2060
20
6
0
2060
2060
2060
2060
2060
206
0
20
6
0
2060
2065
2 065
2065
20
6
5
20
65
2070
2
0
7
0
2
0
7
0
2070
2070
2075
2075
2
0
7
5
2075
2
0
7
5
2
0
7
5
2075
2
0
7
5
2080 2080 2080 2080
2
0
8
0
2
0
8
0
2085 2090 209521002105
T
B
T
B
TB
T
B
TB
TB
T
B
TB
T
U
C
K
ASE
GEE
RI
VE
R
TYPE-
I
I
I
TYPE-I
I
I
TY
P
E
-
I
I
I
TYP
E TL
-
2
TYPE
TL
-
2
TYPE TL-2TYPE-IIITYPE TL-2
TES
TES
GRAU 350 TL-2
TSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY
P
L
A
N
V
I
E
W
G
R
A
P
H
I
C
S
C
A
L
E
0
’
1
0
0
’
2
0
0
’
3
0
0
’
1
0
0
’
NAD 83/95
NC GRID
S
c
a
l
e
:
1
"
=
5
0
’
shown in pla
n
v
i
e
w
f
o
r
c
l
a
r
i
t
y
.
Excavation s
h
o
w
n
i
n
p
r
o
f
i
l
e
v
i
e
w
i
s
n
o
t
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
P
e
r
m
i
t
D
r
a
w
i
n
g
B
l
o
w
u
p
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
B
-
4
1
5
9
TEMPORARY IMPACTS TOTAL COMBINEDTEMPORARY IMPACTS TOTAL COMBINED
S
H
E
E
T
_
_
O
F
_
_
P
E
R
M
I
T
D
R
A
W
I
N
G
1
0
1
1
D
I
15
" RC
P
-III
B
Y
H
Y
D
R
O
1
8
"
C
M
P
L
O
C
A
T
E
D
18" CM
P
RETAIN
24" RCP-III
2
G
I
2
G
I
24" RCP-III
2GI
RC
P-I
V 15"
RCP-III 18"& 24" RCP/
C
M
P
REMOVE DI
’
S
D
E
C
K
D
R
A
I
N
D
I
S
S
I
P
A
T
O
R
P
A
D
S
E
E
D
E
T
A
I
L
D
CFF
F
F
C
C
C
CF
C
F
F
C
CFFF
C
F
LTGR BSTCONC1SBLKBUS
L
T
MT
L
S
DKBSTGR GRDI
D
I
L
T
MTL
CON
C
2
S
B
L
K
A
P
T
3
S
F
A
P
T
GR
B
S
T
2
S
F
A
P
T
DKTWALL108" BLK GAS TANKSCONC W/ UG CONC ISL
S
T
E
P
S
W
D
S
T
E
P
S
WD
BLK WALL48" - 108" 7 ABANDON8911 12
1
3
1
4
15
16
26
2
9
B
LK
WA
LL
CONC LT CANOPYWD W/LT
W
/
C
A
T
V
DK
W/C
A
T
V
B
S
T
W/L
T
24" RCP
2
4
" C
M
P
1SB
K
B
U
S
W
/
C
A
T
V
W/C
AT
V
W
/
C
A
T
V
GR
8"
DIP
S
R
10
0
2
T
8"
DIP
1"
P
L
A
S
TI
C
12
" D
IP
12
"
D
I
P
4
" S
T
E
E
L
12" DIP12" DIP (RAW)6" DIPCONC. WATER VAULT
2"
P
L
A
S
TI
C
C
A
T
V
W/
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
ELL
M
ONI
T
O
R
2" PLASTIC AZTEC DRIVEELEV.=2076.3
7
’
E
L
E
V
.=
2
0
7
6
.5
8
’
18’
BS
T
SP
IK
E
R
/REIP
EIP
DK
B
A
S
E
M
E
N
T
2
S
B
K
D
W
/
S
3
S
B
K
A
P
T
SR 1335
1
S
F
B
U
S
WD36"(RAW)12" DIP
E
DG
E
W
AT
E
R
R
OAD
S
R
17
3
2
BUS/APT3SBK
P
K
N
A
IL
PK NAIL
WCR WCRWCR
5
5
.
0
0
’
3
5
.
0
0
’
+
9
0
.
0
0
-
L
-
+
3
5
.
0
0
-
D
R
1
-
205
0
2
0
5
0
2
0
5
0
2050
2055
2055
205
5
2
05
5
2055
2
0
60
2060
20
60
2060
206
0
2060
2060
206
0
20
60
2060
2065
2065
2065
20
6
5
2065
2070
2
0
7
0
2
0
7
0
2070
2070
2075
2075
2
0
7
5
2075
2
0
7
5
2
0
7
5
2075
2
0
7
5
2080 2080 20 80 2080
2
0
8
0
2
0
8
0
2085 2090 209521002105
T
B
TB
TB
T
B
TB
TB
T
B
TB
T
U
C
K
ASE
GEE
RI
VE
R
TYP
E-
I
I
I
TYP
E-I
I
I
TY
P
E
-
I
I
I
TYPE TL
-
2
TYPE
TL
-
2
TYPE TL-2TYPE-IIITYPE TL-2
TES
TES
GRAU 350 TL-2
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design
(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft)
1 20+07/20+68 -L-Temp Workpad 1A 0.04
1 18+87/20+70 -L-Temp Workpad 1B 0.08
1 20+14/20+86 -L-Temp Workpad 2A 0.05
1 19+45/20+86 -L-Temp Workpad 2B 0.08
1 18+87/20+86 -L-Bank Stabilization 185
TOTALS:0.19 185
ATN Revised 3/31/05 SHEET 11 4/30/2014
JACKSON COUNTY
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
WBS - 35507.1.1 (B-4159)
WETLAND PERMIT IMPACT SUMMARY
SURFACE WATER IMPACTSWETLAND IMPACTS
NOTE: Interior bent of existing bridge to be removed NOTE: Project will be constructed using a series of workpads. Total impacts shown accounts for overlapping of workpads between different
phases of staged construction.
NOTE: Total Bent Impacts: 11,084 in2 < 0.01 acres for all permanent bents
NOTE: Bank Stabilization impacts included within temporary impacts shown.
DHV
D
T
V
=
=
=
=
=
=
%
%
M PH
ADT
ADT
% *
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
FUN C CLASS =
0
0
0
PRO FILE (HO RIZON TAL)
PROJECT LENGTH
RIGH T OF W AY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
D ESIGN DATA Prepared in the Office of:
SIGNATU RE:
SIGNATU RE:
P.E.
P.E.
D IVISION OF H IGH W AYS
PROJECT ENGINEER
PROJECT D ESIGN ENGINEER
GRAPH IC SCALES
C
2
0
3
4
9
8
PLAN S
PRO FILE (VERTICAL)
HYD RAU LICS ENGINEER
ENGINEER
ROAD W AY D ESIGN
LOCATION:
TYPE OF W ORK :
0
9
/
0
8
/
9
9
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
See Sheet 1-A For Index of Sheets
1
0
-
A
P
R
-
2
0
1
4
0
8
:
2
9
R
:
\
R
o
a
d
w
a
y
\
P
r
o
j
\
A
l
t
1
_
P
r
e
f
e
r
r
e
d
\
b
4
1
5
9
_
r
d
y
_
t
s
h
.
d
g
n
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
1000 B irch R idge D r., R aleigh N C , 27610
C
O
N
T
R
A
C
T
:
T
I
P
P
R
O
J
E
C
T
:
D
E
P
A
R
T
MEN
T
O
F T R A N S PORTA
T
I
O
N
S
T
A TEOFNORT
H
C AR
O
LI
N
A
JACK SON COUN TY
AND STRU CTU RE
DECEM BER 16, 2014
TONY HOUSER, P.E.
