HomeMy WebLinkAboutEmergency Repair on US 74 _ Robeson CountyFrom:Rerko, James J
To:Sarah.E.Hair@usace.army.mil; Sprinkle, Hannah H; Price, Gregory W
Cc:Underwood, Chris
Subject:Emergency Repair on US 74 / Robeson County
Date:Tuesday, July 12, 2022 9:43:30 AM
Attachments:C204571 Bridge Scour hole .pdf
image001.png
Liz / Hannah
Blythe Jordan is working on R-5798 (US 74 / Boardman Road Interchange) and upon inspection of
Bridge 398, it was determined that there has been severe erosion around one of the bents and we
are currently below scour critical elevation. The structure has no pile length since the structure was
built using 30 ft – 20 inch concrete piles. When the bridge was constructed in the 1990’s, the area
under the bridge was excavated which basically created a water filled hole.
Structures Management has recommended filling the scour area with a clean fill material and then
capping with Class II rip-rap stone. Since the bridge is within the project limits of R-5798, Blythe can
complete the work under a Supplemental Agreement with the contractor to complete the work.
This will not increase impacts for the project.
If you should have any questions, please contact me.
James J. Rerko, PWS
Project Development and Environmental Analysis Engineer
North Carolina Department of Transportation
910 364-0693 office
910 486 1959 fax
jjrerko@ncdot.gov Email
1000 Transportation Drive
Fayetteville, NC 28302
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
_____________________________________________________________
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.