Loading...
HomeMy WebLinkAbout20190159 Ver 1_Year 0 Monitoring Report_2022_20220718Mitigation Project Information Upload ID#* 20190159 Version* 1 Select Reviewer: * Erin Davis Initial Review Completed Date 07/18/2022 Mitigation Project Submittal - 7/18/2022 .................................................................................................................................................................................................................................................................. Is this a Prospectus, Technical Proposal or a New Site? * 0 Yes O No Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact Information Contact Name: * Email Address: * Jeremiah Dow jeremiah.dow@ncdenr.gov Project Information ID#:* 20190159 Existing ID# Project Type: Project Name: County: • DMS Mitigation Bank Strawberry Hill Mitigation Site Johnston Document Information Mitigation Document Type: * Mitigation As -Built Plans File Upload: Signature ............................................ Print Name: * Signature:* Version:* 1 Strawbe rryH i I I_100094_MY0_2022. pdf Existing Version 54.52MB Please upload only one PDF of the complete file that needs to be submitted... Jeremiah Dow (MYO) FINAL MONITORING REPORT - Stream Mitijiation STRAWBERRY HILL MITIGATION PROJECT Johnston County,North Carolina Neuse River Basin HUC 03020201 NCDMS Project#100094 DMS Contract#7745 RFP: 16-007576 USACE Action ID: SAW-2019-00124 1 DWR Project#2019-0159 +" 4'/_ e k� 1 r1 l�+y 41 g-P .fr y" T a •. cgs � ,Y 6,r f Provided by: Ores Resource Environmental Solutions,LLC for Environmental Banc&Exchange—Neuse I,LLC Prepared for: NC Department of Environmental Quality Division of Mitigation Services 1652 Mail Service Center Raleigh,NC 27699-1652 July 2022 MEMORANDUM fires 3600 Glenwood Avenue, Suite 100 Raleigh, North Carolina 27612 919.770.5573 tel. 919.829.9913 fax TO: Division of Mitigation Services FROM: Jamey McEachran — RES DATE: July 8, 2022 RE: DMS Comments on the Draft As -Built Baseline Monitoring Report Strawberry Hill, Project ID #100094, DMS Contract #0007745 Comments: 1. DMS recommends using the most current templates and tables for monitoring reports. It is understood that this project was contracted in December 2018 and therefore templates from that time period are applicable. However, the most current templates provide the IRT and DMS with the needed information in a more streamlined and less verbose format. Majority of the Report has been updated using the most current template and tables. 2. Recommend adding dates to photos that do not have them either at the top of the page or with each photo. Dates have been added to all photos. 3. Please add Limits of Disturbance to the Record Drawings. Limits of Disturbance (LOD) have been added to the Record Drawings. 4. Please consider updating the Sheet List Table on the Record Drawing Title Page in the buffer report only by removing the reference to sheets that are not included, or otherwise indicating that only sheets M1 & M2 are included. Also consider a reference to sheet EC2. The Sheet List Table has been updated to only include references to sheets M1 and M2. A Cover Page has also been added for the ESC map with a reference to sheet EC2. 5. During the site visit conducted on June 8, 2022 some small, isolated areas of struggling herbaceous growth were observed, specifically a small bare area on JH5 near the tree line and relatively sparse herbaceous cover along some portions of the old farm roads that paralleled JH5 and JH3. Areas did not appear to currently be causing any major issues, but we recommend over seeding this fall if herbaceous vegetation does not more fully establish this summer. This area will be monitored this fall and seeded if needed. 6. At the upstream end of JH1-B near Yelverton Grove Road there is a small area that appears to be less than 30' in width, but greater than 20', which would apply a 25% reduction to buffer credits in this area. Please update the buffer credits and report as necessary. The revision has been made. The area has been separated out as a unique polygon in the buffer shapefile and a row has been added in the buffer credit table that accounts for the 75% credit stipulation. The resulting credit yield was reduced by 227.498 credits. The report, credit table, and GIS shapefile have all been updated accordingly. Digital File Comments: 1. It is not possible to ensure the easement is accurate when compared to the CCPV in the stream asset baseline report, the CCPV does include the entire easement. The digital easement submitted does represent the DMS recorded easement. A requirement of the CCPV is to include the easement boundary, please revise the CCPV in the Stream Baseline Report to include the entire easement boundary. It is complete in the Buffer Baseline Report. Figure 2 has been divided into Figure 2a and 2b so that monitoring devices are legible on 2a and the entire conservation easement is visible on 2b. 2. The tables used are not the most updated templates (2020); this project may not have been contracted with these as requirements. The tables are missing the following information: a. Project Background is missing regulatory information and pre-existing stream lengths The Project Background tables were updated and display the new requirements. b. The goals table is missing from the digital submission and report. The goals table has been added to the report and digital submission. 3. In future submissions, please choose unique names for 'feature name' in buffer excel asset table and use those unique feature names in the digital submission attribute date for buffer feature class. There are numbers on the buffer asset map that are not defined in the legend. This is noted for future submissions, the unique feature names will be consistent. 4. Data missing from the digital submission: Please submit the missing data. a. Longitudinal profile is missing, data and graph Long pro data and graphs are shown in the as -built record drawings and redlines. b. Particle size distribution is missing, data and graph This is not a requirement in the approved mitigation plan nor required as part of the monitoring guidance and therefore was not conducted and will not provided in this report. c. Photo point spatial data file is missing Photo points have been added. d. Station id not included in the raw cross sectional survey data A spreadsheet has been added that includes the raw survey data with station id. e. Planted zone Planted zone has been added. 5. Please refer to DMS As-bult Survey Requirements, item 15; the .dwg file submitted is not adequately attributed. All layers were started with "AB-" to symbolize they are part of the As -Built condition. Layer details can be found behind the AB convention. Table of Contents 1 Project Summary 1 1.1 Project Location and Description 1 1.2 Project Components 1 1.3 Project Goals and Objectives 2 1.4 Construction and As -Built Conditions 3 1.5 Baseline Monitoring Performance (MYO) 3 1.5.1 Vegetation 3 1.5.2 Stream Hydrology 4 1.5.3 Stream Geomorphology 4 2 References 5 Appendix A: Visual Assessment Data Figure 1. Site Location Map Figure 2. Current Conditions Plan View Table 5. Visual Stream Morphology Assessment Table 6. Vegetation Condition Assessment Table General Site Photos Crossing Photos Monitoring Device Photos Appendix B: Vegetation Plot Data Table 7. Planted Species Summary Table 8. Vegetation Plot Mitigation Success Summary Table 9. Stem Count Total and Planted by Plot Species Vegetation Plot Photos Appendix C: Stream Morphology Data Table 10. Baseline Stream Data Summary Table 11. Cross Section Morphology Data Table Cross Section Overlay Plots Appendix D: Hydrologic Data Appendix E: Project Timeline and Contact Information Table 4. Project Timeline and Contact Information Appendix F: Other Data As -built Survey As -built Survey Redline 1 Project Summary 1.1 Project Location and Description The Strawberry Hill Mitigation Project ("Project") is located within a mostly rural watershed in Johnston County near Smithfield, NC at the crossroads of Yelverton Grove Road and Brogden Road. The Project lies within the Neuse River Basin, North Carolina United States Geological Survey (USGS) 8-digit Cataloguing Unit 03020201 (Neuse 01) and 14-digit hydrologic unit code (HUC) 03020201140010, a NC Division of Mitigation Services (DMS) Targeted Local Watershed (TLW) and the Division of Water Resources (NCDWR) sub -basin 03-04-02 (Figure 1). The Project restores 3,719 linear feet (LF) that will provide water quality benefit for 383 acres of drainage area. Additionally, the Project restores and preserves riparian buffer area within the project area, which provides riparian buffer credits for the Neuse 01 watershed. As -built and baseline conditions pertaining to the buffer mitigation component of this Project will be provided in a separate baseline monitoring report. Also, notably, the Project is in very close proximity (approximately 0.4 miles) to the RES Polecat Stream Mitigation Bank Site, offering even more functional uplift to the local watershed. The Project area, in whole, is comprised of a 22.12-acre easement involving two unnamed tributaries to Polecat Branch, which eventually drains to the Neuse River. One of the tributary streams, and its associated ditches, are not subject to stream mitigation and are only utilized for buffer mitigation. That portion of the Project will not be discussed in this stream mitigation as -built baseline monitoring report but will be included in a separate baseline monitoring report. Therefore, the stream mitigation component of the Project involves one tributary, whose total length prior to restoration was 3,267 LF. The Project is accessible from both Yelverton Grove Road and Brogden Road. Coordinates for the Project area are approximately 35.469579, -78.323896 at the NC Department of Transportation (DOT) culvert exiting the Project at Brogden Road. 1.2 Project Components Prior to restoration, the project stream was significantly impacted by historic relocation and straightening, crop production, timbering, and lack of riparian buffer. Proposed improvements to the Project will help meet the river basin needs expressed in the 2010 Neuse RBRP. Through stream restoration, the Project presents 3,719 LF of proposed stream, generating 3,719.000 Warm Stream Mitigation Units (SMUs). The Project Mitigation Quantities and Credits and Project Attributes are provided below in Table 1. Table 1. Strawberry Hill Mitigation Project (ID-100094) Project Mitigation Quantities and Credit Project Segment Original Mitigation Plan Ft/Ac As -Built Ft/Ac Original Mitigation Category Original Restoration Level Original Mitigation Ratio (X:1) Credits Stream 1007 Reach JHt-A 1007 Warm R 1.00000 1,007.000 1054 Reach JHi-B 1054 Warm R 1.00000 1,054.000 1658 Reach JHi-B 1658 Warm R 1.00000 1,658.000 Total: 3,719.000 No Wetland Mitigation Comments Channel restoration,installed log structures for grade control and habitat, riparian planting, installed livestakes (Stream Crossing: STA 11+64 to 12+59) Channel restoration,installed log structures for grade control and habitat, riparian planting, installed livestakes, (Stream Crossing: STA 23+13 to 23+74), Removed trash/debris Channel restoration, installed log structures for grade control and habitat, riparian planting, installed livestakes, Removed trash/debris Project Credits Restoration Level Stream Riparian Non -Rip Coastal Warm Cool Cold Wetland Wetland Marsh Restoration 3,719.000 Totals 3,719.000 Total Stream Credit 3,719.000 Strawberry Hill Mitigation Project Project #100094 1 As -Built Baseline Monitoring Report - Stream July 2022 1.3 Project Goals and Objectives Prior to construction the stream had been significantly impacted by historic relocation and straightening, crop production, timbering and lack of riparian buffer. The past land use disturbances, absence of buffer vegetation, and current agricultural practices presented a significant opportunity for water quality and ecosystem improvements through the implementation of this Project. Through the comprehensive analysis of the Project's maximum functional uplift using the Stream Functions Pyramid Framework, specific, attainable goals and objectives are being realized by the Project. These goals clearly help to address the degraded water quality and nutrient input from agricultural practices that were identified as major watershed stressors in the 2010 Neuse River Basin Restoration Priorities (RBRP) (amended August 2018). Ultimately, the Project supports the RBRP Goals listed in the Approved Mitigation Plan. The Project Summary Goals, Performance, and Results are provided below in Table 2. The Project Attributes are found in Table 3. Table 2: Summary: Goals, Performance and Results Goal Objective/Treatment Likely Functional Uplift Performance Criteria Measurement Cumulative Monitoring Results Improve flood flow attenuation on site and downstream by allowing for overbanks flows and connection to the floodplain. Designed and constructed stream channels sized to convey bankfull flows that will maintain a stable dimension, profile, and planform based on modeling, watershed conditions, and reference reach conditions. Dispersion of high flows on the floodplain, increase in biogeochemical cycling within the system. Four bankfull events and within monitoring period. Intermittent stream reaches must have 30 days of consecutive flow. Stage recorder on JH1-A, and flow gauge on JH1-B. N/A To transport water within streams and floodplains in a stable, non- erosive, non- aggrading manner. Improved flood bank connectivity by reducing bank height ratios and increase entrenchment ratios. Reduction in sediment inputs from bank erosion, reduction of shear stress, and improved overall hydraulic function. Bank height ratios remain below 1.2 and entrenchment ratios above 2.2 over the monitoring period. Visual assessments showing progression towards stability. 