LEE ANN M OO RE
LENG TH O F ROADW AY TIP PRO JECT B-4159 = 0.237 M ILES
LENG TH O F STRUCTURE TIP PRO JECT B-4159 = 0.057 M ILES
TO TAL LENG TH O F TIP PRO JECT B-4159 = 0.294 M ILES
50 25 50 100
50 25 50 100
10 5 10 20
2012
2032
10
60
5
40
DUAL 3* TTST 2
B
-
4
1
5
9
B-4159
4
FOR BRIDGE PROJECTS
THE SUB REGIONAL TIER GUIDELINES
THIS PROJECT W AS DESIGNED USING
VICIN ITY M AP SHO W ING LO CATION O F PRO JECT B-4159
See Sheet 1-B For Conventional Symbols
33507.1.1 BRZ-1002(13)PE
GRAD ING, PAVING, D RAINAGE
RURAL CO LLECTO R
-L- POT STA. 14+25.00
BEGIN TIP PROJECT B-4159
-L- POT STA. 29+75.00
END TIP PROJECT B-4159
-L- POT STA. 21+66.00
END BRIDGE
C
A
R
O
LI
N
A
U
N
I
V
E
R
SI
T
Y
T
O
W
E
S
T
E
R
N
T
O
S
Y
L
V
A
-L-
SR 1002 O L D C U L L O W
H EE R OAD
S
R
17
3
2
E
D
GE
WAT
E
R
R
OA
D
SR 1336 M
ON TEITH GAP ROAD
S
R
116
9
C
E
N
TR
A
L
D
RI
V
E
T
U
C
K
AS
E
GE
E
R
IVE
R
PRO JECT
BEG IN
PRO JECT
END
-Y1-
-Y2--
D
R
1-
-L- POT STA. 18+66.00
BEGIN BRIDGE
BRIDGE NO. 108 OVER TH E TU CKASEGEE RIVER
ON SR 1002 (OLD CU LLOW H EE RD .)
TO N C 107
NOVEM BER 22, 2013
2012 STANDARD SPECIFICATIONS
%%
15,400
9,800
BRZ-1002(13)33507.2.1 RO W & UTIL
THERE IS NO CONTROL OF ACCESS ON THIS PROJECT
CLEARING ON THIS PROJECT SHALL BE PERFORM ED TO THE LIM ITS ESTABLISHED BY M ETHOD II
(107
(107 Cullowhee
W estern
Carolina
University
W
ayehutta
T
uc
kase
ge
e
River
Branch
R
o
g
er
R d.
H
olly
H
i
l
l
s
Rd.
Holly
HillsRd.
Rd.
River
1002
1733
1732
1002
1002
1732
OldCullowheeRd.
1336
Existing Edge of Pavem ent
Existing Curb
Proposed Slope Stakes Cut
Proposed Slope Stakes Fill
Existing M etal G uardrail
Existing Cable G uiderail
Proposed G uardrail
Equality Sym bol
Pavem ent Rem oval
Baseline Control Point
RIGH T OF W AY:
Existing Right of W ay M arker
Existing Right of W ay Line
h
Existing Control of Access
Proposed Control of Access
Proposed Right of W ay Line
C
F
Existing Easem ent Line
Proposed Tem porary Construction Easem ent
Proposed Tem porary Drainage Easem ent
Proposed Perm anent Drainage Easem ent
Proposed Perm anent Utility Easem ent
HYD ROLOGY:
Stream or Body of W ater
Hydro, Pool or Reservoir
Flow Arrow
Disappearing Stream
Spring
;
z
v
W
K
Proposed Lateral, Tail, Head Ditch
False Sum p
Proposed Cable G uiderail
M AJO R:
Bridge, Tunnel or Box Culvert
Bridge W ing W all, Head W all and End W all
M INO R:
Head and End W all
Pipe Culvert
Footbridge
Paved Ditch G utter
U TILITIES:
ROAD S AND RELATED FEATU RES:
Existing Power Pole
Proposed Power Pole
P
U/G Power Cable Hand Hole
Power M anhole
Power Line Tower
Power Transform er
Existing Joint Use Pole
Proposed Joint Use Pole
Existing Telephone Pole
Proposed Telephone Pole
Telephone M anhole
Telephone Booth
Telephone Pedestal
U/G Telephone Cable Hand Hole
R
}
T
p
Q
l
e
]
/
b
H-Fram e Pole O O
PO W ER:
TELEPHON E:
Telephone Cell Tower
Recorded U/G Power Line
Recorded U/G Telephone Cable
