DRAINAGE POND & EROSION CONTROL CALCULATIONS
FOR
PARTNERS EQUITY GROUP
SMITHFIELD, NORTH CAROLINA
o ? + ?pp5
DINO,
0
MARCH 1999
MCKIM & CREED ENGINEERS, P.A..
5625 DILLARD ROAD, SUITE 117
CARY, NORTH CAROLINA 27511
(919) 233-8091
A,
TABLE OF CONTENTS
1. Erosion Control Narrative
2. SCS Curve Number
3. Time of Concentration
4. HEC-1 Existing Conditions
5. HEC-1 Proposed Conditions -Assuming No Tailwater
6. HEC-1 Proposed Conditions -Assuming Tailwater
7. Draw-Down Time Calculations
8. Anti-Flotation Block
9. Temporary Sediment Filter Basin
10. Outlet Protection
. h
Partners Equity Group
Pond And
Erosion Control Narrative
Project Description
The purpose of this project is to construct a wet detention facility for the Partners Equity
subdivision. The detention pond will be located on Lot 6 of said subdivision. Approximately 1.5
acres will be disturbed during this construction period.
Site Description
The site is located along the northern and eastern sides of Lot 6 in Partners Equity subdivision.
The site is roughly bounded on the west by North Equity Drive, on the south by Lot 7, and on the
north and east by 1-95 Properties.
Considerations used in Drainage and Erosion Control Design
• The runoff from the first inch of rainfall must be captured and released over a period of two
to five days.
• The proposed detention pond must be designed to attenuate the post-development peak
discharge from the pre-development rates for the 10-year storm and safely pass the
discharge from the 100-year storm event.
• The Corps of Engineers HEC-1 program was used in the routing of the particular design
storms.
• The Kirpich equation was used in determining the time of concentration.
• SCS TR-55 was used in determining the curve number (CN) value for design. The area was
found to be in the hydrologic soil group B.
• Town of Smithfield regulations for Stormwater Impoundments were used for design.
• The natural drainage pattern is for water to travel from high points located within the site,
through a series of roadside ditches, and eventually to the proposed area for the pond.
Temporary erosion control matters should be in place to maintain this flow pattern and
prevent sediment from affecting the adjoining lands.
• HY-8 was used in determining a rating curve for the barrel, draw-down pipe, and spillway.
• Two scenarios were evaluated in the HEC-1 programs. There are two existing 48° CMP
pipes that are located downstream from the proposed pond. The first scenario was
performed assuming these pipes were to be removed. The second scenario evaluated the
tailwater from these pipes, assuming that they were to remain in place. Design calculations
were based on the second scenario.
• The 10-year storm will back the existing ditches up with water. Draw-down calculations were
made based on the proposed 6" PVC pipe.
u M
SCS CURVE NUMBER
.. Ai
SCS
Project: Partners
Conditions. EXIStIn9
Prepared by: GL
Checked by: Runoff Curve Number
M?.I<IM&
ENCINEERS• PLANNERS- SURVEYORS
VALMINCTON. NORTH CAROLINA RALEIGH. NORTH CAROLINA
SMITHFIELD- NORTH C'
Date: 3-8-99
Date:
Landuse Soil
Group
RCN Area
(Acres) Area
(Sq. Mi.) Product of
RCN and Area
Grass/Brush (good) B 61 48.35 0.08 2949.35
Pavement/Roof B 98 2.55 0.00 249.9
Totals = 50.9 0.08 3199.25
Total (weighted) RCN = total product/total area = 62.85
RCN used = 63
s:\1319\0001 \calcs\final\rcn.xis
SCS Runoff Curve Number
Project: Partners
1\4gKIl`4&,
40
Conditions. Proposed ENGINEERS •PLANNERS •SURVEYORS
WILMINGTON, NORTH CAROLINA RALEIGH. NORTH CAROLINA
SMITHFIELD. NORTH A
Prepared by: GL Date: 3-8-99
Checked by: Date:
Landuse Soil
Group
RCN Area
(Acres) Area
(Sq. Mi.) Product of
RCN and Area
Low density comm (50% grass/50% paved) B 81 50.9 0.08 4122.9
Totals = 50.9 0.08 4122.9
Total (weighted) RCN = total productitotal area = 81.00
RCN used = 81
s:\1319\0001 \calcs\final\rcn.xls
i M
Time of Concentration Calculation
SCS Segmental Method
Project: Partners Equity
Conditions: Existing ?MC'IOM&
Prepared by:DJK Date: 3-15-99 ENGINEERS- PLANNERS - SURVEYORS
Checked by. Date. NALMINGTON. NORT T CAROLINA RALEIGH. NORTH CAROLINA HFIELD NORTH CAROLINA
Sheet Flow
1. Surface description (Table 3-1)
2. Manning's roughness coeff., n (Table 3-1)
3. Flow length, L (Total < 300 ft)
4. Two-year 24-hour rainfall, P
5. Land slope, S
6. Travel time, T t
S= 153-148.5
T, = 0.007(nL)08
P 0.sso.4
z
Segment ID AB
Grass
0.24
ft 200
in 3.6
ft/ft 0.023
hr 0.372
Shallow Concentrated Flow Segment ID BC
7. Surface description (Paved or Unpaved) Unpaved
8. Flow length, L S=148.5-148/180 ft 180
9. Watercourse slope, S vo = 20.3282 ? ft/ft 0.0028
10. Average velocity, (Figure 3-1) ft/sec 0.9
11.Travel time, T t y„ = 16.1345(s)°'' hr 0.059
Channel Flow Segment ID CD
12. Cross sectional flow area, A 16
13. Wetted perimeter, P Assumed 7 ft/s pipe flow ft 11
14. Hydraulic radius, R = ft 1.5
15. Channel slope, S S=148-143/2060 ft/ft 0.0024
16. Manning's roughness coeff., n 0.030
17
Ch
l
l
V
i ft/sec 3
1
.
anne
ve
oc
ty, ziT
iiz .
18. Flow length, L s
V= 1.4 9 R ft 2060
n
19.Travel time, T t hr 0.183
Time of Concentration =
0.61 hr
Lag Time = (0.6)(Tc) = 0.37 hr
s:\1421 \0001 \excell\Tc.xls
19
Time of Concentration Calculation
SCS Segmental Method
Project: Partners Equity
Conditions: Proposed MC R=
Prepared by:DJK Date. 3-15- 99 ENCINEERS• PLANNERS • SURVEYORS
Checked by: Date. vnLMINGTQN. NORTH CAROLINA RALEIGH. NORTH CAROLINA
NORTH T
Sheet Flow Segment ID AB
1. Surface description (Table 3-1) Grass
2. Manning's roughness coeff., n (Table 3-1) 0.24
3. Flow length, L (Total < 300 ft) S= 153-149 ft 100
4. Two-year 24-hour rainfall, P in 3.6
5. Land slope, S T, = 0.0 0 7 (n L) ° s ft/ft 0.040
6. Travel time, T t P2 0.5 s0.4 hr 0.170
Shallow Concentrated Flow Segment ID BC
7. Surface description (Paved or Unpaved) Unpaved
8. Flow length, L S=149-148/280 ft 280
9. Watercourse slope, S o s, ft/ft
V, = 20.328 z (s) ft/sec 0.0036
1
0
10. Average velocity, (Figure 3-1) .
11.Travel time, T t V„ = 16.1345(s) hr 0.080
Channel Flow Segment ID CD
12. Cross sectional flow area, A ft 16
13. Wetted perimeter, P Assumed 7 ft/s pipe flow ft N
14. Hydraulic radius, R = ft 1.5
15. Channel slope, S S=148-143/2060 ft/ft 0.0024
16. Manning's roughness coeff., n 0.030
17. Channel velocity, V V = 1.4 9 R z'a s "z ft/sec
ft 3.1
2060
18. Flow length, L
19.Travel time, T t n hr 0.183
Time of Concentration = 0.43 hr
Lag Time = (0.6)(Tc) = 0.26 hr
s:\1421 \0001 \excell\Tc.xls
?.
*
* FLOOD HYDROGRAPH PACKAGE (HEC-1)
* MAY 1991
* VERSION 4.0.1E
* Lahey F77L-EM/32 version 5.01
* Dodson & Associates, inc.
* RUN DATE 03/17/99 TIME 10:50:21
x x xxxxx xx xx xxx x
x x x x x xx.
x x x x x
xxxx xxx xxxx x xx xxx x
x x x x x
x x x x x x
x x xxxxx xx xx xxx xxx
Gx(5 ,A'
* U.S. ARMY CORPS OF ENGINEERS
* HYDROLOGIC ENGINEERING CENTER
* .609 SECOND STREET..,
+
* DAVIS,:CALIFORNIA 95616 +
* (916) 551-1748 +
THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC-1 KNOWN AS HEC1 (JAN 73), HECIGS, HECIDB, AND HECIKW.
THE DEFINITIONS OF VARIABLES -RTIMP- AND -RTIOR- HAVE CHANGED FROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE.
THE DEFINITION OF -AMSKK- ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEP 81. THIS IS THE FORTRAN77 VERSION
NEW OPTIONS: DAMBREAK OUTFLOW SUBMERGENCE , SINGLE EVENT DAMAGE CALCULATION, DSS:WRITE STAGE FREQUENCY,
DSS:READ TIME SERIES AT DESIRED CALCULATION INTERVAL LOSS RATE:GREEN AND AMPT INFILTRATION
KINEMATIC WAVE: NEW FINITE DIFFERENCE ALGORITHM
'A
LINE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
HEC-1 INPUT PAGE 1
ID....... 1....... 2....... 3....... 4....... 5....... 6... 7........8.......9......10
*DIAGRAM
ID PARTNERS
ID EXISTING CONDITIONS 10-YEAR FREQUENCY, 24 HOUR DURATION
ID SCS TYPE It DISTRIBUTION
IT 5 300
IO 5
JR PREC 5.38
KK BSN 1
KM HYDROGRAPH FROM SUBBASIN 1
BA 0.0795
PB 1
IN 6
PC 0.0 .00101 .00202
PC .01050 .01161 .01272
PC .022 .02321 .02442
PC .03450 .03581 .03712
PC .048 .04941 .05084
PC .063 .06461 .06624
PC .08 .08181 .08364
PC .099 .10101 .10304
PC .12 .12225 .12460
PC .147 .1502 .15340
PC .181 .18512 .18948
PC .235 .24268 .25132
PC .663 .68196 .69864
PC .772 .77796 .78364
PC .82 .82367 .82726
PC .85350 .85647 .85936
PC .88 .88229 .88455
PC .90175 .90379 .9058
PC .921 .92279 .92455
PC .93775 .93929 .9408
PC .952 .9533 .95459
PC .96475 .966 .96724
PC .977 .9782 .97939
PC .98875 .9899 .99104
PC 1.0
LS 63
UD 0.19
22
.00305
.01385
.02565
.03845
.05229
.06789
.08549
.10509
.12705
.1566
.19408
.26092
.71304
.78904
.83079
.86219
.88679
.90779
.92629
.94229
.95588
.96848
.98058
.99218
.00408
.01498
.02688
.03978
.05376
.06956
.08736
.10716
.12960
.1598
.19892
.27148
.72516
.79416
.83424
.86494
.889
.90975
.928
.94375
.95716
.96971
.98176
.99331
.00513 .00618
.01613 .01728
.02813 .02938
.04113 .04248
.05525 .05676
.07125 .07296
.08925 .09116
.10925 .11136
.13225 .135
.163 .16628
.204 .2094
.283 .30684
.735 .74344
.799 .8036
.83763 .84094
.86763 .87024
.89119 .89335
.91169 .9136
.92969 .93135
.94519 .9466
.95844 .95971
.97094 .97216
.98294 .98411
.99444 .99556
.00725
.01845
.03065
.04385
.05829
.07469
.09309
.11349
.13785
.16972
.2152
.35436
.75136
.808
.84419
.87279
.89549
.91549
.93299
.94799
.96098
.97338
.98528
.99668
.00832 .00941
.01962 .02081
.03192 .03321
.04522 .04661
.05984 .06141
.07644 .07821
.09504 .09701
.11564 .11781
:14080 .14385
.17332 .17708
.2214 .228
.43079 .56786
.75876 .76564
.8122 .8162
.84736 .85047
.87526 .87767
.8976 .89969
.91735 .91919
.9346 .93619
.94935 .95069
.96224 .9635
.97459 .9758
.98644 .98760
.99779 .9985
SCHEMATIC DIAGRAM OF STREAM NETWORK
INPUT
LINE (V) ROUTING (--->) DIVERSION OR PUMP FLOW
NO. (.) CONNECTOR (<---) RETURN OF DIVERTED OR PUMPED FLOW
7 BSN 1
(*«") RUNOFF ALSO COMPUTED AT THIS LOCATION
xxwwxww w+x wwx+xxwwxxwwxw+x+w++xxxxx+w++xw - +++ w,t++++++,t+++xx+x++xw+xtx+-,t+++++.++ +x+
* FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CORPS OF ENGINEERS
* MAY 1991 * * HYDROLOGIC ENGINEERING CENTER
* VERSION 4.0.1E w * 609, SECOND STREET. •
* Lahey F77L-EM/32 version 5.01 * * DAVIS, CALIFORNIA: 95616
* Dodson & Associates, Inc. * * (916) 551-1748
* RUN DATE 03/17/99 TIME 10:50:21
xw++wxwx++++wwxwxwxxx++wxxxxwwxw+xx+++xx+ .. - .. wxx+++++++w+x+++++++w+++w+++xx+wxx+x xx+
PARTNERS
EXISTING CONDITIONS 10-YEAR FREQUENCY, 24 HOUR DURATION
SCS TYPE II DISTRIBUTION
5 IO OUTPUT CONTROL VARIABLES
IPRNT 5 PRINT CONTROL
IPLOT 0 PLOT CONTROL
QSCAL 0. HYDROGRAPH PLOT SCALE
IT HYDROGRAPH TIME DATA
NMIN 5 MINUTES IN COMPUTATION INTERVAL
IDATE 1 0 STARTING DATE
ITIME 0000 STARTING TIME
NQ 300 NUMBER OF HYDROGRAPH ORDINATES
NDDATE 2 0 ENDING DATE
NDTIME 0055 ENDING TIME
ICENT 19 CENTURY MARK
COMPUTATION INTERVAL 0.08 HOURS
TOTAL TIME BASE 24.92 HOURS
ENGLISH UNITS
DRAINAGE AREA SQUARE MILES
PRECIPITATION DEPTH INCHES
LENGTH, ELEVATION FEET
FLOW CUBIC FEET PER SECOND
STORAGE VOLUME ACRE-FEET
SURFACE AREA ACRES
TEMPERATURE DEGREES FAHRENHEIT
JP MULTI-PLAN OPTION
NPLAN 1 NUMBER OF PLANS
JR MULTI-RATIO OPTION
RATIOS OF PRECIPITATION
5.38
PEAK FLOW AND STAGE (END-OF-PERIOD) SUMMARY FOR MULTIPLE PLAN-RATIO ECONOMIC COMPUTATIONS
FLOWS IN CUBIC FEET PER SECOND, AREA IN SQUARE MILES
TIME TO PEAK IN HOURS
RATIOS APPLIED TO. PRECIPITATION
OPERATION STATION AREA PLAN RATIO 1
5.38
HYDROGRAPH AT BSN 1 0.08 1 FLOW 89.
TIME 12.08
*•* NORMAL END OF HEC-1 *"*
VJ
1-1
r
W
H
kD
0
O
0
r
n
N
n
h?
F'-
fi
A)
rt
F+-
W
F-j
C
W
ft
P.
LQ
n
K
t
(D
0
m
N
El
(D
(1)
D
O
fr
N
w
r
E
a
rr
N
K
rn
K
O
n
(D
O
N
K
O
P)
t?.
r r r r r Db
r oo ? J r rn r ?n r ? Dq
o. 06
to U1 OD U1 J U1 01 U1 1-n U1
N
N
N
r
r
r
r
r
r
r 10
W N r W OD J 01 IA N r 0
H
04
H
M
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
W W W N N N r
01 ?P r O ?P O Ln J
OJ N A N J J w w o l (4
U) ?P W
ld N r r
co J 01 0) J O ?P
01 o Ul OD ?P iD U7 O
Li]
H
C 0 0 0 0 0 0 0 0 0
0 0 o 01 01 0 10 o o 0
w W W N r r :a
J
O ?P
?P r
U) 0\
m J
%D O
U) .P
w
h
r
r ,
r
N
O
01
OD
tp
W
O?
W
N
r 0
,ro
_ro
om
r r t
"
F. O l0 w O J Ut 'o, r
n
? 0 ko H 0 F- Ln % r
01
W
N '
cr
0 0 0 0 0 0 H
r ,
P+
N
r
r 10
14 H w ID 0 0 0 0 0 tit
0 0 0 0 0
r N r 0
U1 W N r r J yq
N l0 to to r
H
N Ol r
r
J 00 O Ul M
0
0) W N
r N r O OD
r r r r r r r r c]
r o 0o J o? u) in u) ? L? .
OD
O
01
?P
UI
OD
W
O CsJ
C
En
r 01 r J UI W r r H
N y
?
H
•• z
w?
N
& w 0 ko
0 J
w Lrn W
CYN r
00 o
?p ° C
P rn o
n
ro
m
Ea
o 'b
H
Wr
0 L-1
H
K
H
H
roz
w
n
M
m C
[=1 h]
Ja
Lq
z
a
H
LjJ
\
t:p
H
to
c?
