Loading...
HomeMy WebLinkAbout20160977 Ver 1_Mitigation Information_20220712From: Davis. Erin B To: Baker. Caroline D Subject: FW: [External] SECTION B, AS -BUILT MONITORING REPORT: SAW-2016-01988 / Bucher Mitigation Project / Neu -Con UMBI / EBX-Neuse I, LLC Date: Thursday, July 14, 2022 12:03:38 PM Attachments: SAW-2016-01988 Bucher As -Built Credit Release.odf Laserfiche Upload: Email & Attachment DWR#: 20160977 v.1? Doc Type: Mitigation Information From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Sent: Tuesday, July 12, 2022 2:52 PM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Haywood, Casey M CIV MVP <Casey.M.Haywood@usace.army.miI>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Bowers, Todd <bowers.todd@epa.gov> Cc: Merritt, Katie <katie.merritt@ncdenr.gov> Subject: [External] SECTION B, AS -BUILT MONITORING REPORT: SAW-2016-01988 / Bucher Mitigation Project / Neu -Con UMBI / EBX-Neuse I, LLC CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon IRT, I hope everyone is doing well. I wanted to go ahead and send out this report and see if any IRT members are interested in a site visit. I just found out last week that I'll be shifting into the Washington Field Office chief position starting in August so my ability to get out in the field before then is unlikely. If anyone is wanting to get out and look at the site, I will gladly set that up with RES; it just won't be in the cards before I start my detail. As you will recall, the Bucher as -built was broken into 2 separate phases (Section A and B) due to saturated weather conditions back in early 2021. The IRT conducted a site visit for Section A on September 8, 2021, followed by the enclosed credit release. This as -built report is for Section B. The below referenced FINAL As -Built Monitoring Report review has been requested by EBX-Neuse I, LLC. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you intend to request an ADDITIONAL site visit prior to the as -built release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to EBX-Neuse I, LLC and the NCIRT along with District Engineer's intent to approve or disapprove this Final As -Built and as -built implementation credit release. Sponsor: EBX-Neuse I, LLC Name: RES Neu -Con UMBI / Bucher Mitigation Project USACE ID: SAW-2016-01988 River Basin: Neuse HUC: 03020201 County: Durham The As -Built Implementation Credit Release for Section B of the Bucher Mitigation Project would entail would entail 15-percent of the total stream restoration and enhancement credits: 530.025 stream mitigation units. 15-Day Comment Start Date: July 12, 2022 15-Day Comment Deadline: July 27, 2022 45-Day Credit Release Approval Deadline: August 26, 2022 Link to the Bucher Section B As -Built drawings are on RIBITs: https://ri bits.ops. usace.army.m i I/ords/f?p=107:278:9128098523071::: RP.278: P278_BANK_I D:4412 Please ensure you are logged into RIBITS before trying to view the link. Please do not hesitate to contact me with any questions. Best Regards, Sam Samantha Dailey U.S. Army Corps of Engineers Wilmington District, Regulatory Division, Raleigh Field Office Email: Samantha.J.DaileyPusace.army.mil Phone: (304) 617-4915 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 October 22, 2021 Regulatory Division Action ID No. SAW-2016-01988 Re: As -Built Credit Release Associated with Neu -Con Umbrella Mitigation Banking Instrument (UMBI), Bucher Mitigation Project — Section A EBX-Neuse I, LLC 3600 Glenwood Avenue, Suite 100 Raleigh, North Carolina 27612 Dear Mr. Breslow: This correspondence is in reference to the Neu -Con UMBI, Bucher Mitigation Project, located at 3132 Redwood Road, in Durham, Durham County, North Carolina. The mitigation site is adjacent to and within the Neuse River Basin, Hydrologic Unit Code (HUC) 03020201. The purpose of this letter is to confirm the as -built release of credits for this site associated with Section A of the project. As a result of complications encountered during construction of the pond portion of the project, you requested to separate the as -built in to two separate sections (A & B), which was agreed to by the IRT. As a result, this as -built credit release for Section A is a partial release of as -built credits based on the portion of the project located downstream of the pond on the site. Additional, during an IRT field review of the as -built conducted on September 8, 2021, we agreed to minor changes to the mitigation approach and ratio associated with Reach CH6. This change resulted in a minor adjustment to the credit total for the site. As a result, the new credit total for the site has been changed to 11,491.14 credits, and the credit amount associated with this release and future scheduled releases reflects this change. Please note that due to decision to split the as- bult release into two phases, it was determined that the construction bond for the site must remain in effect until the second as -built credit release. Pursuant to the UMBI entitled, Agreement to Establish the Neu -Con Umbrella Wetland Mitigation and Stream Restoration Bank, approved April 2, 2001 and amended April 10, 2009; and the site -specific Bucher Mitigation Project Final Mitigation Plan, dated September 2019, 15 percent of the mitigation site's total restoration and enhancement credits shall be available for sale immediately upon completion of implementation of the Mitigation Plan and submittal of the Baseline Monitoring Report and As -built Survey, which includes construction of all stream restoration and enhancement activities as described in the Plan and associated with Section A, and successful completion of all planting activities as described in the Plan, dated September 2019. All preservation credits associated with the project were previously released as part of the initial credit release. By copy of this correspondence, we confirm that you have satisfied the above requirements for the initial credit release, and 1,136.425 stream mitigation units (SMUs) are now available for sale. Thank you for your interest in restoring and protecting waters of the United States. If you have questions regarding this letter, please contact Samantha Dailey, Raleigh Regulatory Field Office at todd.tugwell(a)usace.army.mil or telephone (919) 210-6265. Sincerely, Todd Tugwell Mitigation Project Manager Regulatory Division Electronic Copies Furnished: NCIRT Distribution List