Loading...
HomeMy WebLinkAboutEmergency Repair on US 74 _ Robeson CountyFrom:Rerko, James J To:Sarah.E.Hair@usace.army.mil; Sprinkle, Hannah H; Price, Gregory W Cc:Underwood, Chris Subject:Emergency Repair on US 74 / Robeson County Date:Tuesday, July 12, 2022 9:43:30 AM Attachments:C204571 Bridge Scour hole .pdf image001.png Liz / Hannah Blythe Jordan is working on R-5798 (US 74 / Boardman Road Interchange) and upon inspection of Bridge 398, it was determined that there has been severe erosion around one of the bents and we are currently below scour critical elevation. The structure has no pile length since the structure was built using 30 ft – 20 inch concrete piles. When the bridge was constructed in the 1990’s, the area under the bridge was excavated which basically created a water filled hole. Structures Management has recommended filling the scour area with a clean fill material and then capping with Class II rip-rap stone. Since the bridge is within the project limits of R-5798, Blythe can complete the work under a Supplemental Agreement with the contractor to complete the work. This will not increase impacts for the project. If you should have any questions, please contact me. James J. Rerko, PWS Project Development and Environmental Analysis Engineer North Carolina Department of Transportation 910 364-0693 office 910 486 1959 fax jjrerko@ncdot.gov Email 1000 Transportation Drive Fayetteville, NC 28302 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. _____________________________________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.