C
w
r
U)
1o
to
t ? tJo f<<lw?ier
1
CURRENT DATE: 03-15-1999 FILE DATE:. 03-05-1999
CURRENT TIME: 11:57:15 FILE NAME: BARREL
--------------------------------------------------------------------------------
-------------------------- FHWA.CULVERT ANALYSIS --------------------------
-------------------------- HY-8, VERSION 4.1 --------------------------
----------------------------------
SITE DATA I CULVERT SHAPE, MATERIAL, INLET
U -------------------- ------1-----------------------------------------------
L INLET OUTLET CULVERT BARRELS
V ELEV. ELEV. LENGTH SHAPE SPAN RISE MANNING INLET
# (FT) (FT) (FT) MATERIAL (FT) (FT) n TYPE
-------------------------- ------------------------------------------------
1 1143.00 142.90 50.00 3 RCP 2.00 2.00 .013 CONVENTIONAL
2
3
4
5
6
--------------------------------------------------------------------------------
------------------------------------------------------
FILE: BARREL CULVERT HEADWATER ELEVATION (FT) ------ --------------------
DATE: 03-05-1999
DISCHARGE 1 2 3 4 5 6 ROADWAY
0 144.90 0.00 0.00 0.00 0.00 0.00 200.00
18 145.01 0.00 0.00 0.00 0.00 0.00 200.10
36 145.31 0.00 0.00 0.00 0.00 0.00 200.15
54 145.83 0.00 0.00 0.00 0.00 0.00 200.20
72 146.55 0.00 0.00 0.00 0.00 0.00 200.24
90 147.47 0.00 0.00 0.00 0.00 0.00 200.28
108 148.61 0.00 0.00 0.00 0.00 0.00 200.32
126 150.06 0.00 0.00 0.00 0.00 0.00 200.35
144 151.81 0.00 0.00 0.00 0.00 0.00 200.39
162 153.94 0.00 0.00 0.00 0.00 0.00 200.42
180 156.82 0.00 0.00 0.00 0.00 0.00 200.45
270 215.90 0.00 0.00 0.00 0.00 0.00 0.00
The above
------------- Q and HW
--------- are for
--------- a point above
-------------- the roadway.
---------------
-----------
---------
2
CURRENT DATE: 03-15-1999 FILE DATE: 03-05-1999
CURRENT TIME: 11:57:15 FILE NAME: BARREL
--------------------------------------------------------------------------------
PERFORMANCE CURVE FOR CULVERT # 1 - 3 ( 2 BY 2 ) RCP
--------------------------------------------------------------------------
DIS HEAD- INLET OUTLET
CHARGE WATER CONTROL CONTROL FLOW NORMAL CRITICAL OUTLET TAILWATER
FLOW ELEV. DEPTH DEPTH TYPE DEPTH DEPTH VEL. DEPTH VEL. DEPTH
(cfs) (ft) (ft) (ft) <F4> (ft) (ft) (fps) (ft) (fps) (ft)
--------------------------------------------------------------------------------
0 144.90 0.00 1.90 0-NF 0.00 0.00 0.00 0.00 0.00 2.00
18 145.01 1.22 2.01 3-Mlf 1.11 0.86 1.91 2.00 0.00 2.00
36 145.31 1.82 2.31 4-FFt 2.00 1.24 3.82 2.00 0.00 2.00
54 145.83 2.42 2.83 4-FFt 2.00 1.52 5.73 2.00 0.00 2.00
72 146.55 3.22 3.55 4-FFt 2.00 1.72 7.64 2.00 0.00 2.00
90 147.47 4.27 4.47 4-FFt 2.00 1.90 9.55 2.00 0.00 2.00
108 148.61 5.56 5.61 4-FFt 2.00 2.00 11.46 2.00 0.00 2.00
126 150.06 7.06 6.94 4-FFt 2.00 2.00 13.37 2.00 0.00 2.00
144 151.81 8.81 8.49 4-FFt 2.00 2.00 15.28 2.00 0.00 2.00
162 153.94 10.94 10.24 4-FFt 2.00 2.00 17.19 2.00 0.00 2.00
180 156.82 13.82 12.19 4-FFt 2.00 2.00 19.10 2.00 0.00 2.00
--------------------------------------------------------------------------------
E1. inlet face invert 143.00 ft E1. outlet invert 142.90 ft
E1. inlet throat invert 0.00 ft El. inlet crest 0.00 ft
--------------------------------------------------------------------------------
***** SITE DATA ***** CULVERT INVERT **************
INLET STATION (FT) 0.00
INLET ELEVATION (FT) 143.00
OUTLET STATION (FT) 50.00
OUTLET ELEVATION (FT) 142.90
NUMBER OF BARRELS 3
SLOPE (V-FT/H-FT) 0.0020
CULVERT LENGTH ALONG SLOPE (FT) 50.00
***** CULVERT DATA SUMMARY ************************
BARREL SHAPE CIRCULAR
BARREL DIAMETER 2.00 FT
BARREL MATERIAL CONCRETE
BARREL MANNING'S N 0.013
INLET TYPE CONVENTIONAL
INLET EDGE AND WALL GROOVED END PROJECTION
INLET DEPRESSION NONE
3
CURRENT DATE: 03-15-1999 FILE DATE: 03-05-1999
CURRENT TIME: 11:57:15 FILE NAME: BARREL
-------------------------- TAILWATER -------------------
------------------------------------------------------- -- -------------------
CONSTANT WATER SURFACE ELEVATION
144.90
--------------------------------------------------------------------------------
-------------------------- ROADWAY OVERTOPPING DATA -:-------------------------
--------------------------------------------------------------------------------
ROADWAY SURFACE PAVED
EMBANKMENT TOP WIDTH (FT) 30.00
CREST LENGTH (FT) 200.00
OVERTOPPING CREST ELEVATION (FT) 200.00
+ +
* FLOOD HYDROGRAPH PACKAGE (HEC-1),
* MAY 1991
* VERSION 4.0.1E
* Lahey F77L-EM/32 version 5.01
* Dodson & Associates, Inc.
* RUN DATE 03/18/99 TIME 11:54:53
/( JAI&S No *.L.Werup
*
+
U.S. ARMY.CORPS OF ENGINEERS +
* HYDROLOGIC ENGINEERING CENTER
609 SECOND STREET •
DAVIS, CALIPORNIA 95616
*
+ (916) SS1-1748
+
X X XXXXX XX XXXXX X
X X X X X XX
X X X X X
XXX XXXX XXXX X XX XXX X
X X X X X
X X X X X X
X X XXXXX XX XXXXX XXX
THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC-1 KNOWN AS HEC1 (JAN 73), HECIGS, HEClDB, AND HECIKW.