Designated U/G Telephone Cable (S.U.E.*)
Recorded U/G Telephone Conduit
Designated U/G Telephone Conduit (S.U.E.*)
Recorded U/G Fiber O ptics Cable
W ATER:
W ater M anhole
W ater M eter
W ater Valve
W ater Hydrant
Recorded U/G W ater Line
4
I
H
a
TV:
TV Satellite Dish
TV Pedestal
TV Tower
U/G TV Cable Hand Hole
Recorded U/G TV Cable
Recorded U/G Fiber O ptic Cable
Designated U/G Fiber O ptic Cable (S.U.E.*)
r
|
I
]
GAS:
G as Valve
G as M eter
Recorded U/G G as Line
n
c
SAN ITARY SEW ER:
Sanitary Sewer M anhole
Sanitary Sewer Cleanout
U/G Sanitary Sewer Line
Recorded SS Forced M ain Line
Designated SS Forced M ain Line (S.U.E.*)
d
o
A/G Water
Above G round G as Line
A/G Gas
Above G round W ater Line
Above G round Sanitary Sewer A/G Sanitary Sew er
M ISCELLAN EOUS:
Utility Pole O
F
S
3
Utility Pole with Base
Utility Located O bject
Utility Traffic Signal Box
Utility Unknown U/G Line
?
CONC
CONC WW
v
v
Drainage Box: Catch Basin, DI or JB
Storm Sewer
Storm Sewer M anhole m
U/G Tank; W ater, G as, O il
A/G Tank; W ater, G as, O il
BOU NDARIES AND PROPERTY:
State Line
County Line
Township Line
City Line
Reservation Line
Property Line
Existing Iron Pin
Property Corner
Property M onum ent
Existing Fence Line
Proposed W oven W ire Fence
Proposed Chain Link Fence
Proposed Barbed W ire Fence
g
F
123
Existing W etland Boundary
Proposed W etland Boundary
Existing Endangered Anim al Boundary
Existing Endangered Plant Boundary
BU ILD INGS AND OTH ER CU LTU RE:
Area O utline
G as Pum p Vent or U/G Tank Cap
Church
School
Dam
Sign
Sm all M ine
W ell
V
M
WW
S
x
Foundation
S
Building
y
y
VEGETATION:
Single Tree X
Y
Vineyard
Single Shrub
Hedge
W oods Line
O rchard
Vineyard
RAILROAD S:
Standard G auge
RR Signal M ilepost
Switch
RR Abandoned
RR Dism antled
S
FLOW
Designated U/G Power Line (S.U.E.*)
Designated U/G Fiber O ptics Cable (S.U.E.*)
Designated U/G W ater Line (S.U.E.*)
Designated U/G TV Cable (S.U.E.*)
Designated U/G G as Line (S.U.E.*)
U/G Test Hole (S.U.E.*)
*S.U .E. = Subsurface U tility Engineering
WLB
EIP B
ECM
CONC HW
CB
CSX TRANSPORTATION
MILEPOST 35
SWITCH
Cem etery
EXISTING STRU CTU RES:
Parcel / Sequence N um ber
E
AATUR
End of Inform ation E.O .I.
Note: Not to Scale
SHEET NO .PRO JECT REFERENCE NO .
1-BB-4159
Abandoned According to Utility Records
WLB
EAB
EPB
R
W
R
W
R
W
C
A
E
TDE
PDE
PUE
S
P
P
T
T
TC
TC
T FO
T FO
W
W
TV
TV
TV FO
TV FO
G
G
SS
FSS
FSS
?UTL
Jurisdictional Stream JS
0
4
/
1
6
/
1
1
Buffer Zone 1
Buffer Zone 2
BZ 1
BZ 2
W etland
Proposed Perm anent Easem ent with
Iron Pin and Cap M arker
Proposed Tem porary Utility Easem ent TUE
Iron Pin and Cap M arker
Proposed Right of W ay Line with
DUEProposed Perm anent Drainage / Utility Easem ent
AUEProposed Aerial Utility Easem ent
CRProposed Curb Ram p
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
CONVEN TIONAL PLAN SHEET SYM BO LS
Underground Storage Tank, Approx. Loc.