14 Cross section surveys. N/A Restore and preserve native floodplain and streambank vegetation. Established and increased forested riparian buffers to 50 feet and greater along both sides of the channel along the project reaches with a hardwood riparian plant community. Reduction in floodplain sediment inputs from runoff, increased bank stability, increased LWD and organic material in streams, increased. Survival rate of 320 stems per acre at MY3, 260 planted stems per acre at MY5, and 210 stems per acre at MY7. Seven fixed vegetation plots and four random vegetation plots. N/A Strawberry Hill Mitigation Project 2 As -Built Baseline Monitoring Report - Stream Project #100094 July 2022 Table 3. Project Attribute Table Project Name Strawberry Hill Mitigation Project County Johnston Project Area (acres) 22.12 Project Coordinates (latitude and longitude decimal 35.469579, -78.323896 Project Watershed Summary Information Physiographic Province 65m - Rolling Coastal Plain River Basin Neuse USGS Hydrologic Unit 8-digit I 3020201 DWR Sub -basin 03-04-02 Project Drainage Area (acres) 383 ac Project Drainage Area Percentage of Impervious Area 2% Land Use Classification Bottomland Forest, Cultivated, Evergreen Shrubland, Southern Yellow Pine, Unconsolidated Sediment Reach Summary Information Parameters Reach JH1-A Reach 1H1-B Pre -project length (feet) 901 2,336 Post -project (feet) 1,007 2,712 Valley confinement (Confined, moderately confined, Unconfined Unconfined Drainage area (acres) 193 ac 266 ac Perennial, Intermittent, Ephemeral Intermittent Intermittent NCDWR Water Quality Classification None None Dominant Stream Classification (existing) F5 F5 Dominant Stream Classification (proposed) C5/E5 CS/ES Dominant Evolutionary class (Simon) if applicable II II Regulatory Considerations Parameters Applicable? Resolved? Supporting Docs? Water of the United States - Section 404 Yes Yes See PCN Approval Water of the United States - Section 401 Yes Yes See PCN Approval Endangered Species Act Yes Yes Appendix L Historic Preservation Act Yes Yes Appendix L Coastal Zone Management Act (CZMA or CAMA) No N/A N/A Essential Fisheries Habitat No N/A N/A 1.4 Construction and As -Built Conditions Project construction was completed on January 20th, 2022, and planting was completed on March 7th, 2022. The Strawberry Hill Project was built to design plans and guidelines. The record drawings are included in Appendix F. There were no changes to the planting plan. However, as some high -quality tree species were found within the cutover areas that were timbered over eight years ago, these species were left in place where feasible. Minor monitoring device location changes were made during as -built installation, however, the quantities remained as proposed in the Mitigation Plan. 1.5 Baseline Monitoring Performance (MVO) The Strawberry Hill Baseline Monitoring activities were performed in February and March 2022. All Baseline Monitoring data is presented below and in the appendices. The Project is on track to meeting stream and vegetation interim success criteria. 1.5.1 Vegetation Setup and monitoring of the seven permanent vegetation plots and four random vegetation plots were completed after stream construction and planting, on March 7th, 2022 and March 15th, 2022. Vegetation Strawberry Hill Mitigation Project 3 As -Built Baseline Monitoring Report - Stream Project #100094 July 2022 data are in Appendix B, associated photos are in Appendix B, and plot locations are in Appendix A. MYO monitoring data indicates that all plots are exceeding the interim success criteria of 320 planted stems per acre. Planted stem densities ranged from 647 to 1,133 planted stems per acre with a mean of 861 planted stems per acre across all plots. A total of twelve planted species were documented within the plots. Two large volunteer species were identified in random plots (Diospyros virginiana and Sambucus canadensis) and it is expected that more volunteers will establish in upcoming years. The average stem height in the vegetation plots was 1.6 feet. Visual assessment of vegetation outside of the monitoring plots indicates that herbaceous vegetation is establishing throughout the project area. 1.5.2 Stream Hydrology One stage recorder and one flow gauge were installed on February 16th, 2022 on reaches JH1-A and JH1- B, respectively. The stage recorder is in place to document bankfull events. The flow gauge is in place to document presence and persistence of stream flow in the intermittent channel. In addition, a camera rig (flow camera) was installed in conjunction with the flow gauge on JH1-B in the attempt to capture daily images of stream flow through the riffle. Stream hydrology data will be included in the Monitoring Year 1 Report in this section and in the appendices. Gauge locations can be found on Figure 2 and photos are in Appendix A. 1.5.3 Stream Geomorphology Cross section setup and geomorphology data collection for MYO was collected on February 16th, 2022. Summary tables and cross section plots are in Appendix C. Overall, the baseline cross sections and profile relatively match the proposed design. The as -built conditions show that shear stress and velocities have been reduced for all restoration reaches. All reaches were designed as gravel bed channels and remain classified as gravel bed channels post -construction. Visual assessment of the stream channel was performed to document signs of instability, such as eroding banks, structural instability, or excessive sedimentation. The channel is transporting sediment as designed and will continue to be monitored for aggradation and degradation (Appendix C). Since Project construction, a suspected beaver dam has formed offsite, somewhere downstream of reach JH1-B and Brogden Road. This is causing some water to back up within the JH1-B channel near the road; however, most of the water is still contained within the channel and not causing any real inundation in the floodplain at this time. RES will continue to monitor the effect, but the suspected dam is offsite and not within the property of the Project's landowner. Strawberry Hill Mitigation Project 4 As -Built Baseline Monitoring Report - Stream Project #100094 July 2022 2 References Griffith, G.E., J.M.Omernik, J.A. Comstock, M.P. Schafale, W.H.McNab, D.R.Lenat, T.F.MacPherson, J.B. Glover, and V.B. Shelburne. (2002). "Ecoregions of North Carolina and South Carolina." (color Poster with map, descriptive text, summary tables, and photographs): Reston, Virginia, U.S. Geological Survey (map scale 1:1,500,000). Lee Michael T., Peet Robert K., Roberts Steven D., and Wentworth Thomas R., 2008. "CVS-EEP Protocol for Recording Vegetation Level." Version 4.2 North Carolina Division of Mitigation Services (NCDMS). "Neuse River Basin Restoration Priorities 2010. Amended August 2018." Peet, R.K., Wentworth, T.S., and White, P.S. (1998). "A flexible, multipurpose method for recording vegetation composition and structure." Castanea 63:262-274 Resource Environmental Solutions (2020). "Strawberry Hill Final Mitigation Plan". US Army Corps of Engineers (USACE). (2016). "Wilmington District Stream and Wetland Compensatory Mitigation Update." NC: Interagency Review Team (IRT). Strawberry Hill Mitigation Project 5 As -Built Baseline Monitoring Report - Stream Project #100094 July 2022 Appendix A Visual Assessment Data QGreen Chapel Missionary Baptist Church 1116 Legend Strawberry Hill Easement Polecat Mitigation Site Neuse River Basin - 03020201 TLW- 03020201140010 Stevens Sausage Co., Inc9 I251 Strawberry Hill Mitigation Project x Brogaen P Community Project Coordintates: 35.469579, -78.323896 0 500 1,000 Feet Figure 1 - Site Location Map Strawberry Hill Mitigation Project Johnston County, North Carolina Date: 3/8/2022 Drawn by: MDD Checked by: JRM 1 inch = 1,000 feet fires . , , , ,....., .,..„ ,, ,,_ P . , , , ., „ „„. 2, res „ .. , , , .. ..., .., • .„,,,,, . , -AP'', -.::'. ;,- - i-''‘,.. :. il. ' - • . , , . ..., . :, .„ d. . s. , , . ,. .. , . . . . .....„ . . . ., . . .. . .. , ,. . ., ., , , . . .... ..„. • • ._ . . .„ .„ , _ , : ., . �„ RVP-1 • �� * 0 100 200 ;, / Il Feet 13/ �te Figure 2a 1M Current Conditions Plan View 1 �� k Stream Mitigation • wp TJ Qr� MY0 2022 WA �0 0 0 �� �.4 ` Strawberry Hi, II /r Mitigation Project e — Johnston County e North Carolina �.�c� Date: 7/6/2022 Drawn by: EJU C Checked by:RTM 1 in=200 feet 111 Legend 40. RVP-3 1 ❑Recorded Easement(22.12 ac) Vegetation Plot >320 stems/acre� Buffer Only Random Vegetation Plot >320 stem/acre 11 ' iz Existing Wetlands / O Pre-existing Top of Bank —Surveyed Top of Bank / �// —Stream Structure /f Cross-section Stream Mitigation Approach i —Restoration No Credit WB �,ri" " — Ditch 1) ` —Swale we / !♦ Stage Recorder 41 ❑ • Flow Gauge Rv?�a ♦ • 10 © Photo Location ll4 11 Vegetation Condition Assessment ` H 44 Target Community w Present Marginal Absent wD Q Absent No Fill rn • Present ` I12I co > LJ �7/ 0 res ,,*, 1. =R'. .,, .. ,. , .. „.,::. , .. .. .,. ,,,, .,. ,, ,... ,./.. , ,,. , , , , 0 \ ‘4. Q/ 5 RVP.-1 6 "'r "© 0 150 300 Il Feet Figure 2b n e Current Conditions Plan View r Stream Mitigation o --, iii* - MY0 2022 4RVP-2i y WA �] Strawberry Hill Mitigation Project e'Q Johnston County, le North Carolina m Date: 7/6/2022 Drawn by: EJU �/ RV�-3 / Checked by:RTM 1 in=300 feet r Legend , _ ,• ,. :t. , • ❑Recorded Easement(22.12 ac) Veg to o Plot(iV4,424R ' Buffer Only Random Vegetation Plot >320 stem/acre wg Existing Wetlands Pre-existing Top of Bank we —Surveyed Top of Bank RwR-ai�] �� ��s t10 —Stream Structure ±4 - . Cross-section Stream Mitigation Approach / —Restoration Q t12 No Credit — Ditch �� —Swale f .A... v Stage Recorder \us - x i• � ' 0 Flow Gauge :,.% ' ® Photo Location r k a `. Vegetation Condition Assessment M w, ,,, , .. s: �13 Target Community * / Present Marginal Absent f ,,,�,,.s, o� - e/►.� •+ S a). Absent No Fill a f' - , Present C Visual Stream Stability Assessment Reach JH 1-A Assessed Stream Length 1007 Assessed Bank Length 2014 Ma'or Channel Cate. ory Number Stable, Performing as Metric Intended Total Number in As -built Amount of Unstable Foota. a % Stable, Performing as Intended Bank Surface Scour/Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour 0 ° 100/o Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse 0 100% Structure Grade Control Tot . Grade control structures exhibiting maintenance of grade across the sill. 9 9 0 100% 100% Bank Protection Bank erosion within the structures extent of influence does not 7 7 100% exceed 15%. (See guidance for this table in DMS monitoring guidance document) Visual Stream Stability Assessment Reach JH 1-B Assessed Stream Length 2712 Assessed Bank Length 5424 Ma'or Channel Cate. ory Number Stable, Performing as Metric Intended Total Number in As -built Amount of Unstable Foota. a % Stable, Performing as Intended Bank Surface Scour/Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour 0 ° 100/o Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse 0 100% Structure Grade Control Tot . Grade control structures exhibiting maintenance of grade across the sill. 21 21 0 100% 100% Bank Protection Bank erosion within the structures extent of influence does not 28 28 100% exceed 15%. (See guidance for this table in DMS monitoring guidance document) Visual Vegetation Assessment Planted acreage 19.73 Vegetation Category Definitions Mapping Threshold Combined Acreage % of Planted Acreage Bare Areas Very limited cover of both woody and herbaceous material. 0.1 acres 0.00 0.0% Low Stem Density Areas Woody stem densities clearly below target levels based on current MY stem count criteria. 0.1 acres 0.00 0.0% Tot l Areas of Poor Growth Rates Planted areas where average height is not meeting current MY Performance Standard. 