THE DEFINITIONS OF VARIABLES -RTIMP- AND -RTIOR- HAVE CHANGED FROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE.-
THE DEFINITION OF -AMSKK- ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEP 81. THIS IS THE FORTRAN77 VERSION
NEW OPTIONS: DAMBREAK OUTFLOW SUBMERGENCE , SINGLE EVENT DAMAGE CALCULATION, DSS:WRITE STAGE FREQUENCY,
DSS:READ TIME SERIES AT DESIRED CALCULATION INTERVAL LOSS RATE:GREEN AND AMPT INFILTRATION
KINEMATIC WAVE: NEW FINITE DIFFERENCE ALGORITHM
LINE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
.31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
HEC-1 INPUT PAGE 1
ID....... 1....... 2....... 3....... 4....... 5.......6... ..7.......8.......9......10
* ASSUMES NO TAILWATER ON RISER SYSTEM
*DIAGRAM
ID PARTNERS
ID PROP CONDITIONS 10-YEAR FREQUENCY, 24 HOUR DURATION
ID SCS TYPE II DISTRIBUTION
IT 5 300
IO 5
JR PREC 5.38 8
KK BSN 1
KM HYDROGRAPH FROM SUBBASIN 1
BA 0.0795
PB 1
IN 6
PC 0.0 .00101 .00202 .00305 .00408 .00513 .00618 .00725 .00832 .00941
PC .01050 .01161 .01272 .01385 .01498 .01613 .01728 .01845 .01962 .02081
PC .022 .02321 .02442 .02565 .02688 .02813 .02938 .03065 .03192 .03321
PC .03450 .03581 .03712 .03845 .03978 .04113 .04248 .04385 .04522 .04661
PC .048 .04941 .05084 .05229 .05376 .05525 .05676 .05829 .05984 .06141
PC .063 .06461 .06624 .06789 .06956 .07125 .07296 .07469 .07644 .07821
PC .08 .08181 .08364 .08549 .08736 .08925 .09116 .09309 .09504 .09701
PC .099 .10101 .10304 .10509 .10716 .10925 .11136 .11349 .11564 .11781
PC .12 .12225 .12460 .12705 .12960 .13225 .135 .13785 .14080 .14385
PC .147 .1502 .15340 .1566 .1598 .163 .16628 .16972 .17332 .17708
PC .181 .18512 .18948 .19408 .19892 .204 .2094 .2152 .2214 .228
PC .235 .24268 .25132 .26092 .27148 .283 .30684 .35436 .43079 .56786
PC .663 .68196 .69864 .71304 .72516 .735 .74344 .75136 .75876 .76564
PC .772 .77796 .78364 .78904 .79416 .799 .8036 .808 .8122 .8162
PC .82 .82367 .82726 .83079 .83424 .83763 .84094 .84419 .84736 '.85047
PC .85350 .85647 .85936 .86219 .86494 .86763 .87024 .87279 .87526 .87767
PC .88 .88229 .88455 .88679 .889 .89119 .89335 .89549 .8976 .89969
PC .90175 .90379 .9058 .90779 .90975 .91169 .9136 .91549 .91735 .91919
PC .921 .92279 .92455 .92629 .928 .92969 .93135 .93299 .9346 .93619
PC .93775 .93929 .9408 .94229 .94375 .94519 .9466 .94799 .94935 .95069
PC .952 .9533 .95459 .95588 .95716 .95844 .95971 .96098 .96224 .9635
PC .96475 .966 .96724 .96848 .96971 .97094 .97216 .97338 .97459 .9758
PC .977 .9782 .97939 .98058 .98176 .98294 .98411 .98528 .98644 .98760
PC .98875 .9899 .99104 .99218 .99331 .99444 .99556 .99668 .99779 .9989
PC 1.0
LS 81
UD 0.345
• 10'x4' CONCRETE RISER BOX WITH TRIPLE 24" RCP'S FOR BARRELS
KK ROUTE
KM ROUTE THROUGH PROPOSED DETENTION POND
RS 1 ELEV 144
SA 1.03 1.28 1.88 2.74 3.65 4
SE 143 144 145 146 147 148
SQ 0 0 1.2 6.3 45.6 71 117 195 290
SE 143 144 145 145.5 146 146.5 147 147.5 148
ZZ
SCHEMATIC DIAGRAM OF STREAM NETWORK
INPUT
LINE (V) ROUTING (--->) DIVERSION OR PUMP FLOW
NO. (.) CONNECTOR (<---) RETURN OF DIVERTED OR PUMPED FLOW
7 BSN 1
V
V
39 ROUTE.
(*"?) RUNOFF ALSO COMPUTED AT THIS LOCATION'
r+wxrxrsxxrwwwwww+wrxw+wwwwwrwwrxr+wxxsrw .. +xr rrsrw?+++wwwxrw+wr,rwxxx++e s++wwr+s wrw
* FLOOD HYDROGRAPH PACKAGE (HEC-1) * *. U.S. ARMY CORPS OF ENGINEERS +
* MAY 1991 HYDROLOGIC ENGINEERING CENTER.
* VERSION 4.0.1E x -_ * 609 SECOND STREET .:. __
* Lahey F77L-EM/32 version 5.01 * * DAVIS,. CALIFORNIA 95616'
* Dodson & Associates, Inc. * * (916) 551-1748
* RUN DATE 03/18/99 TIME 11:54:53 * * '
+xrr++wxrrwwx+x++xxx+xwsrrrwrw+x++wxsrwww - - xxs xsxr+w+w+wwrwrs++rrsw+wr++.rsw3r:s *++
PARTNERS
PROP CONDITIONS 10-YEAR FREQUENCY, 24 HOUR DURATION
SCS TYPE II DISTRIBUTION
5 IO OUTPUT CONTROL VARIABLES
IPRNT 5 PRINT CONTROL
IPLOT 0 PLOT CONTROL
QSCAL 0. HYDROGRAPH PLOT SCALE
IT HYDROGRAPH TIME DATA
NMIN 5 MINUTES IN COMPUTATION INTERVAL
IDATE 1 0 STARTING DATE
ITIME 0000 STARTING TIME
NQ 300 NUMBER OF HYDROGRAPH ORDINATES
NDDATE 2 0 ENDING DATE
NDTIME 0055 ENDING TIME
ICENT 19 CENTURY MARK
COMPUTATION INTERVAL 0.08 HOURS
TOTAL TIME BASE 24.92 HOURS
ENGLISH UNITS
DRAINAGE AREA SQUARE MILES
PRECIPITATION DEPTH INCHES
LENGTH, ELEVATION FEET
FLOW CUBIC FEET PER SECOND
STORAGE VOLUME ACRE-FEET
SURFACE AREA ACRES
TEMPERATURE DEGREES FAHRENHEIT
JP MULTI-PLAN OPTION
NPLAN 1 NUMBER OF PLANS
JR MULTI-RATIO OPTION
RATIOS OF PRECIPITATION
5.38 8.00
PEAK FLOW AND STAGE (END-OF-PERIOD) SUMMARY FOR MULTIPLE PLAN-RATIO ECONOMIC COMPUTATIONS
FLOWS IN CUBIC FEET PER SECOND, AREA IN SQUARE MILES`
TIME TO PEAK IN HOURS
RATIOS APPLIED TO PRECIPITATION
OPERATION STATION AREA PLAN RATIO 1 RATIO 2
5.38 8.00
HYDROGRAPH AT BSN 1 0.08 1 FLOW 131. 223.
TIME 12.25 12.25
ROUTED TO ROUTE 0.08 1 FLOW 66. 142.
TIME 12.58 12.50
** PEAK STAGES IN FEET
1 STAGE 146.40 147.16
TIME 12.58 12.50
*** NORMAL END OF HEC-1 ***
in
/
F'
W
N
10
O
O
0
N
n
N
N
n
/
1-h
F,-
Q1
F-'
ft
H-
F-j
cn
r-? ao r ? r m N U? N .a pd
w In OD In -l in m in u, u,
N N N r r F F' H F+ H
W N H 10 m ?J Ch ?P N F' 0
H
ro
H
IFJ
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 .
W W W N N N N
ON & H co & O to ?I
OD N 4P N J '1 to to O
Ln ?P W N
OD J m m J O ?P
m O N tn 0D P .P tn O
Li]
H
$b
0 0 0 0 0 0 0 0 0 N
0 0 0 0 0 101 0 101 0 oi l I
W W W N N N
?
J ?P N m
* J O ?P H
ISN O ?P to 0
1 W n to m F+ N
N O 01 OO l0 W m W N F
ro
r
-] ON 0) m m In gyp. W N
w W m & H m (n m a?
10
n
? m Ch m 0) n a
m
F O
ro
w o m 11b. r m u, O
.
0 0 0 0 0 0 0 ?''? N cr
M
O
r,
P
N
H
F 10
r to 10 O a% o o o o L1]
F P F' p
OD .
0 .
0 .
0
0
N N N O
. W N N %0 to & ? H
0
m
m
w
in
'1
m
00
'1
M
Ln
m
r
J
L
H
N N F-' O OD O 0 W N 0
:c
O H
4
to r
0 L-1
H
K
tti
H
hi
ro Z
n
cl
K :0
m
W
~ N N F? N N !1
cn w H Ln o m w 0. w t-
tr]
OO
m :a.
F' :a
U1 ?t
.P o C to
H
N H
LXI H
°z
c?
W n
N
H H %D
O ?I
N cn
?P w
m H
aD 0
IQ z C
?P m OD
n
ro
m
x
H
H
t?
2
r
C
C4
w
N
in
to
1
CURRENT DATE: 03-15-1999 FILE DATE: 03-08-1999
CURRENT TIME: 12:17:47 FILE NAME: PARTACCE
--------------------------------------------------------------------------------
-------------------------- FHWA CULVERT ANALYSIS --- --------------------
-------------------------- HY-8, VERSION 4.1 ----------------- ------
----------------------------------
C SITE DATA CULVERT SHAPE, MATERIAL, INLET
U -------------------------- -----------------------------------------------
L INLET OUTLET CULVERT ?. BARRELS
?. V ELEV. ELEV. LENGTH SHAPE SPAN RISE MANNING INLET
# (FT) (FT) (FT) f MATERIAL (FT) (FT) n TYPE
?------------------------ -----------------------------------------------
1 142.90 142.80 80.00 2 CSP 4.00 4.00 .024 CONVENTIONAL
2
3 C
5 ? I
6
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
FILE: PARTACCE CULVERT HEADWATER ELEVATION (FT) DATE: 03-08-1999
DISCHARGE 1 2 3 4 5- 6 ROADWAY
0 144.40 0.00 0.00 0.00 0.00 0.00 147.00
18 144.61 0.00 0.00 0.00 0.00 0.00 .147.10
36 145.04 0.00 0.00 0.00 0.00 0.00 147.15
54 145.48 0.00 0.00 0.00 0.00 0.00 147.20
72 147.21 0.00 0.00 0.00 0.00 0.00 147.24
89 147.43 0.00 0.00 0.00 0.00 0.00 147.28
108 147.73 0.00 0.00 0.00 0.00 0.00 147.32
126 148.06 0.00 0.00 0.00 0.00 0.00 147.35
144 148.45 0.00 0.00 0.00 0.00 0.00 147.39
162 148.89 0.00 0.00 0.00 0.00 0.00 147.42
180 149.38 0.00 0.00 0.00 0.00 0.00 147.45
180 149.38 0.00 0.00 0.00 0.00 0.00 0.00
The above
------------- Q and.HW
---------- are for
------- a point above
--------------- the roadway.
