Loading...
HomeMy WebLinkAboutNCC205399_NOT Closeout Documents_20220715North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Dare Project: College of the Albemarle - New River basin: Pasquotank Person financially responsible: Dare County - Robert Outten, County Manager Project #: DARE-2021-006 Address: P.O. Box 1000, Manteo, NC 27954 1. Project Location: US Hwy 64, Manteo Pictures: No 2. Weather and soil conditions: 85 degrees, sunny, dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No contact was made. Title: Inspection report: Sent Report Date given/sent: July 12, 2022 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self - monitoring or self -inspections are required. The project is in compliance and released under the SPCA. The permittee must request termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) via a Notice of Termination (NOT). The NOT is available at https://edocs.deq.nc.gov/Forms/NCGO1- Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Scott Graboski Others present: Date of inspection: July 01, 2022 Time arriving on site: 11:00 AM Time leaving site: 11:10 AM cc: