Loading...
HomeMy WebLinkAboutNCC211874_MODIFICATION Supporting Doc LOTS 144 147 166-167_20220711ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director N VR, Inc. Attn: Joe Schmidtke, Vice President 5734 Trinity Road, Suite 200 Raleigh, NC 27606 NORTH CAROLINA Environmental Quality July 6, 2022 LETTER OF APPROVAL RE: Project Name: Coble Farms — Lots 144, 147, 166, 167 Acres: 0,65 Project ID: HARNE-2022-135 County: Harnett, City: Angier, Address: SR 1415 River Basin: Cape Fear Stream Classification: Other Submitted By: Morris Ritchie Associates of NC, PC Date Received by LQS: June 23, 2022 Plan Type: Revised Dear Mr. Sehmidtke: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed atdeq.nc.gov/NCG0L Please direct questions about the NO[ form to Annette Lucas at cianny.sinithici;ncclem.gov: or Paul Clark at Pat€1.clark ,c nedenr.aov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually until a Notice of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 413 .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO I permit and the COC, once it is received. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Fayetteville Regional office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 narxru cnr+curi oewnmenewsNo-wu�nnt 910.433.3300 Letter of Approval with Modifications NVR, Inc. July 6, 2022 Page 2 of 2 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, 64"L Jodi Pace, EI Regional Engineering Associate DEMLR Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCGO I Fact Sheet cc: Jamie Guerrero, Morris & Ritchie Associates of NC, PC (electronic copy) Landon Chandler, Senior Planner (electronic copy) DEMLR - Fayetteville Regional Office CERTIFICATE OF PLAN APPROVAL The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environmental Quality in accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted at the primary entrance of the job site before construction begins and until establishment of permanent groundcover as required by North Carolina Administrative Code, Title 15A, Chapter 4B.0127 (b). Coble Farms — Lots 144, 147, 166, 167 -- Harnett County Project Name and Location .duly 6, 2022 Date of Plan Approval Regional Engineer Q5 Certificate of Coverage Number ``.