-----------------
---------
---------
2 -
CURRENT DATE: 03-15-1999 FILE DATE: 03-08-1999
CURRENT TIME: 12:17:47 FILE NAME: PARTACCE
--------------------------------------------------------------------------------
PERFORMANCE CURVE FOR CULVERT # 1 2 ( 4 BY 4 ) CSP.
---------------------------------------------------------------------------------
DIS- HEAD- INLET OUTLET
CHARGE WATER CONTROL CONTROL FLOW NORMAL CRITICAL OUTLET TAILWATER
FLOW ELEV. DEPTH DEPTH TYPE DEPTH DEPTH VEL. DEPTH VEL. DEPTH
(cfs) (ft) (ft) (ft) <F4> (ft) (ft) (fps) (ft) (fps) (ft)
--------------------------------------------------------------------------------
0 144.40 0.00 1.50 '0-NF 0.00 0.00 0.00 0.00 0.00 1.60
18 144.61 1.34 1.71 3-Mlt 1.57 0.86 1.92 1.60 0.00 1.60
36 145.04 1.86 2.14 3-M2t 2.36 1.24 3.83 1.60 0.00 1.60
54 145.48 2.32 2.58 3-M2t 3.21 1.53 5.75 1.60 0.00 1.60
72 147.21 2.74 4.31 6-FFn 4.00 1.78 2.86 4.00 0.00 1.60
89 147.43 3.13 4.53 6-FFn 4.00 2.00 3.54 4.00 0.00 1.60 .
108 147.73 3.55 4.83 6--FFn 4.00 2.20 4.30 4.00 0.00 1.60
126 148.06 3.96 5.16 6-FFn 4.00 2.39 5.01 4.00 0.00 1.60
144 148.45 4.39 5.55 6-FFn 4.00 2.56 5.73 4.00 0.00 1.60
162 148.89 4.86 5.99 6-FFn 4.00 2.72 6.45 4.00 0.00 1.60
180 149.38 5.36 6.48 6-FFn 4.00 2.87 7.16 4.00 0.00 1.60
--------------------------------------------------------------------------------
E1. inlet face invert 142.90 ft E1. outlet invert 142.80 ft
El. inlet throat invert 0.00 ft El. inlet crest 0.00 ft
--------------------------------------------------------------------------------
***** SITE DATA ***** CULVERT INVERT **************
INLET STATION (FT) 0.00
INLET ELEVATION (FT) 142.90
OUTLET STATION (FT) 80.00
OUTLET ELEVATION (FT) 142.80
NUMBER OF BARRELS 2
SLOPE (V-FT/H-FT) 0.0012
CULVERT LENGTH ALONG SLOPE (FT) 80.00
***** CULVERT DATA SUMMARY ************************
BARREL SHAPE CIRCULAR
BARREL DIAMETER 4.00 FT
BARREL MATERIAL CORRUGATED STEEL
BARREL MANNING'S N 0.024
INLET TYPE CONVENTIONAL
INLET EDGE AND WALL THIN EDGE PROJECTING
INLET DEPRESSION NONE
3
CURRENT DATE 03-15-1999 FILE DATE: 03-08-1999
CURRENT TIME: 12:17:47 FILENAME: PARTACCE
--------------------------------------------------------------------------------
-------------------------- TAILWATER ------
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
CONSTANT WATER SURFACE ELEVATION
144.40
--------------------------------------------------------------------------------
------------------------- ROADWAY OVERTOPPING DATA --------------------------
--------------------------------------------------------------------------------
ROADWAY SURFACE. PAVED
EMBANKMENT TOP WIDTH (FT) 20.00
CREST LENGTH (FT) 200.00
OVERTOPPING CREST ELEVATION (FT) 147.00
--------------------------------------------------------------------------------
4. w
FILE DATE: 03-05-1999
CURRENT DATE: 03-15-1999 FILE NAME: BARREL
CURRENT TIME: 12:20:08
-----
--------
-----
--------------
------------------------- -----
----FHWA CULVERT ------
ANALYSIS ------------ --------------.
-----------------------
----- - -- HY-8, VERSION 4.1
---- ------_-----
------- --------------
---
----------------
-------- -------------------------
CULVERT SHAPE, MATERIAL, INLET
---
C I SITE DATA ---------- ------------- ----------
U f-------- BARRELS
I L INLET OUTLET CULVERT
SPAN
RISE MANNIN
G INLET
SHAPE
V ( ELEV. ELEV. LENGTH (FT) (FT) n TYPE
# (FT) (FT) MATERIAL
(FT) ----- ------------- --------------
------------------- ------- ?- 00
2 2.00 .013 CONVENTIONAL
1 ? 143.00 142.90 3 RCP
50.00 i . I
2 I
3 f
4 I I
5 ? I
------
I-6-i------------------ ------------------ ----------- ------------- ---------
----------
----------- ---------
DATE: 03-05-1999
-------------
FILE: BARREL
SPRY OF CULVERT FLOWS (CFS)
5 6 ROADWAY ITR
ELEV (FT) TOTAL 1 2 3 4
0 0 0 p 0 1
143.00 0 0
0 0
° 0
O l
0
18
144.74 18 0 p
0 0
0 1
p
145.45 36 36 0
0 p 0 0 0 1
146.41 54 0
54 0
0 0 0 0 1
148.86 72 72 0
p p
0 0 1
0
150.00 90 90 0 0
0 0 p 0 1
151.44 108 108 0 0
0 0 p 0 1
153.10 126 126 0
0 p
0 0 0 1
155.04 144 0
144 0
° 0 0 0 1
157.23 162 162 0 0
0 0 p 0 1
67 180
159 180 0 0 p 0 OVERTOPPING
.
200.00 258
---- ----------------- 258 0
----
------------- 0
-----------
------------- -----
------------
---- ----------------
----------------- ----
--------------
-------------- -----------
FILE: BAR
FILE: BAR -------------
REL
REL -----------------
DATE: 03-05-1999
DATE: 03-05
SUMMARY OF ITERATIVE SOLUTION ERRORS
TOTAL FLOW ? FLOW
HEAD HEAD
FLOW(CFS), ERROR(CFS) ERROR
ELEV(FT) ERROR(FT) 0 0.00
143.00 0.00 0
18 0 0.00
144.74 0.00
36
0 0.00
145.45 0.00 54 0 0.00
146.41 0.00 72
72 0 0.00
148.86 0.00
90 0 0.00
150.00 0.00
108
° 0.00
151.44 0.00
126 0
0.00
153.10 0.00 144 0 0.00
155.04 0.00 0 0.00
157.23 0.00 180 0 0.00•
159.67 0.00 ---------
-------------------- ------------- <2> TOLERANCE (?) = 0.000
<1> TOLERANCE (FT)
-------------------- = 0.010
-----------------
-----------
-------------- --------------
-----
2
CURRENT DATE: 03-15-1999 FILE DATE: 03-05-1999
CURRENT TIME: 12:20:08 FILE NAME: BARREL .
--------------------------------------------------------------------------------
PERFORMANCE CURVE FOR CULVERT # 1 - 3 ( 2 BY 2 ) RCP
---------------------------------------------------------------------------------
DIS- HEAD- INLET OUTLET
CHARGE WATER CONTROL CONTROL FLOW NORMAL CRITICAL OUTLET TAILWATER
FLOW ELEV. DEPTH DEPTH TYPE DEPTH DEPTH VEL. DEPTH VEL. DEPTH
(cfs) (ft) (ft) (ft) <F4> (ft) (ft) (fps) , (ft) .(fps) (ft)
---------------------------------------------------------------------
0 143.00 0.00 0.00 0-NF 0.00 0.00 0.00 0..00 0.00 0.10
18 144.74 1.22 1.74 3-Mlt 1.11 0.86 2.10 1.71 0.00 1.71
36 145.45 1.82 2.45 4-FFt 2.00 1.24 3.82 2.00 0.00 2.14
54 146.41 2.42 3.41 4-FFt 2.00 1.52 5.73 2.00 0.00 2.58
72 148.86 3.22 5.86 4-FFt 2.00 1.72 7.64 2.00 0.00 4.31
90 150.00 4.27 7.00 4-FFt 2.00 1.90 9.55 2.00 0.00 4.53
108 151.44 5.56 8.44 4-FFt 2.00 2.00 11.46 2.00 0.00 4.83
126 153.10 7.06 10.10 4-FFt 2.00 2.00 13.37 2.00 0.00 5.16
144 155.04 8.81 12.04 4-FFt 2.00 2.00 15.28 2.00 0.00 5.55
162 157.23 10.94 14.23 4-FFt 2.00 2.00 17.19 2.00 0.00 5.99
180 159.67 13.82 16.67 4-FFt 2.00 2.00 19.10 2.00 0.00 6.48
--------------------------------------------------------------------------------
E1. inlet face invert 143.00 ft El. outlet invert 142.90 ft
El. inlet throat invert 0.00 ft El. inlet crest 0.00 ft
--------------------------------------------------------------------------------
***** SITE DATA ***** CULVERT INVERT **************
INLET STATION (FT) 0.00
INLET ELEVATION (FT) 143.00
OUTLET STATION (FT) 50.00
OUTLET ELEVATION (FT) 142.90
NUMBER OF BARRELS 3
SLOPE (V-FT/H-FT) 0.0020
CULVERT LENGTH ALONG SLOPE (FT) 50.00
***** CULVERT DATA SUMMARY ************************
BARREL SHAPE CIRCULAR
BARREL DIAMETER 2.00 FT
BARREL MATERIAL CONCRETE
BARREL MANNING'S N 0.013
INLET TYPE CONVENTIONAL
INLET EDGE AND WALL GROOVED END PROJECTION
INLET DEPRESSION NONE
TAILWATER RATING CURVE
FLOW(CFS) W.S.E.(FT) DEPTH (FT)
0
143.00
.10
0
1S 144.61 1.71
36 145.04 2.
54 145.48 2.58
58
72 147.21 4.31
90 147.43 4.53
108 147.73 4.83
126 148.06 5.16
144 148.45 5.55
162 148.89 5.99
180
149.38
6.48
--------------------
------------
-------- ---------
----------------------------
------------ DATA -----------------
------- ROADWAY OVERTOPPING
_______- _______
--------------------------
PAVED
ROADWAY SURFACE 30.00
EMBANKMENT TOP WIDTH (FT) 200.00
CREST LENGTH (FT) 200.00
nvRRTOPPING CREST ELEVATION (FT)
}. ?SS?MES TAWWATEiZ
.**RRR*#**#x*#x##r#####r#r###*####rx* # U.S. ARMY CORPS OF ENGINEERS #
# # HYDROLOGIC ENGINEERING CENTER'- r
FLOOD HYDROGRAPH PACKAGE (HEC-1) # # 609 SECOND STREET
MAY 1991 R DAVIS, CALIFORNIA 9561.
#.. r
VERSION 4.0.1E * • (916) 551-1748 #
Lahey F77L-EM/32 version 5.01
Dodson & Associates, Inc. x*#*xx#####r##x###rw##xr#x###*#*#.##**#*
2UN DATE 03/18/99 TIME 11:57:40
X'. X XXXXXXX XXXXX XX
X X X X X X
X XX X X
XXXXXXX XXXX X XXXXX X
X. X X X X
X X X X XXX
X X XXXXXXX XXXXX
HECIGS, HECIDB, AND HECIKW.
THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC AGE FROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE-
D 7
THE DEFINITIONS OF VARIABLES -RTIMP- AND ANGE- HAVE
ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEEP 81. THIS I STAGE FREQUENCY,VERSION ION, THE DEFINITION OF -AMSKK- SINGLE EVENT DAMAGE ?'CU?
NEW OPTIONS: DAMBREAK OUTFLOW SUBMERGENCE
DSS ION
:READ TIME SERIES AT DESIRED CALCULATION INTERVAL LOSS RATE:GREEN AND AMPT INFILTRAT
KINEMATIC WAVE: NEW FINITE DIFFERENCE ALGORITHM
LINE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
HEC-1 INPUT PAGE `1
ID....... I....... 2....... 3....... 4....... 5....... 6.......7.... .8.......9.. 10
* ASSUMES TAILWATER ON RISER SYSTEM
*DIAGRAM
ID PARTNERS
ID PROP CONDITIONS 10-YEAR FREQUENCY, 24 HOUR DURATION
ID SCS TYPE II DISTRIBUTION
IT 5 300
IO 5
JR PREC 5.38 8
KK BSN 1
KM HYDROGRAPH FROM SUBBASIN 1
BA 0.0795
PB 1
IN 6
PC 0.0 .00101 .00202 .00305 .00408 ..00513 .00618 .00725 .00832 .00941
PC .01050 .01161 .01272 .01385 .01498 .01613 .01728 .01845 .01962 .02081
PC .022 ..02321 .02442 .02565 .02688 .02813 .02938 .03065 .03192 .03321
PC .03450 .03581 .03712 .03845 .03978 .04113 .04248 .04385 .04522 .04661
PC .048 .04941 .05084 .05229 .05376 .05525 .05676 .05829 .05984 .06141
PC .063 .06461 .06624 .06789 .06956 .07125 .07296 .07469 .07644 .07821
PC .08 .08181 .08364 .08549 .08736 .08925 ..09116 .09309 .09504 .09701
PC .099 .10101 .10304 .10509 .10716 .10925 .11136 .11349 .11564 .11781
PC .12 .12225 .12460 .12705 .12960 .13225 .13S .13785 .14080 .14385
PC .147 .1502 .15340 .1566 .1598 .163 .16628 .16972 .17332 .17708
PC .181 .18512 .18948 .19408 .19892 .204 .2094 .2152 .2214 .228
PC .235 .24268 .25132 .26092 .27148 .283 .30684 .35436 .43079 .56786
PC .663 .68196 .69864. .71304 .72516 .735 .74344 .75136 .75876 .76564
PC .772 .77796 .78364 .78904 .79416 .799 .8036 .808 .8122 .8162
PC .82 .82367 .82726 .83079 .83424 .83763 .84094 .84419 .84736 .85047
PC .85350 .85647 .85936 .86219 .86494 .86763 .87024 .87279 .87526 .87767
PC .88 .88229 .88455 .88679 .889. .89119 .89335 .89549 .8976 .89969
PC .90175 .90379 .9058 ..90779 .90975 .91169 .9136 .91549 .91735 .91919
PC .921 .92279 .92455 .92629 .928 .92969 .93135 .93299 .9346 .93619
PC .93775 .93929 .9408 .94229 .94375 .94519 .9466 .94799 ..94935 .95069
PC .952 .9533 .95459 .95588 .95716 .95844 .95971 ,96098 .96224 .9635
PC .96475 .966 .96724 .96848 .96971 .97094 .97216 .97338 .97459 .9758
PC .977 .9782 .97939 .98058 .98176 .98294 .98411 .98528 .98644 .98760
PC .98875 .9899 .99104 .99218 .99331 .99444 .99556 .99668 .99779 .9989
PC 1.0
LS 81
UD 0.345
* 10'x4' CONCRETE RISER BOX WITH TRIPLE 24" RCP'S FOR BARRELS
KK ROUTE
KM ROUTE THROUGH PROPOSED DETENTION POND
RS 1 ELEV 144
SA 1.03 1.28 1.88 2.74 3.65 4
SE 143 144 145 146 147 148
SQ 0 0 1.2 6.3 45 56 98 168 257
SE 143 144 145 145.5 146 146.5 147 147.5 148
ZZ
###w#f rff rwwwwwf wrrwwxfr#xrxxxxxwwwwr#wxw
# r
+ FLOOD HYDROGRAPH PACKAGE (HEC-1) +
* MAY 1991
* VERSION 4.0.1E
+ Lahey F77L-EM/32 version 5.01
+ Dodson & Associates, Inc.
* RUN DATE 03/18/99 TIME 11:57:40
xf xf xx,tf##wwxxxxfxwfwwf wwww?wffffffff xxxx
*+**+*+*rrr**+***w+**+r*r*#*fr#?r•ar wrfr
* U. S. ARMY CORPS OF ENGINEERS «
* HYDROLOGIC ENGINEERING CENTER +
* 609 SECOND STREET.'` w
•. DAVIS, CALIFORNIA;.55616
+ (916) 551-1748 w
ffrw?x,trrrrr«wwx rf x#x«.#xxfi«wxxf rrwr«f«
PARTNERS
PROP CONDITIONS 10-YEAR FREQUENCY, 24 HOUR DURATION
SCS TYPE II DISTRIBUTION
5 10 OUTPUT CONTROL VARIABLES
IPRNT 5 PRINT CONTROL
IPLOT 0 PLOT CONTROL
QSCAL 0. HYDROGRAPH PLOT SCALE
IT HYDROGRAPH TIME DATA
NMIN 5 MINUTES IN COMPUTATION INTERVAL
IDATE 1 0 STARTING DATE
ITIME 0000 STARTING TIME
NQ 300 NUMBER OF HYDROGRAPH ORDINATES
NDDATE 2 0 ENDING DATE
NDTIME 0055 ENDING TIME
ICENT 19 CENTURY MARK
COMPUTATION INTERVAL 0.08 HOURS
TOTAL TIME BASE 24.92 HOURS
ENGLISH UNITS
DRAINAGE AREA SQUARE MILES
PRECIPITATION DEPTH INCHES
LENGTH, ELEVATION FEET
FLOW CUBIC FEET PER SECOND
STORAGE VOLUME ACRE-FEET
SURFACE AREA ACRES
TEMPERATURE DEGREES FAHRENHEIT
JP MULTI-PLAN OPTION
NPLAN 1 NUMBER OF PLANS
JR MULTI-RATIO OPTION
RATIOS OF PRECIPITATION
5.38 8.00
PEAK FLOW AND STAGE (END-OF-PERIOD) SUMMARY FOR MULTIPLE PLAN-RATIO ECONOMIC COMPUTATIONS
.FLOWS IN CUBIC FEET PER SECOND, AREA IN SQUARE MILES .