G eoenvironm ental Boring
UST
Known Soil Contam ination: Area or Site
Potential Soil Contam ination: Area or Site
Concrete or G ranite R/W M arker
Proposed Right of W ay Line with
C
A Concrete C/A M arker
Proposed Control of Access Line with
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
$
$
$
$
$
$
S
Y
S
T
IM
E
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
D
G
N
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
U
S
E
R
N
A
M
E
$
$
$
$
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.5
/
1
4
/
9
9 SHEET NO.PROJECT REFERENCE NO.
4B-4159
TRAFFIC DIAGRAM
TRAFFIC DIAGRAM
-L-
-Y1-
OLD CULLOWHEE RD
2012 ADT
2032 ADT
300
500
5,100
8,100
6,300
9,900
2012 ADT
2032 ADT
-Y2-
-L-
OLD CULLOWHEE RD
6,800
10,900
6,300
9,900
9,800
15,400
5,200
8,200
1,700
2,700
1,800
2,800
1,500
2,400
EDGEWATER RD (SR 1732)
(SR 1336)
MONTEITH GAP RD
RE
V
IS
IO
N
S
(
R
E
V
IS
IO
N
4
)
,
P
A
R
C
E
L
N
O
.
13
,
B
O
B
W
H
E
A
T
L
E
Y
,
&
P
A
R
C
E
L
N
O
.
17
,
J
E
D
A
.
H
A
L
E
Y
,
P
R
O
P
O
S
E
D
A
E
R
IA
L
U
T
IL
IT
Y
E
A
S
E
M
E
N
T
(
A
U
E
)
W
A
S
R
E
M
O
V
E
D
R
IG
H
T
O
F
W
A
Y
R
E
V
IS
IO
N
0
4
/
0
7
/
2
0
1
4
(
R
IS
V
IS
IO
N
2
)
,
P
A
R
C
E
L
N
O
.
8
,
C
O
N
S
O
L
ID
A
T
E
D
P
R
O
P
E
R
T
Y
S
E
R
V
IC
E
,
IN
C
,
B
A
R
R
IC
A
D
E
W
A
S
M
O
V
E
D
T
O
P
R
O
V
ID
E
A
C
C
E
S
S
T
O
P
R
O
P
E
R
T
Y
(
R
IS
V
IS
IO
N
1)
,
P
A
R
C
E
L
N
O
.
3
,
K
O
K
O
P
E
L
L
I V
IL
L
A
G
E
,
L
L
C
,
P
E
R
M
A
N
E
N
T
U
T
IL
IT
Y
E
A
S
E
M
E
N
T
(
P
U
E
)
W
A
S
C
H
A
N
G
E
T
O
T
E
M
P
O
R
A
R
Y
U
T
IL
IT
Y
E
A
S
E
M
E
N
T
(
T
U
E
)
(
R
E
V
IS
IO
N
3
)
,
P
A
R
C
E
L
N
O
.
10
,
L
O
J
U
A
N
&
M
A
R
IO
N
C
O
O
P
E
R
,
P
D
E
A
D
D
E
D
T
O
E
N
D
O
F
E
X
IS
T
IN
G
18
"
C
M
P
T
O
B
E
R
E
T
A
IN
E
D
,
T
C
E
A
D
D
E
D
T
O
S
O
U
T
H
S
ID
E
O
F
S
R
17
3
2
.
(
R
E
V
IS
IO
N
5
)
,
P
A
R
C
E
L
N
O
.
2
5
,
S
T
A
T
E
O
F
N
C
,
E
X
IS
T
.
