Loading...
HomeMy WebLinkAbout20220949 Ver 1_401 Application_20220714Staff Review Form NORTH CAROLINA EnNmnmenfei Qea(Uy Updated September4, 2020 Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID# * 20220949 Version* 1 Is this project a public transportation project?* Reviewer List:* Select Reviewing Office: * Submittal Type:* Yes No Colleen Cohn:eads\cmcohn Raleigh Regional Office - (919) 791-4200 401 Application Does this project require a request for payment to be sent?* Yes No How much is owed?* $240.00 $570.00 Project Submittal Form Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * For the Record Only (Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre -Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Pre -Filing Meeting Date Request was submitted on: 5/17/2022 Project Contact Information Name: Alex Hornaday Who is submitting the information? Email Address: alex@spanglerenvironmental.com Project Information Project Name: Oakwood Is this a public transportation project? Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown County (ies) Orange Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document Oakwood Efland Quad Topo Map.pdf 832.56KB Oakwood Mebane Quadrangle Topo Map.pdf 1.27MB Oakwood Soil Survey Map.pdf 906.78KB Oakwood PCN_final.pdf 11.01 MB Only pdf or kmz files are accepted. Describe the attachments or comments: PCN form, 401 pre -filing request, site pans/impact maps, USACE JD concurrence, USGS topographic maps, NRCS soil survey map Sign and Submit By checking the box and signing box below, I certify that: • I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form. Signature: l et cE+rzzeea9 Submittal Date: Is filled in automatically. N W E S Locations are approximate and have not been surveyed Stream delineation has not been verified by the USACE 9.5 162.5325 650 975 1 Feet J 3 ' f �, . P Legend Approximate Property Boundary ® Wetlands 50 ft. Buffers Streams Oakwood Property AM 0 Oakwood Street SPANGLER 2019 USGS Topographical Map Mebane, NC ENVIRONMENTAL, INC. Efland Quadrangle February 2020 4338 Bland Road Raleigh, NC 27609 919-875-4288 N W E S Locations are approximate and have not been surveyed Stream delineation has not been verified by the USACE 1% a I" Oakwood Property 0 Oakwood Street Mebane, NC February 2020 i 3r �LL�N&-' - 1. 0 162.5325 650 975 1,300 Feet 1 ' 95 Legend Approximate Property Boundary ® Wetlands 50 ft. Buffers SPANGLER ENVIRONMENTAL, INC. 4338 Bland Road Raleigh, NC 27609 919-875-4288 Streams 11 2019 USGS Topographical Map Mebane Quadrangle N O W E - J JJ■ ri S r Locations are approximate ir and have not been surveyed ■ Stream delineation has not been verified by the USACE .rrr. rr � ■ r r ' rY ti r '• y. � .rrr■•. •r . ■ Jj Oe ■ • r r.%m. ... r . r. rrt rr■ }ti ti ti •. FF• .. j' r" I.•rr �� - a .. Ir r O ^Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 29 & 58 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑X Yes ❑ No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Oakwood 2b. County: Orange 2c. Nearest municipality / town: Mebane 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: *see attached table 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑X Agent ❑ Other, specify: 4b. Name: Melanie Graf 4c. Business name (if applicable): Meritage Homes of NC, Inc. 4d. Street address: 3300 Paramount Pkwy, Suite 120 4e. City, state, zip: Morrisville, NC 27560 4f. Telephone no.: 4g. Fax no.: 4h. Email address: melanie.graf@meritagehomes.com 5. Agent/Consultant Information (if applicable) 5a. Name: Alex Hornaday 5b. Business name (if applicable): Spangler Environmental 5c. Street address: 4338 Bland Rd. 5d. City, state, zip: Raleigh, NC 27607 5e. Telephone no.: (919) 689-5124 5f. Fax no.: 5g. Email address: alex@spanglerenvironmental.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): *see attached table 1 b. Site coordinates (in decimal degrees): Latitude: 36.08268 Longitude:-79.251325 1 c. Property size: 134.15 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Haw Creek 2b. Water Quality Classification of nearest receiving water: WS-V;NSW 2c. River basin: Cape Fear (03030002) 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The project area is occupied by forested areas, maintained fields, and some stormwater devices constructed by prior property owners. 3b. List the total estimated acreage of all existing wetlands on the property: 0.43 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 5,089 3d. Explain the purpose of the proposed project: Proposed residential development 3e. Describe the overall project in detail, including the type of equipment to be used: Bulldozers, excavators, motor graders, off -road trucks, rollers, etc. will be used to clear and grade the property prior to the construction of residences. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (includingall prior phases)in the past? ❑X Yes ❑ No ❑ Unknown Comments: Corps AJD 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑X Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Maria Polizzi Agency/Consultant Company: Spangler Environmental Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Corps AJD dated 3/19/2021 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑Yes ❑X No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑X Wetlands ❑X Streams —tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) Temporary T W1 Choose one Choose one Yes/No - W2 Choose one Choose one Yes/No W3 Choose one Choose one Yes/No W4 Choose one Choose one Yes/No W5 Choose one Choose one Yes/No W6 Choose one Choose one Yes/No 2g. Total Wetland Impacts: 0.076 2h. Comments: 'See attached impact table Total permanent impacts: 0.009 ac Total temporary impacts: 0.067 ac 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 Choose one S2 Choose one S3 Choose one S4 Choose one S5 Choose one S6 Choose one 3h. Total stream and tributary impacts 3,717 3i. Comments: 'See attached impact table Total permanent impact: 3,517 Total temporary impact: 200 Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose O2 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑X Other:Jordan Lake 6b. Buffer Impact number — Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 Yes/No B2 Yes/No B3 Yes/No B4 Yes/No B5 Yes/No B6 Yes/No 6h. Total Buffer Impacts: 6I. Comments: Property is within Jordan Lake buffer area. Impacts will be permitted through the City of Mebane. Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed project was designed to avoid and minimize impacts to aquatic features to the maximum extent practicable. The planned wetland impacts are required to allow road accessibility throughout the site. Additional potential impacts to wetlands due to site grading were avoided by the proposed construction of retaining walls. Hydrologic connectivity between unimpacted areas will be maintained via culverts at all road crossings. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Sediment and erosion control measures will be implemented in order to control runoff and other discharges from activities from activities to be conducted in fill areas. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? 0 Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑X Corps 2c. If yes, which mitigation option will be used for this project? ❑X Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: Mitigation banks are being contacted. AnSO_A­w`iFFe sent to USACE upon receipt. 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑X Yes ❑ No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). Project is located within Jordan Lake buffer area. Impacts will be permitted through the City of Mebane. 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ❑X Yes ❑ No 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑X No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Management Plan? ❑X Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? City of Mebane 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? City of Mebane 3b. Which of the following locally -implemented stormwater management programs apply (check all that apply): ❑ Phase II ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? ❑Yes ❑ No 4. DWQ Stormwater Program Review 4a. Which of the following state -implemented stormwater management programs apply (check all that apply): ❑Coastal counties ❑HQW ❑ORW ❑Session Law 2006-246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ❑X No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, []Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑X Yes ❑ No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Prior property owners constructed multiple stormwater ponds in the project area. These impacts have been incorporated into this permit application. 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Project will be served by municipal sewer. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NCNHP data and onsite investigation 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA EFH mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? A search of SHPO records was not completed. An onsite investigation revealed no indication of historic resources. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes ❑X No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FEMA NFHL mapper Alex Hornaday 7/ 1 4/ 2 0 2 2 Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 Average Impactilill 4akh TorP Type of Impact Stream Perennial or Type of ImpactStream .. ja Road Width B Existing Permanent Yes crossing SA INT 404 9 141 1,263 Road C Existing Permanent Yes crossing SA INT 404 2.5 32 80 Road F Existing Permanent Yes crossing SA INT 404 10 72 732 Road F Proposed Permanent No crossing SA INT 404 8 181 1,442 Sewer line H Proposed Temporary No crossing Haw Creek PER 404 10 20 200 "I =ME ImpactWetlan 1W Type of Area of Type of et an Forested ..impact Bottomland G Proposed Permanent No Grading/fill hardwood Yes 404 0.009 Bottomland H Proposed Temporary No Sewer line hardwood Yes 404 0.032 Bottomland J Proposed I Temporary 1 No Sewer line hardwood Yes 404 0.035 PID Owner Name Owner Mailing Address Deed Book/Page 9825601982 DAVIS LINDA ETAL 504 N FIRST ST, MEBANE, NC 27302 6760/1539 9825502531 TICON PROPERTIES LLC 5836 FAYETTEVILLE RD, STE 203, DURHAM, NC 27713 4542/22 9825404628 TICON PROPERTIES LLC 5836 FAYETTEVILLE RD #201, DURHAM, NC 27713 4530/170 9825604799 DAVIS LINDA S ETAL 504 N FIRST ST, MEBANE, NC 27302 6760/1539 9825529420 BAILEY KATHERINE S HRS 1156 BELFAIR WAY DOWNING CREEK, CHAPEL HILL, NC 27517 212/215 9825614053 DAVIS LINDA S ETAL 504 N FIRST ST, MEBANE, NC 27302 6760/1539 Parcel Table Ward Marotti From: Lisa Long Sent: Tuesday, June 21, 2022 10:58 AM To: Ward Marotti Subject: Fw: Prefiling Notification Request for Oakwood From: Lisa Long Sent: Tuesday, May 17, 2022 12:19 PM To: 401PreFile@ncdenr.gov <401PreFile@ncdenr.gov> Cc: Ward Marotti <ward@spanglerenvironmental.com> Subject: Prefiling Notification Request for Oakwood Hello, Please accept this email as a pre -filing meeting request for the above referenced project, located off of Oakwood St. in Mebane, NC. Thank you, SPANGLER V_N VJ V'L)NM Lk 1 A I_ INC. Lisa Long Environmental Scientist Raleigh • Charlotte • Charleston • Tampa 10 866-772-6453 ' 919-689-5283 spanglerenvironmental. com © lisa(a)spanglerenvironmental. com 4338 Bland Rd., Raleigh, NC 27609 non Any email message sent by any employee of Spangler Environmental is intended only for the identified recipient. It (and any attachment) is strictly confidential and may contain attorney -privileged work product. If you have obtained an email by error or you are not the identified recipient, please notify the sender by calling toll free 1-866-772-6453, then delete the email (and any attachment) from your system. Use of the email (or any attachment) by any person other than the identified recipient is strictly prohibited. 1 I 9 I 9MEMBERS y W v i W VJ C7 = o � W Z N � W W � � v U vUi otA W W 6 y M M z Wo a o a g� 0 ti N pp.... — z z pp p �� WW WW�W WW QQ> zz w� < < 22, z ww ww'w ww as wwWw wW ¢ ww�w0 LLLLz wwQ(~7z LLLL ww< a iiimm¢ Umm< < Fmm c�imma W gw w� C�ww��" �ww �ww ggQ �InI)z zou)22z Flnln LLlnln��z zwwg Ow M:g mww Q z z W m z z W W W O z z 0 z z W W W w00 0011 00 00�� (DN NZi QNN In In 3: YNN W NN O03: 0 Q In W In w VJ p N M w No WN 0 0 z0 o w W F U 1 W d) 0z W Q W In w o O � m w m u I in in in in LL in O ¢ in in in ¢ in in Q U < 1 ( O a H� )w zz zz--Z Ua Qw zz ww zz--z ww�w zz ww •a - ww zz wwpw zzzz ww-w zzzz am a zz ¢¢ zzzz ¢¢w¢ zz ¢¢ Of -° ¢ ¢ ¢ ¢ W ¢ ¢ ¢ W ¢ �mm¢m m 2 2 Z mm<M 01, ww ww�W ww ww as ww�w aama Oww�W ¢aama W as aawa rn ----w� as - -a mm UPWW ----w-- �mmax a��w�mmax., �mmax a OF rnWLL� OWw ¢LLLL Uimm �ww )o � LL LL OLLLL Oww ¢ LL LL¢ (7 wz ww o LL-< o 0-0 z U LL LL W ¢»z 9z c, a LL LL ug z w OLLLL ¢ LL LL .F J ¢»»mw m ¢LLLLwz O»mW O amm¢ »mwz mm¢�¢ a» gmm amm mm¢ mmm¢� ¢¢ W ¢¢ a a m Z m m 0 m m a a a Ua 1- 1- 0 Dm D ¢I-F <m nn O 00 ¢r en mC, ¢ool moO gazZ— (a7 rvW m rW a0- W N o W W QQ Y W W W w WWN22 QQ QQ � zz WQy zzmm w WzzW �OO ¢zzmm~ OOO��W Qzz OO co00mm 000 F-00 1-1 NN mN Nn n Z NNI-I- y W v W VJ � W � W Z N � W W � � v o 6 U W W y tA M M z� aouN a E o W O p N co w 0 u)N O o ZO W N u) F W `•i ' z N W Q II u) O m o O � m W u w W U z LL J � W m LL o5 05 W O O U) Un 2 Un p a a W zO°° W F U U Q Q 0= W Q Q O U U p F a g m m z U( m m U g m 0 m m 0 0 g g m=(7 -- U a 0? X Un mO Un Un U° O Q z O w~ O F� 2 w w w a Q Q w m m ug w w Z w (7 ° (7 (7 J z z O 0 0a m m w Q w U z g g mm� o z 0 z z 0 0 rn m a U ~ a Fw F F m m w w w a ug ug �rn� m O z Q U) 0 w 0 0 0 0° D m X m �m X X m m° z z m m J z O O w U W LL W d F W W d d �j JQU N N Zi Un U) - a Q Owm LL o �■oa A z W°� a I I I of HLi Jew I Paz P F po� I I I ozp zoo fA W v i Q W o � � } < W Z Q � a p a L W O w w < a oN R w m rUi� W o C7 mz a w � W wi y W I x ytA o W rn p N iYi w NO O � o w �N Una �0 U(�1 o zM W Q II u) Un m o O � m W u w m > > F 2 ai W W U z F F z F Wa a z O p U U 0 Oa z�LL O OO z ) w m�(7 w 0> >o m m 0 0 U p O Z F F m p O (q fn fn W Q Oz g W W W a a> W w p p F2 2w w z W (7 ° (7 o 0 o J m m p.. Q W U z z O p z 0 0 0m U)mz z 0 0 0 N Q �mQ m a U m m F Fw U) U) m m w w (gi ug O(iip m O z LL 0 0 w 0 0 0 0° z z m m J z p m' X m �m X X m m O 0 0 W �QU U p W d F W W d d �j N N Zi (n (n Owm U) w I■OR I rl Z°� �w a �mU w HLi ; oo� Um 0 W ®®OB � o o �<� J I I o=s zoo rA W v i W VJ C7 z o W n � W Z N � z (D fq W 0 0 V) U A W N W .. Z Z Z, r z z m m ww o �pj .y v —-- w O IZ \�•��,�` _ ooZ MO N — _ m Z O�- obi Ley I i N—ct W W W Co Q C) Q V Q �_ c) WU R NLLIU z Qco IoCL CL O � o� W w p N co w No UN O ZO w� U) - F U 1 W� Oz� W 1 Q II U) (D m O O m w (=n w W W LL o5 05 W j 0 O f4 U) < w w U O Z p a a Q Q LL O O O a s a x Q w w w Z U U w w w, C9 W w wp >> w w 0 0 U a O z z z X rn w F O p Q z w w Q U U w Q w w m o o Un Un U) w Z 2 W LL LL g a a> w w Q Q z U) o 0 0 2 o o z wWzwUw O��ww�mmo2�Qwc�LL 0 �� z z O p Z 0 0 0 w z z 0 0 rn Z g g w w Q w w m a U w F w w F F in a w w w Q ug ug rn rn a s w O Z Q rn O w O 0 0 0 0 z z w w J z w' X w w X X w w O 0 0 W QaU OQ U U Uo LLwa���wwaa�NN�rn rn -Qas p o om 1 U)m m U) I I I U) w w O,NC J o ZpJ r rl ~W � �mN ME� oQZ X o w w 11 a I I I of LI Op o o 0 W HMO Q J J �Q� Q W J I I I 0 Z LL zoo LLI N W V W a � h C7 = Q U coo Vl E-� O W � w n b _ N C Q o � � "'E "' � uzN v yN �LL 1 z N Q j I LL� \ I II W W 11 ++I .