TIME TO PEAK IN HOURS
RATIOS APPLIED TO PRECIPITATION
OPERATION STATION. AREA PLAN RATIO 1 RATIO 2
5.38 8.00
HYDROGRAPH AT BSN 1 0.08 1 FLOW 131. 223.
TIME 12.25 12.25
ROUTED TO ROUTE 0.08 1 FLOW 56. 135.
TIME 12.67 12.50
**.PEAK STAGES IN FEET *•
1 STAGE 146.49 147.26
TIME 12.67 12.50
**• NORMAL END OF HEC-1 ***
v
?KM& ? MEMO
? TELEPHONE
ENGINEERS ? HELD REPORT
? CONFERENCE
PLANNERS
SURVEYORS DATE: g?Q°1 rr TIME:
AUTHOR: ~? (,,vGy Eraa,?
PROJECT: Rwr wt?-? C ct? ?'? CLIENT:
PROD. NO.
SUBJECT:
„
I OF No ? ?? 1Z M?" • M ?
12 1 17. 7.04
r
w -s5
.w
7A Mf'
.oo
eff
S. S o ? q 1 51 c t •S cI=
lff o 1 Z 4S
?.n? o0 300 - 35 Ll
La
.s
T, o $ej / l ?. t 1.
51 , tk S
Anti-flotation Block
Displacement:
ht= 3 ft.
structure = 10'x 4' Rectangular Riser
cf = area"ht
120.0 cf
safety facto 1.25
150.0 cf
Weight required:
150.0 cf
62.4 Ibs/cf
9360.0 Ibs needed
Block dimensions:
1.5' depth
6.0' width
12.5' length
112.5 cf
Weight provided:
112.5 cf
85 Ibs/cf - concrete submerged
9562.5 Ibs provided
Page 1
m
V
m
m
?o
Li -a
W
z
?
c m
N
Cl)
g
CL. I
n
rt D ?
CJ1 N ,.
0 E
D Y
N
N :3 n
O C7
O
CA
CL
o M
3
om
0
, o n m
CA
3 ,NV ?v?? m? CDC-M ?
a0 0
m
G O
Z az
IV
^
-AD o
> m
(A
0)
n
4
o
-0
G
oc
n
ii o c
.
m cu
v
a
Z n
n
-^ o
o
w 0
m
v n
vr ?
m
CL
(D 3
0) _ cn
o - p
3
3
o ?
0 M r- oo CD 'i
m
- o 0
0
0
m o0 0
c z
C.n ? W
-t o
?
?
<
4
-
lk m
CD
?9mmo;u m
N om, m20<zm Cl)
0o v o m 0 v? U) r
N Tl??o-? z
z
2
o CL CD
3? C/)
m
Ix
I
I
I
I
N '0
,
?
,
,
N
Cl)
• ' - • • DATE DESIGN PHASE
0 3/19/99 PRELIM
PROJECT NAME PROJECT NO CONSTR
Partners Equity Pond 1319-0001.OR REVISION
LOCATION BY RECORD
Smithfield, NC GML OTHER
CHECKED BY (SPECIFY)
MVZ
Storm Outlet Structure
FES No.= Outfall Channel Q10/Qfull = 0.26
Pipe Dia= 72 in = (3) x 24" Dia. VNfull = 0.83
Slope = 0.0025 fUft V = 6.23 fps
Q10 = 56.00 cfs
Qfull = 212.07 cfs
Vfull = 7.50 fps
From Fig. 8.06.b.1: Zone = 3
From Fig. 8.06.b.2: D50 = 10 in
DMAx = 15 i
n
Cl
Ri = 1
prap
ass
Apron Thickness = 22.5 in
Apron Length = 48.0 ft
Apron Width = 3xDia = 18 ft
s:\1319\0001 \calcs\OUTLET.xIs
LATEST PRINTING: 3/18/99 12:48 PM
PAGE 1 OF 1
'07/08/99 12:18
McKIN & CREED/RL -!-?? RANCH WOOD PRO. Z002
Project Name: 1?AZC, Q G20 121 G¢nu? Project Number-
Responsible Party:.SoKN :S.kA%CgoSS _Jp- Phone Number. 91q'434" 3652
And Tide
Address.-? D. BO I( 1x.44, SIC. rrNf11;LD N.C. 2 15T
1. Inspect monthly, or after every runoff-producing rainfall event, whichever is more frequent:
A. Remove debris from the trash rack.
B. Check and dear the; orifice of any obstructions.
C. Check the pond side slopes; remove trash, repair eroded areas before the next rainfall
event.
D. Check the vegetated filter for sediment accumulation, erosion !and proper operation.
Repair as necessary:.
ll. Quarterly
A. Inspect the collection system (.e. catch basins, piping, grassed swales) for proper
functioning. Clear accumulated trash from catch basin grates and catch basin bottoms,
and check piping forobstructions.
B. Check pond inlet po6ds for undercutting, replace riprap, and repair broken pipes.
C. Reseed grassed swales, including the vegetated filter if applicable, twice a year as
necessary. Repair eroded areas immediately.
ill. Every 6 months
A. Remove accumulated, sediment from the bottom of the outlet structure.
B. Check the pond depth at various points in the pond. If depth is reduced to three feet,
sediment will be removed to at least original depth of four feet.
1&07/08/99 12:18 $9192338031
i
POND MAINTENANCE REQUIREMENTS (continued)
PAGE 2
IV. General
A. Mow the side slopes, not including normally submerged vegetated shelf, according to
the season. Mawmum grass height wilt be 6':
B- Cattails, and other indigenous wetland plants are encouraged along the pond perimeter,
however, they must be removed when they cover the entire surface area of the pond.
C. The orifice is designed to draw. down the pond in. 2-5 days. If draw down is not
accomplished in that time, the system may be clogged- The. source of the clogging must
be found and eliminated.
D. All components of the detention pond system must be kept in good woridng order-
POND MAINTENANCE REQUIREMENTS(CoFifinued)
PARTNERS EQUITY GROUP hereby acknowledges that it is the financially responsible
party for maintenance of this detention pond and will perform the maintenance as
outlined above as part of the Certification of Compliance with Stormwater
Regulations received for this project.
PARTNERS EQUITY GROUP
A North Carolina General Partnership
BY: SIX S PARTNERS,
5_A orth arol' a neral Partnership
S. oss, Jr.
eneral Partner
BY: INDUSTRIAL DRIVE PARTNERS
A North Carolina General Partnership
Riles . E erring
Managing Partner
NORTH CAROLINA
JOHNSTON COUNTRY
I, Jean M. Coe, a Notary Public of the County and State aforesaid, certify
that JOHN S. SHALLCROSS, JR., General Partner of SIX S PARTNERS, a North Carolina
general partnership, personally appeared before me this day and acknowledged the
due execution of the foregoing instrument on behalf of the partnership.
Witness my hand and official stamp or seal this the 12 ' day of.•J ]; 4",i-',
.x'
My Commission Expires: ?o Z S?L 6 a O • •
"'; PUBLIC ;? c,c?:
NORTH CAROLINA ,',????? yvVM•' ,,
JOHNSON C +m!
I, a Notary Public of the County and State
aforesa' ce i y tat MI S G. FLEMING, Managing Partner of INDUSTRIAL DRIVE
PARTNER a North Carolina general partnership, personally appeared before this
day and acknowledged'the due execution of the foregoing instrument on behalf of
the partnership.
Witness my hand and official stamp or seal, this the/z day of July, 1999.
• ?1?. W.
N ar Pu 1C ??,• ••°°ya...o2%0 °11 %
My Commission Expires:
/o J'Lov c7 •
"o?• PUBLIC acs J.