0.25 acres 0.00 0.0% Cumulative Total Aim 0.0% Easement Acreage 22.12 Vegetation Category Definitions Mapping Threshold Combined Acreage % of Easement Acreage Invasive Areas of Concern Invasives may occur outside of planted areas and within the easement and will therefore be calculated against the total easement acreage- Include species with the potential to directly outcompete native, young, woody stems in the short-term or community structure for existing communities. Species included in summation above should be identified in report summary. 1000 SF 0.00 0.0% Easement Encroachment Areas Encroachment may be point, line, or polygon. Encroachment to be mapped consists of any violation of restrictions specified in the conservation easement. Common encroachments are mowing, cattle access, vehicular access. Encroachment has no threshold value as will need to be addressed regardless of impact area. none N/A Strawberry Hill General Site Photos . Ly4, t .� i '' �i 'Iln "''t r sr ? a'."--,,.'r,,,,;j.,..-.4,4,,,, ,,,,t. ,,...,..-:1.,r4r,*,.4'..,51'0',:.::;....:741::::'!;',',-;::ft Z,i,..t'',.;«,::,74et.Ii.''',:illi.e. ,c..*1:1&:1% ' ' a s ,r a't +d ke s tea:(� 1% - .d0�n xP 1 4 4 Y S' ga b:�S � t 1 ' 9; 'p L ' '�_s Y r V r:4 " .< ..,.. JH1-A looking upstream (3/7/2022) JH1-A looking downstream (3/15/2022) I. ", t "2 wit ' ..Sr; F °m • age}ti. .YFti 4 �;' £ +,_ air , — ,. _,, ate.- .� �E ge - ' � • "€ .w � z ro= • _ram p ¢ -�P E-- ??„,:i-,,•,,,,,,,,„:"P:::-117'...'!:-.,*t..:44t,E,„.::,41•4:.',,,,:;•:-"ei-4.--„:.'-' :.. . :---:''- r5Z-?.'W.4•-•--:''i:.°-,--,,-,40-.44-;:A444, '-';',:---,--':1':.:.`: r 'F Y .tdL td a.e{ ;'. > Yam'+. ,-.y6„ JH1-B looking downstream(3/7/2022) JH1-B looking upstream (3/15/2022) # n t f I-ek.. +r > 1' 1 P e , .- s..f' ,, f4 _ w , Will "1 .''' 5 4 i Ah Hay bale toe JH1-A(3/15/2022) Hay bale toe—JH1-A(3/15/2022) e '. - ' .-'.- —- --.',- '-'ilr;:°- , ;; 5 'bar C ,` i.iit r . Brush toe—JH1-B (3/15/2022) Wood/rock riffle—JH1-B (3/15/2022) Strawberry Hill Crossing Photos • • kichvgi f - �� i'' f' Fr .h/ a cy. et a4 . tea'R+ - an a ���� � ; ` ve 1 £1'G`� :. _-- .i! -''s"3 ;Zi. - :,:...A('-; .fi„"{ '�7 i '-'-,,, - 't'- ;,tr . s ,;F`a !. "g' .r 4§ trk eV € n'" i" F 3 A. DOT Culvert at Yelverton Grove Rd. (Entrance) (3/7/2022) DOT Culvert at Yelverton Grove Rd. (Exit) (3/7/2022) .1111.11111111.111111111 - r,, ..."0. e t s b .,N,'�" *^ •M � a,,,': � t� # X 'Y - -zt u~'lai "'`$ r [ �Y " x ' .iii ,, �e, 7r A:�` •,ems-re,. ti. 4, " 'x ? Tr,„,.., ' rt' ',�e`t" Culvert at JHl-B Crossing (Entrance) (3/7/2022) Culvert at JH1-B Crossing (Exit) (3/7/2022) DOT Culvert at Brogden Rd. (Entrance) (3/7/2022) Strawberry Hill Monitoring Device Photos r f y �. ° � q �4 l� y 4,3 i' ','.I.:::-''"'. d ` �jt r. all1a i ''' f i ,' �t Y' s j1 .:4.:.i.. rFs a � `F j " a \ 3;•,,4q,4.1,1,,,,\4,,,,:s,.11Mi.'§ e zf 'c i 7 t 2 ems`r [ 4a, S: $ +, i i , ,rk U ,,,,,,,,,F:.,,,;:0,,,-,4e,,*,,ii,; - '' rr s i s r �"f 4,1 1 r „� r 44tr } *� ^,,, E:e i -1�'" i gr;, .. ws7RiA*iI n• ,.,c, 'st ta' i ii • Flow Gauge JH1-A (Looking Upstream) (2/16/2022) Flow Camera JH1-A(2/16/2022) ' r =' 3 a Stage Recorder JH1-B (Looking Upstream) (2/16/2022) Appendix B Vegetation Plot Data Appendix C. Vegetation Plot Data Table 7. Planted Species Summary Common Name Species Zone 1 Zone 2 Total Planted Amount River birch Betula nigra 10 10 1,600 Buttonbush Cephalanthus occidentalis 5 5 800 Yellow poplar Liriodendron tulipifera 10 10 1,600 Wax Myrtle Morella cerifera 5 10 1,000 Swamp tupelo Nyssa bora 5 5 800 American sycamore Platanus occidentalis 10 10 1,600 Laurel oak Quercus laurifolia 5 10 1,000 Overcup oak Quercus lyrata 10 10 1,600 Swamp chestnut oak Quercus michauxii 10 10 1,600 Water oak Quercus nigra 10 10 1,600 Willow oak Quercus phellos 10 10 1,600 Bald cypress Taxodium distichum 10 0 1,000 TOTAL 15,800 Table 8. Vegetation Plot Mitigation Success Summary Plot # Planted Stems/Acre Volunteers Stems/Acre Total Stems/Acre Success Criteria Met? Averaged Planted Stem Height (ft.) 1 850 0 850 Yes 1.6 2 809 0 809 Yes 1.6 3 647 0 647 Yes 1.6 4 769 0 769 Yes 1.7 5 971 0 971 Yes 1.6 6 850 0 850 Yes 1.5 7 809 0 809 Yes 1.3 R1 1133 0 1133 Yes 1.4 R2 890 0 890 Yes 1.3 R3 809 40 850 Yes 1.5 R4 931 81 1012 Yes 2.0 Project Avg 861 11 872 Yes 1.6 Appendix C. Vegetation Plot Data Table 9. Stem Count Total and Planted by Plot Species Strawberry Hill Stream Vegetation Current Plot Data (MYO 2022) Scientific Name Common Name Species Type 100094-01-0001 100094-01-0002 100094-01-0003 100094-01-0004 100094-01-0005 100094-01-0006 100094-01-0007 PnoL! P-all T PnoL! P-all T PnoL' P-all T PnoL! P-all T PnoL! P-all T PnoL! P-all T PnoL' P-all T Betula nigra river birch Tree 2 2 2 3 3 3 2 2 2 3 3 3 2 2 2 Cephalanthus occidentalis common buttonbush Shrub 1 1 1 1 1 1 1 1 1 Diospyros virginiana common persimmon Tree Liriodendron tulipifera tuliptree Tree 1 1 1 3 3 3 1 1 1 2 2 2 1 1 1 4 4 4 2 2 2 Morella cerifera wax myrtle shrub 2 2 2 1 1 1 2 2 2 4 4 4 6 6 6 Nyssa biflora swamp tupelo Tree 2 2 2 1 1 1 1 1 1 1 1 1 Platanus occidentalis American sycamore Tree 2 2 2 4 4 4 2 2 2 Quercus laurifolia laurel oak Tree 4 4 4 3 3 3 3 3 3 3 3 3 1 1 1 Quercus lyrata overcup oak Tree 2 2 2 1 1 1 1 1 1 1 1 1 2 2 2 Quercus michauxii swamp chestnut oak Tree 1 1 1 2 2 2 1 1 1 4 4 4 1 1 1 Quercus nigra water oak Tree 5 5 5 1 1 1 4 4 4 2 2 2 1 1 1 Quercus phellos willow oak Tree 1 1 1 3 3 3 2 2 2 5 5 5 7 7 7 1 1 1 2 2 2 Sambucus canadensis common elderberry shrub Taxodium distichum bald cypress Tree 3 3 3 8 8 8 4 4 4 1 1 1 4 4 4 Stem count size (ares) size (ACRES) Species count Stems per ACRE 21 21 21 20 20 20 16 16 16 19 19 19 24 24 24 21 21 21 20 20 20 1 1 1 1 1 1 1 0.02 0.02 0.02 0.02 0.02 0.02 0.02 9 9 9 8 8 8 9 9 9 8 8 8 7 7 7 9 9 9 9 9 9 850 850 850 809 809 809 647 647 647 769 769 769 971 971 971 850 850 850 809 809 809 Strawberry Hill Stream Vegetation Current Plot Data (MYO 2022) Scientific Name Common Name Species Type 100094-01-R1 100094-01-R2 100094-01-R3 100094-01-R4 MYO (2022) PnoL! P-all T PnoL! P-all T PnoU P-all T PnoL! P-all T PnoL! P-all T Betula nigra river birch Tree 3 3 3 4 4 4 2 2 2 6 6 6 27 27 27 Cephalanthus occidentalis common buttonbush Shrub 1 1 1 1 1 1 1 1 1 6 6 6 Diospyros virginiana common persimmon Tree 1 1 Liriodendron tulipifera tuliptree Tree 1 1 1 5 5 5 1 1 1 21 21 21 Morella cerifera wax myrtle shrub 1 1 1 1 1 1 2 2 2 1 1 1 20 20 20 Nyssa biflora swamp tupelo Tree 1 1 1 2 2 2 1 1 1 2 2 2 11 11 11 P latanus occ identalis American sycamore Tree 2 2 2 2 2 2 12 12 12 Quercus laurifolia laurel oak Tree 5 5 5 3 3 3 1 1 1 3 3 3 26 26 26 Quercus lyrata overcup oak Tree 3 3 3 1 1 1 4 4 4 4 4 4 19 19 19 Quercus michauxii swamp chestnut oak Tree 2 2 2 3 3 3 1 1 1 15 15 15 Quercus nigra water oak Tree 7 7 7 3 3 3 1 1 1 2 2 2 26 26 26 Quercus phellos willow oak Tree 2 2 2 2 2 2 2 2 2 27 27 27 Sambucus canadensis common elderberry shrub 1 1 2 Taxodium distichum bald cypress Tree 3 3 3 1 1 1 24 24 24 Stem count size (ares) size (ACRES) Species count Stems per ACRE 28 28 28 22 22 22 20 20 21 23 23 25 234 234 237 1 1 1 1 11 0.02 0.02 0.02 0.02 0.27 10 10 10 11 11 11 10 10 11 9 9 11 12 12 14 1133 1133 1133 890 890 890 809 809 850 931 931 1012 861 861 872 Strawberry Hill Stream Vegetation Monitoring Plot Photos (MVO) ,r ' 3 gig - �L .n M i y . - i 1 it \ 1 I 1 i I 1 1 „ "',.-S.,',1, ,, �' .ter. "' • y �r .-sty or, " s', aG` � 1 1,'. Fixed Vegetation Plot 1 (3/15/2022) Fixed Vegetation Plot 2 (3/15/2022) I c'4 a • g.-ems 7;, .4'''' ^-.-v`.n -ter , a #i-----,ritl--,-,:,;,.4,, ,- --,A0,1-r'41.," 7,-,-. ...,-,,:-.':,."74.t.:'L'''' '„ ' ,:p---..4.,- * ' 7 '. Fixed Vegetation Plot 3 (3/15/2022) Fixed Vegetation Plot 4 (3/15/2022) 40411411111,loilim" y. e r ' i � -' a 4. v , r aver f a : ' �'�. '' S'''-'7*,.-Z:''''.;! ''''''.,: -,a•,,.4;:,,:::—'; 4-1, :-..:_'''f7zr.4„4.11', _.,.„,,,,.,..-r-,-;,14.4,!..,:,. .. :40,-..?_,L' ., ,mow Fixed Vegetation Plot 5 (3/15/2022) Fixed Vegetation Plot 6 (3/15/2022) . ilort„. ..k,,z_..,. ,....., ,. .,.„... ,, , _., ,,,, _,.., . ___,. ._, .. ,.., ,--„,.._J 1 II _ ,.,-_-.,_-..t:,----,,.,_:-.7_.,-.-,.....t.,,,-.:-_,....',_--_----,:- . . _:- , ..,-t-7 ,-,k ' x 4w a � e; "by Ey -- n Plot 7 (3/15/2022)Fixed Vegetation Strawberry Hill Stream Random Vegetation Monitoring Plot Photos (MVO) - -- '0. ro.t1.4 -.- 1 ..i, lw-imt , ..tre.,, , I„ ,, , . ,i,. ..i.. _ .t. .., „ I. li II 1 A �-� „- , . }� y ' _tea. - ✓- -:th q ,� y, e 5Y " 4 --- f - r c a� "'„� ` s b- r c ,d a ��a� 'L� La-. P. ' "r .d-:S y s ' � 'Xy : .�ti .°' <,kl R - i4`, t - " v � FT ''rr i � - -." * i� �gy Y' tt "e q [' ,mac • s+ Random Vegetation Plot 1 (3/7/2022) Random Vegetation Plot 2(3/7/2022) ,.� _ . t -F - � •� y p 4 11511111111110111111111111111111111111111111 r. a t - G 4. - - , , �� - . � y r _ m, •.�'-. �y \ _ �0 � Miry ram* , Sd, T . 4�3344' a .,• "H 6 i' R..' 1a ck�i -� +.ems tom . . 4 i —. '� i'' & v. _.� "i'.a.r .:.._ro1�1 ..u.. .r- .. is-t, F `r f ,�a Random Vegetation Plot 3 (3/7/2022) Random Vegetation Plot 4 (3/7/2022) Appendix C Stream Morphology Data Baseline Stream Data Summary Strawberry Hill JH1-A Parameter Pre -Existing Condition (applicaple) Design Monitoring Baseline (MVO) Riffle Only A Min Mean Med Max n Min Max Min Max n Bankfull Width (ft) 6.7 9.3 9.3 11.8 2 9.6 9.6 10.1 2 Floodprone Width (ft) 12.4 14.0 14.0 15.5 2 >25 30 30 2 Bankfull Mean Depth (ft) 0.7 0.9 0.9 1.1 2 0.9 --- --- 2 Bankfull Max Depth (ft) 1.2 1.4 1.4 1.5 2 1.4 1.3 1.5 2 Bankfull Cross Sectional Area (ft2) 7.1 7.7 7.7 8.3 2 8.8 8.2 9.2 2 Width/Depth Ratio 6.3 11.6 11.6 16.9 2 10.4 --- --- 2 Entrenchment Ratio 1.3 1.6 1.6 1.9 2 >2.2 >3.0 >3.1 2 Bank Height Ratio 1.5 1.7 1.7 1.9 2 1.0 1 1 2 Max part size (mm) mobilized at bankfull Rosgen Classification F5 C5/E5 C5/E5 Bankfull Discharge (cfs) Sinuosity (ft) 1.00 1.13 1.13 Water Surface Slope (Channel) (ft/ft) Other Baseline Stream Data Summary Strawberry Hill JH1-B Parameter Pre -Existing Condition (applicaple) Design Monitoring Baseline (MVO) Riffle Only A Min Mean Med Max n Min Max Min Max n Bankfull Width (ft) 9.3 9.5 9.5 9.6 2 9.6 8.8 11.1 5 Floodprone Width (ft) 11.6 15.9 15.9 20.2 2 >25 >30 >30 5 Bankfull Mean Depth (ft) 0.9 0.9 0.9 1.0 2 0.9 --- --- 5 Bankfull Max Depth (ft) 1.4 1.5 1.5 1.6 2 1.4 1.4 1.6 5 Bankfull Cross Sectional Area (ft2) 8.5 8.9 8.9 9.3 2 8.8 7.3 9.1 5 Width/Depth Ratio 9.3 10.1 10.1 10.8 2 10.4 --- --- 5 Entrenchment Ratio 1.2 1.7 1.7 2.1 2 >2.2 >2.7 >3.4 5 Bank Height Ratio 1.7 2.0 2.0 2.3 2 1.0 1 1 5 Max part size (mm) mobilized at bankfull Rosgen Classification F5 C5/E5 CS/ES Bankfull Discharge (cfs) Sinuosity (ft) 1.01 1.14 1.14 Water Surface Slope (Channel) (ft/ft) Other Monitoring Data - Cross Section Morphology Monito ing Summary P oject Name/Number (Strawnbe ry Nil / DM :100094) Segmen /Reach: JH1 A and 1H1-B Cross Section 1(Pool -1H1 A) Cross Section 2 (Riffle -.MIA) Cross Section 3 (Riffle -.MIA) Cross Section 4 (Pool -1H1 A) Cross Section 5 (Riffle-IH1-B( MVO MY1 MU MY3 MY5 MY) MY+ MVO MY1 MY2 MY3 MY5 MYJ MY+ MVO MY1 MY2 MY3 MY5 MYJ MY+ MVO MY1 MY2 MY3 MY5 MYJ MY+ MVO MY1 MY2 MY3 MY5 MY) MY+ Bankfull Elevation (ft) - Based on AB-Bankfull' Area -- 139.30 138.85 -- 137.97 Bank Height Ratio Based on AB Bankfuli Area -- 1.00 1.00 -- 1.00 Thalweg Elevation 137.24 137.98 137.34 136.57 136.42 LT0132 Elevation 138.91 139.30 138.85 138.71 137.97 130132 Max Depth (ft) 1.7 1.3 1.5 2.1 l.fi ITOB' Cross Sectional Area (ft'l 7.60 8.20 9.20 13.70 9.10 Cr ss Section 6 (P ol- 1H1 B) Cross Section 7 (Riffle-IH1-B) Cr ss Section 8 (P of-1H1 B) Cr ssSecti n 9 (Riffle-IH1-B) Cr ss Section 10 (P ol-1H1-8) MVO MY1 MY2 MY3 MY5 NM MY+ MVO MY1 MY2 MY3 MY5 NM MY+ MVO MY1 MY2 MY3 MY5 MYJ MY+ MVO MY1 MY2 MY3 MY5 MYJ MY+ MVO MY1 MY2 MY3 MY5 MYJ MY+ Bankfull Elevation (ft) - Based on AB-Bankfull' Area -- 137.52 -- 136.88 BankHeightRatio_Based on AB Bankfuli Area -- 1.00 -- 1.00 Thalweg Elevation 135.85 136.12 135.40 135.53 134.94 LT0132 Elevation 137.91 137.52 137.57 136.88 136.81 LT0132 Max Depth (ft) 2.1 1.4 2.2 1.4 1.9 ITOB' Cross Sectional Area (ft'l 11.50 8.30 12.50 8.30 12.20 Cr as.. n 11(Rifle -11.11- ) C ooSect! n12 (Pool -1111- ) C oas Sect! n13 (Pool -1111- ) Cr asSecti n14 (Rifle -11.11- ) MVO MY1 MY2 MY3 MY5 MYJ MY+ MVO MY1 MY2 MY3 MY5 MYJ MY+ MVO MY1 MY2 MY3 MY5 MYJ MY+ MVO MY1 MY2 MY3 MY5 MYJ MY+ Bankfull Elevation (ft)- Based on AB-Bankfull'Area 136.18 -- -- 135.15 Bank Height Ratio Based on AB Bankfuli Area 1.00 -- -- 1.00 Thalweg Elevation 134.81 134.35 133.13 133.64 LT0132 Elevation 136.18 136.22 135.07 135.15 LTOB' Max Depth (ft) 1.4 1.9 1.9 1.5 ITOB' Cross Sectional Area (fel 7.30 10.10 9.70 8.30 The above morphology parameters reflect the 2018guidan e that a ose from the m3 igation echnica workg oup con fisting of DMS, the IRT a d industry mitig tion pr viders/ ractitu ers. Th outcome result d in th focus o three primary morpholo®cal parameters of interestfor the purpos sof trackingcha nel cha ge mo'ng forward. Th y are th bank height ra'o using a constant As-b It bankfull area nd the rocs sectional a ea and max deph based on each years low top of bank. These are calculated sfollows: 1- Bank Height Ratio (BHR)takes the As -built bankful area as the basis for djustin each su segue t years bankfull levatio . For example if the As -built bankfull are was10 ff2, the the MYl bankfull elevaion would be adjusted until the calculated bankfull area within the MY1 coss Becton sury y=10ff2. The HR wo Id then be calculated wi h the difference between the low top of bank (LTOB) elev Lion for MY1 and the th lweg elevation for MY1 in the numeratorwith the difference between the MY bankfu I elevation and the MY1 halweg elevation in the denomi °tor. This same process is then carried o tin each Buttes five yea . 