Loading...
HomeMy WebLinkAbout20140613 Ver 1_Application_20140708B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): Pamlico 24 Bridge to Bridge Replacement 1b. Site coordinates (in decimal degrees): Latitude: 35.144428 Longitude: - 76.766296 1c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: North Prong Bay River 2b. Water Quality Classification of nearest receiving water: North Prong Bay River SC; Sw, NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: NC 304 is a paved North Carolina Highway. Commercial business and residences dominate the landscape. 3b. List the total estimated acreage of all existing wetlands on the property: 1 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 70 3d. Explain the purpose of the proposed project: Bridge to bridge replacement; the existing bridge has deteriorated and needs replacement. 3e. Describe the overall project in detail, including the type of equipment to be used: The existing 70' long concrete bridge will be replaced by a 110' long cored slab bridge. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases in the past? ❑ Yes ❑X No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑X Yes ❑ No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. CAMA GP has been submitted to CAMA for review and permit. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ❑X Wetlands ❑ Streams —tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P RipRap Pad Unknown Yes Corps 0.002 W2 Choose one Choose one Yes /No W3 Choose one Choose one Yes /No W4 Choose one Choose one Yes /No W5 Choose one Choose one Yes /No W6 Choose one Choose one Yes /No 2g. Total Wetland Impacts: 0.002 2h. Comments: There are 85 sq.ft. of wetland impacts. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 Choose one S2 Choose one S3 Choose one S4 Choose one S5 Choose one S6 Choose one 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009