M
A
IN
T
A
IN
E
D
R
/
W
A
D
D
E
D
T
O
S
R
17
3
2
F
O
R
P
R
O
P
O
S
E
D
R
/
W
&
E
A
S
E
M
E
N
T
T
IE
S
,
P
D
E
A
D
D
E
D
T
O
E
N
D
O
F
3
0
"
R
C
P
#
0
4
1
9
,
T
C
E
A
D
D
E
D
T
O
S
O
U
T
H
S
ID
E
O
F
S
R
17
3
2
v
v
v
v
DI
1S
F
D
C
O
N
C
CONC
T
A
N
K
A/
G
DE
CK
W
D
G R
S
BLK WALL
GR
CONC
BST
48" BLK WALL
2SBKD
C
O
N
C
10
’ GR
DK
T
2S
BL
K/FB
US
LT
GR
GR
1SBLKBUS
BST
CON
C 1SBLKBUS
LTMTL S
DK
DK
BST
GR
GR
DI DI
LT
1SFAPT
MTL
GR
C
ON
C
2SBLKAPT
3SF
A
P
T
G
R
B
ST
2SF
A
PT
2SFA
PT
GR
2S
B
L
K/
B
K
B
US
BST
GR
S
L
T
BS
T
G
R
S
S
G
R
DK
DK
TIESRR
9’ GR
1SFD
S
T
WALL108" BLK GAS TANKSCONC W/ UG
CONC ISL
STE
PS
WD
STEPS
W
D
T
9
’ CONC
B
S
T
C
O
N
C
7 2 " WD
WD DK
DK
S IG PO LE
BLK WALL48" - 108"
ROCK
W
ALL
12
" -
120
"
W / CA T V
6
PO LESIG
7
ABANDON
9
12
17
RALEIGH, N.C. 27609
1000 SAINT ALBANS DRIVE,SUITE 300
VERIZON BUSINESS
TELEPHONE
APEX, N.C. 27502
2451 SCHIEFFLIN RD.
PUBLIC SERVICE CO. OF NORTH CAROLINA
GAS
(828) 586-5189
SYLVA, N.C. 28779
1246 W. MAIN ST.
TUCKASEIGEE WATER & SEWER AUTHORITY
WATER/SEWER
G
R
C
O
N
C
G
R
72"
WD
BL
K
W
ALL
GR
G
R
W/
D
K
120" BL
K
W
ALL 800
G
A
L
P
R
OP
A
N
E T
A
N
K
S
CONC
LT
CANOPYWD
W/LT
W/CATV
DK
W/
C
A
TV
BST
W/
LT
C
ON
C
CONCRETE DAM
W/
BAS
EM
ENT
2
SF
AP
T
DKTANK
PROPA
NE
W/
CATV
W/C
AT
V
S
W
W/
C
AT
V
BS
T
GR
BST
2SF
AP
T
W /BA S E M EN T
2 S B LKA P T
C
A
N
O
P
Y
MT
L
1SB
K
APT
BLK
WAL
L
4
8"-10
8"
W/
L
T
BST
BST
S
WALL
ROCK
WALL
ROCK
12" TERRA COTTA
18
"
H
D
P
E
18" CMP
18
"
C
M
P
36
"
CM
P
36
"
CM
P
24" RCP
24
"
C
M
P15" CMP2SBKD
1SBKBUS
W/CATV
W/CATV
W/CATV
G
R
8 " D IP
SR
1002
26’
BS
T
P
W
R
BOX
WEL
L
S
MO
NIT
O
RMET
AL LI
D
BLK WALL60"-96"
T
T
T
8" DIP
6" D IP
1" PLA
STIC
12" DIP
12" DIP
12"
DIP
12"
DIP
4" PLA STIC
2
" P
L
AS
T
IC
4"
STEEL
4
"
S
T
E
E
L
12" DIP12" DIP
12" DIP
12
" DIP
(RAW)
12" DIP (RAW)
6
"
DI
P
CONC. WATER VAULT
12 " D IP (R A W )
12 " D IP (R A W )12 " D IP
6
" D
IP
2" PL
A
ST
IC
C
A
TV
W/
FO
R
SEW
ER
M
ET
A
L
LID
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
WEL
L
MON
IT
O
R
18
" CM
P
2
"
P
L
A
S
T
I
C
(828) 227-7226
CULLOWHEE, N.C. 28723
3476 OLD CULLOWHEE RD.
FACILITIES MANAGEMENT
WESTERN CAROLINA UNIVERSITY
POWER
1-800-946-5388
SYLVA, N.C. 28779
106E MAIN ST.