2- LTOB Area and Maxdepth-These are based on the LTOB elevaion for ach years suree (The same elevation us d for th LTOB in the BHR calculation). Area below the LTOB eleva ion will be used and tra ked for each year as Note: The smaller the channel the closer the surrey measurements are to their limit of reliable detection, therefore inter -annual variation in morphological measurement (as a percentage) is by default magnified as channel size decereases. Some of the variability above is the result of this factor and some is duet° the large amount of depositional sediments observed. r ''* :4 , ,14',-,/- _.:(;a' k ;1' , :-',-.,...;,i,,--------...- _ a n r Upstream Downstream Strawberry Hill -Reach JH1-A -Cross Section 1 - Pool -Restoration 140.5 - 139.5 c ° 138.5 a) w 137.5 136.5 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Distance(ft) 3X Vertical MYO 2021 — — —Approx. Bankfull Exaggeration Cross Section 1(Pool-JH1-A) MYO MY1 MY2 MY3 MYS MY7 MY+ Bankfull Elevation(ft)-Based on AB-Bankful 11 Area Bank Height Ratio_Based on AB Bankful I1 Area Thalweg Elevation 137.24 LTOB2 Elevation 138.91 LTOB2 Max Depth(ft) 1.7 LTOB2 Cross Sectional Area (ft2) 7.60 1 -Uses the as-built cross sectional area as the basis for adjusting each subsequent years Bankfull elevation 2-Uses the current years low top of bank as the basis for adjusting each subsequent years Bankfull elevation Ji: to �f .: F1 F Upstream Downstream Strawberry Hill - Reach JH1-A -Cross Section 2 - Riffle - Restoration 141 - 140 139 138 137 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Distance (ft) 3X Vertical MYO 2021 — — —Approx.Bankfull —Floodprone Area Low Bank Height Exaggeration Cross Section 2(Riffle-JH1-A) MYO MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation(ft)-Based on AB-Bankfulll Area 139.30 Bank Height Ratio_Based on AB Bankfulll Area 1.00 Thalweg Elevation 137.98 LTOB2 Elevation 139.30 LTOB2 Max Depth(ft) 1.3 LTOB2 Cross Sectional Area (ft2) 8.20 1 -Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2-Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation i . ., 4 3,bM' .. cy F � `a y"`&h` ., ,.� - � ,� _ � 'leaP 'AN, k '' Y M5 `' tg ..' Vi , 4 .d`_ .. ' c x .0 v,,-s&r._ : 'as`'.g `.. r - r cr Tom 3 • S. i >'3 a' -.a '_.:�"y .-,,i- �. - - yy. -:?,-,.'-',,,,,,,,:It.;.'„.`':', -r"`a .,,-�, 1_ ''.1. ' ;v,` ° r • ' ,-11-1Lu...''...... ..,-.1.. x.-11-A...,-;„‘,...,,-;!„,„.' R t, ] fix ' ___ f x'.4 "3'?-: . Upstream Downstream Strawberry Hill -Reach JH1-A -Cross Section 3 -Riffle - Restoration 141 - 140 - ------------ ° 139 a) w 138 137 , I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Distance (ft) MYO 2021 — — •Approx.Bankfull —Floodprone Area Low Bank Height sx Vertical Exaggeration Cross Section 3(Riffle-JH1-A) MY0 MY1 MY2 MY3 NAYS MY7 MY+ Bankfull Elevation(ft)-Based on AB-Bankful I'Area 138.85 Bank Height Ratio_Based on AB Bankfull'Area 1.00 Thalweg Elevation 137.34 LTOB2 Elevation 138.85 LTOB2 Max Depth(ft) 1.5 LTOB2 Cross Sectional Area (ft2) 9.20 1 -Uses the as-built cross sectional area as the basis for adjusting each subsequent years Bankfull elevation 2-Uses the current years low top of bank as the basis for adjusting each subsequent years Bankfull elevation m - £{,HIHI ��YY 'per ^5 i" { £ ! Y Upstream Downstream Strawberry Hill - Reach JH1-A -Cross Section 4- Pool - Restoration 140 - 139 - ° 138 w 137 136 , I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Distance (ft) 3X Vertical •MY0 2021 — — —Approx. Bankfull Exaggeration Cross Section 4(Pool-JH1-A) MY0 MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation(ft)-Based on AB-Bankfulll Area --- Bank Height Ratio_Based on AB Bankfulll Area --- Thalweg Elevation 136.57 LTOB2 Elevation 138.71 LTOB2 Max Depth(ft) 2.1 LTOB2 Cross Sectional Area (ft2) 13.70 1 -Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2-Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation a} 1�is k-C �-' L ,... , ,,y, s #'°`.a4n ,.'.., _—_. v' .. eg' ., ` :' •�F. ,:. -.��� F .c�� °: ,k, K. '''.4!?. s `�' fir'_-. .`-4 sm ,•. aa r .. - zs • .::tt4;:,'"::,"'I::':: 7R "- r- J - ;r alb ; i T 3 En -,. xy -Y wd+ C$h� r d w..,A %c'Iic� } L. V .` • t4 'y ? , • Upstream Downstream 140 - STrawberry Hill - Reach JH1-B -Cross Section 5 - Riffle -Restoration 139 F a) w 137 136 , 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Distance (ft) 3X Vertical MYO 2021 — — —Approx. Bankfull Floodprone Area Low Bank Height Exaggeration Cross Section 5(Riffle-JH1-B) MYO MY1 MY2 MY3 MYS MY7 MY+ 137.97 Bankfull Elevation(ft)-Based on AB-Bankfulll Area Bank Height Ratio_Based on AB Bankfulll Area 1.00 Thalweg Elevation 136.42 LTOB2 Elevation 137.97 LTOB2 Max Depth(ft) 1.6 LTOB2 Cross Sectional Area(ft2) 9.10 1 -Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2-Uses the current years low top of bank as the basis for adjusting each subsequent years Bankfull elevation 71 r am"`; i e g < `s Upstream Downstream Strawberry Hill -Reach JH1-B -Cross Section 6 -Pool - Restoration 139.5 - 138.5 - ° 137.5 136.5 - 135.5 , 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Distance (ft) MYO 2021 — — —Approx. Bankfull 3X Vertical Exaggeration Cross Section 6(Pool-JH1-B) MYO MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation(ft)-Based on AB-Bankfulll Area Bank Height Ratio_Based on AB Bankfulll Area Thalweg Elevation 135.85 LTOB2 Elevation 137.91 LTOB2 Max Depth(ft) 2.1 LTOB2 Cross Sectional Area (ft2) 11.50 1 -Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankful elevation 2-Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation kPk f ads' w :q it k;yk ��£"¢--xfiz _ P.4+47' c r?,,'w ,' 7 4.ire '- - ,,fir'.°"°"Y� s '. g ,.wr » . '—fiI„ a'.71.".. - _ �.. `"` ; �, :s h' r. ; ,iy V:-L. .-. . �jA: Wit .. rk. a ,r '_C, .r*rt t� tk$tya."$-..' `y, es' ; r v` 1 T r .,-c `� 5 a ` :-,` c ?'� s 'Jam 1.*Li 4 yi3 h pi' ,:~ , _ 'r'. a Upstream Downstream 139.5 — Strawberry Hill - Reach JH1-B -Cross Section 7 - Riffle - Restoration 138.5 F. o as _ 111,...miimpia..—.— .*,, ___.—.—.—.— 7 136.5 135.5 , 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Distance (ft) MY0 2021 — — —Approx. Bankfull —Floodprone Area Low Bank Elevation sx Vertical Exaggeration Cross Section 7(Riffle-JH1-B) MYO MY1 MY2 MY3 MY5 MY7 MY+ 137.52 Bankfull Elevation(ft)-Based on AB-Bankfulll Area Bank Height Ratio_Based on AB Bankfulll Area 1.00 Thalweg Elevation 136.12 LTOB2 Elevation 137.52 LTOB2 Max Depth(ft) 1.4 LTOB2 Cross Sectional Area (ft2) 8.30 1 -Uses the as-built cross sectional area as the basis for adjusting each subsequent years ion 2-Uses the current years low top of bank as the basis for adjusting each subsequent yearsbankfull bankfull elelevatevation • ��Y 1 ' ✓" 5l+S. F^ .9r { ��} �{u.�n k 4 6 ,a r , , .>x r • F Aa ", , as r'`a„ �., Upstream Downstream Strawberry Hill - Reach JH1-B -Cross Section 8 -Pool - Restoration 139 - 138 - c • o 137 1-6 w 136 - 135 , 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Distance (ft) MYO 2021 — — —Approx. Bankful) 3X Vertical Exaggeration Cross Section 8(Pool JH1-B) MYO MY1 MY2 MY3 MYS MY7 MY+ Bankful I Elevation(ft)-Based on AB-Bankful 11 Area Bank Height Ratio Based on AB Ban kfulll Area Thalweg Elevation 135.40 LTOBZ Elevation 137.57 LTOB2 Max Depth(ft) 2.2 LTOB2 Cross Sectional Area (ft2) 12.50 1 -Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2-Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation F '= '" :"mac. - s _ ',,, 4 x _ ,•,..:;`-- ‘'",„,:k.1" );-- tif-,-il,A• - .„-V‘, , --q:,,g,,-„,, .;,_- 7,4$.4.!,11;...,,...t . ,. , wisidit. :,,,,-;-,,,.;,..-...:-.... . .... - __ ..„..,-.., . . ._, . Upstream Downstream Strawberry Hill -Reach JH1-B -Cross Section 9 - Riffle - Restoration 139 - 138 - ' :: 135 , 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Distance (ft) cal MY0 2021 — — —Approx.Bankfull —Floodprone Area Low Bank Height 3X a Exaggeration Cross Section 9(Riffle-JH1-B) MYO MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation(ft)-Based on AB-Bankfulll Area 136.88 Bank Height Ratio_Based on AB Bankfulll Area 1.00 Thalweg Elevation 135.53 LTOB2 Elevation 136.88 LTOB2 Max Depth(ft) 1.4 LTOB2 Cross Sectional Area (ft2) 8.30 1 -Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2-Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation :. :..a,; k72-7 �� a r� , 1 x a- ` et rc3iv! . yMiSI 3 ,` x: "hrr C s , y.- Aate' r�% {`- b u-Y ; ^e.+ Y1 -e' Paz,.. . 'r, - - -'-,,'...,..,.'T,`',',i,-...t-7-;1,'7- Wit'' .' ;S 4 ki!'''''' '4'. h-Wri:g!':::--37 l'''''''' ''?':'-'rrl' '\''fi' -'71k. Upstream Downstream STrawberry Hill -Reach JH1-B -Cross Section 10 - Pool - Restoration 138 137 / 0 tts a) 136 w 135 - 134 , 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Distance (ft) MYO 2021 — — —Approx. Bankfull 3X Vertical Exaggeration Cross Section 10(Pool-JH1-B) MYO MY1 MY2 MY3 MYS MY7 MY+ Bankfull Elevation(ft)-Based on AB-Bankfulll Area --- Bank Height Ratio_Based on AB Bankfulll Area --- Thal weg Elevation 134.94 LTOB2 Elevation 136.81 LTOB2 Max Depth(ft) 1.9 LTOB2 Cross Sectional Area (ft2) 12.20 1 -Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2-Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation 1z PIRPIIIIIIIPIIIIIIPII4 ' % teab .3 'r3 " o .. .. 1� t a^` — K -��; . � � o S s 0:i' " ^' ' es4 �" -: v �•s� $44:,,.-,'t-..,,,,A,.,N1 PIT:-- - ''':-,;',1 ,-:,<-+:5,- ,.:- A '":dam '+.� ,y a�, - _ f .t' +b a Upstream Downstream Strawberry Hill -Reach JH1-B -Cross Section 11 -Riffle - Restoration 138 - 137 136 iii 135 134 , 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Distance(ft) MYO 2021 — — —Approx.Bankfull Floodprone Area Low Bank Height Exa ertical ggeration Cross Section 11(Riffle-JH1-B) MYO MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft)-Based on AB-Bankfulll Area 136.18 Bank Height Ratio_Based on AB Bankfulll Area 1.00 Thalweg Elevation 134.81 LTOB2 Elevation 136.18 LTOB2 Max Depth (ft) 1.4 LTOB2 Cross Sectional Area (ft2) 7.30 1 -Uses the as-built cross sectional area as the basis for adjusting each subsequent years Bankfull elevation 2-Uses the current years low top of bank as the basis for adjusting each subsequent years Bankfull elevation . ,� 3 i t Upstream Downstream Strawberry Hill - Reach JH1-B -Cross Section 12 -Pool - Restoration 137.5 - 136.5 - I 134.5 - 133.5 , 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Distance (ft) MYO 2021 — — —Approx. Bankfull 3X Vertical Exaggeration Cross Section 12(Pool -JH1-B) MYO MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft)- Based on AB-Bankfulll Area --- Bank Height Ratio_Based on AB Bankfulll Area --- Thalweg Elevation 134.35 LTOB2 Elevation 136.22 LTOB2 Max Depth(ft) 1.9 LTOB2 Cross Sectional Area (ft2) 10.10 1 -Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2-Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation . au r x ` r,....._,,..= _ ,_,..,__,,....e.,,-,,-..:--,,,-. ..,,,o,„/„.:-. .;,...4...,,;-, -.--_-,---,,,, _ ,,;.-,.--,-...