Loading...
HomeMy WebLinkAbout20050949 Ver 1_More Info Letter_20050714OF W AT Michael F. Easley, Governor ?G l r William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources d .? Alan W. Klimek, P.E. Director Division of Water Quality July 14, 2005 DWQ Project # 05-0949 Johnston County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. John Shallcross, Jr. Partner's Equity Group P.O. Box 1089 Smithfield, NC 27577 Subject Property: Partner's Equity Group Subdivision Lots 18 & 19 Industrial Park Road Smithfield, NC REQUEST FOR MORE INFORMATION Dear Mr. Shallcross: '. On June 17, 2005, the Division of Water Quality (DWQ) receiv?d your application dated May 19, 2005, to impact 1.9 acres of wetlands to construct the proposed retail or.commercial development. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Impact Justification (Avoidance and Minimization) This is a conceptual plan, not a final site plan, and therefore, does not provide sufficient "avoidance and minimization". 2. Stormwater Plan A stormwater plan will be required consisting of bioretention or constructed wetland. Additionally, please provide the following: • The location of any proposed stormwater management practices as required by GC 3402, Condition 4. • Detail for the stormwater management practices as required by GC 3402, Condition 4. • Specify the percent of project imperviousness area based on the estimated built-out conditions. • Indicate all stormwater outfalls on the site plan. • Indicate the diffuse flow provision measures on the site plan. .One Carolina 401 Oversight/Express Review Permits Unit NwAmalif 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncwetiands An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Partner's Equity Group: Page 2 of 2 July 14, 2005: Please respond within three weeks of the date of this letter by sending this information to me in writing and Mike Horan of the DWQ Raleigh Regional Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. John Dorney at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, Cyndi Karoly, Supervisor 401 Oversight/Express Review Permits Unit CBK/ym cc: Mike Horan, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Robin Little, 5409 New Rebel Court, Youngsville, NC, 27596-8856 Filename: 050949PartnersEquityGroupSD(Johnston)OnHold