HomeMy WebLinkAbout20140613 Ver 1_Application_20140708B.
Project Information and Prior Project History
1.
Property Identification
1a.
Property identification no. (tax PIN or parcel ID):
Pamlico 24 Bridge to Bridge Replacement
1b.
Site coordinates (in decimal degrees):
Latitude: 35.144428 Longitude: - 76.766296
1c.
Property size:
acres
2.
Surface Waters
2a.
Name of nearest body of water to proposed project:
North Prong Bay River
2b.
Water Quality Classification of nearest receiving water:
North Prong Bay River SC; Sw, NSW
2c.
River basin:
Neuse
3.
Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
NC 304 is a paved North Carolina Highway. Commercial business and residences dominate the landscape.
3b.
List the total estimated acreage of all existing wetlands on the property: 1
3c.
List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 70
3d. Explain the purpose of the proposed project:
Bridge to bridge replacement; the existing bridge has deteriorated and needs replacement.
3e. Describe the overall project in detail, including the type of equipment to be used:
The existing 70' long concrete bridge will be replaced by a 110' long cored slab bridge.
4.
Jurisdictional Determinations
4a.
Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases in the past?
❑ Yes ❑X No ❑ Unknown
Comments:
4b.
If the Corps made the jurisdictional determination, what type
of determination was made?
❑ Preliminary ❑ Final
4c.
If yes, who delineated the jurisdictional areas?
Name (if known):
Agency /Consultant Company:
Other:
4d.
If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5.
Project History
5a.
Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
❑X Yes ❑ No ❑ Unknown
5b. If yes, explain in detail according to "help file" instructions.
CAMA GP has been submitted to CAMA for review and permit.
6.
Future Project Plans
6a.
Is this a phased project?
❑ Yes ❑X No
6b.
If yes, explain.
Page 3 of 10
PCN Form — Version 1.4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
❑X Wetlands ❑ Streams —tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number
Permanent (P) or
Temporary T
2b.
Type of impact
2c.
Type of wetland
2d.
Forested
2e.
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f.
Area of
impact
(acres)
W1 P
RipRap Pad
Unknown
Yes
Corps
0.002
W2
Choose one
Choose one
Yes /No
W3
Choose one
Choose one
Yes /No
W4
Choose one
Choose one
Yes /No
W5
Choose one
Choose one
Yes /No
W6
Choose one
Choose one
Yes /No
2g. Total Wetland Impacts:
0.002
2h. Comments:
There are 85 sq.ft. of wetland impacts.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial (PER) or
intermittent (INT)?
3e.
Type of
jurisdiction
3f.
Average
stream
width
(feet)
3g.
Impact
length
(linear
feet)
S1
Choose one
S2
Choose one
S3
Choose one
S4
Choose one
S5
Choose one
S6
Choose one
3h. Total stream and tributary impacts
3i. Comments:
Page 4 of 10
PCN Form — Version 1.4 January 2009