-,,z ..r,,, a M s s , f. - i r + C j - fir .", i Upstream Downstream Strawberry Hill - Reach JH1-B -Cross Section 13 -Pool - Restoration 136.5 - 135.5 0 134.5 - i a) w 133.5 132.5 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Distance(ft) MY0 2021 — — —Approx.Bankfull 3X Vertical Exaggeration Cross Section 13(Pool-JH1-B) MVO MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) -Based on AB-BankfulI1 Area --- Bank Height Ratio_Based on AB Bankful 11 Area --- Thalweg Elevation 133.13 LTOB2 Elevation 135.07 LTOB2 Max Depth (ft) 1.9 LTOB2 Cross Sectional Area (ft2) 9.70 1 -Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2-Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation ,� �it •'0' $ _ A -- Upstream Downstream Strawberry Hill - Reach JH1-B -Cross Section 14 - Riffle - Restoration 137 - 136 E ° 135 m w 134 133 , 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Distance(ft) 3X Vertical MY0 2021 — — —Approx.Bankfull —Floodprone Area Low Bank Height Exaggeration Cross Section 14(Riffle-JH1-B) MY0 MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft)-Based on AB-Bankfulll Area 135.15 Bank Height Ratio_Based on AB Bankfulll Area 1.00 Thalweg Elevation 133.64 LTOB2 Elevation 135.15 LTOB2 Max Depth(ft) 1.5 LTOB2 Cross Sectional Area(ft2) 8.30 1 -Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2-Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Appendix D Hydrologic Data (Data to be collected in following monitoring years) Appendix E Project Timeline and Contact Information Table 4. Project Timeline and Contacts Activity or uebverable Data Collection Complete Task Completion or uellverable submission Project Instituted NA Dec-20 Mitigation Plan Approved NA Nov-20 Construction (Grading) Completed NA 20-Jan-22 Planting Completed NA 07-Mar-22 As -built Survey Completed NA May-22 MY-0 Baseline Report Mar-22 May-22 MY1+ Monitoring Reports Remediation Items (e.g. beaver removal, supplements, repairs etc.) Encroachment Strawberry Hill #100094 Provider Mitigation Provider POC RES / 3600 Glenwood Ave., Suite 100, Raleigh, NC 27612 Jamey Mceachran (919) 623-9889 Designer Primary project design POC RES / 3600 Glenwood Ave., Suite 100, Raleigh, NC 27612 Ben Carroll, PE (336) 514-0927 Construction Contractor Construction contractor POC RES / 3600 Glenwood Ave., Suite 100, Raleigh, NC 27612 Jacy Kirkpatrick Appendix F As -built Survey FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\101038_AB_Cover.dwg SAVED BY: Bcarroll 15t Smithfield STRAWBERRY HILL MITIGATION PROJECT PROJECT LOCATION VICINITY MAP NTS PROJECT LOCATION: 35.469170°,-78.312918° JOHNSTON COUNTY, NORTH CAROLINA NEUSE RIVER BASIN: HUC 030202201 MAY 2022 RESOURCE ENVIRONMENTAL SOLUTIONS, LLC 3600 GLENWOOD AVE, SUITE 100 RALEIGH, NC 27612 PROJECT DIRECTORY OWNER: JEREMIAH DOW NC DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF MITIGATION SERVICES 2 1 7 WEST JONES ST., SUITE 3000A RALEIGH, NC 27603 DESIGNED $ CONSTRUCTED BY: RESOURCE ENVIRONMENTAL SOLUTIONS, LLC 3600 GLENWOOD AVE, SUITE 100 RALEIGH, NC 276 12 AS -BUILT SURVEY BY: RESOURCE ENVIRONMENTAL SOLUTIONS, LLC 3600 GLENWOOD AVE, SUITE 100 RALEIGH, NC 276 12 DMS PROJECT #: 100094 CONTRACT #: 7745 USACE ACTION ID #: SAW-201 9-001 24 RFP #: 16-007576 DWR #: 20190159 NOTES: • ALL DISTANCES ARE HORIZONTAL GROUND MEASUREMENTS IN U.S. SURVEY FEET UNLESS OTHERWISE NOTED. • HORIZONTAL DATUM IS NAD83(20 1 1 ); VERTICAL DATUM I S NAVD 88 • THIS MAP IS NOT INTENDED FOR RECORDATION, SALES OR CONVEYANCES • THE PURPOSE OF THIS MAP AND AS -BUILT DRAWING IS TO ILLUSTRATE THE POST- CONSTRUCTION "AS -BUILT CONDITIONS" OF THE STREAM RESTORATION AND MAY NOT SHOW ALL IMPROVEMENTS OR UTILITIES. • NO PROPERTY LINES WERE SURVEYED, ALL BOUNDARY AND CONSERVATION EASEMENT LINES WERE REFERENCED FROM RECORDED PLATS • STATE PLANE COORDINATES AND ELEVATIONS WERE DERIVED FROM EXISTING ONSITE CONTROL SURVEY PREPARED AND ESTABLISHED BY WSP USA INC. / g ■ O 1 1-77 MINN SITE MAP NTS 59 58 I, BRIAN S. hOCKETT CERTIFY THAT THIS MAP WAS DRAWN UNDER MY SUPERVISION AND THAT THIS GROUND SURVEY WAS PERFORMED AT THE 90% CONFIDENCE LEVEL TO MEET FEDERAL GEOGRAPHIC DATA COMMITTEE STANDARDS; THAT THIS SURVEY WAS PERFORMED TO MEET THE REQUIIREMENTS FOR A TOPOGRAPHIC/PLANIMETRIC SURVEY TO THE ACCURACY OF CLASS "A" AND VERTICAL ACCURACY WHEN APPLICABLE TO THE CLASS "A" STANDARD, AND THAT THE ORIGINAL DATA WAS OBTAINED ON OCTOBER 27th 202 1 ; THAT THE SURVEY WAS COMPLETED ON MARCH 29th 2022; THAT CONTOURS SHOWN AS BROKEN LINES MAY NOT MEET THE STATED STANDARD; AND ALL COORDINATES ARE BASED ON NAD83 (20 1 1) AND ELEVATIONS ARE BASED ON NAVD88 (GEOID 1 8) 1. CLASS OF SURVEY: CLASS A 2. POSITIONAL ACCURACY: 0.08' 3. TYPE OF GPS FIELD PROCEDURE: RTK/VRS 4. DATES OF SURVEY: 1 0-27-202 1 - 3-29-2022 5. GEOID MODEL: 18 6. UNITS: U.S. SURVEY FEET WITNESS MY ORIGINAL SIGNATURE, LICENSE NUMBER AND SEAL THIS DAY OF M0.� , 2022, A.D. iitAieutt BRIAN S. HOCKETT L-5 1 65 Sheet List Table Sheet Number Sheet Title -- Cover Al OVERALL AERIAL VIEW S1 REACH JH1 S2 REACH JH1 S3 REACH JH1 S4 REACH J H 1 S5 REACH JH1 S6 REACH J H 1 S7 REACH JH1 S8 REACH JH2 S9 REACH JH3-5 S10 DITCH TIE M1 MAINTENANCE COMPLETED M2 MAINTENANCE COMPLETED r 1 res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL o%�H ' F E s s, o•.liti `_.� SEAL 7. • L-5165 7-7 li REVISIONS: PLOT DATE: RELEASED FOR: AS -BUILT DRAWINGS PROJECT NUMBER: 101038 PROJECT MANAGER: JRM DESIGNED: BRC DRAWN: BSH CHECKED: BRC SHEET NUMBER: #### \ / Strawberry Ill Project Credits M ,, K •''' + ' Proposed Mitigation Reach Mitigation Type SMUs .�a ; �' t F ~.� �' Len.th Ratio . ,• JHl-A Restoration 1,007 1 . 1.0 1,007 '' '' ,4 •;. '" a ` , +::t:A,- , ,,,K. :; `''� \~ }.�46� �� ` -:' '' ' + t ' '"` ws?gym raM' ...' �:�i H '..:. ., ,, ;','. . , . . t'l:'''' 0 J \r„\\„„„eei,,,,,,,„1/4/ s . , JH1-B Restoration 1,054 1 : 1,0 1,054 , x e� ' CzN° ' `� { it Restoration 1,658 1 : 1,0 1,658 ,1, 3600 Glenwood Ave Suite 100 JH2 Buffer 1,009 N/A N/A .��. h, a ,r uit,r:qr > s t y 'r "' 4 a qt 7 ."`q1 + JH3 r*+ M, ,6r �' Raleigh, NC 27612 Buffer 326 N/A N/A `' i .t' ,."a, ' *t. tt.+ i hN 1' 4 �r �; '`V'-• f"' rT 1 �• .r'-tp\ Main: 919.829.9909 H4 Buffer 297 N/A N/A s 1 -,r t �Nw:,, >, y , �,. �r�j`�: ' �� ,i " X °,'`' • ���` ` wvuw.res.us t. � i, V `,.�".' 5 AIM �,.,ti y_ i nJHS Buffer 924 N/A N/A �k' " # i' ? 4E �,''; , 4 a `" " ; �: �; En ineerin Services Provided B.. .� °moo ' <� ,: .., c J J YTotal 6 275 3 719 . , M' ,.:a�. .-' ''', ;t• t . x+ ''w�+k \ - ,. .,, . A,' RES Environmental O eratin Com an LLC ` ' =, ,,��, �, ' ) License: F 1428 �. �C - s- s \ 1 + r i .eitt rr ti,., \ \\ 1 • ,'t,rn . . ` J,� 9�I r 1 _ #_€ r : : • SEAL ,:,. ILEACh Jh I —B ^; �: t � �, ° r \ ,Ty. i • , mow.- S �O E o • j� '.�' ` ` � • _ 9 F ' ; •b •',' - a SEAL , }. , .N�G O LC a '" 'it° '''''. 4-"0- kit.- —). /////1 o ,' ' Z..''Tit:::-44-4I:''".A..:1:'14;7:4IV.'1.444111:4"4'1611-•'I'::::.9,';''' REACH J h I —A w : .y . /-------------------- . . — — OC \ 0 0 - ';' �/ FULL SCALE: 1"=150 0-\ J O ! 1 L❑E4 ' fit: :, . 1--__ 0 150 300 } \ t,' ` r;�` .'`a ' 2" — FULL SCALE - O a" y .art; 1" = HALF SCALE LLJ g N. 1-1.111(g- r.--- - •_.---., 1 - . ',1 1,...-.,, , • , • ' Lk*. .4, N -„, .,\,,,, ., . .._____ , ,. A _ co . - ., - • ... _ _ r7r '�, r '; r` `\ l ft 1t. y } 'lg. + '; • ,.� .,, .tv •'R', 0 O • r •, - - -.I .' 4G _--. r~ I '. r, �'t_..' Y_ae w'.t t ,t lx?^'• s, } r..,• •:�' 0 •, �"" � Ih Yp `� '„�' i` • ,k i.i '.:c 'k LL L(') • r r ji. \�tk c f� { ' { >,y.. B a .'fit, r .r: y _ `..f may,*j _ _ r _ +, �� ,,�y, 'q•�y r �''It." gyp' 3.,E ,y1.�, 3� i1•,,�y .r ,,{► - �: yam'• .C i{. +Shy: 4.. .. -•,P. ,it ,,� - w' : 'P ,�".r?R . ,,r /.' .:,y S":s- •' r y z . 1 •NTi IF f e .;.� .It a `! j' ` -', 114 , i{p I.i ✓ �. ,N .. fj „ 4 , _ 49. N, r�°xI,'4= r :iAr. ,.0 't .� , ! +:«'` st.• "!D _ •, :p%,�T�F, {{ _ �1d' .- i ar .,J ; free-",r ,,•,,..,,._ • d ... f.CtilP. L •0 r �4 l Hv a i• r , - t' t , :.�,; ;{rt'y,°", _4, ,!p f•11c 1 ^c,,. ,. - ,. , .,.• t,'a'.ws-•+liia wr,- a-., k" t" -o �•;` �.t ` 4 (� .'a, Ff ! F „ `.r,: ry11`' - --. - ... . c " `:F _ k w Y Z � ~ nt a-Y {JE} i� =:l {r _� n' cc- �Q/ :, , re. 111IM A ' • irk '110/241ftwier IIMIK .. . . LLJ cc a ii _ r �- 1,v . .> _ - /---_______ . .+.Z 41 ..,,I,a'it -_ ,.. .i. _ "moo' � C `J , „; wh,'-' .*'. ive*•i::..Tvivtr:..:A.-4. ,u - ::1_6. , , —. \k+Ir '' ' ''''' -' -' - ' 7 _,L.L., _iz •t I �,•R,«i, •*At. A \ 1 L DITCh Jh3 .444 41104 <r a - rh „ 1.# �e M , y „j4^i kk y- r m r ','Zr`-' -` '", '• "' ti 3'� .�r•'R :L� _- - ., '�"• :r�,r • R k,.�. t. y` jt 4ar..''" _.4-,_-„ `CL I _ zO E / 0 '>akY'a a , :'�,-t�•>' s,s` ?, r .p" -�1�'�f ,. .�t,.'fi, ,c -r - l I..L inW / i • t- :r 1 . 24 r 1, S'.8 K P. ,."41,' -' ''r am i' i :-' . °' x, t • \e 47 {1; d:,�+ } ']". e��s', -y ,,+r'' l+ ♦• C, rX •M A t,. '1,4,, • • • . .k ��� 4 O /_ L / — -+ . y� T ;ems' - *« .t• . .. t - 0 ii, '4 ,3 ' � 't`, �1►. • •-,S,`.•'t;•j,,1•}J Y` ti~4 b'. rl fi �„ `�is_, ❑ I — Q . � "'"•. . , 3 ;� - , i SCE 0 1 D s' •'t J . Y• �. _71z J , > - - :.t.. a -.t;• :'V a y't" �.}'� •,, ^jam .,_` �„s�w s�` : 1: < E t = in .,r ,t , .,,. a�. s< - `'t,, a a'a�a `! ;\a' +P - Q �co ;, w - ., h•` •�•,�, ,.�k \.s, y. , y ''S 1. -1... Via' 1t., , p ,+, x in ,o Y ' h, i., ..--- ,�, _ I ' ... • ... V • 00 r %. • :l,, •.{, k °'u` .s' �',#. `� :,*�. '"w>' «y. vr .. .,M, 7 t, ,.� 4 ' .. . a., I..L 41 — I • 1" r\', �r.-`. +.-:;, , '- \ r�q„ .4, 4-.. +.: t ,a) F"''rye s L _r,_ . . _ _ O co !' ..t 'y k I `-1!'"- 5 , 7 !✓.< .FP z� i ,a,>, -1 .art \i I ,y.' .•' O J i S= , -,a,, < a F s' 4a 'rc -' ts: 7 ,, Ill W LJJ -y i' .. •.qc,.r. w .-;: - ' `_. f. a ; 'a». ;4 N i •f _ -�40 c m m �y N ;F ''' {y'�+ E'` ,` 14.' .5 v a+ .- -,Y Y) �� ' - .s' ^ ,. Q Q �i " �kk 1. • I. y� i * ,yt,:_.y t ' - !�'�V Sy ' `Y 'n .` � � 1.•' W !l — - ?' 1 !t w •Y. q f. V wt \�a� AT - - - :C J ' 'b '' "i: vl- J^ "`► J> '•• ;y,�, r 1 .."* 13. - .. ,� - �'° 0 < T Z `t, t;` ;1,.. - �_ „" - s„Ado ' 4g- [ ♦' T2 S ti' 11F•' '}K": - 'i1 t\., ..„:-`,' + — C, y= ':r': ,, ,w '' `C 'y�„-+.• +.1„��,%�,,� - - n e,a ,.,, _ q`.^ A. - a I..1� . y ' • is ,i\:�' - "'Y•*, t` • r'_ i' Sit _r {mil; t4W f '., , vv i .,: IY c7i : t~ . -i .S _ I ' ',sv' ✓°'' Y `M, a;R 7!'�yy I 1 . '�,. ,::F F 'Y.4. r - �// �N. a 1- - ���.•g,f- 1�• a. I \ �) d' • .?\„ �''� E �. - „' i !::'.y.{ •, , r „le .r' ..t.i -x, ah,' .• - 1y 7Y M+� "^�. 1 { ; ' PROJECT NUMBER: 101038 O „!;^,� 1'.* ,Z .�'1411P, I'� .Y jf L' '�-. _ - .> 4^ \rr �' { rF� i - - ` - - .'4.' ,; • +� .� , ,?1.fa .t�), '�• - ,.� F ' Y'fi- - -i:F �. .w4-. .r.'.�,� O � 'r ,, ` \—,•-•(.-; . iF#. . ji ,'1 'ifr! i ' I;'�i'` :: `: .ar.. • .�� • {: y. ,s9s', , t' PROJECT MANAGER: JRM •_o .: ,' w_ ., ti w _ �1 BRC .- A.-- * "�^-01— � lla,1r",i}-iris f, .4 • s " � DESIGNED: i 't'•,p K, i.: 5 +� .y' `?fiw r �. >. •e1C"'- t' - r, p c ..w�. ye CC64k h + o DRAWN: BSH Fes' ry r+ sx CHECKED: BRC 8(15 ` i 3 c• `, ( ,%, ,•—lvt r• c SZ, - •7'r 'f Y A." .846\ it -,. - , ; SHEET NUMBER: W ,'�4 r .Y:t, - .jfei+t' •t` �. 'F3 �' „'�`;S g r, i�.�g. • '° ,s'. - - 'i + + `4:, x+fry - .04 '4$ :ale - .. Q y, 7 .•q•r'- - '6,� s;-:•: • . e� a .e ,� '� ``�f.- .,, '. `� �. ., & A 1 'tom/J - i i* ,,„ -ir ,x t:_,' ,"' , k ,', r y. '�4: iliki .\ .:Y''�'C,rL,JIRR' i T -If ��� /( r,, i _.H+-_ S . ... n #.• sl ,#1'F - - -5����1�� 1 - ;v: ti>-v..:J.'. '.:•ilt.]�5�•Q.:., FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\101038_AB_Design.dwg SAVED BY: Bcarroll r o k°° +00 LCE W +50 *� 00 LCE 2_A-50 40_ FIELD DITCH TIED \ TO REACH J H I -A \V XS I LCE I40— — 4+00 A.444 -- LCE 33-1 Aks° /-- ,i "gg_ 00 REACH J H I -A RESTORATION STA I +57 TO I I +64 33-1 LCE 7 -- I39 N N G N\ T@ k68 LCE ]o1 140 00 0 CU ° *►W air Ag ]o1 L( 150 145 140 135 130 0 1 1 1 I I I I I I I I 1 1 AS- TO1OF UILT BANK I � I CHANNEL AS -BUILT BED 1 1 T (STA I + 5 )NSERVAT 1 11 1 1 1 SCALE: HOR I "=30'; VERT I "=3' 150 145 140 135 130 LEGEND CONTOUR MAJOR CONTOUR MINOR WETLAND 50 46 TOP OF BANK — — — — — TB — BOTTOM OF BANK — — — — BB PROPERTY LINE LIMITS OF PROPOSED CONSERVATION EASEMENT BRUSH TOE PROTECTION HAY BALE TOE PROTECTION LOG SILL STRUCTURE BRUSH BED SILL STRUCTURE ROCK WOOD RIFFLE STAGE RECORDER FLOW GAUGE MONITORING CROSS SECTION VEGETATION MONITORING PLOT LCE fCKKKKKxXXS ■...........■ 0 VP# / 1 res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL \,,,,,,,,u1C1A,Ro /�/////// ON\FESS/0••//� =.Q SEAL 9'.v L-5165 tivi.e.i;/;; ,_, ....r..,,,,,,,,..;"i.„—.........1....„.....:".°. 7.' " ' ''''''.. . 0 . . . . .',__,. . - a ee. . . FULL SCALE: 1 "=30 0 30 60 2" = FULL SCALE 1" = HALF SCALE REVISIONS: PLOT DATE: 5/13/2022 RELEASED FOR: AS -BUILT DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH JH1 PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH BRC SHEET NUMBER: S 1 FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\101038_AB_Design.dwg SAVED BY: Bcarroll LCE O CD c r LCE 00 \ \ Te\\9�e\ \, 140 LCE XVJO *sum Tg -0 X �g�—� VA�V O // \e\ +50 \ — TB �e \jam XS 3 LCE 39_ XS 4 XS 3 XS 4 00 LCE \\� y�vv�v 5+50 // yip_ \� -TB_- / -I40 9 +0O LCE 7 =-��!0���, _ yip 131 REACH J h 1 —A RESTORATION STA 1 +57 TO 1 I +64 \ Te= LCE - -1 39 10+50 Tfa00 / ]o1 II+50n BB— + TB -4— - BB — TB— r— n r 12+50 \�o LEGEND CONTOUR MAJOR CONTOUR MINOR WETLAND 50 4G TOP OF BANK — — — — — TB — BOTTOM OF BANK — — — — BB PROPERTY LINE LIMITS OF PROPOSED CONSERVATION EASEMENT BRUSH TOE PROTECTION HAY BALE TOE PROTECTION LOG SILL STRUCTURE BRUSH BED SILL STRUCTURE ROCK WOOD RIFFLE STAGE RECORDER FLOW GAUGE MONITORING CROSS SECTION VEGETATION MONITORING PLOT LCE fCKKKKKxXXS ............. 0 VP# 150 145 140 135 130 6 BANK AS- TO UILT OF Z \_____--- -)K CHANNELBED AS -BUILT - - - - - - - - - - - - I 1 - 1 - - 1- - - - - - - - - SCALE: NOR 1 "=30'; VERT I "=3' 150 145 140 135 130 / 1 res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL \\\\\\\\\\\\\ a.C... Re �/// O%�FESS/�'.�/� `_.� SEAL 9e•9 L-5165 �•••. Su0�.