Loading...
HomeMy WebLinkAboutNCC203095_NOT Closeout Documents_20220714North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Mecklenburg Project: McDowell Creek Greenway Ph II -Dana's Branch River basin: Catawba Person financially responsible: Town of Cornelius -Andrew Grant, Assistant Town Manager project #: MECKL-2019-057 Address: Post Office Box 399, 21455 Catawba Avenue, Cornelius, NC 28031 1. Project Location: Westmoreland Road, Cornelius Pictures: No 2. Weather and soil conditions: Sunny, Workable Soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Doug Williams Inspection report: Sent Report 9. Corrective action needed: Title: Project Manager Date given/sent: December 17, 2021 10. Comments: Overall, the site has sufficient permanent ground cover to restrain erosion, however there is some scouring occurring in drainage ditches along the greenway that need to be repaired and stabilized. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT) unless permit approval date was prior to April 2019. The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGO 1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Jeffrey Chandler Others present: Date of inspection: December 14, 2021 Time arriving on site: 10:45 AM Time leaving site: 12:00 PM cc: