HomeMy WebLinkAbout260025_POA_20220711PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: Facility Name: Certified Operator Name: 26-25 County: Cumbe rl and Riverview Farm Robbie 0 wood Operator #: 1005726 lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name (ID): Structure 1 Structure 2 1 2 Spillway (Yes or No): No No Level (inches): This lagoon not in red at this time. 18.5" 27" 2. Check all applicable items Structure 3 Structure 4 Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation #NAME? 3. Earliest possible date to begin land application of waste: as weather permits I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Russel 0 wood Facility Owner/Manager (print) Phone: Date: 7/11/2022 Cover Page Facility Owner/Manager (signature) Riverview Farm (26-25) PoA30day (7-11-22) Page 1 of 1 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: Riverview #1 (26-25) Riverview #2 (26-25) n. lines 1 + 2 + 3 + 4 + 5 + 6 = line m = -334 Ib PAN line m = 185.1 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN -149 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-t. 2 PAN balance (Ib/acre) TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window 2089 F1 Bermuda Pasture 1.95 125.00 243.8 10/1 - 3/31 2089 F2 Bermuda Pasture 10.99 125.00 1373.8 10/1 - 3/31 2089 F2a Bermuda Pasture 16.82 125.00 2102.5 10/1 - 3/31 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = 3720.0 Ib. PAN -149 Ib. PAN 3720.0 Ib. PAN -3869 Ib. PAN Summary Riverview Farm (26-25) PoA30day (7-11-22) Page 1 of 2 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Remaining PAN will very per irrigation gun therefore the remaining PAN numbers on this form are a conservative estimate. Waste will be applied as soon as weather permits. Summary Riverview Farm (26-25) PoA30day (7-11-22) Page 2 of 2 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Riverview #1 (26-25) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 700 certified herd # 27.0 19.0 inches inches -8 inches 65,136 ft2 -324,812 gallons 180 74,019 700 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period days ft3 74,019 ft3 0 35,910 ft3 ft3 137,045 gallons I. current waste analysis dated 5/25/2022 1.78 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) -334 Ibs. PAN Structure 1 Riverview Farm (26-25) PoA30day (7-11-22) Page 1 of 1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Riverview #2 26-25) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 840 certified herd # 18.5 19.0 inches inches 0.5 inches 86,041 ft2 26,816 gallons 180 88,823 840 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period days ft3 88,823 ft' 0 52,865 ft3 ft3 176,637 gallons I. current waste analysis dated 5/25/2022 0.91 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 185.1 Ibs. PAN Structure 2 Riverview Farm (26-25) PoA30day (7-11-22) Page 1 of 1