•��#. N .: .... FULL SCALE: 1 "=30 0 30 60 2' FULL SCALE 1" = HALF SCALE REVISIONS: PLOT DATE: 5/13/2022 RELEASED FOR: AS -BUILT DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH JH1 PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH BRC SHEET NUMBER: S2 FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\101038_AB_Design.dwg SAVED BY: Bcarroll r LCE 1I+5O0 — EIS —ram-- — BB - TB — n rn W 1 2+50 ti 0 XO _ \� /�. oQrb _- V LCE 3+50 LCE \ Ak00 �e LCE REACh Jh 1 -B RESTORATION STA 12+59 TO 23+ 13 \ 00 _ O � � 6 �' TB I\/ / // 1. // / W 131 4 —I 40 v Vv TIED YARD SWALE TO ���REACh Jh 1-B XS-5 LCE XS 5 �41 6+00 xS� re Te \ / XS6 \V$N CXS \\ WETLAND WA I 4 I t cE LCE LCE \\\\ \�� \� - /33 l3a 0 17 F 4004 040 ,`IAI -i /33 17 LEGEND CONTOUR MAJOR CONTOUR MINOR WETLAND 50 46 TOP OF BANK ----- TB — BOTTOM OF BANK — — — — BB - PROPERTY LINE LIMITS OF PROPOSED CONSERVATION EASEMENT BRUSH TOE PROTECTION HAY BALE TOE PROTECTION LOG SILL STRUCTURE BRUSH BED SILL STRUCTURE ROCK WOOD RIFFLE STAGE RECORDER FLOW GAUGE MONITORING CROSS SECTION VEGETATION MONITORING PLOT LCE ■...........■ 0 VP# 150 145 140 135 130 1 1 1 _ I 1 1 AS-BU TOP I LT OF BANK _ \ � <9 + Q CONSERVATION EASEMENT BREAK AS CHANNEL -BUILT BED ' (STA l 2 + 5 S) SCALE: hOR I "=30'; VERT I "=3' 150 145 140 135 130 / 1 res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL \\\\\\\\\\\\��\\I11ICI I/1411 e //// .F•�ss,o•.1/�; o%�H `_`� SEAL 9.' L-5165 a j '• 9 5-13-2oa-c 11111 III _� i ill FULL SCALE: 1 "=30 0 30 60 2' FULL SCALE 1" = HALF SCALE REVISIONS: PLOT DATE: 5/13/2022 RELEASED FOR: AS -BUILT DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH JH1 PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH BRC SHEET NUMBER: S3 FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\101038_AB_Design.dwg SAVED BY: Bcarroll LCE 138 1' 00 TB _ BB _6),E> \ B— \ \\ \ 1.'\1 \ \\\ 139 00 30- LCE Te /� X -- Fav��v S� B (19 \� LCE REAC h J h 1 -B RESTORATION STA 12+59 TO 23+ 13 00 : -fro, 8 XS 7 O XO LCE N_ l 20-A50 LCE WETLAND WA pc` LCE INSTALLED 24 LF OF 35"(w) x 24"(h) CMPA INV. IN = 1 35.33' INV. OUT = 1 35.30' \38 — 23 —88�� LCE 139 / // 4 % rii.�s �•������ LCE LEGEND CONTOUR MAJOR CONTOUR MINOR WETLAND 50 46 TOP OF BANK ----- TB — BOTTOM OF BANK — — — — BB PROPERTY LINE LIMITS OF PROPOSED CONSERVATION EASEMENT BRUSH TOE PROTECTION HAY BALE TOE PROTECTION LOG SILL STRUCTURE BRUSH BED SILL STRUCTURE ROCK WOOD RIFFLE STAGE RECORDER FLOW GAUGE MONITORING CROSS SECTION VEGETATION MONITORING PLOT LCE fCKKKKKxXXS ■...........■ 0 V P # 150 145 140 135 130 18 AS-B'U I LT I TOP OF BANK \\--_____ --- ____----_________----.-- - ___/'N 35"(w) x 24"(h) C - - D- (STA 23+74) m - + _ AS -BUILT CHANNEL BED co N Q _ (.1) h CONSERVATION EASEMENT BREAK +00 18+50 19+00 19+50 20+00 20+50 2 I +00 2 I +50 22+00 22+50 23+00 1 1 1 23+50 I I I ' 24+1 SCALE: NOR I "=30'; VERT I "=3' 150 145 140 135 130 0 / 1 res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL O%�F6SS/o•.�j� =•Q SEAL -7 •v L-5165 ' 5-13- 2b22e. : ��••• 'PO&.. �'. SUR`��' '`. Illiiiir 111111 1 "=30 60 FULL SCALE: 0 30 2" = FULL SCALE 1" = HALF SCALE REVISIONS: PLOT DATE: 5/13/2022 RELEASED FOR: AS -BUILT DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH JH1 PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH BRC SHEET NUMBER: S4 FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\101038_AB_Design.dwg SAVED BY: Bcarroll r LCE LJ U Te\ \\ 0, ;.::ao. O, /39 WETLAND WA LCE L CE REACH Jh 1 -B RESTORATION STA 23+74 TO 40+32 254-50 a Ts� IC XS 10 26+50 LCE �O // /7 �X / //•� ^: TB / — TB 8\ ��'% T 63, — 88 Tg LCE 28 00 SO TB T8 88 0 3011 LCE — --1 37 `30 001 / TB SO 30 — TB / — TB 3 /\ 150 145 140 135 130 24 I AS-BIJ TOP I LT FBANK -BUILT BED CHANNEL AS 1- 1 I I I +00 24+50 25+00 1 1 1 25+50 1 1 1 1 26+00 1 1 1 1 26+50 27+00 27+50 1 1 28+00 1 1 1 ' 1 1 28+50 29+00 29+50 30+ SCALE: hOR 1 "=30'; VERT I "=3' 150 145 140 135 130 0 LEGEND CONTOUR MAJOR CONTOUR MINOR WETLAND 50 46 TOP OF BANK — — — — — TB — BOTTOM OF BANK — — — PROPERTY LINE LIMITS OF PROPOSED CONSERVATION EASEMENT BRUSH TOE PROTECTION HAY BALE TOE PROTECTION LOG SILL STRUCTURE BRUSH BED SILL STRUCTURE ROCK WOOD RIFFLE STAGE RECORDER FLOW GAUGE MONITORING CROSS SECTION VEGETATION MONITORING PLOT LCE .., res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL ,0111111111//0/ 60 1"=30 FULL SCALE: 0 30 2" = FULL SCALE REVISIONS: PLOT DATE: 5/13/2022 RELEASED FOR: AS -BUILT DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH JH1 PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH BRC SHEET NUMBER: S5 FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\101038_AB_Design.dwg SAVED BY: Bcarroll r +00 (—T: 1N,- -411s-- _ i\TB /I\ T 4\ T �7\ LCE LCE LCE — TB---_ A\\\\ -- 4\ 0 33-1 XS I I TB .,c B /I\ XS 12 XS 12 \ 0 74/71,4,60 _ WETLAND WA WETLAND WB 33 1 4\\ LCE REACH Jh 1 -B RESTORATION STA 23+74 TO 40+32 /I• 33+50 No:it .�s LCE A\ 33- — T 7 i 33-1 WETLAND WC LCE 34+50 3S� T T /\ --137- / T T L 36- 1 4\ / 00 !;;I3176 p10� t tr / 0 UJ z� r LCE T '1 150 145 140 135 I30 30 1 AS TOP -BUILT OF BANK N_Z ----------*_,_ CHANNEL AS -BUILT BED +00 30+50 1 1 31+00 1 1 1 31+50 32+00 32+50 33+00 1 1 33+50 34+00 34+50 35+00 35+50 36+1 SCALE: hOR I "=30'; VERT I "=3' 150 145 140 135 I30 0 LEGEND CONTOUR MAJOR CONTOUR MINOR WETLAND 50 4C TOP OF BANK — — — — — TB — BOTTOM OF BANK — — — — BB PROPERTY LINE _ LIMITS OF PROPOSED CONSERVATION EASEMENT BRUSH TOE PROTECTION HAY BALE TOE PROTECTION LOG SILL STRUCTURE BRUSH BED SILL STRUCTURE ROCK WOOD RIFFLE STAGE RECORDER FLOW GAUGE MONITORING CROSS SECTION VEGETATION MONITORING PLOT LCE .uuuuuuuuuuI. 0 (s) V P # / 1 res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL \\\\\\\\\\\\\ a.C... R0, //// o%�.F E s s,o•..-/ `_.� SEAL "r •9 L-5165 9y5-13-2D714 lit _.__ FULL SCALE: 1 "=30 0 30 60 2' FULL SCALE 1" = HALF SCALE REVISIONS: PLOT DATE: 5/13/2022 RELEASED FOR: AS -BUILT DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH JH1 PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH BRC SHEET NUMBER: S6 FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\101038_AB_Design.dwg SAVED BY: Bcarroll r 34+50 — TB -- _ 8 TB----- TB LCE 3Sx •::rJaa6dJJ, :• -- 137 - ]o1 3c TB LIE 139 LCE WETLAND WC ]o1 -137- - I37 LCF LCE WETLAND WD 3 VAVA vvv � vvv � v VA VA A \ \ VA — J e\ vvvN.\ T REACH Jh 1 -B RESTORATION , : STA 23+74 TO 40+32 - — T / T 331 \\L�_____ 1 \VA\\ \ \\A \ \ \ \ \ \ \\\ V A A VA --,,V A 13 7 �� 150 145 140 135 130 36 I I L 1 1 I I I I I I I I I I_ I I (S. LIMITS OF CON AS-BL,ILT TSP OF BAI\ K CHANNEL AS -BUILT BED 1 1 +00 36+50 37+00 37+50 38+00 38+50 39+00 39+50 40+00 I 40+50 I I I I 4 1 I I I I +00 4 1 + SCALE: hOR 1 "=30'; VERT I "=3' 150 145 140 135 130 50 LEGEND CONTOUR MAJOR CONTOUR MINOR WETLAND 50 46 TOP OF BANK ----- TB — BOTTOM OF BANK — — — — BB PROPERTY LINE . LIMITS OF PROPOSED CONSERVATION EASEMENT BRUSH TOE PROTECTION HAY BALE TOE PROTECTION LOG SILL STRUCTURE BRUSH BED SILL STRUCTURE ROCK WOOD RIFFLE STAGE RECORDER FLOW GAUGE MONITORING CROSS SECTION VEGETATION MONITORING PLOT LCE ■...........■ 0 VP# / 1 res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL \\\\\\\\\\\\\ a.C... Re �//// O%�FESS/o•.�/ i ` .SEAL 7. •9 L-5165 byte,////80S, ,I,i‘, \\ , ' 1 "=30 60 FULL SCALE: 0 30 2" = FULL SCALE 1" = HALF SCALE REVISIONS: PLOT DATE: 5/13/2022 RELEASED FOR: AS -BUILT DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH JH1 PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH BRC SHEET NUMBER: S7 FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\101038_AB_Maintenance Sheets.dwg SAVED BY: Bcarroll DITCH Jh2 BUFFER MITIGATION LCE 301 LCE 301 LC1 301 LCE 301 LCE 301 EXISTING PIPES WERE REMOVED AND DISPOSED OF OFF -SITE LCE 301 REMOVED EXISTING PIPE AND REPLACED WITH SWALE, PER DETAIL FROM ENGINEER LCE 301 I I I I LCE LCE LC LCE LCE --TB__—-----81-----81___^ T9_ CrJ 1 -- iB----- T"---- -Tg___ —TB--- -TB 301 91 ----_ a1----- el — TB EXISTING PIPE PILE WAS REMOVED AND DISPOSED OF OFF -SITE EXISTING IRRIGATION SYSTEM WAS REMOVED AND DISPOSED OF OFF -SITE NOTE: REMOVED ALL PIPES NOT SHOWN ON PLAN BUT FOUND IN FIELD AND DISPOSED OF OFF -SITE J res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL 1f7A- \\\\\\\\\11I 111111///1/4//i 0.• EESS/0.. _ . C SEAL L-5165 :. 9 5-13 - UZzo 43;%. S U RN ' I I I I 1 FULL SCALE: 1 "=50 0 50 100 2" = FULL SCALE 1" = HALF SCALE REVISIONS: PLOT DATE: 5/13/2022 RELEASED FOR: AS -BUILT DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH JH2 PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH BRC SHEET NUMBER: S8 FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\101038_AB_Maintenance Sheets.dwg SAVED BY: Bcarroll NOTE: REMOVED ALL PIPES NOT SHOWN ON PLAN BUT FOUND IN FIELD AND DISPOSED OF OFF -SITE w U J w U J DITCH Jh4 BUFFED MITIGATION EXISTING PIPE WAS REMOVED AND DISPOSED OF OFF -SITE EXISTING PIPE WAS REMOVED AND DISPOSED OF OFF -SITE REACH Jh5 BUFFER MITIGATION LCE —el LCE TB--- — __ ie----- ie TB LCE TB----- TB 331 3C- 331 TB LCE d I 1 I 1 / I I / // / ;/ /&� I /`�i 1 I Il I I / 1 // I ;l 1 1 1 / 1 l I I I 1 I / ,1 / / 1 I 491 1/ //''>'/// 1I 1 1 I 1 / m I� rri EXISTING POSTS WERE REMOVED AND DISPOSED OF OFF -SITE DITCH J113 BUFFER MITIGATION P LCE / --- et m l mi— --TB ..... ...... — el l I /l —BI / , —B / /// --TB-- l� —TB— / / 1 / 1 / 1 / 1 I / I 1 / a 1 ' rfri — 0 r 0 rri LCE —el'I — Bl — -81 ---TB- 3C3 EXISTING RIP -RAP WAS REMOVED AND DISPOSED OF OFF -SITE LCE- EXISTING ASPHALT WAS REMOVED AND DISPOSED OF OFF -SITE EXISTING BUILDINGS WERE DEMOLISHED AND REMOVED DEBRIS FROM THE CONSERVATION EASEMENT. EXISTING CONCRETE WAS REMOVED AND DISPOSED OF OFF -SITE REPLACED WITH CLASS RIP -RAP TO MIN. I .5' DEPTH 1 J res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL \\�\,\\\\11 I l l l l I1///,,,,,, 0.• EESS/� .# .a SEAL L-5165 ck. % 9 5-13 - zozzo.• 43?� SUR�F'.•'''\� FULL SCALE: 1 "=50 0 50 100 2' FULL SCALE 1" = HALF SCALE REVISIONS: PLOT DATE: 5/13/2022 RELEASED FOR: AS -BUILT DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH J H 3-5 PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH BRC SHEET NUMBER: S9 FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\101038_AB_Design.dwg SAVED BY: Bcarroll / .Gc / / j A,,v 7 A� >> >I FIELD DITCH TIED / GC / / TO REACH J h I -A \, / / P° 0+50 , / ; k00 T-B //y/\�V U0 / - V A \ \ \ C� / / VA\� \ \\ \ \ /� 0 \ i/ \ V _ N _ 0A y ,5,,/ xs ` - :,. , s 1 150 145 140 135 2 v AS -BUILT TOP C5F BANK AS- CHA BUILT NNEL BED REACH J h I -A 150 145 140 135 0+00 0+50 I+00 1+50 SCALE: hOR I "=30'; VERT I "=3' c\ LEGEND CONTOUR MAJOR CONTOUR MINOR WETLAND 50 46 TOP OF BANK — — — — — TB — BOTTOM OF BANK — — — — BB PROPERTY LINE LIMITS OF PROPOSED CONSERVATION EASEMENT BRUSH TOE PROTECTION HAY BALE TOE PROTECTION LOG SILL STRUCTURE BRUSH BED SILL STRUCTURE ROCK WOOD RIFFLE STAGE RECORDER FLOW GAUGE MONITORING CROSS SECTION VEGETATION MONITORING PLOT LCE sus ■...........■ 0 (s) VP# / 1 res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL \\\\\\\\\\\\,,,,u1C1A,Ro // O��FESS/o•.�j� _.� SEAL 9 .v . L-5165 Alip 1 "=30 60 FULL SCALE: 0 30 2' FULL SCALE SCALE 1" = HALF REVISIONS: PLOT DATE: 5/13/2022 RELEASED FOR: AS -BUILT DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: DITCH TIE PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH BRC SHEET NUMBER: 310 I FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\101038_AB_Maintenance Sheets.dwg SAVED BY: Bcarroll REMOVED EXISTING PIPE AND DISPOSED OF OFF -SITE WETLAND WB G v J 9 i 3 3 91 REMOVED EXISTING TRASH AND DISPOSED OF OFF -SITE WETLAND WC \\ ' ' \ WETLAND WD \\ • 9 9 9 9 9 3 :-; E. 9 i i 9 9 4 9 9 4 9 4 9 $ /4 4 9 9 WETLAND WA / , / / 4 4�� 44 4 4' $ 4$4 49 REACH Jh I-B 9 4 4 9 4 $ 9 4 4 9 4 9 \ 9 9 4 9 4 9 $ \ 4 43 3 3 3 \ 9 9 9 3 4 49 9 9 9 9 9 4 i 4 9 9 i 4 9 9 9 9 i 9 9 4 9 4 9 $ 9 9 9 3 \ 9 9 9 9 9 9 $ 9 9 4 4 9 9 i $ 4 i 9 i i 9 9 9 9 4 9 9 9 9 9 9 9 9 4 9 9 9 9 \ 9 9 4 9 $ 4 9 9 9 9 9 \ 9 4 9 4 9 9 3 9 9 9 �A 9 9 9 9 9 9 3 9 9 9 9 d L 9 9 9 9 9 tE 3 ICE ` ,�i� i $ 3 4 v � 44 d 9 9 9 9 1 (`E� 9 9 i 9 $ 9 L� 9 r LCt 9 4 4 4 4 3 9 4 9 S4 �� 9` \ 3 ���4 9 9---� —�— �_--.