-(S NU CO NU 1Unti UO III I1� i O i1O WQ� I za O I ICI 1 ➢' N �1 N I N I O co a I N w p N co w o O � Z O U) U) � m o LO Q U Un O m O I O r w m w w = Un ) -/\jj®)()» wm \\w(9\\\\\\\\§\\\\ \mm\ om!J\(§§//((NU)U) \ p)C, | | \■■om| yr< / ,9,\\E (D \ Ie#A®( Li | | | zOzp oo co L) Eca /= tA COD /\§); QR/\| \q))| � c1r) (/o0 -_ §� 2� \§�/� /� 0 W _v i W _ � h W � z � w ` C e U c0 E� O W N U U LL °` a LL a cwi cwi z OF o O 0 w ~ in in in in � J Z oo w p a a z z LL O O O a s cm a= M ry M o U w� wp > >0w w 0 0 U�� mOz U X p w F �� O p Q z w w Q U U a w (� o U ,7, ai O O p u) u) U z g g LL LL a Q Q W w Q J w m z o o 0 0 2 o o J>> -- W - z .n .� .. z z O o z u) m z z m m O m m z���=� w w w w z= I a U w F d F F W F F d d c W W a W W u) uj Q Z Z Z Z W Q .a U w O z LL 0 0 w O 0 0 0 o z z w w Jz� � Q Q Q Q z g v W W' X w w X X w W O O O W F F Q U O W W W W W aH N 0 U o W d F W W d d �j N N Zi u) u- a Q W W W W W W d lA rn 0 o=0 a s a s wa = m I I I Ow ~ U U U U U a O w O J d a a fD d d J ��■O�. J J n Jew ���� Q��<� p U U U O 7 G- z a Au� oQw zaLLLL �LLLLaa wV.....!/ Y. w I I I o,m �omm �mm O a�iP 0 W ®®®A � �l o �arn X oww Uwwww w I I I w>p W z z O z z w J 0 O O Q M N N N N U)� � O W F=G d' •... .. O U Q co / ( zLLI J12, co k� O U �I�/ / / O / W O ? z,:,, LLI coQ , w U N N / Z j LL Q��W Joa �o w _ , z 1�1L LL z Z -_ z- ¢ s o m LL ,OO ZE9 z W �,, O O cm � _ ¢ O .n373 ti �; w Z G � <o �Q '��� w Q U ��o, �� O w W = N N U N ~ Q �z �Ow / — W ��w W VJ r=\ " C) WillU w UOw � U es zmU' W C) Q Co 0 co ct� I I W�.� C LL N I Co oz w - LL� LLNILL� N171 oW Qm w C� m^ro�W z�Po oua`�omWmo, d O< - ,LL m �I ` om Q � Wz � cn W o o -oLL�oz WQ WW WW �U¢ NUQ .-W wzo z� o Z W W W CoUQ ti NN ONE ONE o OUmz - z� WW W o 'moo z O O - - W co p N w NO O � �N ZO o U) �mm� z� Q 1 U oo V J W � U m m VJ W i U LL W h C7 LL W W U p p O F f D 2 O W W = M O aaQ QLLOOO as d= U) U) W a g m m z U U- m j j O m 0 0 xO O OZ g g U a 0? mQW w = 0 0 0 U) U) U W W m z p p p z 2 p p z w w a Q Q w QW F LL J d o `� � Q = pip L� U) Z W W O W W zz Op Z000azz 00Q >> p-- Q w U mmQ���wQ Q .. .. VUj U W '?. 11 �W p M o N°c O Z Q rn a F F w a a O O O O w w F ug ug O ai - z z z W r" o p., Z ,�' W� U `�',� w m LL m m m m 0 U p d F a m Zi w w J 0 0 W Q U N N Zi fn O- a Q Q W W Z Z rv� r� r U ,7, N d p O O O 2 2 N C7 n 0 o �■O� I I I o o �oJ w � � as „wg 0 a I I I on I U) o DQZ Q QaQa tii 9 9 o tiMx9° LJ - OOpm O LU 0 O � o �Z� Z a w w /-� I I I �- >> O ......, J OZ o o X g w w \ 0 0 0 O _ ff� < O F-- W w U) = U ; •h 2 c) ° Z r �WCE-L zbe= N c� z cop Z WCL T N ca m 0' W ct� c N UQ wa o z O U) ^z WYZ QOw �OLLi w af U)U U CZ °oa m --iO02 a_ U Q a_ Qp LU = W Q Z_U LU L W o o �� - I o N¢Eo - - -w oa< Cz7 vWi w o a F w r" O -�XOZO o w w QQo w ��m W O p N iYi w No �N O ZO O U) U I OZ 00 1 U)Q O m O O � a w U) W U Z LL LL W W U >>' O Ogai z w a z z wz O O O p m m OU OU U U OO w LL1 ri a g Z w U g w== 0 w w 0 0 g g =� C U a O z ¢ W x 0 0 0 rn rn U O OZ Z 2� W W a Q Q W w w ¢ z z z m z rn o o o W o o z Z W W O W W 2�� FLLd m p ¢ W U Ir w O Q w w Q Q � D U z z O o z U) m z z 0 O U) N Q��� w Q LL 2 2 2 w a U w F a F W F F a a w W W W Oai<. U w w w z E Q X �= X X 0 0 O W O w JQU ~ a a s U C LL W a F W W a a �j N N Zi O O- a¢ Q F F F p 0=0 a a s 0 moo mL C3 w0� LLBQw aww a Z I I q m ¢Z \\n I oa a U w O z m N W ~ L Oow d z a z z ®® ®� o o Q Q O Z O O I J I I ozo O a ZOO U 3 Of w i LL (5) W � \ W ¢ \ \� K W \ \ Of ¢ K \ W \ N F 0 w¢\ <� °�. \ qg9 / 0 min Z 0 U) Z � � X QpLL' �pw Of Will UU Uxow O a 02 a_ U a_ LU LL LL MD W Q LU = _w Q Q LU LU < U O~ a-U OQ 0 a �QW �ww.�oLLo �¢ o z wo O�o =XQZLLO wz o � o� � w- w QQoo W p N iYi W 0 O Z O o 1 U) U) 1 Q U) O � O O � a w W or U � /I lwi W F � i zmwC) zaOwxzUz OLLLL w0 WpwU.,�wO�wO� Ww 0 wz0 00w jOw JOwO az sNz zaw ggw ggw w- jw F0w¢a�U O0 O z axJ dvUdfCx7i L�n ^W`. w 0O LL 2 2 m M M 0 OO s) 0 U U po O zO g z W g aa>Ww W 0 0 w w 22 gg� W O00om0o za F U) w zza a 0000J z.ai U o 0a w� 0a 0aON N0 UE OUJU WNC__Z2Qz7 mwm ago Mrnp, o � rn N C, 0_ 2 tA W N W Ul) a � � O - pJ ik yz�b O, o o J� w LZ a I I I ���n pow a O U y q u o Z F .9 A ¢ O J I I I 0�0 zoo z Z O „y Q O U) U) w FF z �� O �` ���gniim���1\uj � zz,w o wwzz "��< z ¢ zzw¢ �* Z� p ll�0 2 2 ¢ ,00049 z LL w w 2 w A373 w w w , n U U U ~U' o W vi m d Faa�w yj �� U w z �wwaa i:w z w cD>> X uu)) ug 1d i.: U Q LU Ozzww :5 J w O O ¢ C Q p U) N N � w �%i G o \ - O o co w/1373 m (D W U 99Z\l` W� x_m 11' \99��— W — �sss �? Co CoLU I 9 �� p I�Z99— ����%��\�\yay��y�—=y=yy��� LL LD z� w- ss L LJ H wLLI w N, Will 02 w /L \�L j(DoU \ nQ\; 1\�0 W owl �z , o NW m. s\`zo\ �\\\\ \\ �z�o _ Woad m < \ate - _ ��\ \ \wQ\ \ oss o � �LLwzz wzo — ���`_wa — Qo w o 0o f` I �\�C, vRN �, �� .A .�vv� ���.i 'w ��;� m Co �Q ct co M w ct w� c� coo �0 °p C/7 1— � I— N R � U 1 O O W w u� w � WR WR ZO� Q r U) O w 1 o� o� N �W N N N W i U0 i LL N ME C7 F W w W W U D OF W 2 u N Z F F = n zO a a ¢ ¢ LL z0 0 00 00 ¢ ¢ O = = rn O a m W a g m m z U g g U m j j O m 0 0 U a 0? � w = x0 0 0� U O °z w w a¢ Q w d R Z z U) p p p 0 2 2 p p z p w Q�W zz Op 0azQ��mVl W h W000Q 11 w 0 OF ZO O w O O , � m m mmO O P P <U U cm, m m w>w~ m N N fD fn - d Q ". y •O �LLw 0 �■OA N J J 0 0 0 A n i o I �az II oU� z J I I zoo, r M� Z LL U Q W Q z z z z� w w w w w z z O z a LL 2 U) w w w w a Ua s a s wm i a s O a a Of < z fD U Q Lu~ m m Q m m c w (!) U) a LL LL LL LL d d G W ° iD : O O Z m m m m Q Q U wa dQzz �zz�� Q Of J m 0 0 U 0 0 n< m Q w a c N F w Q F C z a LL LL F- O m OLL N m LU / � N W w W _` \ LL m D N U wI A Ir IJ �qo � oa` o� � � � Jr.l.m O m \99� 1�. N \ \ \� (/i lWl LL -�� I (n / Y LL J) _ Of co � _.. � Z Lu z \ �,9 ` ro v �9— 9 _�_ (n Q _ (n Q j\\ �9gg jjO�� IW w o Z b ZI ,\ O\ -_--. F F F W/ p9j �_ _ Z -\ N Q 2 s aa I Q N HMO (n¢ �1 O m ,e (t) < / f NN — ° (n I N� 0� I 0Z 0 Q i ��< Q w o w� > ° o: o < � w �Dz oow� �mm O,-wW� � ��\ � /� � �A� � �� (n w�z'o o ss Qo w w o«oo s'a z ' T m W W so II �w �U\gym\�LLn�Q�s way p 0 � w N Of \_N \Om -pQ\pw aw _wco Of <a _ < l\ 1� s \ \\ \ LLLL CD LL U) U) � � ¢ ii O 'o w °n I m w w N W h C7 o Z � W W N Z � Z W � W d o w 6 U co � fD Q � W[i7 � fD W W>> ~ � N U w II N W LL c5 c5 W p p O O fn O (7 - a O Z ,L' R� lJ L1 z w a z z W o o cyi c~i O W g ¢ N o N ". v v z v o a m mz 00 O U g w 0 w w 0 0 0 a 0? ¢ z z o U) mo U UE UE U O O z w w a Q Q w z z W W m p p p F p p Z F LL 0 z Z W W O W W m m p ¢ W U W W W V] rn z z O p z uw) 0 O U) z g g ww� w w z o m m U w w F F m m p w w ug ug rn ai () ro w O z LL 0 0 w O 0 0 0 0 z z w w J z ¢ w C, XX W W X X 0 0 o o O W J¢U a U U w U p W m F W W m m N N Zi O O ¢ ¢¢ Z -a � a a a \\nail Wiii 0 I I I rn Z lW a w w o moo a o o w ° 2 Z d I I of u�o¢w a<ZZ U -U C' 0 I I J I I I LLJ ozoo Z "IM1nn'I"uj w LL LL \ o LD V �����` LLw I w - \ iA��. mw � N= i � '� � W Qw No � 0� W p ,( �\ ill ¢ O Q 0)C) 1\= \ Q"�� m 0a_ O:E No LLJ 0Mzl W o room z p o�'', F" W C7 i� aw v\\� �� - - 1 � F z -o w OU oor' F - of � IQ F 0 W iYi o N �ry zpl oN U w (D F w w II U 0 O W U m U) w U z F m ~ w w O p w w U j O Z 0 a a Q Q LLwz 0 0 o o uw F a g mm mz O O m m m F m�c7 X m U O O Q O U pz O 0 z apo w w Q U U w ug w w m p o o 0 p p z w U w O U U w w z z O 0 0, F W m N p Qw0 p Z 0 z z 0 0 m a O ma F Fw U) U) a 0 w w ug ug Oaip m O Z Q O O w O 0 0 0 o p m X m� �m X X m m O z z m m J z C) 0 0 O p LL w a w w a a �QU N N O O -aQ p 0=0 O d ULLw OJ 0 m a w 1 m U Z 1 C, z U U 9 LLJ F LLJ w J I I 0 z00 I w � LL �) LL 1 Wa INII �)/SF l� nE t oz IrII N a / W U % za / J o L N O N O N - L L< r s o o�ll p LL w. 0. 1 00 N m , > m LL m m� K� LL w W m W W Q O F \ma Q m w �\ H W a U U \ N a 1 \ o:05- N z N N N o m o o p o 5 w w w w a� t w W F a a = J ~ U � � Q F a w w v v a LL m m 2 z SWw ww O M O � U) U) W 0 c_ C I— U a_ LLI LL LL MD W n b N C` Q� O� w M N y � b a u Z 0 U) r^ Z VJ w W ^_ H ~ O H O W Will UU UxCol w 0 �Q C)oLm w rn p N M U) zpl oM .- U Q II U � 0 O m W u) w O z LL J_ U) j W W =5 =5 w j OF �O U) fn 2 fn p a a W zO O Q Q 0' Q Q 5 F a g m -0-U m m O m j j O m m 0 0 g g m (7 0 a o? p o O 0 w ww 0z g w w w a Q Q wmm w w z w c7 w w w O C9 (-, w w J z z 0 0 0a m m w Q W U z mm� o z 0 z z 0 0 0 m a o U) a F F w F F a a w 0 w w a I�i ug wrnP, m O z Q 0 0 w 0 0 0 0 m X m �m X X m m 0 z z m m J z 0 0 w O o LL w a � w w a a� �Q0 N nl 0 0 —aQ 0 0=0 � I I w 0 I �■O o o On O z JI o " �I Ulu �i I I wZ I 0LLJ W ®®OB � Q J o 0 0-9 �Q� I J I I ort z00 J T z LU / F o OfWa aw v SS SS I I H W _v i W Z ` � � b MEN W_ N m W = AV W rn � � coo E• � R W ox z N W N� g a o u LL z �g O a „wqg w w � w co l\ w U r Jam � . w� � Of w ¢m \o< a O \ wa �:5 c_ G U a_ 0 U) z X QOw O LLi w z � U p z m O 02oo �¢ mm zo <� zaw=oo O -�XOZO w z o o� - — OE W - QQ w =gym j w p N M w No 0 zQ O� w 0 U) F o w w Q II U) U) 0 O a W U) U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2020-01710 County: ORANGE U.S.G.S. Quad: NC — MEBANE NOTIFICATION OF JURISDICTIONAL DETERNIINATION Requestor: Spangler Environmental, Inc. Ms. Maria Polizzi Address: 4338 Bland Road Raleigh, North Carolina 27609 Size (acres) — 138 Nearest Town Mebane Nearest Waterway McGowan Creek River Basin Cape Fear USGS HUC 03030002 Coordinates Latitude: 36.086 Longitude:-79.254 Location description: The Oakwood Property project area is identified as an approximate 138-acre tract of land, located on Orange County, North Carolina Parcels 9825404628, 9825602982, 9825601982, 9825604799, and 9825614053. These parcels are located near the termini of Enterprise Lane, in Mebane, Orange County, North Carolina. Indicate Which of the Following Apply: A. Preliminary Determination X There are waters, including wetlands, on the above described project area, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters, including