MEDIACOM
CATV
S
R
17
3
3
CAS
E
Y ROA
D
AZTEC DRIVE
SR 1336 M O N TEITH GA P R OAD
4" PLASTIC
GR
18 ’ B S T
HTR
HTR
HTR
HTR
S
RESERVOIR
12
"
CM
P
INV
=2071
.
29
W
PRO
PAN
E
TANK
250
GA
L
MT
L
R/W
MAINT
AINE
DR
/W
MAINT
AINE
D
R
/
W
MA
INT
A
IN
E
DR
/
W
MA
INT
AINED
EX IS T ING
R /W
E X IS T ING R /W
EXISTING R/W
EXISTING R/W
8
" DIP
DK
T
UCKA
S
E
GE
E
R
IVE
R
TUCKASEGEE RIVER
S
R
1
0
0
2
O
L
D
C
U
L
L
O
W
H
E
E
R
D
M
AI
N
T
AI
N
E
D
R/
W
M
AIN
T
AIN
E
D
R/
W
M
AIN
T
AIN
E
D
R/
W
M
AIN
TAIN
ED
R/
W
EXISTING R/W
MAINTAINED R/W
MAINTAINED R/W
EXISTING R/W
V A R IAB LE
M A INT A INE D R /W
MAINTAINED R/W
MAINTAINED R/W
MAI
NT
AI
NE
D
R/
W
MAI
NT
AI
NE
D
R/
W
M
AI
NT
AI
NE
D
R/
W
EXI
S
TI
NG
R/
W
BASEMENT
2SBKD W/
2SFD
S
S
3SBKAPT
SR 1335
1SF BUS
FOUND
OUTFLOW NOT
DIRECTIONAL
15
" C
MP
WD36
"R /W
M
A INTA INED
R/WMAINTAINED
RO CK W A LL
12 "-4 8 "
(
R
A
W)
1
2
"
DI
P
ED
G
E WA
TE
R ROA
D
SR 1732
BUS/APT3SBK
CATVW/
R/W
EXISTING
S
T
R
E
E
T
-
U
N
I
M
P
R
O
V
E
D
P
R
I
V
A
T
E
McGUIR
E
S
T
R
E
E
T
- UN
IMP
R
OV
E
D P
R
IVATE
R
OA
D
- 20
’ WID
E
- P
.C. #2
- S
L. #3
McG
UIRE STREET -
U
NI
MPR
O
VE
D PRIV
ATE R
O
A
D - 20’
WIDE - P.C. #2 - SL. #3
HO
R N E Y ST R EET - UN IMPR O V E D PR IVATE R OAD
- 30’ W IDE - P.C . #2 - SL. #3
WALL
BLK
S
ROCK
15
2
0
25
30
WCR
WCR
WCR
WCR
C
C
C
F
F
F
F
F
C
F
C
F
C
C
C
F
F
C
C
C
CF
F
C
C
C
F
F
F
C
C
C
C
C
C
F
F
F
F
F
F
F
F
F
C
C
F
C
C
F
F
F
F C
F
40.00’
+15.00 -L-
TYPE
TL
-2
TYPE
TL
-2
TYPE TL-2
TYPE TL-2 TES
TES
GRAU 350 TL-2
350 TL-2GRAU
ATTACHMENT
PRELIMINARY JURISDICTIONAL DETERMINATION FORM
BACKGROUND INFORMATION
A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL
DETERMINATION (JD):
B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD:
NCDOT
Attn: Michael Turchy
1598 Mail Service Center
Raleigh, NC 27699-1598
C. DISTRICT OFFICE, FILE NAME, AND NUMBER:
Wilmington District, Asheville Office
D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION:
B-4159, the replacement of Bridge No. 108 over Tuckasegee River on SR 1002.
State:NC County/parish/borough: Jackson City: Cullowhee (unincorporated)
Center coordinates of site (lat/long in degree decimal format):
Lat. 35.315776° N, Long. -83.177870° W .
Name of nearest waterbody:
Tuckasegee River
Identify (estimate) amount of waters in the review area:
Non-wetland waters: 500 linear feet: 125 width (ft) and/or acres.
Cowardin Class:
Stream Flow: moderate
Wetlands: 0 acres.
