Loading...
HomeMy WebLinkAboutNCS000403_NOD_20220708STATE "'*... ROY COOPER Governor If l' a w ELISABETH BISERA o,r, Secretary {t ^nllt IJ 1'77Y BRIAN WRENN``>�"" Director NORTH CAROLINA Environmental Quality July 8, 2021 CERTIFIED MAIL 70201810 0001 2075 2246 RETURN RECEIPT REQUESTED Town of Elon Attn: Rich Roedner, Town Manager Post Office Box 595 Elon, North Carolina 27244 Subject: NOTICE OF DEFICIENCY (NOD-2022-PC-0110) Town of Elon NPDES MS4 Permit No. NCS000403 Alamance County Dear Mr. Roedner: On June 29, 2022, staff from the North Carolina Department of Environmental Quality (DEQ) conducted a compliance audit of subject National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) Permit. The audit identified minor deficiencies with the specific components of the MS4 permit that were reviewed, as provided in the attached DEQ MS4 Permit Compliance Audit Report. This report lists and describes the deficiencies with certain components of the MS4 permit, which constitutes a violation of the Clean Water Act and is grounds for enforcement action. In accordance with Part VI of the permit and DEQ policy, a new 5-year MS4 permit will be issued in response to the audit. As such, the permittee is required to complete the following actions: 1. Respond in writing within thirty (30) calendar days from the date of receipt of this notice to acknowledge these requirements and the intent to comply. 2. Self -evaluate the permit components that were not reviewed by DEQ for compliance and submit the results within one hundred twenty (120) calendar days from the date of receipt of this letter. The Part II of the MS4 Phase II Audit Template on the DEQ stormwater web site can be used for this purpose. The specific sections that should be self -audited include: a. Part II Section B: Public Education and Outreach b. Section C, Public Involvement and Participation 3. Develop a Stormwater Management Plan (SWMP) which details specific actions, measurable goals, and implementation timelines for the stormwater management program over the new 5-year permit term. The SWMP must be documented utilizing the DEQ Phase II MS4 SWMP Template. The permittee shall submit the SWMP to DEQ for review and comment within one hundred twenty (120) calendar days from the date of receipt of this letter. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105 �_,. 336-776-9800