wetlands, have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. _ There are wetlands on the above described property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters, including wetlands, have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction overall of the waters, including wetlands, at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination _ There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ There are waters of the U.S., including wetlands, on the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ We recommend you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. Page 1 of 2 SAW-2020-01710 _ The waters of the U.S., including wetlands, on your project area have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. _ The waters of the U.S., including wetlands, have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on . Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Ms. Samantha Dailey at 919-554-4884, ext. 22 or by email at Samantha.J.Dailevnusace.armv.mil. C. Basis For Determination: Refer to the enclosed Navigable Waters Protection Rule Approved JD Form (Interim) dated March 19, 2021, Preliminary JD Form dated March 19, 2021, and the enclosed Wetland & Stream Map dated February 2020 for a detailed summary of the project area. D. Remarks: E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information for Approved Jurisdiction Determinations (as indicated in Section B. above) If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Mr. Philip A. Shannin Administrative Appeal Review Officer 60 Forsyth Street SW, Floor M9 Atlanta, Georgia 30303-8803 AND PHILIP.A. SHANNIN&USACE.ARMY.MIL SAW-2020-01710 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by May 18, 2021. It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. Corps Regulatory Official: -57� Date: March 19, 2021 Expiration Date: March 19, 2026 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at hgp:HcorpsmEu.usace.army.mil/cm_Uex/Vp=136*0. SAW-2020-01710 ['qWNOTIFICATION OF ADNHNISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Re uestor: Spangler Environmental, Inc. File Number: SAW-2020-01710 Date: March 19, 2021 Attached is: See Section below INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission) A PROFFERED PERMIT Standard Permit or Letter ofpermission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http://www.usace.army.miUMissions/CivilWorks/RegulatoryProgramandPenuits.asi) or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. SAW-2020-01710 E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division MR. PHILIP A. SHANNIN Raleigh Regulatory Field Office ADMINISTRATIVE APPEAL REVIEW OFFICER Attn: Samantha Dailey CESAD-PDS-O 3331 Heritage Trade Drive, Suite 105 60 FORSYTH STREET SOUTHWEST, FLOOR M9 Wake Forest, North Carolina 27587 ATLANTA, GEORGIA 30303-8803 PHONE: (404) 562-5136; FAX (404) 562-5138 EMAIL: PHILIP.A.SHANNIN(aUSACE.ARMY.MIL RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunit to participate in all site investi ations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Samantha Dailey, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Phillip Shannin, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 APPENDIX 2 PRELIMINARY JURISDICTIONAL DETERMINATION FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL DETERMINATION (JD): March 19, 2021 B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD: Requestor: Spanner Environmental, Inc. Ms. Maria Polizzi Address: 4338 Bland Road Raleigh, North Carolina 27609 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington, Oakwood Property, Orange County, SAW-2020- 01710 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The Oakwood Property project area is identified as an approximate 138-acre tract of land, located on Orange County, North Carolina Parcels 9825404628, 9825602982, 9825601982, 9825604799, and 9825614053. These parcels are located near the termini of Enterprise Lane, in Mebane, Orange County, North Carolina. (USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFFERENT SITES) State: NC County/parish/borough: Orange City: Mebane Center coordinates of site (lat/long in degree decimal format): Lat. 36.086°N, Long.-79.254' W. Universal Transverse Mercator: Name of nearest water body: McGowan Creek (Cape Fear 03030002) E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLIES): ® Office (Desk) Determination. Date: March 19, 2021 ® Field Determination. Date(s): October 28, 2020 TABLE OF AQUATIC RESOURCES IN REVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION Site Number Latitude (°N) Latitude (°W) Estimated Amount of Aquatic Resources in Review Area Type of aquatic resource (Le. wetland vs. non- wetland) Geographic authority to which the aquatic resource "may be" subject (i.e. Section 404 or Section 10/404) Linear Feet Acres Wetland WA 36.088 -79.252 N/A 0.09 Wetland Section 404 Wetland WB 36.086 -79.254 N/A 0.28 Wetland Section 404 Stream SA 36.085 -79.250 2380 N/A Non -Wetland Section 404 Stream SB 36.085 -79.250 834 N/A Non -Wetland Section 404 Stream SC 36.088 -79.252 144 N/A Non -Wetland Section 404 Stream SD 36.084 -79.252 1611 N/A Non -Wetland Section 404 Stream SE 36.086 -79.247 120 N/A Non -Wetland Section 404 1. The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre -construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7)whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terns and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD fmds that there "may be " waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for preliminary JD (check all that apply): Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Spangler Environmental, Inc. submitted a Jurisdictional Determination Request on October 1, 2020, with revisions received on November 3, 2020. ® Data sheets prepared/submitted by or on behalf of the PJD requestor. ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ® U.S. Geological Survey map(s). Cite scale & quad name: 1:241c, NC -Mebane ® USDA Natural Resources Conservation Service Soil Survey. Citation: Web Soil Survey: October 2020. ® National wetlands inventory map(s). Cite name: SAW Regulatory Viewer: October 2020 ❑ State/Local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) ® Photographs: ® Aerial (Name & Date): . or ❑ Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Coitus and should not be relied upon for later jurisdictional determinations. ,:Ya4w, � Signature and date of Regulatory Project Manager (REQUIRED) Signature and date of person requesting preliminary JD (REQUIRED, unless obtaining the signature is Impracticable) i Districts may establish timeframes for requestor to return signed PJD forms. If the requestor does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE I. ADMINISTRATIVE INFORMATION Completion Date of Approved Jurisdictional Determination (AJD): 3/19/2021 ORM Number: SAW-2020-01710 Associated JDs: N/A Review Area Location': State/Territory: North Carolina City: Mebane County/Parish/Borough: Center Coordinates of Review Area: Latitude 36.086 Longitude-79.254 II. FINDINGS A. Summary: Check all that apply. At least one box from the following list MUST be selected. Complete the corresponding sections/tables and summarize data sources. ❑ The review area is comprised entirely of dry land (i.e., there are no waters or water features, including wetlands, of any kind in the entire review area). Rationale: N/A or describe rationale. ❑ There are "navigable waters of the United States" within Rivers and Harbors Act jurisdiction within the review area (complete table in Section 11.13). ❑ There are "waters of the United States" within Clean Water Act jurisdiction within the review area (complete appropriate tables in Section II.C). ❑x There are waters or water features excluded from Clean Water Act jurisdiction within the review area (complete table in Section II.D). B. Rivers and Harbors Act of 1899 Section 10 (§ 10)2 10 Name § 10 Size § 10 Criteria Rationale for § 10 Determination N/A. N/A I N/i N/A. N/A. C. Clean Water Act Section 404 Territorial Seas and Traditional Navigable Waters ((a)(1) waters):3 a 1 Name a 1 Size a 1 Criteria Rationale fora 1 Determination Tributaries a 2 waters): a 2 Name a 2 Size a 2 Criteria Rationale fora 2 Determination N_ I N/A. Lakes and ponds, and impoundments of jurisdictional waters ((a)(3 waters): a 3 Name a 3 Size a 3 Criteria Rationale fora 3 Determination Adjacent wetlands ((a)(4) waters): a 4 Name a 4 Size a 4 Criteria Rationale fora 4 Determination N/A I N/A. Map(s)/figure(s) are attached to the AJD provided to the requestor 2 If the navigable water is not subject to the ebb and flow of the tide or included on the District's list of Rivers and Harbors Act Section 10 navigable waters list, do NOT use this document to make the determination. The District must continue to follow the procedure outlined in 33 CFR part 329.14 to make a Rivers and Harbors Act Section 10 navigability determination. 3 A stand-alone TNW determination is completed independently of a request for an AJD. A stand-alone TNW determination is conducted for a specific segment of river or stream or other type of waterbody, such as a lake, where upstream or downstream limits or lake borders are established. A stand- alone TNW determination should be completed following applicable guidance and should NOT be documented on the AJD Form. Page 1 of 4 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM i APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) { NAVIGABLE WATERS PROTECTION RULE D. Excluded Waters or Features Excluded waters ((b)(1) — (b)(12)):4 Exclusion Name Exclusion Size Exclusions Rationale for Exclusion Determination WC - Excluded 0.04 acre(s) (b)(1) Non- WC is not abutting/adjacent to an a(1), a(2), or adjacent wetland. a(3) water. WC is not inundated by flooding from an a(1), a(2), or a(3) water. There is no natural berm, artificial barrier, or culvert between WC