�— / ,/ ,/ 4 — _ $ 30-1 REMOVED EXISTING PIPE AND DISPOSED OF OFF -SITE REMOVED EXISTING CONCRETE AND DISPOSED OF OFF -SIT 331 \ REACH J I-1 I -A \-G \ REMOVED EXISTING CONCRETE AND DISPOSED OF OFF -SITE \ A\\ \ \ \ \ \ ..) \ ,• \ \ \ \ \\ �\ C \ \\ / 1�1 / �j i - 59 \ 1 \ \ \ \ \\ \\ \ 1� \\\`\ • REMOVED EXISTING CONCRETE AND DISPOSED OF OFF -SITE 7 , , \ • , \ \ \ , • , .. res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL FULL 0 1"= 100 200 SCALE: 100 2" = FULL SCALE REVISIONS: PLOT DATE: 5/13/2022 RELEASED FOR: AS -BUILT DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: MAINTENANCE COMPLETED PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH BRC SHEET NUMBER: M 1 FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\101038_AB_Maintenance Sheets.dwg SAVED BY: Bcarroll i DITCh Jh4 EXISTING PIPE WAS REMOVED AND DISPOSED OF OFF -SITE 301 REACH J h 5 TB 301 TB — REMOVED EXISTING PIPE AND DISPOSED OF OFF -SITE CE DITCh Jh3 REMOVED EXISTING ASPHALT PILE AND ISPOSED OF OFF -SITE 1 0 EXISTING CONCRETE WAS REMOVED AND DISPOSED OF OFF -SITE REPLACED WITh CLASS RIP -RAP TO I .5' DEPTH LCE 3C7 r 0 J EXISTING POSTS WERE REMOVED AND DISPOSED OF OFF -SITE EXISTING RIP -RAP WAS REMOVED AND DISPOSED OF OFF -SITE LCE LCE --—_ U a_ — 11 Y TR_ -£ 301 301 REMOVED EXISTING PIPE AND DISPOSED OF OFF -SITE LCE n DITCh Jh2 DEMOLISHED EXISTING BUILDINGS AND REMOVED DEBRIS FROM WITHIN EASEMENT 301 LCE 301 LCE 301 REMOVED EXISTING PIPE AND REPLACED WITh SWALE, PER DETAIL FROM ENGINEER i REMOVED EXISTING PIPE AND DISPOSED OF OFF -SITE — TB TR REMOVED EXISTING PIPE PILE AND DISPOSED OF OFF -SITE REMOVED EXISTING IRRIGATION SYSTEM AND DISPOSED OF OFF -SITE NOTE: REMOVED ALL PIPES NOT SHOWN ON PLAN BUT FOUND IN FIELD AND DISPOSED OF OFF -SITE J 1 res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL 0\\\\111111111 //// \ -\\\• FARO/''''% z: is SEAL 9 - . r . L-5165 B.5 )� zago 4/0 �32••.• S U RO-.••.'` 200 E F FULL SCALE: 1 "=100 0 100 2" = FULL SCALE HALF SCALE 1" = REVISIONS: PLOT DATE: 5/13/2022 RELEASED FOR: AS -BUILT DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: MAINTENANCE COMPLETED PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH BRC SHEET NUMBER: M2 FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\Record Drawings\101038_RD_Cover.dwg SAVED BY: Tswartzfager ! t Smithfield Smithfi'eld ifw a�"ec Clive ofs chin Lit PROJECT LOCATION VICINITY MAP NTS PROJECT DIRECTORY OWNER: JEREMIAH DOW NC DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF MITIGATION SERVICES 2 1 7 WEST JONES ST., SUITE 3000A RALEIGH, NC 27603 DESIGNED $ CONSTRUCTED BY: RESOURCE ENVIRONMENTAL SOLUTIONS, LLC 3600 GLENWOOD AVE, SUITE 100 RALEIGH, NC 27612 AS -BUILT SURVEY BY: RESOURCE ENVIRONMENTAL SOLUTIONS, LLC 3600 GLENWOOD AVE, SUITE 100 RALEIGH, NC 27612 DMS PROJECT #: CONTRACT #: USACE ACTION ID #: RFP #: DWR #: 100094 7745 SAW-201 9-001 24 1 6-007576 20190159 STRAWBERRY HILL MITIGATION SITE AS -BUILT SURVEY SEALED BY BRIAN S. HOCKETT, PLS (L-5 1 65) ON MAY 13, 2022. STRAWBERRY HILL MITIGATION PROJECT PROJECT LOCATION: 35.469170°,-78.312918° JOHNSTON COUNTY, NORTH CAROLINA NEUSE RIVER BASIN: HUC 030202201 MAY 2022 RESOURCE ENVIRONMENTAL SOLUTIONS, LLC 3600 GLENWOOD AVE, SUITE 100 RALEIGH, NC 27612 /0JLCE o � a Pi SITE MAP NTS LCE • 3C� 0 LCE 59 55 Sheet List Table Sheet Number Sheet Title -- Cover Al OVERALL AERIAL VIEW S1 REACH JH1 S2 REACH JH1 S3 REACH JH1 S4 REACH JH1 S5 REACH JH1 S6 REACH JH1 S7 REACH JH1 S8 REACH JH2 S9 REACH JH3-5 S10 DITCH TIE M1 MAINTENANCE COMPLETED M2 MAINTENANCE COMPLETED 1 i s 36 00 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL \,\\„\1111,iiiii/on1/4 ` _FESS/p 9 \ �', SEAL 04 8 ' I l'i illt\\\\\\ l'il IMF I= REVISIONS: PLOT DATE: RELEASED FOR: RECORD DRAWINGS PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH BRC SHEET NUMBER: #### l Strawberry Hill Project Credits _- 4` ._ I. Proposed Mitigation �. ; Ores Reach Mitigation Type SMUs ti ^ i Length(LF) Ratio JH1-A Restoration 1,007 I : 1.0 I,0(l7 �. " �`. JHl-B Restoration 1,054 1: I.0 1,007 `'' a \ Restoration 1,658 1: 1,0 1,658 ►' w+ at 3600 Glenwood Ave, Suite 100 JH2 Buffer 1,009 N/A N/A : .. fy't ' rMr Raleigh, NC 27612 JIB Buffer 326 N/A N/A „ : • 4fi ` Main: 919.829.9909 J H4 Buffer 297 NIA NIA - ;, ::14111:,,'4 (' \ , �\ �, www.res.us JHS Buffer 924 N/A N/A p R ` .' '. :Total 6,275 3 719 I\�ACh Jh I -U yIs c # 4, , �t�a `#` :� � r r \ ",- ra Z\ \ - Engineering Services Provided By: _ y' F {a , \ �` 1 } ' RES Environmental Operating Company, LLC e i '►� ' '� + Q �, i.�r, �'`y w ,�� \�• 1 `' �;':1:: License: F 1428 �: } r f 1"�; SEAL • n 14.0. _._ n !s� �i'' s1j ,0111111111111_; eF r • �Z. LCE �oF •��\\�H C ARO 'i'% /,' LCE , :� t 4 A �, ���` (lt �� �� , t wr -_ GE 0LCE Y + - - L ,� SEAL r� F GINEF-� .� <cF ti 4:' ,• c, w N R U 1nn no 1 3C, L ---- <cF "'`' fir•{ KEACh J h I -A "' GF. �j> LCE LCE 'v. �' �+�. '' '� 0I. ,0 , O LCE J 1 " � ; ;w'f4t� *LCE .. ..� 1 ii/ ram ` - �' �' FULL S750 : 1"=150 12,:. :::,. C_ �C LCE +! ear '` ' ^' 0 300 �, 3Cl O , * 1 �p o 2" FULL SCALE i If tile, . .,. _..,,. �' � 1" HALF SCALE .. .. litii ,,,, . .- ,t,...\\,,,. ,..- . ,,,,, •• l!F y� l ' .iar „V:b M_+ .' `� ,. �,•,. - _ r. \\ 4` s .4< ' -'�.. ,,�••�.: r „'. r e' ' �' o ..- 7 Y� • „ \Y ,t r ram ., -c L'• ,: .?iT.d (\J r_ v 0_ Co 4.,,..!:,...:_iin. ` y�� test-. I .� f `'I* • 1 - - - '• R ! `t - * L r 'f�.' W�✓4et �' 4 ' ,W 'ry T 7P f Y > yy� a R i :111- . ",�, t:"i+`fa w erg''� .1 ` f' _�:'-f«.,..- ..�•r. , y .. N -a ..y yF P a - ,Fr s <.:. 6*' ? ,,ram J. 1 `j� :?.� _ ,. �..� '{'. F' _ s} �� �%: �?}`•1 4 y �J . -,!'�,`' •�.'^3�,.. :1" tt:I , 144, ' -4. ! f 4IA. I - L A,, -,nra l .,wr + •• ^' !. •� rk y N '.I i(� 'y' r�a'�' caf 7�',': S t w- 'f't; r'- .', `"A',,l,: - ' '0 ; • • , - i 1- h ,p I •7 _"'.`�._... •\♦ - - - ' `•y-..i�, V'"rr+ 'w. ' itk7lld �9 . . j,/' }40.� ,f'f ku.ir ,' \°1f ` • * }' :i y' �tLrt�• '� C Y ° - - - •, Tyr ikt i �y. { '�', J�"s /+� « � il �-_ .+ { <''- �: . der?. 4 'T!'+ti L , f .,y • :!4 �' y, • f' k at ,;:.'',61„ _ : ,- ,.,.. -fit 7 t_,., ..., .1, ,1 r .; ai - . , -- _ •.raw- It I r 1 '4 .^' ... i- P ;` y�:4i' ;�.,,, CC L. • _ . ` ! 04 sSS }may_ •.x w. 'r''(' rI ,� 0 't 'I.�' t,', - %., +�,""..i-e•Ic'l:. F:. .err :y, - _ - .^'` O 0 J--- 'ir3, 'R"' '• -t' ! ..y,� 'vl F,: - 1 i� I' �,,ly,+ia ,i s.Iwz:• ,'. t' '� .4•J:` ;'Yi 1) ❑ '1t '.r� ., "'y. ,• '-1 ..', 1 j I i'I r ! ;4, ti:�: r', t _ W �/` ,r,• _ - , - o. err /Yf,y l� i {1+� N' . ( t ' 'i a.a ' ` w�:• - IY ,� x' D I TC h J h 4 1111I " ;11?':' ,' !, • '• W W LJJ :fir ', �� . > ,� , ;fir wits� 4,. y 74- ......., , ,p ( y 0 rr, .... ., ,,,,0_ ,,,_ , , 1 i / ti .s •-t ;`YTgIFR','„ ' ,• I� U / f g 0,4'" ^ ..• U 7< a) iS shy ! \_, 4/115,, 0 // DITCH J H 3 i o_ < 4,1404 / / t--; LLJ s _ F_p..- +r a S #1 +R X` .fy ip �/ /I l 7 ' ',, . t5. s e `i •� 1 At W. \`"` 3 KEAC h J h 5 _� , LCE Q =.fir- }_ _ '� . ^� ,�,� r _ C� O Q ❑0 ..-r -�+-* tea_ - i-Y` .�"p'- ' } _ 1�,. ' 1 !i-,.' i ,rn , ° I \\ 1^ F ,. • 3 W jrI'� s rt y 5 �t k '' Y W R a .. ;. L E ap •i 1 i �y •~ `. - _ 1, z 1i t, ,3. :4•' '41'1- .4."t O/ // ��_ r W C t % + .� CC co _,t„ , -:t:•" -.5 ,� � ' > r: ' 4- a ` ',. .,�o� . �C� - ` U LCE c. G Q �` R �`' ,, \ w '� ,� — _ — _ C LCE -I z J > :�y. y ' ;,. • 4, LCE 'rM+ ,7 'l' -=-f�' • r !'c- a i ' • �n -o,n \'Ir •..Y 'T � - �. D �/ eillh 4 :fir a� ya, -!:4.'., • a ^ :. . . .a ,r ,r •r s»^ _ n I �.71• , to t _- _ O L.L '✓ �- . y��-1,: I / - a .,a,.,. _,r 7,c ;4s.• * , ,(k'` V + c ` _ t -•' ` fy, '_r „xti A* 78I / _ .."'t ' l'• �.71 /� —_ 1A�'' -��� �f •'a. v.'F^ YS' '�3 ...-'�' _ ��. IN - :y-t!:. ..o- T 1t,:i�!'r,` .00' 1..� Q ' s dd, ' 'Y is' N. �` v' / 1T1 Z H 4. `;ice" '\`\ r: - ''.1, tny i ��\ •:Sty` _ l - .'. "'w'x * ,r. ,.- �i ," Z • „3, �y s�w cNt P is .j y�` M a � ", I U a I Z ,. ' V ¢ * 30 * a fix ref. ' -z W — •,, <Ny 4.c+' "'- 4,-i'c - Lv ��66 \w Ny• Y a:f 'ii. .,. -• ...1ts a �! I :`►� 1 .. 4a,i• -.wile. -^:- --404 $ - R'l' -' a F*._. 1=w .i t'�',,i.`.f *ilk. "II ,R- ?,.♦ •- ' .., -P- t�Q .4'` I �i O _`�" � �. �!}y� •2'2 ,'.•, s_ r �, �.. - �t - .? r., .,V� ..It r h' 't- „, wI O Q :? Y " + ,{��jt- ..? -j- ,,qx.d. + ..-V:. �t1iWP ,.c Y' : i... c `�.. cc cc %'y11 i y�l.' -'s QS ' ,,' '!'• tr �p�,, `i�i. �.? 'M a`! ,3:r Y "o- .^•^�+, ♦. - I _ 'I + .n _ 4. C� zi "�.r -t- ,3- • s-r-Y �Y_„i.„ . �� L,ti `:. •r w Vie �` • — — to, •.?'° ,t,• , 't - '1 O - !+ iZ" " • '. -''! ♦! •�IIS .,r�y C ♦. `•a. y.a :r.. !CO - / -- ' s- 4. �. 4 '''k tip* • .. �-4' - c� a ,�,- Fk f; v, C 'A` -s. ._ .r. ' d t' A� i:.1 A r r� 0 '� PROJECT NUMBER: 101038 i ., i,t .y al,e rJ,.:'Y• R" d '„� L. - ►i .. 'i 1 " ~ ��;?.J( ,n r '' ;F ,� = w i.. +. y� -7 PROJECT MANAGER: JRM ci9 "f'. :f :�"4 �; yf`; Flf �. � + ` ' ae • �. �' - DESIGNED: BRC 31F" € r �"� h' t �� a; . \ r t cs>q r : a DRAWN: BSH y1. • 'A e',' ,0,4?c4,4,i:•a'� _ i CHECKED: TRS I - _ r - 'J!` '•'d. �`. ; Pr t -xN'' c �` , a .ir 4. .}.�-aa.y/: - -R: .� • :* . ffi ,"'°,a. i, " SHEET NUMBER: x 1 CC -. t � 'Vva " �. "` `"'R�'� '; '�•44K' r ,p� - , . , Y +t - ` "1� - �y�z, �'' ,;, Q - ' '._ _ S i t `'_!1r- ;Ai'' .'rf."3'� .� •,P,' ,•ji' .a - - - - - a: ".x v k--1.. ` " \i. •.:F I• • .'i•14 "P= e "`" - - t _ - 3. <.- any:+,�„ - ,,(� :Jf 'ti• �� �• - ' e• `ter • Al J r. x J \ J 01038 RD Design.dwg SAVED BY: Bca y Hill\ABRL\Record Drawings FILE NAME:R:\Rescad\Projects\101038-S REACh Jh I -A RESTORATION STA I+57TO I I+64 AS TOP -BUILT OF BANK PROPOSED - — TOP —OF BANK 1 / \ — — — — — — - — AS -BUILT CHANNEL BED PROPOSED CHONEL BED 1 1 1 SCALE: HOR I "=30'; VERT I "=3' LEGEND PROPOSED CONTOUR MAJOR 50 PROPOSED CONTOUR MINOR CONTOUR MAJOR CONTOUR MINOR WETLAND 46 50 46 w w w TOP OF BANK — — — — TB — BOTTOM OF BANK — — — — BB — PROPERTY LINE LIMITS OF CONSERVATION EASEMENT PERMITTED LIMITS OF DISTURBANCE PROPOSED BRUSH TOE PROTECTION PROPOSED HAY BALE TOE PROTECTION PROPOSED LOG STRUCTURE PROPOSED BRUSH BED SILL PROPOSED ROCK WOOD RIFFLE BRUSH TOE PROTECTION HAY BALE TOE PROTECTION LOG SILL STRUCTURE BRUSH BED SILL ROCK WOOD RIFFLE STAGE RECORDER FLOW GAUGE MONITORING CROSS SECTION VEGETATION MONITORING PLOT LC E LOD ■...........■ ■...........■ 0 VP# NOTE: ALL SIGNIFICANT CHANGES FROM THE DESIGN ARE SHOWN IN RED 1 res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL k t�lA RDA®' `°��''"•, SEAL 6 77/Zz it 101\ .......""-- A •::::._........,, 00- G . „. I 1 "=30 60 FULL SCALE: 0 30 2" = FULL SCALE 1\ 1" = HALF SCALE 1\ REVISIONS: PLOT DATE: 6/27/2022 RELEASED FOR: RECORD DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH JH1 PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH TRS SHEET NUMBER: SI J 01038 RD Design.dwg SAVED BY: Bca y Hill\ABRL\Record Drawings FILE NAME:R:\Rescad\Projects\101038-S 150 145 140 135 130 6 REACh Jh 1 -A RESTORATION STA 1+57T0 I 1+64 1 I I I I I AS -BUILT 1 I PROPOSED TOP OF BANK TOP OF BANK —►— .a...—_� AS -BUILT BED CHANNEL PROPOSED CHANNEL BED 1 I 1 SCALE: hOR 1 "=30'; VERT I "=3' 150 145 140 135 130 LEGEND PROPOSED CONTOUR MAJOR 50 PROPOSED CONTOUR MINOR CONTOUR MAJOR CONTOUR MINOR WETLAN D 46 50 46 TOP OF BANK — — — — — TB BOTTOM OF BANK — — — — — BB PROPERTY LINE LIMITS OF CONSERVATION EASEMENT PERMITTED LIMITS OF DISTURBANCE PROPOSED BRUSH TOE PROTECTION PROPOSED HAY BALE TOE PROTECTION PROPOSED LOG STRUCTURE PROPOSED BRUSH BED SILL PROPOSED ROCK WOOD RIFFLE BRUSH TOE PROTECTION HAY BALE TOE PROTECTION LOG SILL STRUCTURE BRUSH BED SILL ROCK WOOD RIFFLE STAGE RECORDER FLOW GAUGE MONITORING CROSS SECTION VEGETATION MONITORING PLOT c LCE LOD ■...........■ sus ■...........■ 0 0 VP# NOTE: ALL SIGNIFICANT CHANGES FROM THE DESIGN ARE SHOWN IN RED 1 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL ,„,r ®' .F oki\°‘t� tClA RD/.//1 •, t C. ": '. ,sesio,s SEAL e584 GINEF,' iiillk FULL 0 'A 1 "=30 60 ://11 SCALE: 30 2" = FULL SCALE 1\ 1" = HALF SCALE 1\ REVISIONS: PLOT DATE: 6/27/2022 RELEASED FOR: RECORD DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH JH1 PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH TRS SHEET NUMBER: S2 01038 RD Design.dwg SAVED BY: Bca y Hill\ABRL\Record Drawings CES FILE NAME:R:\Rescad\Projects\101038-S LOD 001 150 145 140 135 130 _OD L U Q 00 LOD C107 0 —J 3 LOD LOD LOD LOD \CE C0 3S SCE LCE 138 OX /. 14I TIED YARD SWALE TO REACH Jh 1 -D SOD co LOD LCE REACh Jh I -D RESTORATION STA 12+59 TO 23+ 1 3 0 CE > SOD SOD 140 0 CE LOD LCE 140 -3O7 1 AS -BUILT TOP OF BANK PROPOSED TOP OF BANK CONSERVATION EASEMENT BREAK in CHANEL AS -BUILT BED PROPOSED — + — + N CHANNEL BED Q Q U? 1 1 1 1 + + + + + + SCALE: HOR I "=301; VERT I "=3' + + + + +50 15+ �gk F 150 145 140 135 130 LEGEND PROPOSED CONTOUR MAJOR 50 PROPOSED CONTOUR MINOR CONTOUR MAJOR CONTOUR MINOR WETLAND TOP OF BANK BOTTOM OF BANK PROPERTY LINE LIMITS OF CONSERVATION EASEMENT PERMITTED LIMITS OF DISTURBANCE PROPOSED BRUSH TOE PROTECTION PROPOSED HAY BALE TOE PROTECTION PROPOSED LOG STRUCTURE PROPOSED BRUSH BED SILL PROPOSED ROCK WOOD RIFFLE BRUSH TOE PROTECTION HAY BALE TOE PROTECTION LOG SILL STRUCTURE BRUSH BED SILL ROCK WOOD RIFFLE STAGE RECORDER FLOW GAUGE MONITORING CROSS SECTION VEGETATION MONITORING PLOT 46 50 46 — — — — TB — — — — BB LCE LOD ■...........■ 'MEM 0 VP# NOTE: ALL SIGNIFICANT CHANGES FROM THE DESIGN ARE SHOWN IN RED 1 res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL iiiiiio oki`\°\1y tCA lRD''''''•, ,O �OF ES S/p�9�'t'y' SEAL 4 58g22 zr/�v "' TO , C T''''''''''''...."'",..... 1 1 ' . . - • . ..... . .. ,„ •:..-, , . . .4 . ,:, 0 ...—• " ". . . Ag--- ''''4 " . . . w4.