•
'°
%
?''.yiy••••.°°....•••' ?l
'01th NC01161o.
t",lAts NJ 1 !4« WATM (V
rrrwr rrr#wrfrwrwwrwr#wwrwfwwr+#+rrwrwwrwf
?r r
* FLOOD HYDROGRAPH PACKAGE (HEC-1) •
* MAY 1991 •
* VERSION 4.0.1E
• Lahey F77L-EM/32 version 5.01
* Dodson & Associates, Inc. •
* RUN DATE 07/11/00 TIME 14:25:21
wwrf#+wwr#w#rwwwwwww+r+ff::r##?rr?wrww#wr
' +wr#rrrrwrrrrwww##rw#w+rrrww#wr•+wrrw#r
r r
* U.S. ARMY CORPS OF ENGINEERS
* HYDROLOGIC ENGINEERING CENTER
* 609 SECOND STREET +
• DAVIS, CALIFORNIA 95616 +
* (916) 551-1748 #
rwff###frfwwwrrl+f#rrrwr#ww•wrrw lwr wf#?
x x xxxxx xx xx xxx x
x x x x x xx
x x. x x x
xxxx xxx xxxx x xx xxx x
x x x x x
x x x x x x
x x XXXX2 = xx xxx xxx
THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC-1 KNOWN AS HEC1 (JAN 73), HECIGS, HECIDB, AND HECiKW.
THE DEFINITIONS OF VARIABLES -RTIMP- AND -RTIOR- HAVE CHANGED FROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE.
THE DEFINITION OF -AMSKK- ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEP 81. THIS IS THE FORTRAN77 VERSION
NEW OPTIONS: DAMBREAK OUTFLOW SUBMERGENCE , SINGLE EVENT DAMAGE CALCULATION, DSS:WRITE STAGE FREQUENCY,
DSS:READ TIME SERIES AT DESIRED CALCULATION INTERVAL LOSS RATE:GREEN AND AMPT INFILTRATION
KINEMATIC WAVE: NEW FINITE DIFFERENCE ALGORITHM
HEC-1 INPUT PAGE 1
LINE ID. ...... 1.. ..... 2. ...... 3....... 4.. ..... 5. ...... 6 ....... 7 ....... 8 ....... 9 ...... 10
* ASSUMES NO TAILWATER ON RISER SYSTEM
*DIAGRAM
1 ID PARTNERS
2 ID PROP CONDITIONS 10-YEAR FREQUENCY, 24 HOUR DURATION
3 ID SCS TYPE II DISTRIBUTION
4 IT 5 300
5 IO 5
6 JR PREC 5.38 8
7 KK BSN 1
8 KM HYDROGRAPH FROM SUBBASIN 1
9 BA 0.0795
10 PB 1
11 IN 6
12 PC 0.0 .00101 .00202 .00305 .00408 .00513 .00618 .00725 .00832 .00941
13 PC .01050 .01161 .01272 .01385 .01498 .01613 .01728 .01845 .01962 .02081
14 PC .022 .02321 .02442 .02565 .02688 .02813 .02938 .03065 .03192 .03321
15 PC .03450 .03581 .03712 .03845 .03978 .04113 .04248 .04385 .04522 .04661
16 PC .048 .04941 .05084 .05229 .05376 .05525 .05676 .05829 .05984 .06141
17 PC .063 .06461 .06624 .06789 .06956 .07125 .07296 .07469 .07644 .07821
18 PC .08 .08181 .08364 .08549 .08736 .08925 .09116 .09309 .09504 .09701
19 PC .099 .10101 .10304 .10509 .10716 .10925 .11136 .11349 .11564 .11781
20 PC .12 .12225 .12460 .12705 .12960 .13225 .135 .13785 .14080 .14385
21 PC .147 .1502 .15340 .1566 .1598 .163 .16628 .16972 .17332 .17708
22 PC .181 .18512 .18948 .19408 .19892 .204 .2094 .2152 .2214 .228
23 PC .235 .24268 .25132 .26092 .27148 .283 .30684 .35436 .43079 .56786
24 PC .663 .68196 .69864 .71304 .72516 .735 .74344 .75136 .75876 .76564
25 PC .772 .77796 .78364 .78904 .79416 .799 .8036 .808 .8122 .8162
26 PC .82 .82367 .82726 .83079 .83424 .83763 .84094 .84419 .84736 .85047
27 PC .85350 .85647 .85936 .86219 .86494 .86763 .87024 .87279 .87526 .87767
28 PC .88 .88229 .88455 .88679 .889 .89119 .89335 .89549 .8976 .89969
29 PC .90175 .90379 .9058 .90779 .90975 .91169 .9136 .91549 .91735 .91919
30 PC .921 .92279 .92455 .92629 .928 .92969 .93135 .93299 .9346 .93619
31 PC .93775 .93929 .9408 .94229 .94375 .94519 .9466 .94799 .94935 .95069
32 PC .952 .9533 .95459 .95588 .95716 .95844 .95971 .96098 .96224 .9635
33 PC .96475 .966 .96724 .96848 .96971 .97094 .97216 .97338 .97459 .9758
34 PC .977 .9782 .97939 .98058 .98176 .98294 .98411 .98528 .98644 .98760
35 PC .98875 .9899 .99104 .99218 .99331 .99444 .99556 .99668 .99779 .9989
36 PC 1.0
37 LS 88
38 UD 0.345
* 1 0'x4' CONCRETE RISER BOX WITH TRIPLE 24" RCP'S FOR BARRELS
39 KK ROUTE
40 KM ROUTE THROUGH PROPOSED DETENTION POND
41 RS 1 ELEV 144
42 SA 1.03 1.28 1.88 2.74 3.65 4
43 SE 143 144 145 146 147 148
44 SQ 0 0 1.2 6.3 45.6 71 117 195 290
45 SE 143 144 145 145.5 146 146.5 147 147.5 148
46 ZZ
SCHEMATIC DIAGRAM OF STREAM NETWORK
INPUT
LINE (V) ROUTING (--->) DIVERSION OR PUMP FLOW
NO. (.) CONNECTOR (<---) RETURN OF DIVERTED OR PUMPED FLOW
7 BSN 1
V
V
39 ROUTE
(***) RUNOFF ALSO COMPUTED AT THIS LOCATION
*y ?
wrr++wwrrrrrrw+w++ww r+ww+rrw+wwww+,e+wwwrw - +w+ +wwr+wrrr+ww+wrwwwwwr+rr++w*wr+ww w+w
* FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CORPS OF ENGINEERS
* MAY 1991 * * HYDROLOGIC ENGINEERING CENTER
* VERSION 4.0.1E * * 609 SECOND STREET
* Lahey F77L-EM/32 version 5.01 * *. DAVIS, CALIFORNIA 95616
* Dodson & Associates, Inc. * * (916) 551-1748
* RUN DATE 07/11/00 TIME 14:25:21
+ww+wwr++r+wwwwww+++++rr++ww+rwrrr++rwwwr - w+r+wr+rw+++r+t+w ww:r+wwwwr,rwwrwrwtr wrr
PARTNERS
PROP CONDITIONS 10-YEAR FREQUENCY, 24 HOUR DURATION
SCS TYPE II DISTRIBUTION
5 IO OUTPUT CONTROL VARIABLES
IPRNT 5 PRINT CONTROL
IPLOT 0 PLOT CONTROL
QSCAL 0. HYDROGRAPH PLOT SCALE
IT HYDROGRAPH TIME DATA
NMIN 5 MINUTES IN COMPUTATION INTERVAL
IDATE 1 0 STARTING DATE
ITIME 0000 STARTING TIME
NO 300 NUMBER OF HYDROGRAPH ORDINATES
NDDATE 2 0 ENDING DATE
NDTIME 0055 ENDING TIME
ICENT 19 CENTURY MARK
COMPUTATION INTERVAL 0.08 HOURS
TOTAL TIME BASE 24.92 HOURS
ENGLISH UNITS
DRAINAGE AREA SQUARE MILES
PRECIPITATION DEPTH INCHES
LENGTH, ELEVATION FEET
FLOW CUBIC FEET PER SECOND
STORAGE VOLUME ACRE-FEET
SURFACE AREA ACRES
TEMPERATURE DEGREES FAHRENHEIT
JP MULTI-PLAN OPTION
NPLAN 1 NUMBER OF PLANS
JR MULTI-RATIO OPTION
RATIOS OF PRECIPITATION
5.38 8.00
PEAK FLOW AND STAGE (END-OF-PERIOD) SUMMARY FOR MULTIPLE PLAN-RATIO ECONOMIC COMPUTATIONS
FLOWS IN CUBIC FEET PER SECOND, AREA IN SQUARE MILES
TIME TO PEAK IN HOURS
RATIOS APPLIED TO PRECIPITATION
OPERATION STATION AREA PLAN RATIO 1 RATIO 2
5:38 8.00
HYDROGRAPH AT BSN 1 0.08 1 FLOW 155. 248.
TIME 12.25 12.25
ROUTED TO ROUTE 0.08 1 FLOW 89. 167.
TIME 12.50 12.50
** PEAK STAGES IN FEET •*
1 STAGE 146.69 147.32
TIME 12.50 12.50
*** NORMAL END OF HEC-1 ***