and Stream SD, the nearest a(2) water. WD - Excluded 0.02 acre(s) (b)(1) Non- WD is not abutting/adjacent to an a(1), a(2), or adjacent wetland. a(3) water. WD is not inundated by flooding from an a(1), a(2), or a(3) water. There is no natural berm, artificial barrier, or culvert between WD and Stream SD, the nearest a(2) water. SW -A 0.46 acre(s) (b)(10) SW -A was excavated solely in uplands, off-line Stormwater from the nearest a(2) water. control feature constructed or excavated in upland or in a non -jurisdictional water to convey, treat, infiltrate, or store stormwater runoff. SW-B 0.22 acre(s) (b)(10) SW-B was excavated solely in uplands, off-line Stormwater from the nearest a(2) water. control feature constructed or excavated in upland or in a non -jurisdictional water to convey, treat, infiltrate, or store stormwater runoff. SW-C 0.3 acre(s) (b)(10) SW-C was excavated solely in uplands, off-line Stormwater from the nearest a(2) water. control feature constructed or excavated in upland or in a non -jurisdictional water to convey, treat, infiltrate, or 4 Some excluded waters, such as (b)(2) and (b)(4), may not be specifically identified on the AJD form unless a requestor specifically asks a Corps district to do so. Corps districts may, in case -by -case instances, choose to identify some or all of these waters within the review area. 5 Because of the broad nature of the (b)(1) exclusion and in an effort to collect data on specific types of waters that would be covered by the (b)(1) exclusion, four sub -categories of (b)(1) exclusions were administratively created for the purposes of the AJD Form. These four sub -categories are not new exclusions, but are simply administrative distinctions and remain (b)(1) exclusions as defined by the NWPR. Page 2 of 4 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE Excluded waters ((b)(1) — (b)(12)):4 Exclusion Name Exclusion Size Exclusions Rationale for Exclusion Determination store stormwater runoff. acre(s) (b)(10) SW-D was excavated solely in uplands, off-line Stormwater from the nearest a(2) water. control feature constructed or excavated in upland or in a non -jurisdictional water to convey, treat, infiltrate, or store stormwater runoff. 0.49 acre(s) (b)(10) SW-E was excavated solely in uplands, off-line Stormwater from the nearest a(2) water. control feature constructed or excavated in upland or in a non -jurisdictional water to convey, treat, infiltrate, or store stormwater runoff. III. SUPPORTING INFORMATION A. Select/enter all resources that were used to aid in this determination and attach data/maps to this document and/or references/citations in the administrative record, as appropriate. X Information submitted by, or on behalf of, the applicant/consultant: Spangler Environmental, Inc. submitted a Jurisdictional Determination Request on October 1, 2020, with revisions received on November 3, 2020. This information is sufficient for purposes of this AJD. Rationale: N/A or describe rationale for insufficiency (including partial insufficiency). ❑ Data sheets prepared by the Corps: tle(s) and/or date(s). 0 Photographs: Aerial: Google Earth 0 Corps site visit(s) conducted on: October 28, 2020 ❑ Previous Jurisdictional Determinations (AJDs or PJDs): ORM Number(s) and date(s). 0 Antecedent Precipitation Tool: provide detailed discussion in Section 111.B. 0 USDA NRCS Soil Survey: Orange County, GIS Soils Date 0 USFWS NWI maps: USFWS NWI Mapper 0 USGS topographic maps: USGS 1:24K — NC Mebane Other data sources used to aid in this determination: Data Source (select) Name and/or date and other relevant information USGS Sources Page 3 of 4 Form Version 29 July 2020_updated U.S. ARMY CORPS OF ENGINEERS REGULATORY PROGRAM APPROVED JURISDICTIONAL DETERMINATION FORM (INTERIM) NAVIGABLE WATERS PROTECTION RULE Data Source (select) Name and/or date and other relevant information USDA Sources N/A. NOAA Sources N/A. USACE Sources SAW Regulatory Viewer / October 2020 State/Local/Tribal Sources N/A. Other Sources N/A. B. Typical year assessment(s): Antecedent Precipitation Tool indicates wetter than normal conditions during the October 28, 2020 on -site field verificaiton. C. Additional comments to support AJD: UW is situatied in a depressional near the ridge of the watershed, along an existing access road/path, with no inlet or outlet. Refer to the enclosed Wetland & Stream Map dated June 2020. Please note, this map acdcurately reflects the August 2020 site visit. Page 4 of 4 Form Version 29 July 2020_updated N Le W E S Locations are approximate and have not been surveyed Co h A z , ,y fte k t 4.14 qr- An- fi f n y v y'{k Oakwood Property 0 Oakwood Street Mebane, NC February 2020 SPANGLER ENVIRONMENTAL, INC. 4338 Bland Road Raleigh, NC 27609 919-875-4288 Excluded MM uded I Legend GPreliminary JD Boundary ® Wetlands --- L---j Approved JD Boundary ® Excluded Wetland 50 ft. Buffers Excluded Stormwater Streams Wetland & Stream Delineation Map Source: Orange Co. GIS