*. FULL SCALE: 1 "=30 0 30 60 2" = FULL SCALE 1` 1" = HALF SCALE 1` REVISIONS: PLOT DATE: 6/27/2022 RELEASED FOR: RECORD DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH JH1 PROJECT NUMBER: 101038 PROJECT MANAGER: JRM DESIGNED: BRC DRAWN: BSH CHECKED: TRS SHEET NUMBER: S3 FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\Record Drawings\101038_RD_Design.dwg SAVED BY: Bcarroll .DC-1 OD OO N SOD LOD LCE LCE I38 0101 C LOD 001 ID1 LOD LUU LCE LCE REACH Jh I -B RESTORATION STA 12+59 TO 23+ 13 L \.J v I 4 I WETLAND WA LCE INSTALLED 24 If OF 35"(w) x 24"(h) CMPA INV. IN = I35.33' INV. OUT = 135.30' LCE LCE 150 145 140 135 I30 15 H I! 1 I I I r PROPOSED TCP OF BANK AS —BUILT TOP OF BANK �� �i i \ z / 'rr'T _ —INSTALLED CUL 35"(w) x 24"(h) c (STA 23+74) AS —BUILT CHANNEL BED Er + FROPPSEE CHANNEL BED N Q 1 f CONSERVATION EASEMENT BREAK L +00 15+50 , 1 9+00 1 , 1 9+50 20+00 20+50 , 2 I +00 , 2 I +50 , 22+00 , 22+50 ,, 23+00 i, , , 23+50 „ 24+, SCALE: HOR I "=30'; VERT I "=3' 150 145 140 135 130 0 LEGEND PROPOSED CONTOUR MAJOR 50 PROPOSED CONTOUR MINOR CONTOUR MAJOR CONTOUR MINOR WETLAND 46 50 46 W W W W W W TOP OF BANK — — — — TB — BOTTOM OF BANK — — — — BB — PROPERTY LINE LIMITS OF CONSERVATION EASEMENT PERMITTED LIMITS OF DISTURBANCE PROPOSED BRUSH TOE PROTECTION PROPOSED HAY BALE TOE PROTECTION PROPOSED LOG STRUCTURE PROPOSED BRUSH BED SILL PROPOSED ROCK WOOD RIFFLE BRUSH TOE PROTECTION HAY BALE TOE PROTECTION LOG SILL STRUCTURE BRUSH BED SILL ROCK WOOD RIFFLE STAGE RECORDER FLOW GAUGE MONITORING CROSS SECTION VEGETATION MONITORING PLOT LCE LOD ■��������...■ ■I.I.I.1E1E1M 0 (s) VP# NOTE: ALL SIGNIFICANT CHANGES FROM THE DESIGN ARE SHOWN IN RED 1 res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL •�Ayt 1�IA RDi®''"/•, �O , , SEAL 042580 ® � FG/Z9/e '�F,I,GINv ��T H II I01\ 1 "=30 60 FULL SCALE: 0 30 2" = FULL SCALE 1\ 1" = HALF SCALE 1` REVISIONS: PLOT DATE: 6/27/2022 RELEASED FOR: RECORD DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH JH1 PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH TRS SHEET NUMBER: S4 FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\Record Drawings\101038_RD_Design.dwg SAVED BY: Bcarroll 0 P1 135 135 W O� O( WETLAND WA 137 /o CIO-1 I- LCE XS 9 XS 10 LOD 01 001 SOD LCE SOU 1 001 ,\5 001 r� Lop Lop LCE LOD LCE \35 REACh Jh I -B RESTORATION STA 23+74 TO 40+32 001 _ 33;1 331 3C1 150 145 140 135 130 24 1 1 PROPOSED TOP OF BANK AS-:,UILT TOP OF BANK —_-- ,— -- -- CHANNEL AS-BJILT BED PROPOSED CHANNEL BED 1 +00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+ SCALE: hOK 1 "=30'; VERT 1 "=3' 150 145 140 135 130 0 XS LEGEND PROPOSED CONTOUR MAJOR PROPOSED CONTOUR MINOR CONTOUR MAJOR CONTOUR MINOR WETLAND 50 46 TOP OF BANK — — — — — TB — BOTTOM OF BANK — — — PROPERTY LINE LIMITS OF CONSERVATION EASEMENT PERMITTED LIMITS OF DISTURBANCE PROPOSED BRUSH TOE PROTECTION PROPOSED HAY BALE TOE PROTECTION PROPOSED LOG STRUCTURE PROPOSED BRUSH BED SILL PROPOSED ROCK WOOD RIFFLE BRUSH TOE PROTECTION HAY BALE TOE PROTECTION LOG SILL STRUCTURE BRUSH BED SILL ROCK WOOD RIFFLE STAGE RECORDER FLOW GAUGE MONITORING CROSS SECTION VEGETATION MONITORING PLOT c LCE LOD ■...........■ WESZZ292s ■I.I.I.I.I.I. 0 0 VP# NOTE: ALL SIGNIFICANT CHANGES FROM THE DESIGN ARE SHOWN IN RED 1 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL ,r,,,e,,,,,/,,,,,,s `,. 0N 'sr "', 0FESSiQ4, SEAL 0458A ///,SIIIo�� 60 FULL 0 1 "=30 SCALE: 30 2" = FULL SCALE HALF SCALE 1` 1" = 1` REVISIONS: PLOT DATE: 6/27/2022 RELEASED FOR: RECORD DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH JH1 PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH TRS SHEET NUMBER: S5 01038 RD Design.dwg SAVED BY: Bca y Hill\ABRL\Record Drawings FILE NAME:R:\Rescad\Projects\101038-S REACH JH I -B RESTORATION STA 23+74 TO 40+32 2�0 I37 WETLAND WC 1 35��' 101 _. _ AS-BUILTce TOPOF BANK PROPOSED TOP OF DANK — CHAN A -BUILT Ji EL BED I P3OP CHANNEL 5ED BED 1 1 1 +00 30+50 3 I +00 3 I +50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+ SCALE: HOR I "=30'; VERT I "=3' I50 I45 I40 I 35 I30 0 LEGEND PROPOSED CONTOUR MAJOR 50 PROPOSED CONTOUR MINOR 46 CONTOUR MAJOR CONTOUR MINOR WETLAND 50 46 TOP OF BANK — — — — — TB - BOTTOM OF BANK — — — - — BB - PROPERTY LINE LIMITS OF CONSERVATION EASEMENT PERMITTED LIMITS OF DISTURBANCE PROPOSED BRUSH TOE PROTECTION PROPOSED HAY BALE TOE PROTECTION PROPOSED LOG STRUCTURE PROPOSED BRUSH BED SILL PROPOSED ROCK WOOD RIFFLE BRUSH TOE PROTECTION HAY BALE TOE PROTECTION LOG SILL STRUCTURE BRUSH BED SILL ROCK WOOD RIFFLE STAGE RECORDER FLOW GAUGE MONITORING CROSS SECTION VEGETATION MONITORING PLOT LC E LOD ■...........■ M%.X22X.S ■........I... 0 0 VP# NOTE: ALL SIGNIFICANT CHANGES FROM THE DESIGN ARE SHOWN IN RED 1 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL q ��, z.`,. oFESSiQ4, SEAL Gzytr CQ```\ t. FULL SCALE: 1 "=30 0 30 60 2" = FULL SCALE 1` 1" = HALF SCALE 1` REVISIONS: PLOT DATE: 6/27/2022 RELEASED FOR: RECORD DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH JH1 PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH TRS SHEET NUMBER: S6 01038 RD Design.dwg SAVED BY: Bca y Hill\ABRL\Record Drawings FILE NAME:R:\Rescad\Projects\101038-S V 007 /N 137 OD LCE 3S IC1 007 150 145 140 135 130 36 i LOD r U 3G 35 •'+•>:: REACh AI 1 -15 RESTORATION STA 23+74 TO 40+32 _ 1 1 I IIII (STA 40+32) LIMITS OF CONSERVATION EASEMENT] 1 1 1 1 PROPOSED TOP OF ANK AS -BUILT 1TOOANK ----__ rj Ill --..._— — — CHANNEL AS-5 I LT BED PROPOSED CHANNEL BED +00 36+50 1 1 1 11 37+00 37+50 35+00 35+50 39+00 39+50 40+00 1 40+50 4 I +00 4 I + SCALE: hOR 1 "=30'; VERT I "=3' 150 145 140 135 130 50 LEGEND PROPOSED CONTOUR MAJOR 50 PROPOSED CONTOUR MINOR CONTOUR MAJOR CONTOUR MINOR WETLAND 46 50 46 TOP OF BANK — — — — — TB— BOTTOMOFBANK — — — — — BE PROPERTY LINE LIMITS OF CONSERVATION EASEMENT PERMITTED LIMITS OF DISTURBANCE PROPOSED BRUSH TOE PROTECTION PROPOSED HAY BALE TOE PROTECTION PROPOSED LOG STRUCTURE PROPOSED BRUSH BED SILL PROPOSED ROCK WOOD RIFFLE BRUSH TOE PROTECTION HAY BALE TOE PROTECTION LOG SILL STRUCTURE BRUSH BED SILL ROCK WOOD RIFFLE STAGE RECORDER FLOW GAUGE MONITORING CROSS SECTION VEGETATION MONITORING PLOT LCE LOD ■...........■ ■...........■ 0 0 VP# NOTE: ALL SIGNIFICANT CHANGES FROM THE DESIGN ARE SHOWN IN RED 1 res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL P� S `�., �OF ESS/p,�y''%, SEAL friZ53 ®,/THGINV-i: N seas iuuk FULL SCALE: 1 "=30 0 30 60 2" = FULL SCALE 1` 1" = HALF SCALE 1` REVISIONS: PLOT DATE: 6/27/2022 RELEASED FOR: RECORD DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH JH1 PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH TRS SHEET NUMBER: S7 \. J FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\Record Drawings\101038_RD_S8_S9 Sheets.dwg SAVED BY: Bcarroll 30-7 O � TB / 9 +So• TB / \ + o0 91 Un DITCH Jh2 BUFFER MITIGATION LCE LCE -91--91 --_ I O+B - I�___-- 91 -JL--- -_- 91 OO 9 + ooB — _ — TB _ 8+00 TB -- LCE I I LCE y J _ / I —91 --J 7+00TB_T _ G+00 331 EXISTING PIPES WERE REMOVED AND DISPOSED OF OFF —SITE LCE LCE - _ _ TB --91 ___ 5+00 TB TB --- 91 --91 -_-- - TB - _ B -- 4+00 -- T_±- 3 +00 REMOVED EXISTING PIPE AND REPLACED WITH SWALE, PER DETAIL FROM ENGINEER 1 91 LC - TB --- -�-T +00 LCE — TB — -- TB--- _ -TB-- -91 - O+ - 91 EXISTING PIPE PILE WA5 REMOVED AND DISPOSED OF OFF —SITE EXISTING IRRIGATION 5Y5TEV WAS REMOVED AND DISPOSED OF OFF-5ITE NOTE: — — REMOVED ALL PIPES NOT SHOWN ON PLAN BUT FOUND IN FIELD AND DISPOSED OF OFF —SITE 1 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL � \ �` CAR '%, E �ti< Q SEALS i q ,,,s FULL SCALE: 1 "=50 0 50 100 2"FULL SCALE I` 1" = HALF SCALE I` REVISIONS: PLOT DATE: 6/27/2022 RELEASED FOR: RECORD DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH JH2 PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH TRS SHEET NUMBER: S8 FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\Record Drawings\101038_RD_S8_S9 Sheets.dwg SAVED BY: Bcarroll DITCH Jh4 BUFFER MITIGATION EXISTING PIPE WAS REMOVED AND DISPOSED OF OFF -SITE EXISTING PIPE WA5 REMOVED AND DISPOSED OF OFF -SITE REACH J h 5 BUFFER MITIGATION — gl — TB_ +00 NOTE: REMOVED ALL PIPES NOT SHOWN ON PLAN BUT FOUND IN FIELD AND DISPOSED OF OFF -SITE — TB LCL, TB----- 7+00 8+00 01 W C3 / U / "0 / / 91 TB . / +00 n EXISTING POSTS WERE REMOVED AND DISPOSED OF OFF -SITE DITCH Jh3 BUFFER MITIGATION 17 L CE gl FC / TB O+Oe1 3+0� 2 +56 EXISTING RIP -RAP WAS REMOVED AND DISPOSED OF OFF -SITE I EXISTING ASPHALT WAS REMOVED AND r DISPOSED OF OFF -SITE n TB EXISTING BUILDINGS WERE DEMOLISHED AND REMOVED DEBRIS F�OV THE CONSERVATION EASEMENT, EXISTING CONCRETE WAS REMOVED AND DISPOSED OF OFF-5ITE REPLACED WITH CLASS RIP -RAP TO MIN. I .5' DEPTH 3 CE SCE SCE gi _ i ----gl J1 s 0+B — — —� OO TB— — TB--- 9+00 — TB — 3C1 ]C 1 1 res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL \$ L F` ,,,\\ lIHII//,,,, .`N CAR %,, QQLF ��9 SEAL Q4 58 at 4/0IN6 ; *--.I; �v FULL SCALE: 1 "=50 0 50 100 2" = FULL SCALE I` 1" = HALF SCALE I` REVISIONS: PLOT DATE: 6/27/2022 RELEASED FOR: RECORD DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: REACH JH3-5 PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH TRS SHEET NUMBER: S9 01038 RD Design.dwg SAVED BY: Bca y Hill\ABRL\Record Drawings FILE NAME:R:\Rescad\Projects\101038-S PROPOSED TOP OF BANK - A T - -BUILT P OF BANK ChANNEL�BED AS- U I LT PROPO CHANNEL ED BE SCALE: I-IOK I "=30'; VERT I "=3' LEGEND PROPOSED CONTOUR MAJOR 50 PROPOSED CONTOUR MINOR 46 CONTOUR MAJOR CONTOUR MINOR WETLAND 50 46 W 4Y W w w w TOP OF BANK — — — — TB BOTTOM OF BANK — — — — BB — PROPERTY LINE LIMITS OF CONSERVATION EASEMENT PERMITTED LI M ITS OF DISTURBANCE PROPOSED BRUSH TOE PROTECTION PROPOSED HAY BALE TOE PROTECTION PROPOSED LOG STRUCTURE PROPOSED BRUSH BED SILL PROPOSED ROCK WOOD RIFFLE BRUSH TOE PROTECTION HAY BALE TOE PROTECTION LOG SILL STRUCTURE BRUSH BED SILL ROCK WOOD RIFFLE STAGE RECORDER FLOW GAUGE MONITORING CROSS SECTION VEGETATION MONITORING PLOT LC E LOD ■...........■ cEEE_X_XM5 ■...........■ 0 0 VP# NOTE: ALL SIGNIFICANT CHANGES FROM THE DESIGN ARE SHOWN IN RED 1 s 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL `,. '®.�'�� q �', 0 SSiQ4, SEAL .FHGINE-C: 0 ilit V. FULL SCALE: 1 "=30 30 60 2" = FULL SCALE SCALE 1\ 1" = HALF 1\ REVISIONS: PLOT DATE: 6/27/2022 RELEASED FOR: RECORD DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: DITCH TIE PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH TRS SHEET NUMBER: s10 J FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\Record Drawings\101038_RD_Maintenace Sheets.dwg SAVED BY: Bcarroll REMOVED EXISTING PIPE AND DISPOSED OF OFF -SITE/ 7 7 WETLAND WB v� v fti 7 WETLAND WA 7 7 7 9 9 9 \ 3 : 3 3 REMOVED EXISTING TRASh AND DISPOSED3 \ 3 3 3 3 3 :4 E..34 4 4: c,44 _ _ _ _ _ _434 444 43 3 3 3 3 3 OF Off-5ITE �� �� �� �� �� �� 3 �� �� �� �� �� _1 $ �� �� �$ �� 3$ LC 3 3 3 3 9 9 9 9 9 4 9 4 9 4 ��� 9 4 9 9 9 9 9 B 9 9 �i 9 9 $ , � 9 9 i 9 9 9 9 9 9 9 i $ 4 3 WETLAND WD $ REMOVED EXISTING PIPE AND DISPOSED OF Off-5ITE DISPOSED OF Off -SITS\ 3 REMOVED EXISTING CONCRETE AND DISPOSED OF OFF-5ITE \ \ REACH J I-1 I -A \\ 77, REMOVED EXISTING CONCRETE AND DISPOSED OF Off-5ITE \ n (S\ \ r res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL ���\\11111111111/1/4/ ,A '/ ' R '",, 2 SEAL qq4 58 GINEO\�. 111 i 11111���\\``\ FULL 0 1 "=100 200 SCALE: 100 2" = FULL SCALE HALF SCALE 1" = I\ REVISIONS: PLOT DATE: 6/27/2022 RELEASED FOR: RECORD DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: MAINTENANCE COMPLETED PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH TRS SHEET NUMBER: MI l FILE NAME:R:\Rescad\Projects\101038-Strawberry Hill\ABRL\Record Drawings\101038_RD_Maintenace Sheets.dwg SAVED BY: Bcarroll ww Raw R/w ww / 5 ww Rnw EXISTING PIPE WAS REMOVED AND DISPOSED OF OFF —SITE ww W C // Rwv Rwv R/w ww / / 5 DITCH Jh3 r— R/w Rrw REMOVED EXISTING PIPE AND DISPOSED OF OFF-5ITE t CE REMOVED EXISTING ASPHALT PILE AND ISPOSED OF OFF —SITE _ EXISTING CONCRETE WAS REMOVED AND DISPOSED OF OFF-5ITE REPLACED WITh CLA55 I RIP —RAP TO 1 .5' DEPTH • o (5) (s) / zz o/i -Rw EXISTING POSTS WERE REMOVED AND DISPOSED OF OFF —SITE EXISTING RIP —RAP WAS REMOVED AND DISPOSED OF OFF —SITE LCE 33-1 Rwv R/W REMOVED EXISTING PIPE AND DISPOSED OF OFF-5ITE 3P DITCH Jh2 y�E 331 LCE DEMOLISHED EXISTING BUILDINGS AND REMOVED DEBRIS FROM WITHIN REMOVED EXISTING PIPE EASEMENT AND REPLACED WITH SWALE, PER DETAIL FROM ENGINEER R/w R/w CE ww REMOVED EXISTING PIPE AND DISPOSED OF OFF —SITE REMOVED EXISTING PIPE PILE AND DISPOSED OF OFF —SITE REMOVED EXISTING IRRIGATION SYSTEM AND DISPOSED OF OFF —SITE NOTE: 'EMOVED ALL PIPES NOT SHOWN ON PLAN BUT FOUND IN FIELD AND DISPOSED OF OFF —SITE 1 res 3600 Glenwood Ave, Suite 100 Raleigh, NC 27612 Main: 919.829.9909 www.res.us Engineering Services Provided By: RES Environmental Operating Company, LLC License: F-1428 SEAL `` �\CIHAIIR/1/4/' "1\ \� = � Q�pE Diy9< "I SEAL 0erift FNGINE - ; = ;_ SI FULL SCALE: 1 "=100 0 100 200 2"FULL SCALE I` 1" = HALF SCALE I` REVISIONS: PLOT DATE: 6/27/2022 RELEASED FOR: RECORD DRAWINGS PROJECT NAME: STRAWBERRY HILL MITIGATION PROJECT JOHNSTON COUNTY, NORTH CAROLINA DRAWING TITLE: MAINTENANCE COMPLETED PROJECT NUMBER: PROJECT MANAGER: DESIGNED: DRAWN: CHECKED: 101038 JRM BRC BSH TRS SHEET NUMBER: M2