Cowardin Class:
Name of any water bodies on the site that have been identified as Section 10 waters:
Tidal:
Non-Tidal:
E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY):
Office (Desk) Determination. Date:
Field Determination. Date(s):
1
1. The Corps of Engineers believes that there may be jurisdictional waters of the United
States on the subject site, and the permit applicant or other affected party who requested this
preliminary JD is hereby advised of his or her option to request and obtain an approved
jurisdictional determination (JD) for that site. Nevertheless, the permit applicant or other
person who requested this preliminary JD has declined to exercise the option to obtain an
approved JD in this instance and at this time.
2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide
General Permit (NWP) or other general permit verification requiring “pre-construction
notification” (PCN), or requests verification for a non-reporting NWP or other general permit,
and the permit applicant has not requested an approved JD for the activity, the permit
applicant is hereby made aware of the following: (1) the permit applicant has elected to seek a
permit authorization based on a preliminary JD, which does not make an official determination
of jurisdictional waters; (2) that the applicant has the option to request an approved JD before
accepting the terms and conditions of the permit authorization, and that basing a permit
authorization on an approved JD could possibly result in less compensatory mitigation being
required or different special conditions; (3) that the applicant has the right to request an
individual permit rather than accepting the terms and conditions of the NWP or other general
permit authorization; (4) that the applicant can accept a permit authorization and thereby agree
to comply with all the terms and conditions of that permit, including whatever mitigation
requirements the Corps has determined to be necessary; (5) that undertaking any activity in
reliance upon the subject permit authorization without requesting an approved JD constitutes
the applicant’s acceptance of the use of the preliminary JD, but that either form of JD will be
processed as soon as is practicable; (6) accepting a permit authorization (e.g., signing a
proffered individual permit) or undertaking any activity in reliance on any form of Corps permit
authorization based on a preliminary JD constitutes agreement that all wetlands and other
water bodies on the site affected in any way by that activity are jurisdictional waters of the
United States, and precludes any challenge to such jurisdiction in any administrative or judicial
compliance or enforcement action, or in any administrative appeal or in any Federal court; and
(7) whether the applicant elects to use either an approved JD or a preliminary JD, that JD will
be processed as soon as is practicable. Further, an approved JD, a proffered individual permit
(and all terms and conditions contained therein), or individual permit denial can be
administratively appealed pursuant to 33 C.F.R. Part 331, and that in any administrative
appeal, jurisdictional issues can be raised (see 33 C.F.R. 331.5(a)(2)). If, during that
administrative appeal, it becomes necessary to make an official determination whether CWA
jurisdiction exists over a site, or to provide an official delineation of jurisdictional waters on the
site, the Corps will provide an approved JD to accomplish that result, as soon as is practicable.
This preliminary JD finds that there “may be” waters of the United States on the subject project
site, and identifies all aquatic features on the site that could be affected by the proposed
activity, based on the following information:
2
SUPPORTING DATA. Data reviewed for preliminary JD (check all that apply - checked
items should be included in case file and, where checked and requested, appropriately
reference sources below):
Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: NCDOT.
Data sheets prepared/submitted by or on behalf of the applicant/consultant.
Office concurs with data sheets/delineation report.
Office does not concur with data sheets/delineation report.
Data sheets prepared by the Corps: .
Corps navigable waters’ study: .
U.S. Geological Survey Hydrologic Atlas: .
USGS NHD data.
USGS 8 and 12 digit HUC maps.
U.S. Geological Survey map(s). Cite scale & quad name:
USDA Natural Resources Conservation Service Soil Survey. Citation: .
National wetlands inventory map(s). Cite name: .
State/Local wetland inventory map(s): .
FEMA/FIRM maps: .
100-year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929)
Photographs: Aerial (Name & Date): .
or Other (Name & Date): .
Previous determination(s). File no. and date of response letter: .
Other information (please specify): .
IMPORTANT NOTE: The information recorded on this form has not necessarily been
verified by the Corps and should not be relied upon for later jurisdictional
determinations.
_________________________ __________________________
Signature and date of Signature and date of
Regulatory Project Manager person requesting preliminary JD
(REQUIRED) (REQUIRED, unless obtaining the signature is
impracticable)
3