Loading...
HomeMy WebLinkAbout20140560 Ver 1_Application_20140710Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 • -nim MmagullwM0711 A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Carps: Section 404 Permit [] Section 10 Permit I b. Specify Nationwide Permit (NWP) number.- 14 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? G] Yes E] No 1 d. Type(s) of approval sought from the DWO (check all that apply): 401 Water Quality Certification — Regular 0 Non-404 Jurisdictional General Permit 0 401 Water Quality Certification — Express n Riparian Buffer Authorization 11 e. Is this notification solely for the record For the record only for DWQ For the record only for Corps Permit: because written approval is not required? 401 Certification: 0 Yes No Yes El No 1 f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank Yes Eg No or in-lieu fee program. 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h E] Yes E] No below. 3. Owner Information 3a. Name(s) on Recorded Deed': North Carolina Department of Transportation 3b. Deed Book and Page No. N/A 3c. Res . ponsible Party (for LLC if N/A Page 1 of 10 PCN Form — 'Version 1.4 January 2009 4. Applicant # : different from R. 4a. Appricant is: Agent Other, specify: Division 2 Environmental Officer 4c. Business name North Carolina Department of Transportation 4d. Street address: P.O. Box 1557 4e. City, state, zip; Greenville, IBC 27835 4f. "telephone no.: 252- 439 -2800 4g. Fax no.: 252- 530 -3341 4h, S. 5a. Email address; Agent/Consultant Information Name: I jbjohnson@ncdot.gov (if applicable) NIA, 5b. Business name 50. Street address: 5d. City, state, zip'. 5e. Telephone no.: 5f. Fax no.. 5g. Email address: B,. Project Information and Prior Project History _........__..... ... .._..._. _ 1. Property Identification 1 a. Property identification no. (tax IPIN or parcel ID): Beaufort 255 Bridge to Pipe Replacement 1 b. Site coordinates (in decimal degrees): Latitude: 35.603113 Longitude: - 76.7439 75 1c. Property size: acres 2. Surface Waters 2a. Name of nearest body of mater to proposed project: Broad Creek Canal lib. Water Quality Classification of nearest receiving water: C Sw; NSW 2c. River basins Tar-Pamlico Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: NGSR 1612 (lrerra oeia Road) is a paved secondary road. ,Agriculture dominates the landscape. 3b. List the total estimated acreage of all existing wetlands on the property: g 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 210 3d. Explain the purpose of the proposed project: Bridge to (pipe replacement;; the existing bridge has deteriorated and needs replacement. 3e. Describe the overall! project in detail, including the type of equipment to be used: The 120' long steel plank floor bridge will be replaced with a 3 -cell 9'x 13' reinforced concrete box culvert. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Q yes Q No 0 Unknown Corps or State been requested or obtained for this property ! Comments: project ilncludin all prior phases) in the past? 4b. If the Corps made the jurisdictional determination, what type ® Preliminary [] Final of determination was made? 4c. If yes" who delineated the jurisdictional areas? Agency /Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project (History 5a. Have permits or certifications been requested or obtained for ®yes [D No ®U'nknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help tile" instructions. 6. Future Project Plans 6a. is this a phased project? yes No 6b. If yes, explain. Page 3 of —Version PCN Form 0 C. Proposed III Impacts III IINII Ii ent 1. Impacts 1 a. Which sections were completed below for your project (check all that apply): ® Wetland's M Streams .... tributaries ® Suffers ®l Open waters El' Pond Construction . Wetland Impacts If there are wetiand impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d, 2e. 2f. Wetland impact Type of impact Type of wetland Forested Type of jurisdiction ' Area of number Corps (404,1!0) or impact Permanent (P) or CMh,+11C (401, other) (acres) Tem ora T W1 _ Choose one Choose one Yes/No - if4 - Choose one Choose one Yes/No - 3 - Choose one Choose one YesiNo W4 - Choose one Choose one YeslNo - 'il"U5 - Choose one Choose one Yes /No W6 - Choose one Choose one Yes /No 2g. Total Wetland Impacts: 2h, Comments: 3.. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b, 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)"? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 P Culvert Broad Creek Canal PER Corps 20 2.10 S2 T Diversion Channel Broad Creek Carnal PER Corps 20 76 S3 - Choose one S4 - Choose one S5 - Choose one SS - Choose one 3h. Total'streami and tributairy impacts 286 N. Comments: Page 4 of PCN • 2009 4,. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b, 4c. 4d, 4e. Open! water Name of waterbody impact number (if applicable) Type of impact Waterbody Area of impact (acres) Permanent (P) or type Temporary (T) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond! or Lake Construction If and or lake construction proposed, then complete the chart below. Sa. 5b. 5,c. 5& 5e. Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland purpose of pond (acres) Flooded Filled Excavated Flooded Filled Excavated Pi Choose one P2 Choose one 5f. Totall: 5g. Comments: 5h. Is a dam high hazard permit required? Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres), 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6,a. Project is in which protected basin? [] Neuse Tar-Pamlico ❑I Catawba [] Randleman n Other: 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact Reason for impact Stream name Buffer Zone 1 Zone 2 number— mitigation impact impact Permanent (P) or required? (square (square 1tMRqra aJTJ feet) _feet B1 Yes/No B2 Yes/No B3 - YeslNo, B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: I 1-1KOTST17157- am i�= .. . ..... . ..... --------- - ................ ------ D. Impact Justification, and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in dlesigning project. No wetlands or buffers impacted. Permanent stream and temporary stream impacts are limited to what is needed to install the proposed pipe and stabillize the inlet and outlet end from erosion. 1 b. Specifically describe imeasures taken to avoid or minimize the proposed impacts through construction techniques. Use of existing roadway to operate construction equipment, 2. CompAnsato!y Mitigation for Impacts to 'Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for Yes n\ No Impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): n DWO El Corps El Mitigation bank 2c. If yes, which mitigation option wiill be used for this Payment to in-lieu fee program project? El Permittee Responsible Mitigation 3. Complete if Using I a Mitigation Bank 3a. Name of Mitigation Bank: Type: Choose one Quantity: 3b. Credits Purchased (attach receipt and letter) Type, Choose one Quantity, Type: Choose one Quantity: . ....... .... . .. ... . .. 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. E] Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature-. Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested'. acres 4g. Coastal (tidal) wetland mitigation requested: acres ,4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. IIf using a permittee responsible miitigation plan, provide a description of the proposed mitigation plan. Page 6 i PCN Form — Version, 1.4 January 21009 6. Buffer Mitigation (State, Regulated Riparian Buffer Rules) — required by DWO 6a. Will the project result in an impact within a protected riparian buffer that requires Yes No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d, 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.gi., payment to private mitigation bank, permittee, responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments.- E. Stormwater Management and Diffuse Flow Plan (required by ©WQ) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified E] Yes n No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Yes ❑ No 2. Stormwater Mana ernent Plan 2a. What is the overall percent imperviousness of this project? % 2b. floes this project require a Stormwater Management Plan? El Yes ® No 2c. If this ;project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Flan, then provide a grief, narrative description of the plan: Roadway runoff will discharge through vegetated roadway shouldeWfill slopes prior to entering the stream. Vegetated treatment swales are not required for this project. 2e. Who will be responsible for the review of the Stormwater Management Plan? DWR 401 Unfi 1 Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this ro'ect? NIA E] Phase II' ❑ NSW 3b. Which of the following locally-implemented stormwater management programs ® I.ISMP apply (check all that apply): ❑ Water Supply Watershed ' ® ether: 3c. Has the approved Stormwater Management Plan with proof of approval been n Yes E] No attached? 4. i]WQ Stormwater Program Review ®Coastall counties 0HQW 4a. Which of the following state - implemented stormwater management programs apply EIORW (check all that apply): ®Session Law 2006 -246 [90ther': NPDES Permit 4b. Has the approved Stormwater Management Plan with proof of approval been ® Yes E] No attached? 6. CDWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management 'Plan :meet the appropriate requirements? ] Yes E] No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ®' No Page rN r PCN r —Version 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. floes the project involve an expenditure of public (federal/state /local) funds or the 0 Yes El No use of public (federal /state) land? 1b. If you answered 'yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State �°-�� E l Yes Q No (North Carolina) Environmental Policy Act (NIEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing blouse? (If so, attach a copy of the NEPA or SEPA final approval n Yes n No letter.) Comments.: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NiCAC 2H .0500), Isolated Wetland Rules (1'5A N'CAC 2I-1 .1'300)„ DWQ Surface Water or Wetland Standards, El Yes [i No or Riparian Duffer Rules (15A NCAC 2B MOO)? 2b. Is this an after- the -fact permit application? El Yes E] No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s). 3. Cumulative Impacts (DWQ Requirement) 3a. 'J Ul this protect (based on past and reasonably anticipated future impacts) result in ® Yes U No additional development., which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. . • "" of 10 PCN Form — Version 1.4 January 2009 6. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or Yes, n\I No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act 0 Yes EJ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. What data sources, did you use to determine whether your site would impact Endangered Species, or Designated Critical Habitat? Onsite field investigation by Jay Johnson ""No Effect" S. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? es No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NCVVRC - See attached email 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation E] Yes n\ No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would, impact historic or archeological resources? NCDOT HEU Historic Architecture and Archaeology 8. Flood Zone Designation (Corps Requirement) 8,a. Will this project occur in a FEMA-designated 100-y,ear floodplain? Yes No 8b. If yes, explain how project meets FEMA requirements-. Designed to no-rise standards 8c. What source(s) did' you use to make the floodplain, determination? FEMIA FIRM Maps Jay B. Johnson 07-110-2014 Appliicanit/Agent"s Printed Name Date A E? Ag s Signature, �n! (Agent's i turo� only if an authorization rficant le fTom is provided.)